82_FR_43627 82 FR 43449 - Portland & Western Railroad's Request for Positive Train Control Safety Plan Approval and System Certification

82 FR 43449 - Portland & Western Railroad's Request for Positive Train Control Safety Plan Approval and System Certification

DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration

Federal Register Volume 82, Issue 178 (September 15, 2017)

Page Range43449-43450
FR Document2017-19598

This document notifies the public that Portland & Western Railroad (PNWR) submitted to FRA its Positive Train Control Safety Plan (PTCSP) (Version 1.5, dated July 21, 2017) for its Westside Express Service and a copy of that PTCSP is available for public review and comment. PNWR asks FRA to approve its PTCSP and issue a Positive Train Control System Certification for PNWR's Enhanced Automatic Train Control (E-ATC), under the appropriate regulations.

Federal Register, Volume 82 Issue 178 (Friday, September 15, 2017)
[Federal Register Volume 82, Number 178 (Friday, September 15, 2017)]
[Notices]
[Pages 43449-43450]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-19598]


=======================================================================
-----------------------------------------------------------------------

 DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration

[Docket Number FRA-2010-0073]


Portland & Western Railroad's Request for Positive Train Control 
Safety Plan Approval and System Certification

AGENCY: Federal Railroad Administration (FRA), U.S. Department of 
Transportation (DOT).

ACTION: Notice of availability and request for comments.

-----------------------------------------------------------------------

SUMMARY: This document notifies the public that Portland & Western 
Railroad (PNWR) submitted to FRA its Positive Train Control Safety Plan 
(PTCSP) (Version 1.5, dated July 21, 2017) for its Westside Express 
Service and a copy of that PTCSP is available for public review and 
comment. PNWR asks FRA to approve its PTCSP and issue a Positive Train 
Control System Certification for PNWR's Enhanced Automatic Train 
Control (E-ATC), under the appropriate regulations.

DATES: FRA will consider comments received by October 16, 2017, before 
taking final action on the PTCSP. FRA may consider comments received 
after that date if practicable.

ADDRESSES: All communications concerning this proceeding should 
identify Docket Number FRA-2010-0073 and may be submitted by any of the 
following methods:
     Web site: http://www.regulations.gov. Follow the online 
instructions for submitting comments.
     Fax: 202-493-2251.
     Mail: Docket Operations Facility, U.S. Department of 
Transportation, 1200 New Jersey Avenue SE., W12-140, Washington, DC 
20590.
     Hand Delivery: 1200 New Jersey Avenue SE., Room W12-140, 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal Holidays.

[[Page 43450]]


FOR FURTHER INFORMATION CONTACT: Dr. Mark Hartong, Senior Scientific 
Technical Advisor, at (202) 493-1332 or [email protected]; or Mr. 
David Blackmore, Staff Director, Positive Train Control Division, at 
(312) 835-3903 or [email protected].

SUPPLEMENTARY INFORMATION: In its PTCSP, PNWR asserts that its E-ATC 
system is designed as a vital overlay positive train control (PTC) 
system as defined in 49 CFR 236.1015(e)(2). The PTCSP describes PNWR's 
E-ATC implementation and the associated E-ATC safety processes, safety 
analyses, and test, validation, and verification processes used during 
the development of E-ATC. The PTCSP also contains PNWR's operational 
and support requirements and procedures.
    PNWR's PTCSP and the accompanying request for approval and system 
certification are available for review online at http://www.regulations.gov (Docket Number FRA-2010-0073) and in person at 
DOT's Docket Operations Facility, 1200 New Jersey Avenue SE., W12-140, 
Washington, DC 20590. The Docket Operations Facility is open from 9 
a.m. to 5 p.m., Monday through Friday, except Federal Holidays.
    Interested parties are invited to comment on the PTCSP by 
submitting written comments or data. During its review of the PTCSP, 
FRA will consider any comments or data submitted. However, FRA may 
elect not to respond to any particular comment and, under 49 CFR 
236.1009(d)(3), FRA maintains the authority to approve or disapprove 
the PTCSP at its sole discretion. FRA does not anticipate scheduling a 
public hearing regarding PNWR's PTCSP because the circumstances do not 
appear to warrant a hearing. If any interested party desires an 
opportunity for oral comment, the party should notify FRA in writing 
before the end of the comment period and specify the basis for his or 
her request.

