The Environmental Protection Agency (EPA) is taking direct final action to approve a revision to the State Implementation Plan (SIP) submitted by the State of Iowa for the purpose of incorporating an amendment to the Administrative Consent Order (ACO) for Grain Processing Corporation (GPC), Muscatine, Iowa. The revision amends the ACO to change the date for completion of performance testing to allow the state more time to complete processing air construction permit applications submitted by GPC and specify testing requirements as appropriate in the final permits. This revision will not impact the schedule for installation and operation of control equipment, will not alter any other compliance dates, and will not adversely affect air quality in Muscatine, Iowa. The state held a 30-day comment period, during which no comments were received.

Federal Register, Volume 82 Issue 164 (Friday, August 25, 2017)
[Federal Register Volume 82, Number 164 (Friday, August 25, 2017)]
[Rules and Regulations]
[Pages 40491-40493]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-17417]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R07-OAR-2017-0143; FRL-9966-59-Region 7]


Air Plan Approval; Iowa; Amendment to the Administrative Consent 
Order, Grain Processing Corporation, Muscatine, Iowa

AGENCY: Environmental Protection Agency (EPA).

ACTION: Direct final rule.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) is taking direct 
final action to approve a revision to the State Implementation Plan 
(SIP) submitted by the State of Iowa for the purpose of incorporating 
an amendment to the Administrative Consent Order (ACO) for Grain 
Processing Corporation (GPC), Muscatine, Iowa. The revision amends the 
ACO to change the date for completion of performance testing to allow 
the state more time to complete processing air construction permit 
applications submitted by GPC and specify testing requirements as 
appropriate in the final permits. This revision will not impact the 
schedule for installation and operation of control equipment, will not 
alter any other compliance dates, and will not adversely affect air 
quality in Muscatine, Iowa. The state held a 30-day comment period, 
during which no comments were received.

DATES: This direct final rule will be effective October 24, 2017, 
without further notice, unless EPA receives adverse comment by 
September 25, 2017. If EPA receives adverse comment, we will publish a 
timely withdrawal of the direct final rule in the Federal Register 
informing the public that the rule will not take effect.

ADDRESSES: Submit your comments, identified by Docket ID No. EPA-R07-
OAR-2017-0143, to http://www.regulations.gov. Follow the online 
instructions for submitting comments. Once submitted, comments cannot 
be edited or removed from Regulations.gov. EPA may publish any comment 
received to its public docket. Do not submit electronically any 
information you consider to be Confidential Business Information (CBI) 
or other information whose disclosure is restricted by statute. 
Multimedia submissions (audio, video, etc.) must be accompanied by a 
written comment. The written comment is considered the official comment 
and should include discussion of all points you wish to make. EPA will 
generally not consider comments or comment contents located outside of 
the primary submission (i.e. on the web, cloud, or other file sharing 
system). For additional submission methods, the full EPA public comment 
policy, information about CBI or multimedia submissions, and general 
guidance on making effective comments, please visit http://www2.epa.gov/dockets/commenting-epa-dockets.

FOR FURTHER INFORMATION CONTACT: Heather Hamilton, Environmental 
Protection Agency, Air Planning and Development Branch, 11201 Renner 
Boulevard, Lenexa, Kansas 66219 at 913-551-7039, or by email at 
[email protected].

SUPPLEMENTARY INFORMATION: Throughout this document ``we,'' ``us,'' and 
``our'' refer to EPA. This section provides additional information by 
addressing the following:

I. What is being addressed in this document?
II. Have the requirements for approval of a SIP revision been met?
III. What action is EPA taking?
IV. Incorporation by Reference
V. Statutory and Executive Order Reviews

I. What is being addressed in this document?

    This direct final action approves a revision to the Iowa State 
Implementation Plan (SIP) submitted by the State of Iowa for the 
purpose of incorporating an amendment to the Administrative Consent 
Order (ACO) with Grain Processing Corporation (GPC), Muscatine, Iowa. 
The revision changes the date for completion of performance testing 
from May 31, 2017, to May 31, 2018, and will allow the state more time 
to complete processing air construction permit applications submitted 
by GPC and specify testing requirements as appropriate in the final 
permits. This amendment will not impact the schedule for installation 
and operation of control equipment, will not alter any other compliance 
dates, and

[[Page 40492]]

will not adversely affect air quality in the Muscatine, Iowa, area.
    The state held a 30-day comment period, during which no comments 
were received.
    Additional information with respect to this rule is included in the 
Technical Support Document that is part of this docket.

II. Have the requirements for approval of a SIP revision been met?

    The state submission has met the public notice requirements for SIP 
submissions in accordance with 40 CFR 51.102. The state instituted a 
30-day comment period; no comments were received. The submission also 
satisfied the completeness criteria of 40 CFR part 51, appendix V. In 
addition, as explained above and in more detail in the Technical 
Support Document which is part of this docket, the revision meets the 
substantive SIP requirements of the Clean Air Act (CAA), including 
section 110 and implementing regulations.

III. What action is EPA taking?

    This direct final action approves a SIP revision submitted by the 
State of Iowa for the purpose of incorporating an amendment to the 
Administrative Consent Order (ACO) with Grain Processing Corporation 
(GPC), Muscatine, Iowa. Additional information with respect to this 
rule is included in the Technical Support Document that is part of this 
docket.
    We are publishing this direct final rule without a prior proposed 
rule because we view this as a noncontroversial action and anticipate 
no adverse comment. However, in the ``Proposed Rules'' section of this 
Federal Register, we are publishing a separate document that will serve 
as the proposed rule to approve this SIP revision. If adverse comments 
are received on this direct final rule, we will not institute a second 
comment period on this action. Any parties interested in commenting 
must do so at this time. For further information about commenting on 
this rule, see the ADDRESSES section of this document. If EPA receives 
adverse comment, we will publish a timely withdrawal in the Federal 
Register informing the public that this direct final rule will not take 
effect. We will address all public comments in any subsequent final 
rule based on the proposed rule.

IV. Incorporation by Reference

    In this rule, EPA is finalizing regulatory text that includes 
incorporation by reference. In accordance with requirements of 1 CFR 
51.5, EPA is finalizing the incorporation by reference of a revision to 
Iowa's EPA-approved State source-specific permits described in the 
direct final amendments to 40 CFR part 52 set forth below. EPA has 
made, and will continue to make, these materials generally available 
through www.regulations.gov and/or at the EPA Region 7 Office (please 
contact the person identified in the FOR FURTHER INFORMATION CONTACT 
section of this preamble for more information).
    Therefore, these materials have been approved by EPA for inclusion 
in the State Implementation Plan, have been incorporated by reference 
by EPA into that plan, are fully Federally enforceable under sections 
110 and 113 of the CAA as of the effective date of the final rulemaking 
of EPA's approval, and will be incorporated by reference by the 
Director of the Federal Register in the next update to the SIP 
compilation.\1\
---------------------------------------------------------------------------

    \1\ 62 FR 27968 (May 22, 1997).
---------------------------------------------------------------------------

V. Statutory and Executive Order Reviews

    Under the CAA, the Administrator is required to approve a SIP 
submission that complies with the provisions of the Act and applicable 
Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in 
reviewing SIP submissions, EPA's role is to approve state choices, 
provided that they meet the criteria of the CAA. Accordingly, this 
action merely approves state law as meeting Federal requirements and 
does not impose additional requirements beyond those imposed by state 
law. For that reason, this action:
     Is not a significant regulatory action subject to review 
by the Office of Management and Budget under Executive Orders 12866 (58 
FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
     Does not impose an information collection burden under the 
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
     Is certified as not having a significant economic impact 
on a substantial number of small entities under the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.);
     Does not contain any unfunded mandate or significantly or 
uniquely affect small governments, as described in the Unfunded 
Mandates Reform Act of 1995 (Pub. L. 104-4);
     Does not have Federalism implications as specified in 
Executive Order 13132 (64 FR 43255, August 10, 1999);
     Is not an economically significant regulatory action based 
on health or safety risks subject to Executive Order 13045 (62 FR 
19885, April 23, 1997);
     Is not a significant regulatory action subject to 
Executive Order 13211 (66 FR 28355, May 22, 2001);
     Is not subject to requirements of section 12(d) of the 
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 
note) because application of those requirements would be inconsistent 
with the CAA; and
     Does not provide EPA with the discretionary authority to 
address, as appropriate, disproportionate human health or environmental 
effects, using practicable and legally permissible methods, under 
Executive Order 12898 (59 FR 7629, February 16, 1994).
    The SIP is not approved to apply on any Indian reservation land or 
in any other area where EPA or an Indian tribe has demonstrated that a 
tribe has jurisdiction. In those areas of Indian country, the rule does 
not have tribal implications and will not impose substantial direct 
costs on tribal governments or preempt tribal law as specified by 
Executive Order 13175 (65 FR 67249, November 9, 2000).
    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the 
Small Business Regulatory Enforcement Fairness Act of 1996, generally 
provides that before a rule may take effect, the agency promulgating 
the rule must submit a rule report, which includes a copy of the rule, 
to each House of the Congress and to the Comptroller General of the 
United States. EPA will submit a report containing this action and 
other required information to the U.S. Senate, the U.S. House of 
Representatives, and the Comptroller General of the United States prior 
to publication of the rule in the Federal Register. A major rule cannot 
take effect until 60 days after it is published in the Federal 
Register. This action is not a ``major rule'' as defined by 5 U.S.C. 
804(2).
    Under section 307(b)(1) of the CAA, petitions for judicial review 
of this action must be filed in the United States Court of Appeals for 
the appropriate circuit by October 24, 2017. Filing a petition for 
reconsideration by the Administrator of this final rule does not affect 
the finality of this action for the purposes of judicial review nor 
does it extend the time within which a petition for judicial review may 
be filed, and shall not postpone the effectiveness of such rule or 
action. This action may not be challenged later in proceedings to 
enforce its requirements. (See section 307(b)(2)).

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Incorporation by

[[Page 40493]]

reference, Particulate matter, Reporting and recordkeeping 
requirements.

    Dated: August 9, 2017.
Edward H. Chu,
Acting Regional Administrator, Region 7.

    For the reasons stated in the preamble, EPA amends 40 CFR part 52 
as set forth below:

PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

0
1. The authority citation for part 52 continues to read as follows:

    Authority:  42 U.S.C. 7401 et seq.

Subpart Q--Iowa

0
2. In Sec.  52.820, the table in paragraph (d) is amended by revising 
the entry ``(29) Grain Processing Corporation'' to read as follows:


Sec.  52.820   Identification of plan.

* * * * *
    (d) * * *

                                EPA-Approved Iowa Source-Specific Orders/Permits
----------------------------------------------------------------------------------------------------------------
                                                             State
          Name of source             Order/Permit No.   effective date   EPA approval date       Explanation
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
(29) Grain Processing Corporation  Administrative              1-16-17  12/1/14, 79 FR       The last sentence
                                    Consent Order No.                    71025; amendment     of Paragraph 5,
                                    2014-AQ-A1.                          approved 8-25-17,    Section III and
                                                                         [insert Federal      Section VI are not
                                                                         Register citation].  approved by EPA as
                                                                                              part of the SIP.
 
                                                  * * * * * * *
----------------------------------------------------------------------------------------------------------------

* * * * *
[FR Doc. 2017-17417 Filed 8-24-17; 8:45 am]
 BILLING CODE 6560-50-P



                                                                Federal Register / Vol. 82, No. 164 / Friday, August 25, 2017 / Rules and Regulations                                          40491

                                             Consideration (REC) supporting this                     radio VHF–FM channel 16 (156.8 MHz).                  www.regulations.gov. Follow the online
                                             determination is available in the docket                All persons and vessels in the safety                 instructions for submitting comments.
                                             where indicated in the ADDRESSES                        zone must comply with all lawful orders               Once submitted, comments cannot be
                                             section of this preamble.                               or directions given to them by the COTP               edited or removed from Regulations.gov.
                                                                                                     or the COTP’s designated representative.              EPA may publish any comment received
                                             G. Protest Activities                                     (d) Enforcement period. This section                to its public docket. Do not submit
                                               The Coast Guard respects the First                    will be enforced August 26, 2017, from                electronically any information you
                                             Amendment rights of protesters.                         9 p.m. to 11:59 p.m.                                  consider to be Confidential Business
                                             Protesters are asked to contact the                       Dated: August 21, 2017.                             Information (CBI) or other information
                                             person listed in the FOR FURTHER                                                                              whose disclosure is restricted by statute.
                                                                                                     Scott E. Anderson,
                                             INFORMATION CONTACT section to                                                                                Multimedia submissions (audio, video,
                                                                                                     Captain, U.S. Coast Guard, Captain of the
                                             coordinate protest activities so that your                                                                    etc.) must be accompanied by a written
                                                                                                     Port Delaware Bay.
                                             message can be received without                                                                               comment. The written comment is
                                                                                                     [FR Doc. 2017–18031 Filed 8–24–17; 8:45 am]
                                             jeopardizing the safety or security of                                                                        considered the official comment and
                                                                                                     BILLING CODE 9110–04–P
                                             people, places or vessels.                                                                                    should include discussion of all points
                                             List of Subjects in 33 CFR Part 165                                                                           you wish to make. EPA will generally
                                                                                                                                                           not consider comments or comment
                                               Harbors, Marine safety, Navigation                    ENVIRONMENTAL PROTECTION                              contents located outside of the primary
                                             (water), Reporting and recordkeeping                    AGENCY                                                submission (i.e. on the web, cloud, or
                                             requirements, Security measures,                                                                              other file sharing system). For
                                             Waterways.                                              40 CFR Part 52
                                                                                                                                                           additional submission methods, the full
                                               For the reasons discussed in the                      [EPA–R07–OAR–2017–0143; FRL–9966–59–                  EPA public comment policy,
                                             preamble, the Coast Guard amends 33                     Region 7]                                             information about CBI or multimedia
                                             CFR part 165 as follows:                                                                                      submissions, and general guidance on
                                                                                                     Air Plan Approval; Iowa; Amendment                    making effective comments, please visit
                                             PART 165—REGULATED NAVIGATION                           to the Administrative Consent Order,                  http://www2.epa.gov/dockets/
                                             AREAS AND LIMITED ACCESS AREAS                          Grain Processing Corporation,                         commenting-epa-dockets.
                                                                                                     Muscatine, Iowa
                                             ■ 1. The authority citation for part 165                                                                      FOR FURTHER INFORMATION CONTACT:
                                             continues to read as follows:                           AGENCY: Environmental Protection                      Heather Hamilton, Environmental
                                                                                                     Agency (EPA).                                         Protection Agency, Air Planning and
                                               Authority: 33 U.S.C. 1231; 50 U.S.C. 191;
                                             33 CFR 1.05–1, 6.04–1, 6.04–6, and 160.5;               ACTION: Direct final rule.                            Development Branch, 11201 Renner
                                             Department of Homeland Security Delegation                                                                    Boulevard, Lenexa, Kansas 66219 at
                                                                                                     SUMMARY:    The Environmental Protection
                                             No. 0170.1.                                                                                                   913–551–7039, or by email at
                                                                                                     Agency (EPA) is taking direct final
                                             ■ 2. Add § 165.T05–0627 to read as                                                                            hamilton.heather@epa.gov.
                                                                                                     action to approve a revision to the State
                                             follows:                                                Implementation Plan (SIP) submitted by                SUPPLEMENTARY INFORMATION:
                                                                                                     the State of Iowa for the purpose of                  Throughout this document ‘‘we,’’ ‘‘us,’’
                                             § 165.T05–0627 Safety Zone; Atlantic
                                             Ocean, Ocean City, NJ.                                  incorporating an amendment to the                     and ‘‘our’’ refer to EPA. This section
                                                                                                     Administrative Consent Order (ACO) for                provides additional information by
                                               (a) Definitions. As used in this
                                                                                                     Grain Processing Corporation (GPC),                   addressing the following:
                                             section, designated representative
                                                                                                     Muscatine, Iowa. The revision amends                  I. What is being addressed in this document?
                                             means a Coast Guard Patrol
                                                                                                     the ACO to change the date for                        II. Have the requirements for approval of a
                                             Commander, including a Coast Guard
                                                                                                     completion of performance testing to                       SIP revision been met?
                                             petty officer, warrant or commissioned
                                                                                                     allow the state more time to complete                 III. What action is EPA taking?
                                             officer on board a Coast Guard vessel                                                                         IV. Incorporation by Reference
                                                                                                     processing air construction permit
                                             and or on board another Federal, State,                                                                       V. Statutory and Executive Order Reviews
                                                                                                     applications submitted by GPC and
                                             or local law enforcement vessel assisting
                                                                                                     specify testing requirements as
                                             the Captain of the Port, Delaware Bay                                                                         I. What is being addressed in this
                                                                                                     appropriate in the final permits. This
                                             with enforcement of the safety zone.                                                                          document?
                                               (b) Location. The following area is a                 revision will not impact the schedule
                                             safety zone: All waters of the North                    for installation and operation of control                This direct final action approves a
                                             Atlantic Ocean within a 600 yard radius                 equipment, will not alter any other                   revision to the Iowa State
                                             of the fireworks barge in approximate                   compliance dates, and will not                        Implementation Plan (SIP) submitted by
                                             location latitude 39°16′22″ N., longitude               adversely affect air quality in                       the State of Iowa for the purpose of
                                             074°33′54″ W., in the vicinity of the                   Muscatine, Iowa. The state held a 30-                 incorporating an amendment to the
                                             shoreline at Ocean City, NJ.                            day comment period, during which no                   Administrative Consent Order (ACO)
                                               (c) Regulations. (1) The general safety               comments were received.                               with Grain Processing Corporation
                                             zone regulations found in § 165.23                      DATES: This direct final rule will be                 (GPC), Muscatine, Iowa. The revision
                                             apply to the safety zone created by this                effective October 24, 2017, without                   changes the date for completion of
                                             temporary section.                                      further notice, unless EPA receives                   performance testing from May 31, 2017,
                                               (2) Under the general safety zone                     adverse comment by September 25,                      to May 31, 2018, and will allow the state
                                             regulations in § 165.23, persons may not                2017. If EPA receives adverse comment,                more time to complete processing air
pmangrum on DSK3GDR082PROD with RULES




                                             enter the safety zone described in                      we will publish a timely withdrawal of                construction permit applications
                                             paragraph (b) of this section unless                    the direct final rule in the Federal                  submitted by GPC and specify testing
                                             authorized by the COTP or the COTP’s                    Register informing the public that the                requirements as appropriate in the final
                                             designated representative.                              rule will not take effect.                            permits. This amendment will not
                                               (3) To request permission to enter the                ADDRESSES: Submit your comments,                      impact the schedule for installation and
                                             safety zone, contact the COTP or the                    identified by Docket ID No. EPA–R07–                  operation of control equipment, will not
                                             COTP’s representative on marine band                    OAR–2017–0143, to http://                             alter any other compliance dates, and


                                        VerDate Sep<11>2014   16:00 Aug 24, 2017   Jkt 241001   PO 00000   Frm 00019   Fmt 4700   Sfmt 4700   E:\FR\FM\25AUR1.SGM   25AUR1


                                             40492              Federal Register / Vol. 82, No. 164 / Friday, August 25, 2017 / Rules and Regulations

                                             will not adversely affect air quality in                by reference of a revision to Iowa’s EPA-              safety risks subject to Executive Order
                                             the Muscatine, Iowa, area.                              approved State source-specific permits                 13045 (62 FR 19885, April 23, 1997);
                                               The state held a 30-day comment                       described in the direct final                             • Is not a significant regulatory action
                                             period, during which no comments                        amendments to 40 CFR part 52 set forth                 subject to Executive Order 13211 (66 FR
                                             were received.                                          below. EPA has made, and will continue                 28355, May 22, 2001);
                                               Additional information with respect                   to make, these materials generally                        • Is not subject to requirements of
                                             to this rule is included in the Technical               available through www.regulations.gov                  section 12(d) of the National
                                             Support Document that is part of this                   and/or at the EPA Region 7 Office                      Technology Transfer and Advancement
                                             docket.                                                 (please contact the person identified in               Act of 1995 (15 U.S.C. 272 note) because
                                                                                                     the FOR FURTHER INFORMATION CONTACT                    application of those requirements would
                                             II. Have the requirements for approval                                                                         be inconsistent with the CAA; and
                                             of a SIP revision been met?                             section of this preamble for more
                                                                                                     information).                                             • Does not provide EPA with the
                                                The state submission has met the                       Therefore, these materials have been                 discretionary authority to address, as
                                             public notice requirements for SIP                      approved by EPA for inclusion in the                   appropriate, disproportionate human
                                             submissions in accordance with 40 CFR                   State Implementation Plan, have been                   health or environmental effects, using
                                             51.102. The state instituted a 30-day                   incorporated by reference by EPA into                  practicable and legally permissible
                                             comment period; no comments were                        that plan, are fully Federally enforceable             methods, under Executive Order 12898
                                             received. The submission also satisfied                 under sections 110 and 113 of the CAA                  (59 FR 7629, February 16, 1994).
                                             the completeness criteria of 40 CFR part                                                                          The SIP is not approved to apply on
                                                                                                     as of the effective date of the final
                                             51, appendix V. In addition, as                                                                                any Indian reservation land or in any
                                                                                                     rulemaking of EPA’s approval, and will
                                             explained above and in more detail in                                                                          other area where EPA or an Indian tribe
                                                                                                     be incorporated by reference by the
                                             the Technical Support Document which                                                                           has demonstrated that a tribe has
                                                                                                     Director of the Federal Register in the
                                             is part of this docket, the revision meets                                                                     jurisdiction. In those areas of Indian
                                                                                                     next update to the SIP compilation.1
                                             the substantive SIP requirements of the                                                                        country, the rule does not have tribal
                                             Clean Air Act (CAA), including section                  V. Statutory and Executive Order                       implications and will not impose
                                             110 and implementing regulations.                       Reviews                                                substantial direct costs on tribal
                                                                                                        Under the CAA, the Administrator is                 governments or preempt tribal law as
                                             III. What action is EPA taking?                                                                                specified by Executive Order 13175 (65
                                                                                                     required to approve a SIP submission
                                                This direct final action approves a SIP                                                                     FR 67249, November 9, 2000).
                                                                                                     that complies with the provisions of the
                                             revision submitted by the State of Iowa                                                                           The Congressional Review Act, 5
                                                                                                     Act and applicable Federal regulations.
                                             for the purpose of incorporating an                                                                            U.S.C. 801 et seq., as added by the Small
                                                                                                     42 U.S.C. 7410(k); 40 CFR 52.02(a).
                                             amendment to the Administrative                                                                                Business Regulatory Enforcement
                                                                                                     Thus, in reviewing SIP submissions,
                                             Consent Order (ACO) with Grain                                                                                 Fairness Act of 1996, generally provides
                                                                                                     EPA’s role is to approve state choices,
                                             Processing Corporation (GPC),                                                                                  that before a rule may take effect, the
                                                                                                     provided that they meet the criteria of
                                             Muscatine, Iowa. Additional                                                                                    agency promulgating the rule must
                                                                                                     the CAA. Accordingly, this action
                                             information with respect to this rule is                                                                       submit a rule report, which includes a
                                                                                                     merely approves state law as meeting
                                             included in the Technical Support                                                                              copy of the rule, to each House of the
                                                                                                     Federal requirements and does not
                                             Document that is part of this docket.                                                                          Congress and to the Comptroller General
                                                We are publishing this direct final                  impose additional requirements beyond
                                                                                                                                                            of the United States. EPA will submit a
                                             rule without a prior proposed rule                      those imposed by state law. For that
                                                                                                                                                            report containing this action and other
                                             because we view this as a                               reason, this action:
                                                                                                                                                            required information to the U.S. Senate,
                                             noncontroversial action and anticipate                     • Is not a significant regulatory action
                                                                                                                                                            the U.S. House of Representatives, and
                                             no adverse comment. However, in the                     subject to review by the Office of
                                                                                                                                                            the Comptroller General of the United
                                             ‘‘Proposed Rules’’ section of this                      Management and Budget under
                                                                                                                                                            States prior to publication of the rule in
                                             Federal Register, we are publishing a                   Executive Orders 12866 (58 FR 51735,
                                                                                                                                                            the Federal Register. A major rule
                                             separate document that will serve as the                October 4, 1993) and 13563 (76 FR 3821,
                                                                                                                                                            cannot take effect until 60 days after it
                                             proposed rule to approve this SIP                       January 21, 2011);
                                                                                                                                                            is published in the Federal Register.
                                             revision. If adverse comments are                          • Does not impose an information
                                                                                                                                                            This action is not a ‘‘major rule’’ as
                                             received on this direct final rule, we                  collection burden under the provisions
                                                                                                                                                            defined by 5 U.S.C. 804(2).
                                             will not institute a second comment                     of the Paperwork Reduction Act (44                        Under section 307(b)(1) of the CAA,
                                             period on this action. Any parties                      U.S.C. 3501 et seq.);                                  petitions for judicial review of this
                                             interested in commenting must do so at                     • Is certified as not having a                      action must be filed in the United States
                                             this time. For further information about                significant economic impact on a                       Court of Appeals for the appropriate
                                             commenting on this rule, see the                        substantial number of small entities                   circuit by October 24, 2017. Filing a
                                             ADDRESSES section of this document. If                  under the Regulatory Flexibility Act (5                petition for reconsideration by the
                                             EPA receives adverse comment, we will                   U.S.C. 601 et seq.);                                   Administrator of this final rule does not
                                             publish a timely withdrawal in the                         • Does not contain any unfunded                     affect the finality of this action for the
                                             Federal Register informing the public                   mandate or significantly or uniquely                   purposes of judicial review nor does it
                                             that this direct final rule will not take               affect small governments, as described                 extend the time within which a petition
                                             effect. We will address all public                      in the Unfunded Mandates Reform Act                    for judicial review may be filed, and
                                             comments in any subsequent final rule                   of 1995 (Pub. L. 104–4);                               shall not postpone the effectiveness of
                                             based on the proposed rule.                                • Does not have Federalism                          such rule or action. This action may not
pmangrum on DSK3GDR082PROD with RULES




                                                                                                     implications as specified in Executive                 be challenged later in proceedings to
                                             IV. Incorporation by Reference                          Order 13132 (64 FR 43255, August 10,                   enforce its requirements. (See section
                                               In this rule, EPA is finalizing                       1999);                                                 307(b)(2)).
                                             regulatory text that includes                              • Is not an economically significant
                                             incorporation by reference. In                          regulatory action based on health or                   List of Subjects in 40 CFR Part 52
                                             accordance with requirements of 1 CFR                                                                            Environmental protection, Air
                                             51.5, EPA is finalizing the incorporation                 1 62   FR 27968 (May 22, 1997).                      pollution control, Incorporation by


                                        VerDate Sep<11>2014   13:35 Aug 24, 2017   Jkt 241001   PO 00000   Frm 00020    Fmt 4700   Sfmt 4700   E:\FR\FM\25AUR1.SGM   25AUR1


                                                                  Federal Register / Vol. 82, No. 164 / Friday, August 25, 2017 / Rules and Regulations                                                     40493

                                             reference, Particulate matter, Reporting                  PART 52—APPROVAL AND                                     Subpart Q—Iowa
                                             and recordkeeping requirements.                           PROMULGATION OF
                                                                                                       IMPLEMENTATION PLANS                                     ■  2. In § 52.820, the table in paragraph
                                               Dated: August 9, 2017.
                                                                                                                                                                (d) is amended by revising the entry
                                             Edward H. Chu,                                                                                                     ‘‘(29) Grain Processing Corporation’’ to
                                                                                                       ■ 1. The authority citation for part 52
                                             Acting Regional Administrator, Region 7.                                                                           read as follows:
                                                                                                       continues to read as follows:
                                               For the reasons stated in the                               Authority: 42 U.S.C. 7401 et seq.                    § 52.820   Identification of plan.
                                             preamble, EPA amends 40 CFR part 52                                                                                *       *    *          *     *
                                             as set forth below:                                                                                                    (d) * * *

                                                                                         EPA-APPROVED IOWA SOURCE-SPECIFIC ORDERS/PERMITS
                                                                                                                            State effective
                                                     Name of source                         Order/Permit No.                                          EPA approval date                       Explanation
                                                                                                                                 date


                                                      *                          *                     *                          *                         *                     *                       *
                                             (29) Grain Processing Cor-              Administrative Consent Order                 1–16–17         12/1/14, 79 FR 71025;               The last sentence of Para-
                                               poration.                               No. 2014–AQ–A1.                                              amendment approved 8–               graph 5, Section III and
                                                                                                                                                    25–17, [insert Federal              Section VI are not ap-
                                                                                                                                                    Register citation].                 proved by EPA as part of
                                                                                                                                                                                        the SIP.

                                                        *                        *                         *                      *                        *                      *                     *



                                             *      *       *       *      *                           FOR FURTHER INFORMATION CONTACT:     Clay                a software update would be unduly
                                             [FR Doc. 2017–17417 Filed 8–24–17; 8:45 am]               DeCell, 202–418–0803, Clay.DeCell@                       burdensome to operators, many of
                                             BILLING CODE 6560–50–P                                    fcc.gov.                                                 which are small businesses. And
                                                                                                       SUPPLEMENTARY INFORMATION: This is a                     importantly, we note that no satellite
                                                                                                       summary of the Commission’s                              operators, the direct beneficiaries of the
                                                                                                       Memorandum Opinion and Order, FCC                        DVB–CID requirement, opposed further
                                             FEDERAL COMMUNICATIONS                                    17–100, adopted July 28, 2017, and                       relief.
                                             COMMISSION                                                released August 1, 2017. The full text of                   Based on the record, we conclude it
                                                                                                       this document is available at https://                   will serve the public interest to waive
                                             47 CFR Part 25                                                                                                     47 CFR 25.281(b) for earth stations using
                                                                                                       apps.fcc.gov/edocs_public/attachmatch/
                                                                                                       FCC-17-100A1.pdf. It is also available                   modulators manufactured before August
                                             [IB Docket No. 12–267; FCC 17–100]                        for inspection and copying during                        1, 2017, that cannot be made compliant
                                                                                                       business hours in the FCC Reference                      with the DVB–CID standard by a
                                             Implementation of Transmitter                                                                                      software upgrade. This waiver will
                                                                                                       Information Center, Portals II, 445 12th
                                             Identification Requirements for Video                                                                              allow use and resale of non-compliant
                                                                                                       Street SW., Room CY–A257,
                                             Uplink Transmissions                                                                                               modulators until the end of their useful
                                                                                                       Washington, DC 20554. To request
                                             AGENCY:  Federal Communications                           materials in accessible formats for                      life, but requires earth stations using
                                             Commission.                                               people with disabilities, send an email                  newly manufactured modulators to be
                                                                                                       to FCC504@fcc.gov or call the Consumer                   DVB–CID compliant. Other affected
                                             ACTION: Final rule.                                                                                                earth stations must meet the DVB–CID
                                                                                                       & Governmental Affairs Bureau at 202–
                                             SUMMARY:    The Federal Communications                    418–0530 (voice), 202–418–0432 (TTY).                    standard by September 3, 2017. We
                                             Commission (Commission) is issuing                                                                                 conclude this treatment best balances
                                                                                                       Synopsis                                                 the costs and benefits of implementing
                                             this final rule to is waive a transmitter
                                             identification requirement for certain                       In the Part 25 Order, FCC 13–111, the                 DVB–CID in light of the significant cost
                                             digital video transmissions that cannot                   Commission concluded that adoption of                    disparity presented in the record. We
                                             be made compliant by a software                           the Digital Video Broadcasting–Carrier                   believe that the amount of equipment
                                             upgrade and incorporate by reference a                    Identification (DVB–CID) standard for                    affected by this waiver will steadily
                                             new version of an existing standard.                      digital video uplinks from temporary-                    decrease as such equipment reaches the
                                                                                                       fixed earth stations was appropriate to                  end of its useful life. Should the
                                             DATES: Effective September 25, 2017.                      address potential instances of harmful                   Commission find that the continued
                                             The incorporation by reference of a                       interference, by making transmissions                    operation of non-compliant equipment
                                             publication listed in the rule is                         more readily identifiable by satellite                   causes a pattern of complaints from
                                             approved by the Director of the Federal                   operators. We continue to believe that                   satellite operators that they are having
                                             Register as of September 25, 2017.                        an added cost of a few hundred dollars                   difficulty identifying the sources of any
                                             ADDRESSES: FCC Reference Information                      per unit is justified to achieve this goal               harmful interference, the Commission
                                             Center, Portals II, 445 12th Street SW.,                  for earth station equipment that can                     may revisit this waiver.
pmangrum on DSK3GDR082PROD with RULES




                                             Room CY–A257, Washington, DC 20554                        undergo a software upgrade. We also
                                             for full text of ‘‘Memorandum Opinion                     agree with the overwhelming response                     Procedural Matters
                                             and Order, FCC 17–100’’ (also at https://                 from commenters in this proceeding on                      This document does not contain new
                                             apps.fcc.gov/edocs_public/attachmatch/                    the implementation of the DVB–CID                        or modified information collection
                                             FCC-17-100A1.pdf) and inspection of                       standard, however, that the much more                    requirements subject to the Paperwork
                                             material incorporated by reference. See                   significant expense of replacing older                   Reduction Act of 1995, Public Law 104–
                                             SUPPLEMENTARY INFORMATION for details.                    equipment that cannot simply undergo                     13. In addition, therefore, it does not


                                        VerDate Sep<11>2014     13:35 Aug 24, 2017   Jkt 241001   PO 00000     Frm 00021   Fmt 4700   Sfmt 4700    E:\FR\FM\25AUR1.SGM   25AUR1



Document Created: 2018-10-24 12:41:44
Document Modified: 2018-10-24 12:41:44
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionDirect final rule.
DatesThis direct final rule will be effective October 24, 2017, without further notice, unless EPA receives adverse comment by September 25, 2017. If EPA receives adverse comment, we will publish a timely withdrawal of the direct final rule in the Federal Register informing the public that the rule will not take effect.
ContactHeather Hamilton, Environmental Protection Agency, Air Planning and Development Branch, 11201 Renner Boulevard, Lenexa, Kansas 66219 at 913-551-7039, or by email at [email protected]
FR Citation82 FR 40491 
CFR AssociatedEnvironmental Protection; Air Pollution Control; Incorporation by Reference; Particulate Matter and Reporting and Recordkeeping Requirements

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR