82_FR_42061 82 FR 41891 - Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Sarasota, FL

82 FR 41891 - Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Sarasota, FL

DEPARTMENT OF HOMELAND SECURITY
Coast Guard

Federal Register Volume 82, Issue 170 (September 5, 2017)

Page Range41891-41893
FR Document2017-18710

The Coast Guard is modifying the operating schedule of four bridges across the Gulf Intracoastal Waterway (GICW); Stickney Point Drawbridge, mile 68.6, Siesta Drive Drawbridge, mile 71.6, Cortez Drawbridge, mile, 87.4, and Anna Maria Drawbridge, mile 89.2, in Sarasota, FL. The request was made to the Coast Guard to change the operation of four drawbridges due to an increase in vehicle traffic throughout these areas at all times of the year. This rulemaking would change the bridges' operating schedules from a three times an hour opening schedule to a twice an hour opening schedule throughout the year.

Federal Register, Volume 82 Issue 170 (Tuesday, September 5, 2017)
[Federal Register Volume 82, Number 170 (Tuesday, September 5, 2017)]
[Rules and Regulations]
[Pages 41891-41893]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-18710]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2016-0330]
RIN 1625-AA09


Drawbridge Operation Regulation; Gulf Intracoastal Waterway, 
Sarasota, FL

AGENCY: Coast Guard, DHS.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is modifying the operating schedule of four 
bridges across the Gulf Intracoastal Waterway (GICW); Stickney Point 
Drawbridge, mile 68.6, Siesta Drive Drawbridge, mile 71.6, Cortez 
Drawbridge, mile, 87.4, and Anna Maria Drawbridge, mile 89.2, in 
Sarasota, FL. The request was made to the Coast Guard to change the 
operation of four drawbridges due to an increase in vehicle traffic 
throughout these areas at all times of the year. This rulemaking would 
change the bridges' operating schedules from a three times an hour 
opening schedule to a twice an hour opening schedule throughout the 
year.

DATES: This rule is effective October 5, 2017.

ADDRESSES: To view documents mentioned in this preamble as being 
available in the docket, go to http://www.regulations.gov, type USCG-
2016-0330. In the ``SEARCH'' box and click ``SEARCH.'' Click on Open 
Docket Folder on the line associated with this rulemaking.

FOR FURTHER INFORMATION CONTACT: If you have questions about this rule, 
call or email, Ms. Jennifer Zercher with the Seventh Coast Guard 
District Bridge Office; telephone (305) 415-6740, email 
[email protected].

SUPPLEMENTARY INFORMATION: 

I. Table of Abbreviations

CFR Code of Federal Regulations
DHS Department of Homeland Security
FR Federal Register
GICW Gulf Intracoastal Waterway
OMB Office of Management and Budget
NPRM Notice of proposed rulemaking
Sec.  Section
U.S.C. United States Code

II. Background Information and Regulatory History

    On February 13, 2017, we published a notice of proposed rulemaking 
(NPRM) entitled Drawbridge Operation Regulation; Gulf Intracoastal 
Waterway, Sarasota, FL in the Federal Register (82 FR 10444). We 
received 125 comments on this rule. 118 comments were in favor of this 
regulation change and 7 were against this change.

III. Legal Authority and Need for Rule

    The Coast Guard is issuing this rule under authority in 33 U.S.C. 
499.
    Stickney Point Bridge across the GICW, mile 68.6, at South 
Sarasota, Florida is a bascule bridge. This drawbridge has a vertical 
clearance of 18 feet in the closed position and a horizontal clearance 
of 90 feet between fenders. Presently, in accordance with 33 CFR 117.5, 
the Stickney Point Bridge is required to open on demand.
    Siesta Drive Bridge across the GICW, mile 71.6, at Sarasota, 
Florida is a bascule bridge. This drawbridge has a vertical clearance 
of 25 feet in the closed position and a horizontal clearance of 90 feet 
between fenders. Presently, in accordance with 33 CFR 117.287(c), the 
Siesta Drive Bridge is required to open on signal, except that from 6 
a.m. to 7 p.m., the draw need only open on the hour, twenty minutes 
past the hour and forty minutes past the hour. On weekends and Federal 
holidays, from 11 a.m. to 6 p.m., the draw need open only on the hour, 
twenty minutes past the hour and forty minutes past the hour.
    Cortez (SR 684) Bridge across the GICW, mile 87.4, at Bradenton 
Beach, Florida is a bascule bridge. This drawbridge has a vertical 
clearance of 22 feet in the closed position and a horizontal clearance 
of 90 feet between fenders. Presently, in accordance with 33 CFR 
117.287 (d)(1), the Cortez (SR 684) Bridge is required to open on 
signal, except that from 6 a.m. to 7 p.m., the draw need only open on 
the hour, 20 minutes after the hour, and 40 minutes after the hour. 
From January 15 to May 15, from 6 a.m. to 7 p.m., the draw need only 
open on the hour and half hour.
    Anna Maria (SR 64) (Manatee Avenue West) Bridge, mile 89.2, at 
Bradenton Beach, Florida is a bascule bridge. This drawbridge has a 
vertical clearance of 24 feet in the closed position and a horizontal 
clearance of 90 feet between fenders. Presently, in accordance with 33 
CFR 117.287(d)(2), the Anna Maria (SR 64) (Manatee Avenue West) Bridge 
is required to open on signal, except that from 6 a.m. to 7 p.m., the 
draw need only open on the hour, 20 minutes after the hour, and 40 
minutes after the hour. From January 15 to May 15, from 6 a.m. to 7 
p.m., the draw need only open on the hour and half hour.
    The Metropolitan Planning Office for Sarasota and Manatee Counties, 
along with the concurrence of the local mayors, have requested that the 
Coast Guard consider changing the bridge operating regulations for four 
bridges in this area to accommodate a year-round increase of vehicular 
traffic. In the past, increased traffic was only associated with the 
tourist season. For this reason, the Coast Guard is modifying the four 
bridge schedules to provide for both the reasonable needs of navigation 
and those of land transportation. The bridge owner, Florida Department 
of Transportation, concurs with these recommendations.