Privacy Act Notice

    Anyone can search the electronic form of any written communications 
and comments received into any of our dockets by the name of the 
individual submitting the comment (or signing the document, if 
submitted on behalf of an association, business, labor union, etc.). 
Under 49 CFR 211.3, FRA solicits comments from the public to better 
inform its decisions. DOT posts these comments, without edit, including 
any personal information the commenter provides, to 
www.regulations.gov, as described in the system of records notice (DOT/
ALL-14 FDMS), which can be reviewed at https://www.transportation.gov/privacy. See https://www.regulations.gov/privacyNotice for the privacy 
notice of regulations.gov.

    Issued in Washington, DC, on September 8, 2017.
Robert C. Lauby,
Associate Administrator for Railroad Safety, Chief Safety Officer.
[FR Doc. 2017-19598 Filed 9-14-17; 8:45 am]
 BILLING CODE 4910-06-P



                                                                              Federal Register / Vol. 82, No. 178 / Friday, September 15, 2017 / Notices                                                43449

                                                  be consistent, however, with the                           TVA has identified the following new               commitment within the permit that
                                                  shoreline appearance in other locations                 mitigation measures associated with the               states that in the vicinity of cultural
                                                  and therefore would not be significant.                 implementation of the Brightwater Park                resource site 40LD346, rip-rap would be
                                                  Alternative B would, however, provide                   SEA Alternative B—Section 26a Permit                  placed from the beach with no
                                                  some environmental benefits. These                      Approval.                                             equipment allowed on top of the site
                                                  benefits include reducing shoreline                        • No flood-damageable facilities or                and no bank shaping would be done. In
                                                  erosion at locations where the riprap                   equipment would be located within the                 addition, TVA would require that an
                                                  stabilization measures are placed and                   Brightwater Park grand lawn. The lawn                 archaeological monitor be present while
                                                  completion of Brightwater Park                          would be kept as a grassy area which                  work is being conducted in that area.
                                                  providing accessible public land and                    would not be expected to incur damage
                                                                                                                                                                David Bowling,
                                                  recreation resources as was originally                  during a flood.
                                                  intended with the 2003 decision.                           • The switch on the irrigation pump                Vice President, Land and Resource
                                                                                                          would be located at or above an                       Management.
                                                  Amended Decision                                        elevation of 820 feet.                                [FR Doc. 2017–19657 Filed 9–14–17; 8:45 am]
                                                    TVA has decided to amend the                             • The minimum amount of rip-rap                    BILLING CODE 8120–01–P
                                                  September 2003 ROD to incorporate the                   would be used while still meeting
                                                  approval of Alternative B—Section 26a                   project objectives.
                                                  Permit Approval. The rationale for                         • The Brightwater Park sun shelter                 DEPARTMENT OF TRANSPORTATION
                                                  approving Alternative B is consistent                   will remain open to the elements and
                                                  with the rationale provided in the                      may never be enclosed in the future.                  Federal Railroad Administration
                                                  September 2003 ROD. The changes to                      Any flood-damageable equipment stored
                                                  the original proposal described in                      in the sun shelter will be elevated to or             [Docket Number FRA–2010–0073]
                                                  Alternative B achieves both WindRiver’s                 above elevation 820 feet.
                                                                                                             • For purposes of shoreline bank                   Portland & Western Railroad’s Request
                                                  objectives for development of the
                                                                                                          stabilization, all portions will be                   for Positive Train Control Safety Plan
                                                  residential and recreational community
                                                                                                          constructed or placed, on average, no                 Approval and System Certification
                                                  and TVA’s overall goals for providing
                                                  recreational opportunities in the                       more than two feet from the existing                  AGENCY:  Federal Railroad
                                                  Tennessee Valley. Environmental                         shoreline at normal summer pool                       Administration (FRA), U.S. Department
                                                  impacts associated with Alternative B                   elevation.                                            of Transportation (DOT).
                                                  would be minor and slightly greater                        • For all electrical services permitted,
                                                                                                                                                                ACTION: Notice of availability and
                                                  than impacts associated with                            including the electrical plug, a
                                                                                                                                                                request for comments.
                                                  Alternative A.                                          disconnect must be located at or above
                                                                                                          elevation 818.1 that is accessible during             SUMMARY:   This document notifies the
                                                  Mitigation Measures                                     flooding.                                             public that Portland & Western Railroad
                                                     The September 2003 ROD lists                            • The floor elevation of the fixed                 (PNWR) submitted to FRA its Positive
                                                  mitigation measures associated with the                 courtesy pier will be a minimum of 2.0                Train Control Safety Plan (PTCSP)
                                                  2003 Rarity Pointe FEIS. These                          feet above the normal summer pool                     (Version 1.5, dated July 21, 2017) for its
                                                  mitigation measures remain in effect                    elevation 813.0.                                      Westside Express Service and a copy of
                                                  across the development. TVA has                            • The applicant should contact the                 that PTCSP is available for public
                                                  identified the following 2003 mitigation                local government official(s) to ensure                review and comment. PNWR asks FRA
                                                  measures to be specifically applicable to               that this facility complies with all                  to approve its PTCSP and issue a
                                                  the current proposed actions related to                 applicable local floodplain regulations.              Positive Train Control System
                                                  the stabilization measures and                             • Any excess excavated material not                Certification for PNWR’s Enhanced
                                                  Brightwater Park:                                       needed to grade Edgewater Road and the                Automatic Train Control (E–ATC),
                                                     • Fully shielded light fixtures or                   parking lot will be disposed of and                   under the appropriate regulations.
                                                  those with internal low-glare optics (so                contained on land lying and being above
                                                                                                                                                                DATES: FRA will consider comments
                                                  no light is emitted from the fixture at                 the 816.7-foot contour. Every precaution
                                                                                                          will be taken to prevent the reentry of               received by October 16, 2017, before
                                                  angles above the horizon) will be used
                                                                                                          the spoil material into the reservoir.                taking final action on the PTCSP. FRA
                                                  in the development. This commitment
                                                                                                             • In the stabilization areas, the only             may consider comments received after
                                                  would also apply to the actions at
                                                                                                          trees that would be removed are those                 that date if practicable.
                                                  Brightwater Park.
                                                     • Any future facilities or equipment                 already undermined and actively falling               ADDRESSES: All communications
                                                  subject to flood damage will be located                 into the adjacent water. No trees greater             concerning this proceeding should
                                                  at or above elevation of 820 feet.                      than 3 inches in diameter at breast                   identify Docket Number FRA–2010–
                                                     • Any future development proposed                    height would be removed.                              0073 and may be submitted by any of
                                                  within the limits of the 100-year                          • A vegetated buffer zone of at least              the following methods:
                                                  floodplain, elevation 816.7 feet MSL,                   50 feet will be retained by TVA and                     • Web site: http://
                                                  will be consistent with the requirements                maintained along the shoreline from the               www.regulations.gov. Follow the online
                                                  of EO 11988.                                            summer pool level in order to maintain                instructions for submitting comments.
                                                     • All future development will be                     continuity on the site, and reduce                      • Fax: 202–493–2251.
                                                  consistent with the requirements of                     possible impacts to water quality and                   • Mail: Docket Operations Facility,
                                                  TVA’s Flood Control Storage Loss                        wetlands.                                             U.S. Department of Transportation, 1200
mstockstill on DSK30JT082PROD with NOTICES




                                                  Guideline.                                                 • If the reservoir falls below the                 New Jersey Avenue SE., W12–140,
                                                     • WindRiver will continue to mitigate                elevation of the intake, the applicant                Washington, DC 20590.
                                                  impacts to wetlands (W4 and W5) in the                  will be responsible for finding another                 • Hand Delivery: 1200 New Jersey
                                                  vicinity of Brightwater Park by                         source of raw water.                                  Avenue SE., Room W12–140,
                                                  implementing the wetland mitigation                        • Cultural resource site 40LD29                    Washington, DC 20590, between 9 a.m.
                                                  plan in Appendix C of the 2003 Rarity                   would be avoided for all construction                 and 5 p.m., Monday through Friday,
                                                  Pointe FEIS.                                            activities. TVA would place a                         except Federal Holidays.


                                             VerDate Sep<11>2014   17:07 Sep 14, 2017   Jkt 241001   PO 00000   Frm 00125   Fmt 4703   Sfmt 4703   E:\FR\FM\15SEN1.SGM   15SEN1


                                                  43450                       Federal Register / Vol. 82, No. 178 / Friday, September 15, 2017 / Notices

                                                  FOR FURTHER INFORMATION CONTACT:      Dr.               www.transportation.gov/privacy. See                   without change to http://
                                                  Mark Hartong, Senior Scientific                         https://www.regulations.gov/                          www.regulations.gov, including any
                                                  Technical Advisor, at (202) 493–1332 or                 privacyNotice for the privacy notice of               personal information provided.
                                                  Mark.Hartong@dot.gov; or Mr. David                      regulations.gov.                                        Privacy Act: Anyone is able to search
                                                  Blackmore, Staff Director, Positive Train                 Issued in Washington, DC, on September 8,           the electronic form of all comments
                                                  Control Division, at (312) 835–3903 or                  2017.                                                 received into any of our dockets by the
                                                  David.Blackmore@dot.gov.                                Robert C. Lauby,                                      name of the individual submitting the
                                                  SUPPLEMENTARY INFORMATION: In its                       Associate Administrator for Railroad Safety,
                                                                                                                                                                comment (or signing the comment, if
                                                  PTCSP, PNWR asserts that its E–ATC                      Chief Safety Officer.                                 submitted on behalf of an association,
                                                  system is designed as a vital overlay                   [FR Doc. 2017–19598 Filed 9–14–17; 8:45 am]
                                                                                                                                                                business, labor union, etc.). You may
                                                  positive train control (PTC) system as                                                                        review DOT’s complete Privacy Act
                                                                                                          BILLING CODE 4910–06–P
                                                  defined in 49 CFR 236.1015(e)(2). The                                                                         Statement in the Federal Register
                                                  PTCSP describes PNWR’s E–ATC                                                                                  published on April 11, 2000 (65 FR
                                                  implementation and the associated E–                    DEPARTMENT OF TRANSPORTATION                          19477–78) or you may visit http://
                                                  ATC safety processes, safety analyses,                                                                        www.dot.gov/privacy.html.
                                                  and test, validation, and verification                  National Highway Traffic Safety                       FOR FURTHER INFORMATION CONTACT: Ms.
                                                  processes used during the development                   Administration                                        Debbie Sweet, NHTSA, 1200 New Jersey
                                                  of E–ATC. The PTCSP also contains                                                                             Avenue SE., Washington, DC 20590;
                                                  PNWR’s operational and support                          [Docket No. NHTSA–2017–0083]
                                                                                                                                                                Telephone (202) 366–7179; Fax: (202)
                                                  requirements and procedures.                            Reports, Forms, and Recordkeeping                     366–2106; email address:
                                                    PNWR’s PTCSP and the                                                                                        Debbie.Sweet@dot.gov.
                                                                                                          Requirements
                                                  accompanying request for approval and
                                                                                                                                                                SUPPLEMENTARY INFORMATION: Under the
                                                  system certification are available for                  AGENCY:  National Highway Traffic                     Paperwork Reduction Act of 1995,
                                                  review online at http://                                Safety Administration (NHTSA),                        before an agency submits a proposed
                                                  www.regulations.gov (Docket Number                      Department of Transportation (DOT).                   collection of information to OMB for
                                                  FRA–2010–0073) and in person at                         ACTION: Request for public comment on                 approval, it must first publish a
                                                  DOT’s Docket Operations Facility, 1200                  the modification of an existing                       document in the Federal Register
                                                  New Jersey Avenue SE., W12–140,                         collection of information.
                                                  Washington, DC 20590. The Docket                                                                              providing a 60-day comment period and
                                                  Operations Facility is open from 9 a.m.                                                                       otherwise consult with members of the
                                                                                                          SUMMARY:   Before a Federal agency may
                                                  to 5 p.m., Monday through Friday,                                                                             public and affected agencies concerning
                                                                                                          collect certain information from the
                                                  except Federal Holidays.                                                                                      each proposed collection of information.
                                                                                                          public, it must receive approval from
                                                    Interested parties are invited to                                                                           OMB has promulgated regulations
                                                                                                          the Office of Management and Budget
                                                  comment on the PTCSP by submitting                                                                            describing what must be included in
                                                                                                          (OMB). Under procedures established
                                                  written comments or data. During its                                                                          such a document. Under OMB’s
                                                                                                          by the Paperwork Reduction Act of
                                                  review of the PTCSP, FRA will consider                                                                        regulation (at 5 CFR 1320.8(d)), an
                                                                                                          1995, before seeking OMB approval,
                                                  any comments or data submitted.                                                                               agency must request public comment on
                                                                                                          Federal agencies must solicit public
                                                  However, FRA may elect not to respond                                                                         the following:
                                                                                                          comment on proposed collections of
                                                  to any particular comment and, under                                                                            (i) Whether the proposed collection of
                                                                                                          information, including extensions and
                                                  49 CFR 236.1009(d)(3), FRA maintains                                                                          information is necessary for the proper
                                                                                                          reinstatements of previously approved
                                                  the authority to approve or disapprove                                                                        performance of the functions of the
                                                                                                          collections. This document describes a
                                                  the PTCSP at its sole discretion. FRA                                                                         agency, including whether the
                                                                                                          modification of an existing collection of
                                                  does not anticipate scheduling a public                                                                       information will have practical utility;
                                                                                                          information for which NHTSA intends                     (ii) the accuracy of the agency’s
                                                  hearing regarding PNWR’s PTCSP                          to seek OMB approval.
                                                  because the circumstances do not                                                                              estimate of the burden of the proposed
                                                                                                          DATES: Comments must be received on                   collection of information, including the
                                                  appear to warrant a hearing. If any
                                                                                                          or before November 14, 2017.                          validity of the methodology and
                                                  interested party desires an opportunity
                                                  for oral comment, the party should                      ADDRESSES: You may submit comments                    assumptions used;
                                                  notify FRA in writing before the end of                 using any of the following methods:                     (iii) how to enhance the quality,
                                                  the comment period and specify the                        Electronic submissions: Go to http://               utility, and clarity of the information to
                                                  basis for his or her request.                           www.regulations.gov. Follow the online                be collected;
                                                                                                          instructions for submitting comments.                   (iv) how to minimize the burden of
                                                  Privacy Act Notice                                        Mail: Docket Management Facility,                   the collection of information on those
                                                    Anyone can search the electronic                      M–30, U.S. Department of                              who are to respond, including the use
                                                  form of any written communications                      Transportation, West Building, Ground                 of appropriate automated, electronic,
                                                  and comments received into any of our                   Floor, 1200 New Jersey Ave. SE., Room                 mechanical, or other technological
                                                  dockets by the name of the individual                   W12–140, Washington, DC 20590.                        collection techniques or other forms of
                                                  submitting the comment (or signing the                    Hand Delivery: West Building Ground                 information technology, e.g. permitting
                                                  document, if submitted on behalf of an                  Floor, Room W12–140, 1200 New Jersey                  electronic submission of responses.
                                                  association, business, labor union, etc.).              Avenue SE., Washington, DC, between 9                   In compliance with these
                                                  Under 49 CFR 211.3, FRA solicits                        a.m. and 5 p.m., Monday through                       requirements, NHTSA asks for public
                                                  comments from the public to better                      Friday, except Federal holidays.                      comments on the following proposed
mstockstill on DSK30JT082PROD with NOTICES




                                                  inform its decisions. DOT posts these                   Telephone (202) 366–9826; Fax: (202)                  collection of information:
                                                  comments, without edit, including any                   493–2251.                                               Title: Automated Driving Systems 2.0:
                                                  personal information the commenter                        Instructions: Each submission must                  A Vision for Safety.
                                                  provides, to www.regulations.gov, as                    include the Agency name and the                         Type of Request: Modification of a
                                                  described in the system of records                      Docket number for this proposed                       currently approved information
                                                  notice (DOT/ALL–14 FDMS), which can                     collection of information. Note that all              collection.
                                                  be reviewed at https://                                 comments received will be posted                        OMB Clearance Number: 2127–0723.


                                             VerDate Sep<11>2014   17:07 Sep 14, 2017   Jkt 241001   PO 00000   Frm 00126   Fmt 4703   Sfmt 4703   E:\FR\FM\15SEN1.SGM   15SEN1



Document Created: 2017-09-15 00:18:06
Document Modified: 2017-09-15 00:18:06
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability and request for comments.
DatesFRA will consider comments received by October 16, 2017, before taking final action on the PTCSP. FRA may consider comments received after that date if practicable.
ContactDr. Mark Hartong, Senior Scientific Technical Advisor, at (202) 493-1332 or [email protected]; or Mr. David Blackmore, Staff Director, Positive Train Control Division, at (312) 835-3903 or [email protected]