82_FR_37597 82 FR 37444 - Amended Application for Presidential Permit; Nogales Interconnection Project

82 FR 37444 - Amended Application for Presidential Permit; Nogales Interconnection Project

DEPARTMENT OF ENERGY

Federal Register Volume 82, Issue 153 (August 10, 2017)

Page Range37444-37445
FR Document2017-16882

Nogales Transmission, L.L.C. (Nogales Transmission, or the Applicant) has submitted two amendments to its application for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the United States border with Mexico.

Federal Register, Volume 82 Issue 153 (Thursday, August 10, 2017)
[Federal Register Volume 82, Number 153 (Thursday, August 10, 2017)]
[Notices]
[Pages 37444-37445]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-16882]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. PP-420]


Amended Application for Presidential Permit; Nogales 
Interconnection Project

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of amended application.

-----------------------------------------------------------------------

SUMMARY: Nogales Transmission, L.L.C. (Nogales Transmission, or the 
Applicant) has submitted two amendments to its application for a 
Presidential permit to construct, operate, maintain, and connect an 
electric transmission line across the United States border with Mexico.

DATES: Comments or motions to intervene must be submitted on or before 
September 11, 2017.

ADDRESSES: Comments or motions to intervene should be addressed as 
follows: Office of Electricity Delivery and Energy Reliability (OE-20), 
U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 
20585.

FOR FURTHER INFORMATION CONTACT: Christopher Lawrence (Program Office) 
at 202-586-5260 or via electronic mail at 
[email protected]; Rishi Garg (Program Attorney) at 202-
586-0258.

SUPPLEMENTARY INFORMATION: The construction, operation, maintenance, 
and connection of facilities at the international border of the United 
States for the transmission of electric energy between the United 
States and a foreign country requires a Presidential permit issued 
pursuant to Executive Order (E.O.) 10485, as amended by E.O. 12038.
    On April 8, 2016, Nogales Transmission filed an application with 
the Office of Electricity Delivery and Energy Reliability of the U.S. 
Department of Energy (DOE) for a Presidential permit for the proposed 
Nogales Interconnection Project (the Project). Nogales Transmission has 
its principal place of business in Dallas, Texas. It is a subsidiary of 
Hunt Power, L.P., a Delaware limited partnership, which in turn is a 
subsidiary of Hunt Consolidated, Inc.
    On May 19, 2016, DOE published a Notice of Application in the 
Federal Register for the proposed Project. In the initial application, 
the proposed Project would originate at the existing UNS Electric, Inc. 
(UNSE) Valencia Substation in Nogales, Arizona. A new, approximately 3-
mile, overhead, 138-kV alternating current (AC) transmission line would 
be constructed from the Valencia Substation west to the proposed 
Gateway Substation. An approximately two-mile, overhead, 230-kV AC line 
would be constructed from the proposed Gateway Substation to the 
proposed international border crossing at the U.S.-Mexico border.
    A 300 MW bi-directional back-to-back high-voltage direct current 
(HVDC) converter (i.e., DC tie) would be located at the proposed 
Gateway Substation, which would allow for an asynchronous connection 
between the U.S. and Mexico. The DC tie would be constructed in two 
phases, with each phase capable of 150 megawatts (MW) of bi-directional 
flow, for a total of up to 300 MW. Minor modifications within the 
existing Valencia Substation would be made to accommodate the 
connection of the proposed 138-kV transmission line.
    In the initial application, the U.S. portion of the proposed 
Project would cross the U.S.-Mexico border at 31[deg]19'57.844'' N., 
110[deg]58'35.908'' W., which is just west of the Mariposa Port of 
Entry. On January 9, 2017, Nogales Transmission amended its application 
to modify the proposed international border crossing to a location 
approximately 25 feet to the east at 31[deg]19'57.846'' N., 
110[deg]58'35.620'' W. A portion of the new, approximately two-mile, 
overhead, 230-kV AC transmission line extending south from the proposed 
Gateway Substation to the proposed international border crossing was 
also proposed to be shifted approximately 25 feet to the east (the 
location of the proposed right-of-way [ROW] was not proposed to be 
changed).
    On May 31, 2017, DOE received a letter from Nogales Transmission 
amending its initial Presidential permit application a second time to 
reflect

[[Page 37445]]

changes to the proposed electrical configuration, which has been 
designed to make the proposed Project more cost-effective for the 
Applicant.
    The reconfiguration would connect the proposed Project to the UNSE 
transmission system at the proposed Gateway Substation rather than at 
the existing Valencia Substation, as initially proposed. A new, 
approximately 3-mile, overhead double-circuit 138-kV AC transmission 
line would be constructed on new monopoles. The first circuit would 
originate at an existing pole 1,900 feet west of the existing Valencia 
Substation and terminate at the proposed Gateway Substation. At this 
origination point, the existing UNSE ``Vail to Valencia'' transmission 
line would be severed and connected to this new line, thereby 
converting the existing UNSE ``Vail to Valencia'' transmission line to 
the ``Vail to Gateway'' transmission line. The second circuit would 
originate at the proposed Gateway Substation and proceed in an easterly 
direction to the same pole (1,900 feet west of the existing Valencia 
Substation), where it would connect with the existing portion of the 
UNSE 138-kV ``Vail to Valencia'' transmission line that travels east to 
the existing Valencia Substation. This circuit would constitute the new 
``Gateway to Valencia'' transmission line and serve as the source for 
Valencia. The existing UNSE Vail to Valencia line currently connects to 
the Valencia Substation; this line is the current (and only) source of 
power for the City of Nogales. The Valencia Substation is the first 
existing substation within the U.S. The Nogales Interconnection project 
would change the configuration such that the Vail to Valencia line 
would become the Vail to Gateway line. Because the Valencia Substation 
still needs a source of power, the Gateway to Valencia line would be 
built. Minor modifications to relaying equipment within the Valencia 
Substation would be made to accommodate this Gateway to Valencia line.
    In addition to the DC tie at the Gateway site as initially proposed 
(now referred to as the Nogales Gateway Substation), on the eastern 
portion of the Gateway site, a 138-kV UNSE Gateway Substation would 
consist of a three bay breaker and a half open air configuration to 
accommodate the line from Vail, the line to Valencia, and the 
connection to the DC tie, as well as a future UNSE distribution 
transformer. The Nogales Gateway Substation and the UNSE Gateway 
Substation would be located on the Gateway site and collectively 
referred to as the Gateway Substation. There were no additional changes 
proposed in this amendment to the location of the new, approximately 
two-mile, overhead, 230-kV AC transmission line extending south from 
the proposed Gateway Substation to the proposed international border 
crossing. The proposed reconfiguration would not affect the location of 
the proposed route or ROW requirements, but certain changes were 
proposed to be made to the conductors and towers. A comparison of the 
initial configuration and the reconfiguration for each of the 
alternative routes is provided in the application amendment.
    The draft Environmental Assessment contains relevant figures in 
Chapters 1 and 2. It can be downloaded from the Document Library page 
on the project Web site: http://nogalesinterconnectionea.com/.
    The Proposed Project One-line Diagram (Figure 2.4-5) illustrates 
the details of the configuration as proposed by the amendment. A side-
by-side comparison of the reconfiguration to the original application 
is also in the appendix to the Applicant's amendment (which can also be 
downloaded from the project Web site).
    Procedural Matters: Any person may comment on this application by 
filing such comment at the address provided above. Any person seeking 
to become a party to this proceeding must file a motion to intervene at 
the address provided above in accordance with Rule 214 of the Federal 
Energy Regulatory Commission's Rules of Practice and Procedure (18 CFR 
385.214). Two copies of each comment or motion to intervene should be 
filed with DOE on or before the date listed above.
    Additional copies of such motions to intervene also should be filed 
directly with: Enrique Marroquin, Nogales Transmission, L.L.C., 1900 
North Akard Street, Dallas, Texas 75201.
    Before a Presidential permit may be issued or amended, DOE must 
determine that the proposed action is in the public interest. In making 
that determination, DOE considers the environmental impacts of the 
proposed project pursuant to the National Environmental Policy Act of 
1969, as amended, determines the project's impact on electric 
reliability by ascertaining whether the proposed project would 
adversely affect the operation of the U.S. electric power supply system 
under normal and contingency conditions, and any other factors that DOE 
may also consider relevant to the public interest. DOE also must obtain 
the concurrences of the Secretary of State and the Secretary of Defense 
before taking final action on a Presidential permit application.
    Copies of this application amendment will be made available for 
public inspection and copying (upon request) at the address provided 
above, and by accessing the program Web site at: http://energy.gov/oe/services/electricity-policy-coordination-and-implementation/international-electricity-regulatio-2.

    Issued in Washington, DC, on August 3, 2017.
Christopher A. Lawrence,
Electricity Policy Analyst, Transmission Permitting and Technical 
Assistance Division, Office of Electricity Delivery and Energy 
Reliability.
[FR Doc. 2017-16882 Filed 8-9-17; 8:45 am]
 BILLING CODE 6450-01-P



                                                  37444                       Federal Register / Vol. 82, No. 153 / Thursday, August 10, 2017 / Notices

                                                  of Maryland; 4:50 p.m. Public                           time or in response to an approved                       On April 8, 2016, Nogales
                                                  Discussion/Adjourn for the day.                         meeting agenda. All written statements                Transmission filed an application with
                                                    Thursday, September 14, 2017: 8:30                    shall be submitted to the DFO for the                 the Office of Electricity Delivery and
                                                  a.m. Convene—Dr. Joseph Hughes,                         Strategic Environmental Research and                  Energy Reliability of the U.S.
                                                  Chair; 8:40 a.m. Environmental                          Development Program, Scientific                       Department of Energy (DOE) for a
                                                  Restoration Overview—Dr. Andrea                         Advisory Board. The DFO will ensure                   Presidential permit for the proposed
                                                  Leeson, Environmental Restoration                       that the written statements are provided              Nogales Interconnection Project (the
                                                  Program Manager; 8:50 a.m. ER18–C3–                     to the membership for their                           Project). Nogales Transmission has its
                                                  1371 (ER18–1371): Development of                        consideration. Time is allotted at the                principal place of business in Dallas,
                                                  Tools to Inform the Selection of                        close of each meeting day for the public              Texas. It is a subsidiary of Hunt Power,
                                                  Stormwater Controls at DoD Bases to                     to make comments.                                     L.P., a Delaware limited partnership,
                                                  Limit Potential Sediment                                   Oral Statements: Oral comments are                 which in turn is a subsidiary of Hunt
                                                  Recontamination (FY18 New Start)—Dr.                    allowed during the public discussion                  Consolidated, Inc.
                                                  Danny Reible, Texas Tech University;                    portion of the meeting agenda. Oral                      On May 19, 2016, DOE published a
                                                  9:35 a.m. ER18–C3–1145 (ER18–1145):                     comments are limited to 5 minutes per                 Notice of Application in the Federal
                                                  Prevention of Sediment                                  person.                                               Register for the proposed Project. In the
                                                  Recontamination by Improved BMPs to                       Dated: August 7, 2017.                              initial application, the proposed Project
                                                  Remove Organic and Metal                                Aaron Siegel,                                         would originate at the existing UNS
                                                  Contaminants from Stormwater Runoff                                                                           Electric, Inc. (UNSE) Valencia
                                                                                                          Alternate OSD Federal Register Liaison
                                                  (FY18 New Start)—Dr. Richard Luthy,                     Officer, Department of Defense.                       Substation in Nogales, Arizona. A new,
                                                  Stanford University; 10:20 a.m. Break;                                                                        approximately 3-mile, overhead, 138-kV
                                                                                                          [FR Doc. 2017–16897 Filed 8–9–17; 8:45 am]
                                                  10:35 a.m. ER18–C3–1230 (ER18–1230):                                                                          alternating current (AC) transmission
                                                                                                          BILLING CODE 5001–06–P
                                                  Development, Evaluation, and                                                                                  line would be constructed from the
                                                  Technology Transfer of BMPs for                                                                               Valencia Substation west to the
                                                  Optimizing Removal of PAHs, PCBs,                                                                             proposed Gateway Substation. An
                                                  PFASs, and Metals from Stormwater at                    DEPARTMENT OF ENERGY                                  approximately two-mile, overhead, 230-
                                                  DoD Sites (FY18 New Start)—Dr. Staci                    [OE Docket No. PP–420]                                kV AC line would be constructed from
                                                  Simonich, Oregon State University;                                                                            the proposed Gateway Substation to the
                                                  11:20 a.m. Environmental Restoration                    Amended Application for Presidential                  proposed international border crossing
                                                  Overview—Dr. Andrea Leeson,                             Permit; Nogales Interconnection                       at the U.S.-Mexico border.
                                                  Environmental Restoration Program                       Project                                                  A 300 MW bi-directional back-to-back
                                                  Manager; 11:30 a.m. ER18–C4–1428                                                                              high-voltage direct current (HVDC)
                                                                                                          AGENCY: Office of Electricity Delivery
                                                  (ER18–1428): Drinking Water Treatment                                                                         converter (i.e., DC tie) would be located
                                                                                                          and Energy Reliability, DOE.
                                                  Residuals as Material for In Situ                                                                             at the proposed Gateway Substation,
                                                                                                          ACTION: Notice of amended application.                which would allow for an asynchronous
                                                  Capping of Metal Contaminated
                                                  Sediments (FY18 New Start)—Dr. Jean-                    SUMMARY:    Nogales Transmission, L.L.C.              connection between the U.S. and
                                                  Claude Bonzongo, University of Florida;                 (Nogales Transmission, or the                         Mexico. The DC tie would be
                                                  12:15 p.m. Lunch; 1:15 p.m. Munitions                   Applicant) has submitted two                          constructed in two phases, with each
                                                  Response Overview—Dr. Herbert                           amendments to its application for a                   phase capable of 150 megawatts (MW)
                                                  Nelson, Munitions Response Program                      Presidential permit to construct,                     of bi-directional flow, for a total of up
                                                  Manager; 1:25 p.m. MR18–C1–1051                         operate, maintain, and connect an                     to 300 MW. Minor modifications within
                                                  (MR18–1051): Simulation, Signal                         electric transmission line across the                 the existing Valencia Substation would
                                                  Extraction, and Augmented                               United States border with Mexico.                     be made to accommodate the
                                                  Visualization for 3D BOSS data (FY18                    DATES: Comments or motions to
                                                                                                                                                                connection of the proposed 138-kV
                                                  New Start)—Dr. Timothy Marston                          intervene must be submitted on or                     transmission line.
                                                  University of Washington; 2:10 p.m.                                                                              In the initial application, the U.S.
                                                                                                          before September 11, 2017.
                                                  MR18–C1–1406 (MR18–1406):                                                                                     portion of the proposed Project would
                                                                                                          ADDRESSES: Comments or motions to                     cross the U.S.-Mexico border at
                                                  Demonstration of Physics-Based
                                                                                                          intervene should be addressed as                      31°19′57.844″ N., 110°58′35.908″ W.,
                                                  Inversions of Multibeam Echosounder
                                                                                                          follows: Office of Electricity Delivery               which is just west of the Mariposa Port
                                                  for Sediment Properties (FY18 New
                                                                                                          and Energy Reliability (OE–20), U.S.                  of Entry. On January 9, 2017, Nogales
                                                  Start)—Dr. Brian Hefner, University of
                                                                                                          Department of Energy, 1000                            Transmission amended its application
                                                  Washington; 2:55 p.m. Break; 3:10 p.m.
                                                                                                          Independence Avenue SW.,                              to modify the proposed international
                                                  Strategy Session; 3:40 p.m. Public
                                                  Discussion/Adjourn meeting.                             Washington, DC 20585.                                 border crossing to a location
                                                    Meeting Accessibility: The meeting                    FOR FURTHER INFORMATION CONTACT:                      approximately 25 feet to the east at
                                                  location has proper and working                         Christopher Lawrence (Program Office)                 31°19′57.846″ N., 110°58′35.620″ W. A
                                                  facilities for those with disabilities.                 at 202–586–5260 or via electronic mail                portion of the new, approximately two-
                                                  Please contact the Designated Federal                   at Christopher.Lawrence@hq.doe.gov;                   mile, overhead, 230-kV AC transmission
                                                  Officer (DFO) if there are any issues.                  Rishi Garg (Program Attorney) at 202–                 line extending south from the proposed
                                                    Written Statements: Pursuant to 41                    586–0258.                                             Gateway Substation to the proposed
                                                  CFR 102–3.140, and section 10(a)(3) of                  SUPPLEMENTARY INFORMATION: The                        international border crossing was also
                                                  the Federal Advisory Committee Act of                   construction, operation, maintenance,                 proposed to be shifted approximately 25
mstockstill on DSK30JT082PROD with NOTICES




                                                  1972, the public or interested                          and connection of facilities at the                   feet to the east (the location of the
                                                  organizations may submit written                        international border of the United States             proposed right-of-way [ROW] was not
                                                  statements to the Strategic                             for the transmission of electric energy               proposed to be changed).
                                                  Environmental Research and                              between the United States and a foreign                  On May 31, 2017, DOE received a
                                                  Development Program, Scientific                         country requires a Presidential permit                letter from Nogales Transmission
                                                  Advisory Board. Written statements may                  issued pursuant to Executive Order                    amending its initial Presidential permit
                                                  be submitted to the committee at any                    (E.O.) 10485, as amended by E.O. 12038.               application a second time to reflect


                                             VerDate Sep<11>2014   17:03 Aug 09, 2017   Jkt 241001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\10AUN1.SGM   10AUN1


                                                                              Federal Register / Vol. 82, No. 153 / Thursday, August 10, 2017 / Notices                                                 37445

                                                  changes to the proposed electrical                      changes proposed in this amendment to                    Copies of this application amendment
                                                  configuration, which has been designed                  the location of the new, approximately                will be made available for public
                                                  to make the proposed Project more cost-                 two-mile, overhead, 230-kV AC                         inspection and copying (upon request)
                                                  effective for the Applicant.                            transmission line extending south from                at the address provided above, and by
                                                     The reconfiguration would connect                    the proposed Gateway Substation to the                accessing the program Web site at:
                                                  the proposed Project to the UNSE                        proposed international border crossing.               http://energy.gov/oe/services/electricity-
                                                  transmission system at the proposed                     The proposed reconfiguration would not                policy-coordination-and-
                                                  Gateway Substation rather than at the                   affect the location of the proposed route             implementation/international-
                                                  existing Valencia Substation, as initially              or ROW requirements, but certain                      electricity-regulatio-2.
                                                  proposed. A new, approximately 3-mile,                  changes were proposed to be made to                     Issued in Washington, DC, on August 3,
                                                  overhead double-circuit 138-kV AC                       the conductors and towers. A                          2017.
                                                  transmission line would be constructed                  comparison of the initial configuration               Christopher A. Lawrence,
                                                  on new monopoles. The first circuit                     and the reconfiguration for each of the               Electricity Policy Analyst, Transmission
                                                  would originate at an existing pole                     alternative routes is provided in the                 Permitting and Technical Assistance
                                                  1,900 feet west of the existing Valencia                application amendment.                                Division, Office of Electricity Delivery and
                                                  Substation and terminate at the                            The draft Environmental Assessment                 Energy Reliability.
                                                  proposed Gateway Substation. At this                    contains relevant figures in Chapters 1               [FR Doc. 2017–16882 Filed 8–9–17; 8:45 am]
                                                  origination point, the existing UNSE                    and 2. It can be downloaded from the                  BILLING CODE 6450–01–P
                                                  ‘‘Vail to Valencia’’ transmission line                  Document Library page on the project
                                                  would be severed and connected to this                  Web site: http://
                                                  new line, thereby converting the                        nogalesinterconnectionea.com/.                        DEPARTMENT OF ENERGY
                                                  existing UNSE ‘‘Vail to Valencia’’                         The Proposed Project One-line
                                                  transmission line to the ‘‘Vail to                      Diagram (Figure 2.4–5) illustrates the                Federal Energy Regulatory
                                                  Gateway’’ transmission line. The second                 details of the configuration as proposed              Commission
                                                  circuit would originate at the proposed                 by the amendment. A side-by-side
                                                                                                                                                                [Docket No. EF17–4–000]
                                                  Gateway Substation and proceed in an                    comparison of the reconfiguration to the
                                                  easterly direction to the same pole                     original application is also in the
                                                                                                                                                                Bonneville Power Administration;
                                                  (1,900 feet west of the existing Valencia               appendix to the Applicant’s amendment
                                                                                                                                                                Notice of Filing
                                                  Substation), where it would connect                     (which can also be downloaded from
                                                  with the existing portion of the UNSE                   the project Web site).                                   Take notice that on July 31, 2017,
                                                  138-kV ‘‘Vail to Valencia’’ transmission                   Procedural Matters: Any person may                 Bonneville Power Administration
                                                  line that travels east to the existing                  comment on this application by filing                 submitted tariff filing per: BP–18 IS–18
                                                  Valencia Substation. This circuit would                 such comment at the address provided                  Rate to be effective 10/1/2017.
                                                  constitute the new ‘‘Gateway to                         above. Any person seeking to become a                    Any person desiring to intervene or to
                                                  Valencia’’ transmission line and serve as               party to this proceeding must file a                  protest this filing must file in
                                                  the source for Valencia. The existing                   motion to intervene at the address                    accordance with Rules 211 and 214 of
                                                  UNSE Vail to Valencia line currently                    provided above in accordance with Rule                the Commission’s Rules of Practice and
                                                  connects to the Valencia Substation; this               214 of the Federal Energy Regulatory                  Procedure (18 CFR 385.211, 385.214).
                                                  line is the current (and only) source of                Commission’s Rules of Practice and                    Protests will be considered by the
                                                  power for the City of Nogales. The                      Procedure (18 CFR 385.214). Two copies                Commission in determining the
                                                  Valencia Substation is the first existing               of each comment or motion to intervene                appropriate action to be taken, but will
                                                  substation within the U.S. The Nogales                  should be filed with DOE on or before                 not serve to make protestants parties to
                                                  Interconnection project would change                    the date listed above.                                the proceeding. Any person wishing to
                                                  the configuration such that the Vail to                    Additional copies of such motions to               become a party must file a notice of
                                                  Valencia line would become the Vail to                  intervene also should be filed directly               intervention or motion to intervene, as
                                                  Gateway line. Because the Valencia                      with: Enrique Marroquin, Nogales                      appropriate. Such notices, motions, or
                                                  Substation still needs a source of power,               Transmission, L.L.C., 1900 North Akard                protests must be filed on or before the
                                                  the Gateway to Valencia line would be                   Street, Dallas, Texas 75201.                          comment date. On or before the
                                                  built. Minor modifications to relaying                     Before a Presidential permit may be                comment date, it is not necessary to
                                                  equipment within the Valencia                           issued or amended, DOE must                           serve motions to intervene or protests
                                                  Substation would be made to                             determine that the proposed action is in              on persons other than the Applicant.
                                                  accommodate this Gateway to Valencia                    the public interest. In making that                      The Commission encourages
                                                  line.                                                   determination, DOE considers the                      electronic submission of protests and
                                                     In addition to the DC tie at the                     environmental impacts of the proposed                 interventions in lieu of paper using the
                                                  Gateway site as initially proposed (now                 project pursuant to the National                      eFiling link at http://www.ferc.gov.
                                                  referred to as the Nogales Gateway                      Environmental Policy Act of 1969, as                  Persons unable to file electronically
                                                  Substation), on the eastern portion of                  amended, determines the project’s                     should submit an original and 5 copies
                                                  the Gateway site, a 138-kV UNSE                         impact on electric reliability by                     of the protest or intervention to the
                                                  Gateway Substation would consist of a                   ascertaining whether the proposed                     Federal Energy Regulatory Commission,
                                                  three bay breaker and a half open air                   project would adversely affect the                    888 First Street NE., Washington, DC
                                                  configuration to accommodate the line                   operation of the U.S. electric power                  20426.
                                                  from Vail, the line to Valencia, and the                supply system under normal and                           This filing is accessible on-line at
mstockstill on DSK30JT082PROD with NOTICES




                                                  connection to the DC tie, as well as a                  contingency conditions, and any other                 http://www.ferc.gov, using the eLibrary
                                                  future UNSE distribution transformer.                   factors that DOE may also consider                    link and is available for review in the
                                                  The Nogales Gateway Substation and                      relevant to the public interest. DOE also             Commission’s Public Reference Room in
                                                  the UNSE Gateway Substation would be                    must obtain the concurrences of the                   Washington, DC. There is an
                                                  located on the Gateway site and                         Secretary of State and the Secretary of               eSubscription link on the Web site that
                                                  collectively referred to as the Gateway                 Defense before taking final action on a               enables subscribers to receive email
                                                  Substation. There were no additional                    Presidential permit application.                      notification when a document is added


                                             VerDate Sep<11>2014   17:03 Aug 09, 2017   Jkt 241001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\10AUN1.SGM   10AUN1



Document Created: 2017-08-10 01:01:02
Document Modified: 2017-08-10 01:01:02
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of amended application.
DatesComments or motions to intervene must be submitted on or before September 11, 2017.
ContactChristopher Lawrence (Program Office) at 202-586-5260 or via electronic mail at [email protected]; Rishi Garg (Program Attorney) at 202- 586-0258.
FR Citation82 FR 37444 