IV. Discussion of Comments, Changes and the Final Rule

    There were seven comments opposing the final rule. Six comments 
were against modifying the existing schedule and one comment suggested 
that even with this modified schedule the bridge will still open too 
often. Not allowing these bridges to open at least twice an hour would 
place an undue burden on the marine community. Two of the comments 
suggested the City/County/State should look into putting in higher 
level bridges and do a traffic management study, as the problem is 
traffic control, not the bridge openings.

[[Page 41892]]

These comments were directed to the bridge owner. Four comments stated 
that having vessels waiting for a half-hour for the bridge to open 
could be a safety concern. As the timing between bridge openings has 
been adjusted to accommodate traveling at a no wake speed between the 
bridges, vessels should not have to wait for longer than 5 to 10 
minutes for an opening. Of these four comments sighting safety 
concerns, one commenter has posted the same concern twice. No 
adjustments have been made to this regulation based on the comments.

V. Regulatory Analyses

    We developed this rule after considering numerous statutes and 
Executive Orders related to rulemaking. Below we summarize our analyses 
based on a number of these statutes and Executive Orders, and we 
discuss First Amendment rights of protesters.

A. Regulatory Planning and Review

    Executive Orders 12866 and 13563 direct agencies to assess the 
costs and benefits of available regulatory alternatives and, if 
regulation is necessary, to select regulatory approaches that maximize 
net benefits. Executive Order 13771 directs agencies to control 
regulatory costs through a budgeting process. This rule has not been 
designated a ``significant regulatory action,'' under Executive Order 
12866. Accordingly, it has not been reviewed by the Office of 
Management and Budget (OMB) and pursuant to OMB guidance it is exempt 
from the requirements of Executive Order 13771.
    This regulatory action determination is based on the ability that 
vessels can still transit the bridges during the scheduled openings. 
Vessels that can transit the bridge in the closed position may continue 
to do so. Public vessels of the United States and tugs with tows may 
request an opening at any time.

B. Impact on Small Entities

    The Regulatory Flexibility Act of 1980 (RFA), 5 U.S.C. 601-612, as 
amended, requires federal agencies to consider the potential impact of 
regulations on small entities during rulemaking. The term ``small 
entities'' comprises small businesses, not-for-profit organizations 
that are independently owned and operated and are not dominant in their 
fields, and governmental jurisdictions with populations of less than 
50,000. The Coast Guard received no comments from the Small Business 
Administration on this rule. The Coast Guard certifies under 5 U.S.C. 
605(b) that this rule will not have a significant economic impact on a 
substantial number of small entities.
    While some owners or operators of vessels intending to transit the 
bridge may be small entities, for the reasons stated in section V.A 
above, this final rule would not have a significant economic impact on 
any vessel owner or operator.
    Under section 213(a) of the Small Business Regulatory Enforcement 
Fairness Act of 1996 (Pub. L. 104-121), we want to assist small 
entities in understanding this rule. If the rule would affect your 
small business, organization, or governmental jurisdiction and you have 
questions concerning its provisions or options for compliance, please 
contact the person listed in the FOR FURTHER INFORMATION CONTACT, 
above.
    Small businesses may send comments on the actions of Federal 
employees who enforce, or otherwise determine compliance with, Federal 
regulations to the Small Business and Agriculture Regulatory 
Enforcement Ombudsman and the Regional Small Business Regulatory 
Fairness Boards. The Ombudsman evaluates these actions annually and 
rates each agency's responsiveness to small business. If you wish to 
comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR 
(1-888-734-3247). The Coast Guard will not retaliate against small 
entities that question or complain about this rule or any policy or 
action of the Coast Guard.

C. Collection of Information

    This rule calls for no new collection of information under the 
Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

D. Federalism and Indian Tribal Government

    A rule has implications for federalism under Executive Order 13132, 
Federalism, if it has a substantial direct effect on the States, on the 
relationship between the national government and the States, or on the 
distribution of power and responsibilities among the various levels of 
government. We have analyzed this rule under that Order and have 
determined that it is consistent with the fundamental federalism 
principles and preemption requirements described in Executive Order 
13132.
    Also, this rule does not have tribal implications under Executive 
Order 13175, Consultation and Coordination with Indian Tribal 
Governments, because it does not have a substantial direct effect on 
one or more Indian tribes, on the relationship between the Federal 
Government and Indian tribes, or on the distribution of power and 
responsibilities between the Federal Government and Indian tribes.

E. Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) 
requires Federal agencies to assess the effects of their discretionary 
regulatory actions. In particular, the Act addresses actions that may 
result in the expenditure by a State, local, or tribal government, in 
the aggregate, or by the private sector of $100,000,000 (adjusted for 
inflation) or more in any one year. Though this rule will not result in 
such an expenditure, we do discuss the effects of this rule elsewhere 
in this preamble.

F. Environment

    We have analyzed this rule under Department of Homeland Security 
Management Directive 023-01 and Commandant Instruction M16475.lD, which 
guides the Coast Guard in complying with the National Environmental 
Policy Act of 1969 (NEPA)(42 U.S.C. 4321-4370f), and have made a 
determination that this action is one of a category of actions which do 
not individually or cumulatively have a significant effect on the human 
environment. This rule simply promulgates the operating regulations or 
procedures for drawbridges. This action is categorically excluded from 
further review, under figure 2-1, paragraph (32)(e), of the 
Instruction.
    A preliminary Record of Environmental Consideration and a 
Memorandum for the Record are not required for this rule.

G. Protest Activities

    The Coast Guard respects the First Amendment rights of protesters. 
Protesters are asked to contact the person listed in the For Further 
Information Contact; section to coordinate protest activities so that 
your message can be received without jeopardizing the safety or 
security of people, places or vessels.

List of Subjects in 33 CFR Part 117

    Bridges.

    For the reasons discussed in the preamble, the Coast Guard amends 
33 CFR part 117 as follows:

PART 117--DRAWBRIDGE OPERATION REGULATIONS

0
1. The authority citation for part 117 continues to read as follows:

    Authority:  33 U.S.C. 499; 33 CFR 1.05-1; and Department of 
Homeland Security Delegation No. 0170.1.


[[Page 41893]]



0
2. Amend Sec.  117.287 by revising paragraphs (c) and (d) to read as 
follows:


Sec.  117.287  Gulf Intracoastal Waterway.

* * * * *
    (c)(1) The Stickney Point Bridge, mile 68.6, at South Sarasota, 
Florida shall open on signal, except that from 6 a.m. to 7 p.m. daily, 
the draw need only open on the hour and half hour.
    (2) The draw of the Siesta Drive Bridge, mile 71.6, at Sarasota, 
Florida shall open on signal, except that from 6 a.m. to 7 p.m. daily, 
the draw need only open on the hour and half hour.
    (d)(1) The draw of the Cortez (SR 684) Bridge, mile 87.4, at 
Bradenton Beach, Florida shall open on signal, except that from 6 a.m. 
to 7 p.m. daily, the draw need only open on the quarter hour and three 
quarter hour.
    (2) The draw of the Anna Maria (SR 64) (Manatee Avenue West) 
Bridge, mile 89.2, at Bradenton Beach, Florida shall open on signal, 
except that from 6 a.m. to 7 p.m. daily, the draw need only open on the 
quarter hour and three quarter hour.
* * * * *

    Dated: August 22, 2017.
Peter J. Brown,
Rear Admiral, U.S. Coast Guard, Commander, Seventh Coast Guard 
District.
[FR Doc. 2017-18710 Filed 9-1-17; 8:45 am]
 BILLING CODE 9110-04-P



                                                                 Federal Register / Vol. 82, No. 170 / Tuesday, September 5, 2017 / Rules and Regulations                                        41891

                                                G. Protest Activities                                   schedules from a three times an hour                  draw need open only on the hour,
                                                  The Coast Guard respects the First                    opening schedule to a twice an hour                   twenty minutes past the hour and forty
                                                Amendment rights of protesters.                         opening schedule throughout the year.                 minutes past the hour.
                                                                                                        DATES: This rule is effective October 5,                 Cortez (SR 684) Bridge across the
                                                Protesters are asked to contact the
                                                                                                        2017.                                                 GICW, mile 87.4, at Bradenton Beach,
                                                person listed in the FOR FURTHER
                                                                                                        ADDRESSES: To view documents                          Florida is a bascule bridge. This
                                                INFORMATION CONTACT section to
                                                                                                        mentioned in this preamble as being                   drawbridge has a vertical clearance of
                                                coordinate protest activities so that your
                                                                                                        available in the docket, go to http://                22 feet in the closed position and a
                                                message can be received without                                                                               horizontal clearance of 90 feet between
                                                jeopardizing the safety or security of                  www.regulations.gov, type USCG–2016–
                                                                                                        0330. In the ‘‘SEARCH’’ box and click                 fenders. Presently, in accordance with
                                                people, places or vessels.                                                                                    33 CFR 117.287 (d)(1), the Cortez (SR
                                                                                                        ‘‘SEARCH.’’ Click on Open Docket
                                                List of Subjects in 33 CFR Part 117                     Folder on the line associated with this               684) Bridge is required to open on
                                                                                                        rulemaking.                                           signal, except that from 6 a.m. to 7 p.m.,
                                                  Bridges.
                                                                                                                                                              the draw need only open on the hour,
                                                  For the reasons discussed in the                      FOR FURTHER INFORMATION CONTACT: If
                                                                                                                                                              20 minutes after the hour, and 40
                                                preamble, the Coast Guard amends 33                     you have questions about this rule, call              minutes after the hour. From January 15
                                                CFR part 117 as follows:                                or email, Ms. Jennifer Zercher with the               to May 15, from 6 a.m. to 7 p.m., the
                                                                                                        Seventh Coast Guard District Bridge                   draw need only open on the hour and
                                                PART 117—DRAWBRIDGE                                     Office; telephone (305) 415–6740, email               half hour.
                                                OPERATION REGULATIONS                                   Jennifer.N.Zercher@uscg.mil.                             Anna Maria (SR 64) (Manatee Avenue
                                                                                                        SUPPLEMENTARY INFORMATION:                            West) Bridge, mile 89.2, at Bradenton
                                                ■ 1. The authority citation for part 117
                                                                                                        I. Table of Abbreviations                             Beach, Florida is a bascule bridge. This
                                                continues to read as follows:
                                                                                                                                                              drawbridge has a vertical clearance of
                                                  Authority: 33 U.S.C. 499; 33 CFR 1.05–1;              CFR Code of Federal Regulations                       24 feet in the closed position and a
                                                Department of Homeland Security Delegation              DHS Department of Homeland Security                   horizontal clearance of 90 feet between
                                                No. 0170.1.                                             FR Federal Register
                                                                                                                                                              fenders. Presently, in accordance with
                                                                                                        GICW Gulf Intracoastal Waterway
                                                ■   2. Revise § 117.324 to read as follows:             OMB Office of Management and Budget                   33 CFR 117.287(d)(2), the Anna Maria
                                                                                                        NPRM Notice of proposed rulemaking                    (SR 64) (Manatee Avenue West) Bridge
                                                § 117.324   Rice Creek.                                                                                       is required to open on signal, except
                                                                                                        § Section
                                                   The CSX Railroad Swing Bridge, mile                  U.S.C. United States Code                             that from 6 a.m. to 7 p.m., the draw
                                                0.8, in Putnam County, FL. shall open                                                                         need only open on the hour, 20 minutes
                                                with a 24-hour advance notice to CSX                    II. Background Information and                        after the hour, and 40 minutes after the
                                                at 1–800–232–0142.                                      Regulatory History                                    hour. From January 15 to May 15, from
                                                P.J. Brown,                                                On February 13, 2017, we published                 6 a.m. to 7 p.m., the draw need only
                                                                                                        a notice of proposed rulemaking                       open on the hour and half hour.
                                                Rear Admiral, U.S. Coast Guard, Commander,
                                                                                                        (NPRM) entitled Drawbridge Operation                     The Metropolitan Planning Office for
                                                Seventh Coast Guard District.
                                                                                                        Regulation; Gulf Intracoastal Waterway,               Sarasota and Manatee Counties, along
                                                [FR Doc. 2017–18708 Filed 9–1–17; 8:45 am]
                                                                                                        Sarasota, FL in the Federal Register (82              with the concurrence of the local
                                                BILLING CODE 9110–04–P
                                                                                                        FR 10444). We received 125 comments                   mayors, have requested that the Coast
                                                                                                        on this rule. 118 comments were in                    Guard consider changing the bridge
                                                                                                        favor of this regulation change and 7                 operating regulations for four bridges in
                                                DEPARTMENT OF HOMELAND
                                                                                                        were against this change.                             this area to accommodate a year-round
                                                SECURITY
                                                                                                                                                              increase of vehicular traffic. In the past,
                                                                                                        III. Legal Authority and Need for Rule                increased traffic was only associated
                                                Coast Guard
                                                                                                           The Coast Guard is issuing this rule               with the tourist season. For this reason,
                                                33 CFR Part 117                                         under authority in 33 U.S.C. 499.                     the Coast Guard is modifying the four
                                                                                                           Stickney Point Bridge across the                   bridge schedules to provide for both the
                                                [Docket No. USCG–2016–0330]                             GICW, mile 68.6, at South Sarasota,                   reasonable needs of navigation and
                                                                                                        Florida is a bascule bridge. This                     those of land transportation. The bridge
                                                RIN 1625–AA09                                           drawbridge has a vertical clearance of                owner, Florida Department of
                                                Drawbridge Operation Regulation; Gulf                   18 feet in the closed position and a                  Transportation, concurs with these
                                                Intracoastal Waterway, Sarasota, FL                     horizontal clearance of 90 feet between               recommendations.
                                                                                                        fenders. Presently, in accordance with
                                                AGENCY:  Coast Guard, DHS.                              33 CFR 117.5, the Stickney Point Bridge               IV. Discussion of Comments, Changes
                                                                                                        is required to open on demand.                        and the Final Rule
                                                ACTION: Final rule.
                                                                                                           Siesta Drive Bridge across the GICW,                  There were seven comments opposing
                                                SUMMARY:   The Coast Guard is modifying                 mile 71.6, at Sarasota, Florida is a                  the final rule. Six comments were
                                                the operating schedule of four bridges                  bascule bridge. This drawbridge has a                 against modifying the existing schedule
                                                across the Gulf Intracoastal Waterway                   vertical clearance of 25 feet in the                  and one comment suggested that even
                                                (GICW); Stickney Point Drawbridge,                      closed position and a horizontal                      with this modified schedule the bridge
                                                mile 68.6, Siesta Drive Drawbridge, mile                clearance of 90 feet between fenders.                 will still open too often. Not allowing
                                                71.6, Cortez Drawbridge, mile, 87.4, and                Presently, in accordance with 33 CFR                  these bridges to open at least twice an
mstockstill on DSK30JT082PROD with RULES




                                                Anna Maria Drawbridge, mile 89.2, in                    117.287(c), the Siesta Drive Bridge is                hour would place an undue burden on
                                                Sarasota, FL. The request was made to                   required to open on signal, except that               the marine community. Two of the
                                                the Coast Guard to change the operation                 from 6 a.m. to 7 p.m., the draw need                  comments suggested the City/County/
                                                of four drawbridges due to an increase                  only open on the hour, twenty minutes                 State should look into putting in higher
                                                in vehicle traffic throughout these areas               past the hour and forty minutes past the              level bridges and do a traffic
                                                at all times of the year. This rulemaking               hour. On weekends and Federal                         management study, as the problem is
                                                would change the bridges’ operating                     holidays, from 11 a.m. to 6 p.m., the                 traffic control, not the bridge openings.


                                           VerDate Sep<11>2014   16:52 Sep 01, 2017   Jkt 241001   PO 00000   Frm 00067   Fmt 4700   Sfmt 4700   E:\FR\FM\05SER1.SGM   05SER1


                                                41892            Federal Register / Vol. 82, No. 170 / Tuesday, September 5, 2017 / Rules and Regulations

                                                These comments were directed to the                     on a substantial number of small                      or on the distribution of power and
                                                bridge owner. Four comments stated                      entities.                                             responsibilities between the Federal
                                                that having vessels waiting for a half-                    While some owners or operators of                  Government and Indian tribes.
                                                hour for the bridge to open could be a                  vessels intending to transit the bridge
                                                                                                        may be small entities, for the reasons                E. Unfunded Mandates Reform Act
                                                safety concern. As the timing between
                                                bridge openings has been adjusted to                    stated in section V.A above, this final                 The Unfunded Mandates Reform Act
                                                accommodate traveling at a no wake                      rule would not have a significant                     of 1995 (2 U.S.C. 1531–1538) requires
                                                speed between the bridges, vessels                      economic impact on any vessel owner                   Federal agencies to assess the effects of
                                                should not have to wait for longer than                 or operator.                                          their discretionary regulatory actions. In
                                                5 to 10 minutes for an opening. Of these                   Under section 213(a) of the Small                  particular, the Act addresses actions
                                                four comments sighting safety concerns,                 Business Regulatory Enforcement                       that may result in the expenditure by a
                                                one commenter has posted the same                       Fairness Act of 1996 (Pub. L. 104–121),               State, local, or tribal government, in the
                                                concern twice. No adjustments have                      we want to assist small entities in                   aggregate, or by the private sector of
                                                been made to this regulation based on                   understanding this rule. If the rule                  $100,000,000 (adjusted for inflation) or
                                                the comments.                                           would affect your small business,                     more in any one year. Though this rule
                                                                                                        organization, or governmental                         will not result in such an expenditure,
                                                V. Regulatory Analyses                                  jurisdiction and you have questions                   we do discuss the effects of this rule
                                                  We developed this rule after                          concerning its provisions or options for              elsewhere in this preamble.
                                                considering numerous statutes and                       compliance, please contact the person
                                                Executive Orders related to rulemaking.                 listed in the FOR FURTHER INFORMATION                 F. Environment
                                                Below we summarize our analyses                         CONTACT, above.                                          We have analyzed this rule under
                                                based on a number of these statutes and                    Small businesses may send comments                 Department of Homeland Security
                                                Executive Orders, and we discuss First                  on the actions of Federal employees                   Management Directive 023–01 and
                                                Amendment rights of protesters.                         who enforce, or otherwise determine                   Commandant Instruction M16475.lD,
                                                                                                        compliance with, Federal regulations to               which guides the Coast Guard in
                                                A. Regulatory Planning and Review
                                                                                                        the Small Business and Agriculture                    complying with the National
                                                   Executive Orders 12866 and 13563                     Regulatory Enforcement Ombudsman                      Environmental Policy Act of 1969
                                                direct agencies to assess the costs and                 and the Regional Small Business                       (NEPA)(42 U.S.C. 4321–4370f), and
                                                benefits of available regulatory                        Regulatory Fairness Boards. The                       have made a determination that this
                                                alternatives and, if regulation is                      Ombudsman evaluates these actions                     action is one of a category of actions
                                                necessary, to select regulatory                         annually and rates each agency’s                      which do not individually or
                                                approaches that maximize net benefits.                  responsiveness to small business. If you              cumulatively have a significant effect on
                                                Executive Order 13771 directs agencies                  wish to comment on actions by                         the human environment. This rule
                                                to control regulatory costs through a                   employees of the Coast Guard, call 1–                 simply promulgates the operating
                                                budgeting process. This rule has not                    888–REG–FAIR (1–888–734–3247). The                    regulations or procedures for
                                                been designated a ‘‘significant                         Coast Guard will not retaliate against                drawbridges. This action is categorically
                                                regulatory action,’’ under Executive                    small entities that question or complain              excluded from further review, under
                                                Order 12866. Accordingly, it has not                    about this rule or any policy or action               figure 2–1, paragraph (32)(e), of the
                                                been reviewed by the Office of                          of the Coast Guard.                                   Instruction.
                                                Management and Budget (OMB) and                                                                                  A preliminary Record of
                                                pursuant to OMB guidance it is exempt                   C. Collection of Information
                                                                                                                                                              Environmental Consideration and a
                                                from the requirements of Executive                        This rule calls for no new collection               Memorandum for the Record are not
                                                Order 13771.                                            of information under the Paperwork                    required for this rule.
                                                   This regulatory action determination                 Reduction Act of 1995 (44 U.S.C. 3501–
                                                is based on the ability that vessels can                3520).                                                G. Protest Activities
                                                still transit the bridges during the                                                                            The Coast Guard respects the First
                                                scheduled openings. Vessels that can                    D. Federalism and Indian Tribal
                                                                                                        Government                                            Amendment rights of protesters.
                                                transit the bridge in the closed position                                                                     Protesters are asked to contact the
                                                may continue to do so. Public vessels of                   A rule has implications for federalism             person listed in the FOR FURTHER
                                                the United States and tugs with tows                    under Executive Order 13132,                          INFORMATION CONTACT; section to
                                                may request an opening at any time.                     Federalism, if it has a substantial direct            coordinate protest activities so that your
                                                                                                        effect on the States, on the relationship             message can be received without
                                                B. Impact on Small Entities                             between the national government and                   jeopardizing the safety or security of
                                                   The Regulatory Flexibility Act of 1980               the States, or on the distribution of                 people, places or vessels.
                                                (RFA), 5 U.S.C. 601–612, as amended,                    power and responsibilities among the
                                                requires federal agencies to consider the               various levels of government. We have                 List of Subjects in 33 CFR Part 117
                                                potential impact of regulations on small                analyzed this rule under that Order and                 Bridges.
                                                entities during rulemaking. The term                    have determined that it is consistent                   For the reasons discussed in the
                                                ‘‘small entities’’ comprises small                      with the fundamental federalism                       preamble, the Coast Guard amends 33
                                                businesses, not-for-profit organizations                principles and preemption requirements                CFR part 117 as follows:
                                                that are independently owned and                        described in Executive Order 13132.
                                                operated and are not dominant in their                     Also, this rule does not have tribal               PART 117—DRAWBRIDGE
mstockstill on DSK30JT082PROD with RULES




                                                fields, and governmental jurisdictions                  implications under Executive Order                    OPERATION REGULATIONS
                                                with populations of less than 50,000.                   13175, Consultation and Coordination
                                                The Coast Guard received no comments                    with Indian Tribal Governments,                       ■ 1. The authority citation for part 117
                                                from the Small Business Administration                  because it does not have a substantial                continues to read as follows:
                                                on this rule. The Coast Guard certifies                 direct effect on one or more Indian                     Authority: 33 U.S.C. 499; 33 CFR 1.05–1;
                                                under 5 U.S.C. 605(b) that this rule will               tribes, on the relationship between the               and Department of Homeland Security
                                                not have a significant economic impact                  Federal Government and Indian tribes,                 Delegation No. 0170.1.



                                           VerDate Sep<11>2014   16:52 Sep 01, 2017   Jkt 241001   PO 00000   Frm 00068   Fmt 4700   Sfmt 4700   E:\FR\FM\05SER1.SGM   05SER1


                                                                 Federal Register / Vol. 82, No. 170 / Tuesday, September 5, 2017 / Rules and Regulations                                         41893

                                                ■ 2. Amend § 117.287 by revising                        ADDRESSES:   To view documents                        received by the Coast Guard until
                                                paragraphs (c) and (d) to read as follows:              mentioned in this preamble as being                   August 25, 2017, and the dredging
                                                                                                        available in the docket, go to, type                  operation will begin September 5, 2017.
                                                § 117.287   Gulf Intracoastal Waterway.                 USCG–2017–0843 in the ‘‘SEARCH’’                      The safety zone is needed by September
                                                *      *    *     *     *                               box and click ‘‘SEARCH.’’ Click on                    5, 2017, to ensure safe navigation of
                                                   (c)(1) The Stickney Point Bridge, mile               Open Docket Folder on the line                        vessels transiting the Shark River, and it
                                                68.6, at South Sarasota, Florida shall                  associated with this rule.                            is impracticable to publish an NPRM
                                                open on signal, except that from 6 a.m.                 FOR FURTHER INFORMATION CONTACT: If                   and consider comments before that date.
                                                to 7 p.m. daily, the draw need only open                you have questions about this rule, call              The dredge and dredge piping must be
                                                on the hour and half hour.                              or email Marine Science Technician                    positioned in the main navigational
                                                   (2) The draw of the Siesta Drive                     Second Class Amanda Boone, U.S. Coast                 channel in order for the dredging
                                                Bridge, mile 71.6, at Sarasota, Florida                 Guard, Sector Delaware Bay, Waterways                 company to complete the proper
                                                shall open on signal, except that from 6                Management Division, Coast Guard;                     dredging of the main navigational
                                                a.m. to 7 p.m. daily, the draw need only                telephone (215) 271–4889, email                       channel. Allowing this event to go
                                                open on the hour and half hour.                         Amanda.N.Boone@uscg.mil.                              forward without a safety zone in place
                                                   (d)(1) The draw of the Cortez (SR 684)                                                                     would expose mariners and the public
                                                                                                        SUPPLEMENTARY INFORMATION:
                                                Bridge, mile 87.4, at Bradenton Beach,                                                                        to unnecessary dangers associated with
                                                Florida shall open on signal, except that               I. Table of Abbreviations                             dredge piping and dredge operations.
                                                from 6 a.m. to 7 p.m. daily, the draw                   CFR Code of Federal Regulations                       Therefore, it is imperative that there is
                                                need only open on the quarter hour and                  DHS Department of Homeland Security                   a safety zone restricting traffic in this
                                                three quarter hour.                                     FR Federal Register                                   portion of the Shark River, in Neptune
                                                   (2) The draw of the Anna Maria (SR                   NPRM Notice of proposed rulemaking                    City, NJ.
                                                64) (Manatee Avenue West) Bridge, mile                  § Section                                                We are issuing this rule, and under 5
                                                89.2, at Bradenton Beach, Florida shall                 U.S.C. United States Code                             U.S.C. 553(d)(3) the Coast Guard finds
                                                open on signal, except that from 6 a.m.                 COTP Captain of the Port                              that good cause exists for making it
                                                to 7 p.m. daily, the draw need only open                II. Background Information and                        effective less than 30 days after
                                                on the quarter hour and three quarter                   Regulatory History                                    publication in the Federal Register for
                                                hour.                                                                                                         the reasons stated above. The Coast
                                                                                                           Efforts to dredge the Shark River have             Guard expects that there will be an
                                                *      *    *     *     *                               been underway for well over a decade.                 impact to vessel traffic during times
                                                  Dated: August 22, 2017.                               After Superstorm Sandy, the need to                   when the navigational channel is
                                                Peter J. Brown,                                         dredge the river increased significantly              restricted. However, there will be times
                                                Rear Admiral, U.S. Coast Guard, Commander,              due to sediment deposited by the storm,               throughout the project where vessel
                                                Seventh Coast Guard District.                           which impeded navigation within the                   traffic is not restricted and traffic will be
                                                [FR Doc. 2017–18710 Filed 9–1–17; 8:45 am]              channel.                                              able to transit through the main
                                                BILLING CODE 9110–04–P                                     Mobile Dredging and Pumping Co.                    navigational channel. Furthermore,
                                                                                                        has been awarded the contract to restore              notification of the waterway restrictions
                                                                                                        the state channels to allow safe passage              will be made by the contractor, Mobile
                                                DEPARTMENT OF HOMELAND                                  for recreational and commercial traffic.              Dredging and Pumping Co. Additionally
                                                SECURITY                                                The sediment will be hydraulically                    the New Jersey Department of
                                                                                                        dredged and piped via a secure welded                 Transportation, Office of Marine
                                                Coast Guard                                             pipeline to the selected dewatering                   Resources, will be conducting outreach
                                                                                                        locations.                                            to the local community. Notification of
                                                33 CFR Part 165                                            The purpose of this rule is to promote             the safety zone and waterway
                                                                                                        maritime safety and protect vessels from              restrictions will be made by the COTP
                                                [Docket Number USCG–2017–0843]
                                                                                                        the hazards of dredge piping and dredge               via marine safety broadcast using VHF–
                                                RIN 1625–AA00                                           operations. The rule will temporarily                 FM channel 16 and through the Local
                                                                                                        restrict vessel traffic from transiting a             Notice to Mariners.
                                                Safety Zone; Dredging, Shark River, NJ                  portion of the Shark River while
                                                                                                        dredging operations are being                         III. Legal Authority and Need for Rule
                                                AGENCY:  Coast Guard, DHS.                              conducted in the main navigational                       The Coast Guard is issuing this rule
                                                ACTION: Temporary final rule.                           channel.                                              under authority in 33 U.S.C. 1231. The
                                                                                                           The Coast Guard is issuing this                    COTP Delaware Bay has determined
                                                SUMMARY:    The Coast Guard is                          temporary rule without prior notice and               that potential hazards are associated
                                                establishing a temporary safety zone on                 opportunity to comment pursuant to                    with dredge piping and dredge
                                                a portion of Shark River, in Neptune                    authority under section 4(a) of the                   operations from September 5, 2017,
                                                City, NJ, from September 5, 2017,                       Administrative Procedure Act (APA) (5                 through September 23, 2017. The rule is
                                                through September 23, 2017, while                       U.S.C. 553(b)). This provision                        necessary to promote maritime safety
                                                dredging operations are being                           authorizes an agency to issue a rule                  and protect vessels from the hazards of
                                                conducted in the main navigational                      without prior notice and opportunity to               dredge piping and dredge operations.
                                                channel. This safety zone is necessary to               comment when the agency for good                         The rule will have an impact to
                                                provide for the safety of life on                       cause finds that those procedures are                 vessels transiting through the Shark
                                                navigable waters during dredging
mstockstill on DSK30JT082PROD with RULES




                                                                                                        ‘‘impracticable, unnecessary, or contrary             River main navigational channel, from
                                                operations and will restrict vessel traffic             to the public interest.’’ Under 5 U.S.C.              latitude 40°10′54.20″ N., longitude
                                                from transiting the main navigational                   553(b)(B), the Coast Guard finds that                 74°1′51.05″ W., bounded by the eastern
                                                channel.                                                good cause exists for not publishing a                side of the channel and the western side
                                                DATES: This rule is effective from                      notice of proposed rulemaking (NPRM)                  of the channel, north, to latitude
                                                September 5, 2017 through September                     with respect to this rule because the                 40°11′6.87″ N., longitude 74° 1′53.54″
                                                23, 2017.                                               final details for this event were not                 W., as vessels will be unable to transit


                                           VerDate Sep<11>2014   16:52 Sep 01, 2017   Jkt 241001   PO 00000   Frm 00069   Fmt 4700   Sfmt 4700   E:\FR\FM\05SER1.SGM   05SER1



Document Created: 2017-09-02 03:25:22
Document Modified: 2017-09-02 03:25:22
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionFinal rule.
DatesThis rule is effective October 5, 2017.
ContactIf you have questions about this rule, call or email, Ms. Jennifer Zercher with the Seventh Coast Guard District Bridge Office; telephone (305) 415-6740, email [email protected]
FR Citation82 FR 41891 
RIN Number1625-AA09

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR