82_FR_39738 82 FR 39578 - Bidden Creek Bores Properties, LLC; JBS Rentals, LLC; Notice of Transfer of Exemption

82 FR 39578 - Bidden Creek Bores Properties, LLC; JBS Rentals, LLC; Notice of Transfer of Exemption

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 160 (August 21, 2017)

Page Range39578-39578
FR Document2017-17557

Federal Register, Volume 82 Issue 160 (Monday, August 21, 2017)
[Federal Register Volume 82, Number 160 (Monday, August 21, 2017)]
[Notices]
[Page 39578]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-17557]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 6550-004]


Bidden Creek Bores Properties, LLC; JBS Rentals, LLC; Notice of 
Transfer of Exemption

    1. By letter filed June 23, 2017, Stephen J. Bores informed the 
Commission that the exemption from licensing for the Biber-Spellenberg 
Hydro Project No. 6550, originally issued February 14, 1983 \1\ has 
been transferred to JBS Rentals, LLC. The project is located on Bidden 
Creek in Trinity County, California. The transfer of an exemption does 
not require Commission approval.
---------------------------------------------------------------------------

    \1\ Order Granting Exemption from Licensing of a Small 
Hydroelectric Project of 5 MW or Less. Frank M. Biber and Steven 
Spellenberg, 22 FERC ] 62,182 (1983).
---------------------------------------------------------------------------

    2. JBS Rentals, LLC is now the exemptee of the Biber-Spellenberg 
Project No. 6550. All correspondence should be forwarded to: Mr. Jeremy 
Brown, Owner, P.O. Box 1233, Willow Creek, CA 95573, Phone 530-629-
3100.

    Dated: August 15, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-17557 Filed 8-18-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                    39578                        Federal Register / Vol. 82, No. 160 / Monday, August 21, 2017 / Notices

                                                    November 9, 1982 1 located on the Sugar                 Brown, Owner, P.O. Box 1233, Willow                   of DCP’s otherwise non-jurisdictional
                                                    River in Sullivan County, New                           Creek, CA 95573, Phone 530–629–3100.                  gathering and processing facilities.
                                                    Hampshire; (2) West Hopkinton Hydro,                      Dated: August 15, 2017.                                Pursuant to section 157.9 of the
                                                    LLC exemptee for the Hoague-Sprague                                                                           Commission’s rules (18 CFR 157.9),
                                                                                                            Kimberly D. Bose,
                                                    Project No. 4337, originally issued                                                                           within 90 days of this Notice, the
                                                                                                            Secretary.                                            Commission staff will either: complete
                                                    March 11, 1982 2 located on the
                                                    Contoocook River in Merrimack County,                   [FR Doc. 2017–17557 Filed 8–18–17; 8:45 am]           its environmental assessment (EA) and
                                                    New Hampshire; and (3) the Sweetwater                   BILLING CODE 6717–01–P                                place it into the Commission’s public
                                                    Hydroelectric, LLC exemptee for the                                                                           record (eLibrary) for this proceeding; or
                                                    Woodsville Reactivation Project No.                                                                           issue a Notice of Schedule for
                                                    5307, originally issued February 5,                     DEPARTMENT OF ENERGY                                  Environmental Review. If a Notice of
                                                    1982 3 located on the Ammonoosuc                                                                              Schedule for Environmental Review is
                                                                                                            Federal Energy Regulatory
                                                    River in Grafton County, New                                                                                  issued, it will indicate, among other
                                                                                                            Commission
                                                    Hampshire. Transfer of an exemption                                                                           milestones, the anticipated date for the
                                                    does not require Commission approval.                   [Docket No. CP17–481–000]                             Commission staff’s issuance of the final
                                                       2. Green Mountain Power Corporation                                                                        environmental impact statement (FEIS)
                                                    is now the exemptee of the Lower                        Notice of Application: DCP Operating                  or EA for this proposal. The filing of the
                                                    Valley Project No. 6756; the Hoague-                    Company, LP                                           EA in the Commission’s public record
                                                    Sprague Project No. 4337; and the                                                                             for this proceeding or the issuance of a
                                                                                                               Take notice that on August 2, 2017,
                                                    Woodsville Reactivation Project No.                                                                           Notice of Schedule for Environmental
                                                                                                            DCP Operating Company, LP (DCP), 370
                                                    5307. All correspondence should be                                                                            Review will serve to notify federal and
                                                                                                            17th Street, Suite 2500, Denver,
                                                    forwarded to: Green Mountain Power                                                                            state agencies of the timing for the
                                                                                                            Colorado 80202, filed in the above
                                                    Corporation, 163 Acorn Lane,                                                                                  completion of all necessary reviews, and
                                                                                                            referenced docket an application
                                                    Colchester, VT 05446.                                                                                         the subsequent need to complete all
                                                                                                            pursuant to section 7(c) of the Natural
                                                      Dated: August 15, 2017.                                                                                     federal authorizations within 90 days of
                                                                                                            Gas Act (NGA), and Part 157 of the
                                                    Kimberly D. Bose,                                                                                             the date of issuance of the Commission
                                                                                                            Commission’s regulations requesting
                                                                                                                                                                  staff’s FEIS or EA.
                                                    Secretary.                                              authorization to construct and operate                   There are two ways to become
                                                    [FR Doc. 2017–17558 Filed 8–18–17; 8:45 am]             approximately 8.4 miles of 20-inch-                   involved in the Commission’s review of
                                                    BILLING CODE 6717–01–P                                  diameter natural gas pipeline with a                  this project. First, any person wishing to
                                                                                                            maximum capacity of 253million cubic                  obtain legal status by becoming a party
                                                                                                            feet per day (MMcf/d) in Weld County,                 to the proceedings for this project
                                                    DEPARTMENT OF ENERGY                                    Colorado (Mewbourn 3 Residue East                     should, on or before the comment date
                                                                                                            Pipeline), all as more fully set forth in             stated below file with the Federal
                                                    Federal Energy Regulatory                               the application which is on file with the
                                                    Commission                                                                                                    Energy Regulatory Commission, 888
                                                                                                            Commission and open to public                         First Street NE., Washington, DC 20426,
                                                    [Project No. 6550–004]                                  inspection. The filing is available for               a motion to intervene in accordance
                                                                                                            review at the Commission in the Public                with the requirements of the
                                                    Bidden Creek Bores Properties, LLC;                     Reference Room or may be viewed on                    Commission’s Rules of Practice and
                                                    JBS Rentals, LLC; Notice of Transfer                    the Commission’s Web site web at                      Procedure (18 CFR 385.214 or 385.211)
                                                    of Exemption                                            http://www.ferc.gov using the                         and the Regulations under the NGA (18
                                                       1. By letter filed June 23, 2017,                    ‘‘eLibrary’’ link. Enter the docket                   CFR 157.10). A person obtaining party
                                                    Stephen J. Bores informed the                           number excluding the last three digits in             status will be placed on the service list
                                                    Commission that the exemption from                      the docket number field to access the                 maintained by the Secretary of the
                                                    licensing for the Biber-Spellenberg                     document. For assistance, contact FERC                Commission and will receive copies of
                                                    Hydro Project No. 6550, originally                      at FERCOnlineSupport@ferc.gov or call                 all documents filed by the applicant and
                                                    issued February 14, 1983 1 has been                     toll-free, (866) 208–3676 or TYY, (202)               by all other parties. A party must submit
                                                    transferred to JBS Rentals, LLC. The                    502–8659.                                             seven copies of filings made in the
                                                    project is located on Bidden Creek in                      Any questions concerning this                      proceeding with the Commission and
                                                    Trinity County, California. The transfer                application may be directed to Tyler                  must mail a copy to the applicant and
                                                    of an exemption does not require                        Culbertson, Manager, Regulatory Affairs,              to every other party. Only parties to the
                                                    Commission approval.                                    DCP Operating Company, LP, 370 17th                   proceeding can ask for court review of
                                                       2. JBS Rentals, LLC is now the                       Street, Suite 2500, Denver, Colorado                  Commission orders in the proceeding.
                                                    exemptee of the Biber-Spellenberg                       80202, at (303) 605–2278.                                However, a person does not have to
                                                    Project No. 6550. All correspondence                       Further, DCP asks for clarification                intervene in order to have comments
                                                    should be forwarded to: Mr. Jeremy                      about the applicability of the Part 157,              considered. The second way to
                                                                                                            Subpart F blanket certificate program to              participate is by filing with the
                                                      1 Notice of Exemption from Licensing. Claremont       Mewbourn 3 Residue East Pipeline. DPC                 Secretary of the Commission, as soon as
                                                    Hydro Associates, 21 FERC 62,216 (1982).                also seeks waivers of certain regulatory              possible, an original and two copies of
                                                      2 Order Granting Exemption from Licensing of a        requirements, including the                           comments in support of or in opposition
                                                    Small Hydroelectric Project (5 MW or Less). ECH
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                                                                            Commission’s interstate natural gas                   to this project. The Commission will
                                                    Hydro Associates, 18 FERC 62,419 (1982).
                                                      3 Order Granting Exemption from Licensing of a
                                                                                                            pipeline open access, tariff, posting,                consider these comments in
                                                    Small Hydroelectric Project of 5 Megawatts or Less      accounting, and reporting requirements,               determining the appropriate action to be
                                                    and Denying Competing Application for                   like similar residue pipeline owner/                  taken, but the filing of a comment alone
                                                    Preliminary Permit, New England Hydro, Inc.             operators. DCP wants confirmation that                will not serve to make the filer a party
                                                    Woodsville Fire District, 18 FERC 62,158 (1982).        the Commission’s assertion of                         to the proceeding. The Commission’s
                                                      1 Order Granting Exemption from Licensing of a

                                                    Small Hydroelectric Project of 5 MW or Less. Frank
                                                                                                            jurisdiction over the Mewbourn 3                      rules require that persons filing
                                                    M. Biber and Steven Spellenberg, 22 FERC ¶ 62,182       Residue East Pipeline in no way                       comments in opposition to the project
                                                    (1983).                                                 jeopardizes the non-jurisdictional status             provide copies of their protests only to


                                               VerDate Sep<11>2014   18:37 Aug 18, 2017   Jkt 241001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\21AUN1.SGM   21AUN1



Document Created: 2017-08-19 00:44:59
Document Modified: 2017-08-19 00:44:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 39578 