82_FR_39275 82 FR 39117 - Village of Waterbury; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

82 FR 39117 - Village of Waterbury; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 158 (August 17, 2017)

Page Range39117-39118
FR Document2017-17351

Federal Register, Volume 82 Issue 158 (Thursday, August 17, 2017)
[Federal Register Volume 82, Number 158 (Thursday, August 17, 2017)]
[Notices]
[Pages 39117-39118]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-17351]



[[Page 39117]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD17-18-000]


Village of Waterbury; Notice of Preliminary Determination of a 
Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On August 4, 2017, the Village of Waterbury filed a notice of 
intent to construct a qualifying conduit hydropower facility, pursuant 
to section 30 of the Federal Power Act (FPA), as amended by section 4 
of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The 
proposed Guptil Road 4.0 kW In-conduit Hydroelectric Net-Metered 
Project (Guptil Road Project) would have an installed capacity of 4 
kilowatts (kW), and would be located along a 12-inch diameter potable 
water pipeline. The project would be located near the Village of 
Waterbury in Washington County, Vermont.
    Applicant Contact: William Shepeluk, Municipal Manager, Village of 
Waterbury, 28 North Main Street, Waterbury, VT 05676; Phone No. (802) 
244-7033
    FERC Contact: Robert Bell, Phone No. (202) 502-6062; Email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A new 4 foot-long, 1.5-inch diameter 
intake pipe off of the 12-inch diameter potable water pipeline, (2) one 
generating unit with an installed capacity of four kW located within an 
existing 8-foot-long by 12-foot-wide pressure reducing vault; (3) a new 
4-foot-long, 2-inch diameter outlet pipe returning water to the 12-inch 
diameter water main; and (4) appurtenant facilities. The proposed 
project would have an estimated annual generation of 35.6 megawatt-
hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision            Description        Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by  The conduit the        Y
 HREA.                           facility uses is a
                                 tunnel, canal,
                                 pipeline, aqueduct,
                                 flume, ditch, or
                                 similar manmade
                                 water conveyance
                                 that is operated for
                                 the distribution of
                                 water for
                                 agricultural,
                                 municipal, or
                                 industrial
                                 consumption and not
                                 primarily for the
                                 generation of
                                 electricity.
FPA 30(a)(3)(C)(i), as amended  The facility is        Y
 by HREA.                        constructed,
                                 operated, or
                                 maintained for the
                                 generation of
                                 electric power and
                                 uses for such
                                 generation only the
                                 hydroelectric
                                 potential of a non-
                                 federally owned
                                 conduit.
FPA 30(a)(3)(C)(ii), as         The facility has an    Y
 amended by HREA.                installed capacity
                                 that does not exceed
                                 5 megawatts.
FPA 30(a)(3)(C)(iii), as        On or before August    Y
 amended by HREA.                9, 2013, the
                                 facility is not
                                 licensed, or
                                 exempted from the
                                 licensing
                                 requirements of Part
                                 I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed hydroelectric project will 
utilize an existing potable water pipeline, the primary purpose of 
which is to convey drinking water to the Village of Waterbury. The 
addition of the Guptil Road Project will not alter the conduit's 
primary purpose. Therefore, based upon the above criteria, Commission 
staff preliminarily determines that the proposal satisfies the 
requirements for a qualifying conduit hydropower facility, which is not 
required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2017).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD17-18) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.


[[Page 39118]]


    Dated: August 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-17351 Filed 8-16-17; 8:45 am]
BILLING CODE P6717-01-P



                                                                            Federal Register / Vol. 82, No. 158 / Thursday, August 17, 2017 / Notices                                                   39117

                                                DEPARTMENT OF ENERGY                                    of 2013 (HREA). The proposed Guptil                     Qualifying Conduit Hydropower
                                                                                                        Road 4.0 kW In-conduit Hydroelectric                  Facility Description: The proposed
                                                Federal Energy Regulatory                               Net-Metered Project (Guptil Road                      project would consist of: (1) A new 4
                                                Commission                                              Project) would have an installed                      foot-long, 1.5-inch diameter intake pipe
                                                                                                        capacity of 4 kilowatts (kW), and would               off of the 12-inch diameter potable
                                                [Docket No. CD17–18–000]                                                                                      water pipeline, (2) one generating unit
                                                                                                        be located along a 12-inch diameter
                                                Village of Waterbury; Notice of                         potable water pipeline. The project                   with an installed capacity of four kW
                                                Preliminary Determination of a                          would be located near the Village of                  located within an existing 8-foot-long by
                                                Qualifying Conduit Hydropower                           Waterbury in Washington County,                       12-foot-wide pressure reducing vault;
                                                Facility and Soliciting Comments and                    Vermont.                                              (3) a new 4-foot-long, 2-inch diameter
                                                Motions To Intervene                                                                                          outlet pipe returning water to the 12-
                                                                                                          Applicant Contact: William Shepeluk,                inch diameter water main; and (4)
                                                  On August 4, 2017, the Village of                     Municipal Manager, Village of                         appurtenant facilities. The proposed
                                                Waterbury filed a notice of intent to                   Waterbury, 28 North Main Street,                      project would have an estimated annual
                                                construct a qualifying conduit                          Waterbury, VT 05676; Phone No. (802)                  generation of 35.6 megawatt-hours.
                                                hydropower facility, pursuant to section                244–7033                                                A qualifying conduit hydropower
                                                30 of the Federal Power Act (FPA), as                     FERC Contact: Robert Bell, Phone No.                facility is one that is determined or
                                                amended by section 4 of the                             (202) 502–6062; Email: robert.bell@                   deemed to meet all of the criteria shown
                                                Hydropower Regulatory Efficiency Act                    ferc.gov.                                             in the table below.

                                                                                  TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                      Satisfies
                                                             Statutory provision                                                             Description                                               (Y/N)

                                                FPA 30(a)(3)(A), as amended by HREA ...             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or        Y
                                                                                                      similar manmade water conveyance that is operated for the distribution of water
                                                                                                      for agricultural, municipal, or industrial consumption and not primarily for the gen-
                                                                                                      eration of electricity.
                                                FPA 30(a)(3)(C)(i), as amended by HREA              The facility is constructed, operated, or maintained for the generation of electric           Y
                                                                                                      power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                      erally owned conduit.
                                                FPA 30(a)(3)(C)(ii), as amended by HREA             The facility has an installed capacity that does not exceed 5 megawatts ...................   Y
                                                FPA 30(a)(3)(C)(iii), as amended by HREA            On or before August 9, 2013, the facility is not licensed, or exempted from the li-           Y
                                                                                                      censing requirements of Part I of the FPA.



                                                   Preliminary Determination: The                       all capital letters the ‘‘COMMENTS                    208–3676 (toll free), or (202) 502–8659
                                                proposed hydroelectric project will                     CONTESTING QUALIFICATION FOR A                        (TTY). In lieu of electronic filing, please
                                                utilize an existing potable water                       CONDUIT HYDROPOWER FACILITY’’                         send a paper copy to: Secretary, Federal
                                                pipeline, the primary purpose of which                  or ‘‘MOTION TO INTERVENE,’’ as                        Energy Regulatory Commission, 888
                                                is to convey drinking water to the                      applicable; (2) state in the heading the              First Street NE., Washington, DC 20426.
                                                Village of Waterbury. The addition of                   name of the applicant and the project                 A copy of all other filings in reference
                                                the Guptil Road Project will not alter the              number of the application to which the                to this application must be accompanied
                                                conduit’s primary purpose. Therefore,                   filing responds; (3) state the name,                  by proof of service on all persons listed
                                                based upon the above criteria,                          address, and telephone number of the                  in the service list prepared by the
                                                Commission staff preliminarily                          person filing; and (4) otherwise comply
                                                                                                                                                              Commission in this proceeding, in
                                                determines that the proposal satisfies                  with the requirements of sections
                                                                                                                                                              accordance with 18 CFR 4.34(b) and
                                                the requirements for a qualifying                       385.2001 through 385.2005 of the
                                                                                                        Commission’s regulations.1 All                        385.2010.
                                                conduit hydropower facility, which is
                                                not required to be licensed or exempted                 comments contesting Commission staff’s                  Locations of Notice of Intent: Copies
                                                from licensing.                                         preliminary determination that the                    of the notice of intent can be obtained
                                                   Comments and Motions to Intervene:                   facility meets the qualifying criteria                directly from the applicant or such
                                                Deadline for filing comments contesting                 must set forth their evidentiary basis.               copies can be viewed and reproduced at
                                                whether the facility meets the qualifying                  The Commission strongly encourages                 the Commission in its Public Reference
                                                criteria is 45 days from the issuance                   electronic filing. Please file motions to             Room, Room 2A, 888 First Street NE.,
                                                date of this notice.                                    intervene and comments using the                      Washington, DC 20426. The filing may
                                                   Deadline for filing motions to                       Commission’s eFiling system at http://                also be viewed on the web at http://
                                                intervene is 30 days from the issuance                  www.ferc.gov/docs-filing/efiling.asp.                 www.ferc.gov/docs-filing/elibrary.asp
                                                date of this notice.                                    Commenters can submit brief comments                  using the ‘‘eLibrary’’ link. Enter the
                                                   Anyone may submit comments or a                      up to 6,000 characters, without prior
                                                                                                                                                              docket number (i.e., CD17–18) in the
                                                motion to intervene in accordance with                  registration, using the eComment system
                                                                                                                                                              docket number field to access the
sradovich on DSK3GMQ082PROD with NOTICES




                                                the requirements of Rules of Practice                   at http://www.ferc.gov/docs-filing/
                                                and Procedure, 18 CFR 385.210 and                       ecomment.asp. You must include your                   document. For assistance, call toll-free
                                                385.214. Any motions to intervene must                  name and contact information at the end               1–866–208–3676 or email
                                                be received on or before the specified                  of your comments. For assistance,                     FERCOnlineSupport@ferc.gov. For TTY,
                                                deadline date for the particular                        please contact FERC Online Support at                 call (202) 502–8659.
                                                proceeding.                                             FERCOnlineSupport@ferc.gov, (866)
                                                   Filing and Service of Responsive
                                                Documents: All filings must (1) bear in                   1 18   CFR 385.2001–2005 (2017).



                                           VerDate Sep<11>2014   19:44 Aug 16, 2017   Jkt 241001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\17AUN1.SGM   17AUN1


                                                39118                       Federal Register / Vol. 82, No. 158 / Thursday, August 17, 2017 / Notices

                                                  Dated: August 10, 2017.                               additional capital and/or operating                   DEPARTMENT OF ENERGY
                                                Kimberly D. Bose,                                       expenditures which could potentially
                                                Secretary.                                              result in an increased net operating loss             Federal Energy Regulatory
                                                [FR Doc. 2017–17351 Filed 8–16–17; 8:45 am]             for Florida Gas as time goes on.                      Commission
                                                BILLING CODE P6717–01–P                                    Pursuant to section 157.9 of the                   [Docket No. CP17–477–000]
                                                                                                        Commission’s rules, 18 CFR 157.9,
                                                                                                        within 90 days of this Notice the                     Columbia Gas Transmission, LLC;
                                                DEPARTMENT OF ENERGY
                                                                                                        Commission staff will either: Complete                Notice of Request Under Blanket
                                                Federal Energy Regulatory                               its environmental assessment (EA) and                 Authorization
                                                Commission                                              place it into the Commission’s public
                                                                                                                                                                 Take notice that on July 31, 2017,
                                                                                                        record (eLibrary) for this proceeding; or
                                                [Docket No. CP17–480–000]                                                                                     Columbia Gas Transmission, LLC
                                                                                                        issue a Notice of Schedule for
                                                                                                                                                              (Columbia), 700 Louisiana Street, Suite
                                                Florida Gas Transmission Company,                       Environmental Review. If a Notice of                  700, Houston, Texas 77002–2700, filed
                                                LLC; Notice of Request Under Blanket                    Schedule for Environmental Review is                  in Docket No. CP17–477–000 a prior
                                                Authorization                                           issued, it will indicate, among other                 notice request pursuant to sections
                                                                                                        milestones, the anticipated date for the              157.205 and 157.216 of the
                                                   Take notice that on August 2, 2017,                  Commission staff’s issuance of the final
                                                Florida Gas Transmission Company,                                                                             Commission’s regulations under the
                                                                                                        environmental impact statement (FEIS)                 Natural Gas Act (NGA), as amended,
                                                LLC (Florida Gas), 1300 Main Street,
                                                                                                        or EA for this proposal. The filing of the            requesting authorization to abandon two
                                                Houston, Texas 77002, filed in the
                                                                                                        EA in the Commission’s public record                  injection/withdrawal (I/W) wells, along
                                                above referenced Docket, a prior notice
                                                request pursuant to sections 157.205,                   for this proceeding or the issuance of a              with the associated pipelines and
                                                157.208, and 157.216 of the                             Notice of Schedule for Environmental                  appurtenances at its Lucas Storage
                                                Commission’s regulations under the                      Review will serve to notify federal and               Field, located in Ashland and Richland
                                                Natural Gas Act (NGA) for authorization                 state agencies of the timing for the                  Counties, Ohio. Columbia states that the
                                                to abandon approximately 6.7 miles of                   completion of all necessary reviews, and              Lucas 10697 and 10722 I/W wells have
                                                the 8-inch-diameter Rinker Lateral,                     the subsequent need to complete all                   historically performed poorly in relation
                                                associated measurement and regulation                   federal authorizations within 90 days of              to other wells in the Lucas Storage Field
                                                station, and appurtenant facilities, all                the date of issuance of the Commission                and, based the age of the wells, the
                                                located in Miami-Dade County, Florida                   staff’s FEIS or EA.                                   wells would require an extensive case
                                                (Rinker Facilities Abandonment                                                                                replacement job. Columbia asserts that
                                                                                                           Any person may, within 60 days after
                                                Project), all as more fully set forth in the                                                                  the proposed abandonment of the Lucas
                                                                                                        the issuance of the instant notice by the
                                                application which is on file with the                                                                         10697 well includes the abandonment
                                                                                                        Commission, file pursuant to Rule 214                 of 977 feet of 3.5-inch-diameter pipeline
                                                Commission and open to public                           of the Commission’s Procedural Rules
                                                inspection.                                                                                                   and appurtenances and the proposed
                                                                                                        (18 CFR 385.214) a motion to intervene                abandonment of the Lucas 10722 well
                                                   The filing may also be viewed on the
                                                                                                        or notice of intervention. Any person                 includes the abandonment of 4.5-inch-
                                                web at http://www.ferc.gov using the
                                                eLibrary link. Enter the docket number                  filing to intervene or the Commission’s               diameter pipeline and appurtenances.
                                                excluding the last three digits in the                  staff may, pursuant to section 157.205 of             Columbia avers that there will be no
                                                docket number field to access the                       the Commission’s Regulations under the                change to the existing boundary, total
                                                document. For assistance, please contact                Natural Gas Act (NGA) (18 CFR 157.205)                inventory, reservoir pressure, reservoir
                                                FERC Online Support at                                  file a protest to the request. If no protest          and buffer boundaries, or the
                                                FERCOnlineSupport@ferc.gov or toll                      is filed within the time allowed                      certificated capacity of the Lucas
                                                free at (866) 208–3676, or TTY, contact                 therefore, the proposed activity shall be             Storage Field as a result of the proposed
                                                (202) 502–8659.                                         deemed to be authorized effective the                 abandonment, all as more fully set forth
                                                   Any questions concerning this prior                  day after the time allowed for protest. If            in the application which is on file with
                                                notice request should be directed to                    a protest is filed and not withdrawn                  the Commission and open to public
                                                Blair Lichtenwalter, Senior Director of                 within 30 days after the time allowed                 inspection. The filing may also be
                                                Certificates, Florida Gas Transmission                  for filing a protest, the instant request             viewed on the web at http://
                                                Company, LLC, 1300 Main St., Houston,                   shall be treated as an application for                www.ferc.gov using the ‘‘eLibrary’’ link.
                                                Texas, 77002, or call (713) 989–2605, or                authorization pursuant to section 7 of                Enter the docket number excluding the
                                                fax (713) 989–1205, or via email                        the NGA.                                              last three digits in the docket number
                                                Blair.Lichtenwalter@energytransfer.com.                                                                       field to access the document. For
                                                   Specifically, Florida Gas proposes to                   The Commission strongly encourages                 assistance, please contact FERC Online
                                                abandon in place the Rinker Lateral,                    electronic filings of comments, protests,             Support at FERCOnlineSupport@
                                                which originates downstream of Lateral                  and interventions via the internet in lieu            ferc.gov or toll free at (866) 208–3676, or
                                                Line Valve (LLV) 20–90B at Mile Post                    of paper. See 18 CFR 385.2001(a)(1)(iii)              TTY, contact (202) 502–8659.
                                                914.0 on Florida Gas’s mainline and the                 and the instructions on the                              Any questions concerning this
                                                Rinker Measurement and Regulation                       Commission’s Web site (www.ferc.gov)                  application may be directed to Linda
                                                Station located at Rinker Portland                      under the e-Filing link.                              Farquhar, Manager, Project
                                                Cement Corp’s plant. Florida Gas also                                                                         Determinations & Regulatory
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                          Dated: August 11, 2017.
                                                proposes to abandon by removal LLV                      Kimberly D. Bose,
                                                                                                                                                              Administration, Columbia Gas
                                                20–90B. Florida Gas states that Rinker                                                                        Transmission, LLC, 700 Louisiana
                                                Lateral and facilities have not been used               Secretary.                                            Street, Suite 700, Houston, Texas,
                                                to provide interruptible or firm                        [FR Doc. 2017–17390 Filed 8–16–17; 8:45 am]           77002–2700, by telephone at (832) 320–
                                                transportation in over two years. Florida               BILLING CODE P6717–01–P                               5685, by fax at (832) 320–6685, or by
                                                Gas further states that proposed                                                                              email at linda_farquhar@
                                                abandonment would eliminate                                                                                   transcanada.com.


                                           VerDate Sep<11>2014   19:44 Aug 16, 2017   Jkt 241001   PO 00000   Frm 00016   Fmt 4703   Sfmt 4703   E:\FR\FM\17AUN1.SGM   17AUN1



Document Created: 2017-08-17 01:42:35
Document Modified: 2017-08-17 01:42:35
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 39117 