82_FR_39519 82 FR 39360 - Drawbridge Operation Regulation; Willamette River, Portland, OR

82 FR 39360 - Drawbridge Operation Regulation; Willamette River, Portland, OR

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 82, Issue 159 (August 18, 2017)

Page Range39360-39360
FR Document2017-17523

The Coast Guard has issued a temporary deviation from the operating schedule that governs the upper deck of the Steel Bridge across the Willamette River, mile 12.1, in Portland, OR. The deviation is necessary to support the removal and replacement of roadway pavement. This deviation allows the upper lift span of the bridge to remain in the closed-to-navigation position to ensure the safety of construction crew members.

Federal Register, Volume 82 Issue 159 (Friday, August 18, 2017)
[Federal Register Volume 82, Number 159 (Friday, August 18, 2017)]
[Rules and Regulations]
[Page 39360]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-17523]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2017-0766]


Drawbridge Operation Regulation; Willamette River, Portland, OR

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the upper deck of the Steel Bridge 
across the Willamette River, mile 12.1, in Portland, OR. The deviation 
is necessary to support the removal and replacement of roadway 
pavement. This deviation allows the upper lift span of the bridge to 
remain in the closed-to-navigation position to ensure the safety of 
construction crew members.

DATES: This deviation is effective from 4 a.m. to 11:59 p.m. on October 
7, 2017.

ADDRESSES: The docket for this deviation, USCG-2017-0766, is available 
at http://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Mr. Steven Fischer, Bridge 
Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, 
email [email protected].

SUPPLEMENTARY INFORMATION: Union Pacific Railroad Company (UPRR), 
bridge owner, has requested a temporary deviation from the operating 
schedule for the Steel Bridge across the Willamette River, at mile 
12.1, in Portland, OR. The deviation is necessary to accommodate 
roadway improvements. Oregon Department of Transportation will be 
removing and replacing pavement on the upper lift roadway. The Steel 
Bridge is a double-deck lift bridge with a lower lift deck and an upper 
lift deck which operate independent of each other. To facilitate this 
paving operation, the upper deck will remain in the closed-to-
navigation position. When the lower deck is in the closed-to-navigation 
position, the bridge provides 26 feet of vertical clearance above 
Columbia River Datum 0.0; and in open-to-navigation position, the 
vertical clearance is 71 feet above Columbia River Datum 0.0. The 
deviation period is from 4 a.m. to 11:59 p.m. on October 7, 2017. The 
lower deck for the Steel Bridge will continue to operate in accordance 
with 33 CFR 117.897(c)(3)(ii), and at the end of this deviation period, 
the upper deck of the Steel Bridge will resume operating in accordance 
with 33 CFR 117.897(c)(3)(ii).
    Waterway usage on this part of the Willamette River includes 
vessels ranging from commercial tug and barge to small pleasure craft. 
Vessels able to pass through the bridge with the lower deck in the 
open-to-navigation position or upper deck in the closed-to-navigation 
position may do so at any time. The upper lift of the Steel Bridge will 
not be able to open for emergencies; however, the lower lift will be 
able to open for emergencies, and there is no immediate alternate route 
for vessels to pass. The Coast Guard has conducted public outreach 
regarding this closure of the upper deck on the subject bridge to known 
mariners that transit on the river. The Coast Guard has not received 
any objections to this temporary deviation from the operating schedule. 
The Coast Guard will also inform the users of the waterways through our 
Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so that vessel operators can arrange their 
transits to minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the designated 
time period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: August 15, 2017.
Steven Michael Fischer,
Bridge Administrator, Thirteenth Coast Guard District.
[FR Doc. 2017-17523 Filed 8-17-17; 8:45 am]
 BILLING CODE 9110-04-P



                                                39360              Federal Register / Vol. 82, No. 159 / Friday, August 18, 2017 / Rules and Regulations

                                                the Spectator Area. Spectators may                      schedule that governs the upper deck of               will not be able to open for emergencies;
                                                contact the Coast Guard Patrol                          the Steel Bridge across the Willamette                however, the lower lift will be able to
                                                Commander to request permission to                      River, mile 12.1, in Portland, OR. The                open for emergencies, and there is no
                                                either enter the Spectator Area or pass                 deviation is necessary to support the                 immediate alternate route for vessels to
                                                through the regulated area. If permission               removal and replacement of roadway                    pass. The Coast Guard has conducted
                                                is granted, spectators must enter the                   pavement. This deviation allows the                   public outreach regarding this closure of
                                                Spectator Area or pass directly through                 upper lift span of the bridge to remain               the upper deck on the subject bridge to
                                                the regulated area as instructed at safe                in the closed-to-navigation position to               known mariners that transit on the river.
                                                speed and without loitering.                            ensure the safety of construction crew                The Coast Guard has not received any
                                                   (7) The Coast Guard Patrol                           members.                                              objections to this temporary deviation
                                                Commander and official patrol vessels                   DATES: This deviation is effective from               from the operating schedule. The Coast
                                                enforcing this regulated area can be                    4 a.m. to 11:59 p.m. on October 7, 2017.              Guard will also inform the users of the
                                                contacted on marine band radio VHF–                     ADDRESSES: The docket for this                        waterways through our Local and
                                                FM channel 16 (156.8 MHz) and                           deviation, USCG–2017–0766, is                         Broadcast Notices to Mariners of the
                                                channel 22A (157.1 MHz). Persons and                    available at http://www.regulations.gov.              change in operating schedule for the
                                                vessels desiring to transit, moor, or                   Type the docket number in the                         bridge so that vessel operators can
                                                anchor within the regulated area must                   ‘‘SEARCH’’ box and click ‘‘SEARCH.’’                  arrange their transits to minimize any
                                                obtain authorization from Captain of the                Click on Open Docket Folder on the line               impact caused by the temporary
                                                Port Maryland-National Capital Region                   associated with this deviation.                       deviation.
                                                or Coast Guard Patrol Commander. The                                                                             In accordance with 33 CFR 117.35(e),
                                                                                                        FOR FURTHER INFORMATION CONTACT: If
                                                Captain of the Port Maryland-National                                                                         the drawbridge must return to its regular
                                                                                                        you have questions on this temporary
                                                Capital Region can be contacted at                                                                            operating schedule immediately at the
                                                                                                        deviation, call or email Mr. Steven
                                                telephone number 410–576–2693 or on                                                                           end of the designated time period. This
                                                                                                        Fischer, Bridge Administrator,
                                                Marine Band Radio, VHF–FM channel                       Thirteenth Coast Guard District;                      deviation from the operating regulations
                                                16 (156.8 MHz). The Coast Guard Patrol                  telephone 206–220–7282, email d13-pf-                 is authorized under 33 CFR 117.35.
                                                Commander can be contacted on Marine                    d13bridges@uscg.mil.                                    Dated: August 15, 2017.
                                                Band Radio, VHF–FM channel 16 (156.8
                                                                                                        SUPPLEMENTARY INFORMATION: Union                      Steven Michael Fischer,
                                                MHz).
                                                   (8) The Coast Guard will publish a                   Pacific Railroad Company (UPRR),                      Bridge Administrator, Thirteenth Coast Guard
                                                notice in the Fifth Coast Guard District                bridge owner, has requested a temporary               District.
                                                Local Notice to Mariners and issue a                    deviation from the operating schedule                 [FR Doc. 2017–17523 Filed 8–17–17; 8:45 am]
                                                marine information broadcast on VHF–                    for the Steel Bridge across the                       BILLING CODE 9110–04–P

                                                FM marine band radio.                                   Willamette River, at mile 12.1, in
                                                   (d) Enforcement. The Coast Guard                     Portland, OR. The deviation is necessary
                                                may be assisted with marine event                       to accommodate roadway                                DEPARTMENT OF HOMELAND
                                                patrol and enforcement of the regulated                 improvements. Oregon Department of                    SECURITY
                                                area by other federal, state, and local                 Transportation will be removing and
                                                                                                        replacing pavement on the upper lift                  Coast Guard
                                                agencies.
                                                   (e) Enforcement periods. This section                roadway. The Steel Bridge is a double-
                                                will be enforced from 8:30 a.m. until                   deck lift bridge with a lower lift deck               33 CFR Part 165
                                                5:30 p.m. on August 19, 2017, and from                  and an upper lift deck which operate                  [Docket Number USCG–2017–0521]
                                                8:30 a.m. until 5:30 p.m. on August 20,                 independent of each other. To facilitate
                                                2017.                                                   this paving operation, the upper deck                 RIN 1625–AA00
                                                                                                        will remain in the closed-to-navigation
                                                  Dated: August 15, 2017.                               position. When the lower deck is in the               Safety Zone; Kaskaskia River,
                                                Michael W. Batchelder,                                  closed-to-navigation position, the bridge             Evansville, IL
                                                Commander, U.S. Coast Guard, Acting                     provides 26 feet of vertical clearance
                                                Captain of the Port Maryland-National                                                                         AGENCY:    Coast Guard, DHS.
                                                                                                        above Columbia River Datum 0.0; and in
                                                Capital Region.                                         open-to-navigation position, the vertical             ACTION:   Final rule.
                                                [FR Doc. 2017–17513 Filed 8–17–17; 8:45 am]             clearance is 71 feet above Columbia                   SUMMARY:   The Coast Guard is
                                                BILLING CODE 9110–04–P                                  River Datum 0.0. The deviation period                 establishing a safety zone for all
                                                                                                        is from 4 a.m. to 11:59 p.m. on October               navigable waters on the Kaskaskia River
                                                                                                        7, 2017. The lower deck for the Steel                 between mile marker (MM) 9.0 and MM
                                                DEPARTMENT OF HOMELAND                                  Bridge will continue to operate in
                                                SECURITY                                                                                                      11.0. This action is necessary to provide
                                                                                                        accordance with 33 CFR                                for the safety of life on these navigable
                                                Coast Guard                                             117.897(c)(3)(ii), and at the end of this             waters near Evansville, IL during high
                                                                                                        deviation period, the upper deck of the               speed boat races. Entry of vessels or
                                                33 CFR Part 117                                         Steel Bridge will resume operating in                 persons into this safety zone is
                                                                                                        accordance with 33 CFR                                prohibited unless authorized by the
                                                [Docket No. USCG–2017–0766]                             117.897(c)(3)(ii).                                    Captain of the Port Upper Mississippi
                                                                                                           Waterway usage on this part of the                 River (COTP) or a designated
                                                Drawbridge Operation Regulation;                        Willamette River includes vessels
                                                Willamette River, Portland, OR                                                                                representative.
mstockstill on DSK30JT082PROD with RULES




                                                                                                        ranging from commercial tug and barge
                                                AGENCY: Coast Guard, DHS.                               to small pleasure craft. Vessels able to              DATES: This rule is effective from 8 a.m.
                                                                                                        pass through the bridge with the lower                on September 16, 2017, through 6 p.m.
                                                ACTION: Notice of deviation from
                                                                                                        deck in the open-to-navigation position               on September 17, 2017.
                                                drawbridge regulation.
                                                                                                        or upper deck in the closed-to-                       ADDRESSES: To view documents
                                                SUMMARY: The Coast Guard has issued a                   navigation position may do so at any                  mentioned in this preamble as being
                                                temporary deviation from the operating                  time. The upper lift of the Steel Bridge              available in the docket, go to http://


                                           VerDate Sep<11>2014   15:59 Aug 17, 2017   Jkt 241001   PO 00000   Frm 00026   Fmt 4700   Sfmt 4700   E:\FR\FM\18AUR1.SGM   18AUR1



Document Created: 2017-08-18 07:40:56
Document Modified: 2017-08-18 07:40:56
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionNotice of deviation from drawbridge regulation.
DatesThis deviation is effective from 4 a.m. to 11:59 p.m. on October 7, 2017.
ContactIf you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email [email protected]
FR Citation82 FR 39360 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR