[Federal Register Volume 82, Number 187 (Thursday, September 28, 2017)]
[Notices]
[Pages 45283-45284]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-20789]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 10254-026]


Pelzer Hydro Company, LLC, Consolidated Hydro Southeast, LLC; 
Notice of Application Accepted for Filing and Soliciting Motions To 
Intervene and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New License.
    b. Project No.: 10254-026.
    c. Date filed: November 30, 2015.
    d. Applicant: Pelzer Hydro Company, LLC (Pelzer Hydro), 
Consolidated Hydro Southeast, LLC (Consolidated Hydro).
    e. Name of Project: Upper Pelzer Hydroelectric Project.
    f. Location: The existing project is located on the Saluda River in 
the Town of Pelzer, in Anderson and Greenville Counties, South 
Carolina. The project does not affect federal land.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Beth E. Harris, P.E., Regional Operations 
Manager, Enel Green Power North America, Inc., 11 Anderson Street, 
Piedmont, SC 29673; Telephone--(864) 846-0042; Email_
[email protected] OR Kevin Webb, Hydro Licensing Manager, Enel Green 
Power North America, Inc., One Tech Drive, Suite 220, Andover, MA 
01810; Telephone--(978) 681-1900; [email protected].
    i. FERC Contact: Navreet Deo, (202) 502-6304, or 
[email protected].
    j. Deadline for filing motions to intervene and protests and 
requests for cooperating agency status: 60 days from the issuance date 
of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests and requests for cooperating agency 
status using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-10254-026.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted, but is not ready for 
environmental analysis at this time.
    l. The Upper Pelzer Project consists of: (1) A 505-foot-long by 
29.7-foot-high granite masonry dam, consisting of (i) a 150-foot-long 
non-overflow section, (ii) a 280-foot-long ungated overflow spillway 
topped with 4-foot wooden flashboards, and (iii) a 75-foot-long gated 
intake section containing six gates; (2) a 25-acre impoundment at a 
normal pool elevation of 718.7 feet mean sea level, as measured at the 
top of the flashboards; (3) a 260-foot-long by 52-foot-wide forebay 
canal channeling flow from 6 canal gates to the project's 2 
powerhouses; (4) an upstream concrete powerhouse, protected by a 65-
foot-long trashrack structure with 5.5-inch clear bar spacing for 38 
feet of length, and 2-inch clear bar spacing for 27 feet of length, 
containing two vertical Francis turbine generating units that total 
1,500 kW (kW); (5) a downstream powerhouse, protected by a trashrack 
structure with 2-inch clear bar spacing, containing one vertical 
Francis turbine generating unit that totals 450 kW; (6) a 95-foot-long 
by 74-foot-wide tailrace extending from the upstream powerhouse, and a 
132-foot-long by 24-foot-wide tailrace extending from the downstream 
powerhouse; (7) a 65-foot-long, 3,300-volt transmission line, 
connecting the upper and lower powerhouses with the grid via a 7.2/
12.47 kilovolt transformer; and (8) appurtenant facilities.
    Pelzer Hydro and Consolidated Hydro (co-licensees) operate the 
project in a run-of-river mode, with no useable storage or flood 
control capacity. There are no minimum flow requirements downstream of 
the dam. The project operates under an estimated average head of 25 
feet, including the 4-foot spillway flashboards. The impoundment

[[Page 45284]]

water surface elevation is maintained at 718.7 feet. River flows 
between 159 cubic feet per second (cfs) and 1,200 cfs are used for 
power generation, while flows in excess of 1,200 cfs are passed over 
the spillway. A single manually operated, low level outlet gate located 
in the unregulated spillway portion of the dam is used to drain the 
impoundment during maintenance activities. The total installed capacity 
of the project is 1,950 kW between the three generating units. The 
project generates approximately 6,223 megawatt-hours annually, which 
are sold to a local utility.
    The co-licensees propose to continue to operate and maintain the 
Upper Pelzer Project as is required in the existing license, and to 
develop canoe portage facilities. The co-licensees also propose to 
release a continuous minimum flow of 15 cfs or inflow, whichever is 
less, from the project dam in order to maintain aquatic habitat and 
water quality conditions in the 115-foot-long reach between the dam and 
the upstream powerhouse tailrace.
    Other than the development of canoe portage facilities, no new 
construction or major project modifications are proposed.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room, or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC 
Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, .211, and .214. In determining the appropriate action to 
take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
protests or motions to intervene must be received on or before the 
specified comment date for the particular application.
    All filings must: (1) Bear in all capital letters the title protest 
or motion to intervene; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain 
copies of the application directly from the applicant. A copy of any 
protest or motion to intervene must be served upon each representative 
of the applicant specified in the particular application.

    Dated: September 21, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-20789 Filed 9-27-17; 8:45 am]
 BILLING CODE 6717-01-P



                              Federal Register / Vol. 82, No. 187 / Thursday, September 28, 2017 / Notices                                           45283

     achieved via a weir on the spillway                     may obtain copies of the application                  Support at FERCOnlineSupport@
     crest. The project operates under an                    directly from the applicant. A copy of                ferc.gov, (866) 208–3676 (toll free), or
     estimated average head of 26 feet,                      any protest or motion to intervene must               (202) 502–8659 (TTY). In lieu of
     including the 16-inch spillway                          be served upon each representative of                 electronic filing, please send a paper
     flashboards. The impoundment water                      the applicant specified in the particular             copy to: Secretary, Federal Energy
     surface elevation is maintained at 774                  application.                                          Regulatory Commission, 888 First Street
     feet. River flows between 159 cfs and                     Dated: September 21, 2017.                          NE., Washington, DC 20426. The first
     535 cfs are used for power generation,                                                                        page of any filing should include docket
                                                             Kimberly D. Bose,
     while flows in excess of 535 cfs are                                                                          number P–10254–026.
                                                             Secretary.                                               The Commission’s Rules of Practice
     passed over the flashboards and
     spillway. The total installed capacity of               [FR Doc. 2017–20787 Filed 9–27–17; 8:45 am]           require all intervenors filing documents
     the project is 1,000 kW from the single                 BILLING CODE 6717–01–P                                with the Commission to serve a copy of
     generating unit. The project generates                                                                        that document on each person on the
     approximately 5,369 megawatt-hours                                                                            official service list for the project.
     annually, which are sold to a local                     DEPARTMENT OF ENERGY                                  Further, if an intervenor files comments
     utility.                                                                                                      or documents with the Commission
        Aquenergy proposes to continue to                    Federal Energy Regulatory                             relating to the merits of an issue that
     operate and maintain the Piedmont                       Commission                                            may affect the responsibilities of a
     Project as is required in the existing                  [Project No. 10254–026]                               particular resource agency, they must
     license, and to develop canoe portage                                                                         also serve a copy of the document on
     facilities. No changes to project                       Pelzer Hydro Company, LLC,                            that resource agency.
     operations are proposed. Other than the                 Consolidated Hydro Southeast, LLC;                       k. This application has been accepted,
     development of canoe portage facilities,                Notice of Application Accepted for                    but is not ready for environmental
     no new construction or major project                    Filing and Soliciting Motions To                      analysis at this time.
     modifications are proposed.                             Intervene and Protests                                   l. The Upper Pelzer Project consists
        m. A copy of the application is                                                                            of: (1) A 505-foot-long by 29.7-foot-high
     available for review at the Commission                    Take notice that the following                      granite masonry dam, consisting of (i) a
     in the Public Reference Room, or may be                 hydroelectric application has been filed              150-foot-long non-overflow section, (ii)
     viewed on the Commission’s Web site at                  with the Commission and is available                  a 280-foot-long ungated overflow
     http://www.ferc.gov using the eLibrary                  for public inspection.                                spillway topped with 4-foot wooden
     link. Enter the docket number excluding                   a. Type of Application: New License.                flashboards, and (iii) a 75-foot-long
     the last three digits in the docket                       b. Project No.: 10254–026.                          gated intake section containing six
     number field to access the document.                      c. Date filed: November 30, 2015.                   gates; (2) a 25-acre impoundment at a
     For assistance, contact FERC Online                       d. Applicant: Pelzer Hydro Company,                 normal pool elevation of 718.7 feet
     Support. A copy is also available for                   LLC (Pelzer Hydro), Consolidated Hydro                mean sea level, as measured at the top
     inspection and reproduction at the                      Southeast, LLC (Consolidated Hydro).                  of the flashboards; (3) a 260-foot-long by
     address in item h above.                                  e. Name of Project: Upper Pelzer                    52-foot-wide forebay canal channeling
        You may also register online at http://              Hydroelectric Project.                                flow from 6 canal gates to the project’s
     www.ferc.gov/docs-filing/                                 f. Location: The existing project is                2 powerhouses; (4) an upstream
     esubscription.asp to be notified via                    located on the Saluda River in the Town               concrete powerhouse, protected by a 65-
     email of new filings and issuances                      of Pelzer, in Anderson and Greenville                 foot-long trashrack structure with 5.5-
     related to this or other pending projects.              Counties, South Carolina. The project                 inch clear bar spacing for 38 feet of
     For assistance, contact FERC Online                     does not affect federal land.                         length, and 2-inch clear bar spacing for
     Support.                                                  g. Filed Pursuant to: Federal Power                 27 feet of length, containing two vertical
        n. Anyone may submit a protest or a                  Act 16 U.S.C. 791(a)–825(r).                          Francis turbine generating units that
     motion to intervene in accordance with                    h. Applicant Contact: Beth E. Harris,               total 1,500 kW (kW); (5) a downstream
     the requirements of Rules of Practice                   P.E., Regional Operations Manager, Enel               powerhouse, protected by a trashrack
     and Procedure, 18 CFR 385.210, .211,                    Green Power North America, Inc., 11                   structure with 2-inch clear bar spacing,
     and .214. In determining the appropriate                Anderson Street, Piedmont, SC 29673;                  containing one vertical Francis turbine
     action to take, the Commission will                     Telephone—(864) 846–0042; Email—                      generating unit that totals 450 kW; (6) a
     consider all protests or other comments                 beth.harris@enel.com OR Kevin Webb,                   95-foot-long by 74-foot-wide tailrace
     filed, but only those who file a motion                 Hydro Licensing Manager, Enel Green                   extending from the upstream
     to intervene in accordance with the                     Power North America, Inc., One Tech                   powerhouse, and a 132-foot-long by 24-
     Commission’s Rules may become a                         Drive, Suite 220, Andover, MA 01810;                  foot-wide tailrace extending from the
     party to the proceeding. Any protests, or               Telephone—(978) 681–1900; Email—                      downstream powerhouse; (7) a 65-foot-
     motions to intervene must be received                   kevin.webb@enel.com.                                  long, 3,300-volt transmission line,
     on or before the specified comment date                   i. FERC Contact: Navreet Deo, (202)                 connecting the upper and lower
     for the particular application.                         502–6304, or navreet.deo@ferc.gov.                    powerhouses with the grid via a 7.2/
        All filings must: (1) Bear in all capital              j. Deadline for filing motions to                   12.47 kilovolt transformer; and (8)
     letters the title PROTEST or MOTION                     intervene and protests and requests for               appurtenant facilities.
     TO INTERVENE; (2) set forth in the                      cooperating agency status: 60 days from                  Pelzer Hydro and Consolidated Hydro
     heading the name of the applicant and                   the issuance date of this notice.                     (co-licensees) operate the project in a
     the project number of the application to                  The Commission strongly encourages                  run-of-river mode, with no useable
     which the filing responds; (3) furnish                  electronic filing. Please file motions to             storage or flood control capacity. There
     the name, address, and telephone                        intervene and protests and requests for               are no minimum flow requirements
     number of the person protesting or                      cooperating agency status using the                   downstream of the dam. The project
     intervening; and (4) otherwise comply                   Commission’s eFiling system at http://                operates under an estimated average
     with the requirements of 18 CFR                         www.ferc.gov/docs-filing/efiling.asp. For             head of 25 feet, including the 4-foot
     385.2001 through 385.2005. Agencies                     assistance, please contact FERC Online                spillway flashboards. The impoundment


VerDate Sep<11>2014   18:44 Sep 27, 2017   Jkt 241001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\28SEN1.SGM   28SEN1


     45284                    Federal Register / Vol. 82, No. 187 / Thursday, September 28, 2017 / Notices

     water surface elevation is maintained at                which the filing responds; (3) furnish                   The Commission strongly encourages
     718.7 feet. River flows between 159                     the name, address, and telephone                      electronic filing. Please file motions to
     cubic feet per second (cfs) and 1,200 cfs               number of the person protesting or                    intervene and protests and requests for
     are used for power generation, while                    intervening; and (4) otherwise comply                 cooperating agency status using the
     flows in excess of 1,200 cfs are passed                 with the requirements of 18 CFR                       Commission’s eFiling system at http://
     over the spillway. A single manually                    385.2001 through 385.2005. Agencies                   www.ferc.gov/docs-filing/efiling.asp. For
     operated, low level outlet gate located in              may obtain copies of the application                  assistance, please contact FERC Online
     the unregulated spillway portion of the                 directly from the applicant. A copy of                Support at FERCOnlineSupport@
     dam is used to drain the impoundment                    any protest or motion to intervene must               ferc.gov, (866) 208–3676 (toll free), or
     during maintenance activities. The total                be served upon each representative of                 (202) 502–8659 (TTY). In lieu of
     installed capacity of the project is 1,950              the applicant specified in the particular             electronic filing, please send a paper
     kW between the three generating units.                  application.                                          copy to: Secretary, Federal Energy
     The project generates approximately                       Dated: September 21, 2017.
                                                                                                                   Regulatory Commission, 888 First
     6,223 megawatt-hours annually, which                                                                          Street, NE., Washington, DC 20426. The
                                                             Kimberly D. Bose,
     are sold to a local utility.                                                                                  first page of any filing should include
        The co-licensees propose to continue                 Secretary.                                            docket number P–10253–032.
     to operate and maintain the Upper                       [FR Doc. 2017–20789 Filed 9–27–17; 8:45 am]              The Commission’s Rules of Practice
     Pelzer Project as is required in the                    BILLING CODE 6717–01–P                                require all intervenors filing documents
     existing license, and to develop canoe                                                                        with the Commission to serve a copy of
     portage facilities. The co-licensees also                                                                     that document on each person on the
     propose to release a continuous                         DEPARTMENT OF ENERGY                                  official service list for the project.
     minimum flow of 15 cfs or inflow,                                                                             Further, if an intervenor files comments
     whichever is less, from the project dam                 Federal Energy Regulatory                             or documents with the Commission
     in order to maintain aquatic habitat and                Commission                                            relating to the merits of an issue that
     water quality conditions in the 115-foot-               [Project No. 10253–032]                               may affect the responsibilities of a
     long reach between the dam and the                                                                            particular resource agency, they must
     upstream powerhouse tailrace.                           Pelzer Hydro Company, LLC,                            also serve a copy of the document on
        Other than the development of canoe                  Consolidated Hydro Southeast, LLC;                    that resource agency.
     portage facilities, no new construction                 Notice of Application Accepted for                       k. This application has been accepted,
     or major project modifications are                      Filing and Soliciting Motions To                      but is not ready for environmental
     proposed.                                               Intervene and Protests                                analysis at this time.
        m. A copy of the application is                                                                               l. The Lower Pelzer Project consists
     available for review at the Commission                    Take notice that the following                      of: (1) A 696-foot-long by 40-foot-high
     in the Public Reference Room, or may be                 hydroelectric application has been filed              granite masonry dam, consisting of (i) a
     viewed on the Commission’s Web site at                  with the Commission and is available                  310-foot-long spillway section topped
     http://www.ferc.gov using the eLibrary                  for public inspection.                                with 4-foot wooden flashboards, (ii) a
     link. Enter the docket number excluding                   a. Type of Application: New License.                40-foot-long non-overflow section with
     the last three digits in the docket                       b. Project No.: 10253–032.                          two 10-foot-wide by 6-foot-high gates,
     number field to access the document.                      c. Date filed: November 30, 2015.                   and (iii) a 236-foot-long non-overflow
     For assistance, contact FERC Online                       d. Applicant: Pelzer Hydro Company,                 section; (2) an 80-acre impoundment at
     Support. A copy is also available for                   LLC (Pelzer Hydro), Consolidated Hydro                a normal pool elevation of 693 feet
     inspection and reproduction at the                      Southeast, LLC (Consolidated Hydro).                  mean sea level; (3) a 110-foot-long by
     address in item h above.                                  e. Name of Project: Lower Pelzer                    14-foot-wide intake, protected by a
        You may also register online at http://              Hydroelectric Project.                                trashrack structure with 2-inch clear bar
     www.ferc.gov/docs-filing/                                 f. Location: The existing project is                spacing, controlling flow to the
     esubscription.asp to be notified via                    located on the Saluda River near the                  powerhouse through five, 10.5-foot-
     email of new filings and issuances                      Towns of Pelzer and Williamston, in                   wide square gates; (4) a 110-foot-long by
     related to this or other pending projects.              Anderson and Greenville Counties,                     68-foot-wide brick powerhouse integral
     For assistance, contact FERC Online                     South Carolina. The project does not                  with the dam, containing 5 horizontal
     Support.                                                affect federal land.                                  Francis turbine generating units that
        n. Anyone may submit a protest or a                     g. Filed Pursuant to: Federal Power                total 3,300 kilowatts (kW); (5) a 600-
     motion to intervene in accordance with                  Act 16 U.S.C. 791(a)–825(r).                          foot-long by 110-foot-wide tailrace; (6) a
     the requirements of Rules of Practice                      h. Applicant Contact: Beth E. Harris,              3-mile-long, 3,300-volt transmission line
     and Procedure, 18 CFR 385.210, .211,                    P.E., Regional Operations Manager, Enel               connecting the powerhouse to the grid
     and .214. In determining the appropriate                Green Power North America, Inc., 11                   via a 7.2/12.47 kilovolt transformer; and
     action to take, the Commission will                     Anderson Street Piedmont, SC 29673;                   (7) appurtenant facilities.
     consider all protests or other comments                 Telephone—(864) 846–0042; Email—                         Pelzer Hydro and Consolidated Hydro
     filed, but only those who file a motion                 beth.harris@enel.com OR Kevin Webb,                   (co-licensees) operate the project in a
     to intervene in accordance with the                     Hydro Licensing Manager, Enel Green                   run-of-river mode, with no storage or
     Commission’s Rules may become a                         Power North America, Inc., One Tech                   flood control capacity. A continuous
     party to the proceeding. Any protests or                Drive, Suite 220, Andover, MA 01810;                  minimum flow of 140 cubic feet per
     motions to intervene must be received                   Telephone—(978) 681–1900; Email—                      second (cfs) or inflow, whichever is less,
     on or before the specified comment date                 kevin.webb@enel.com.                                  is released into the bypassed reach. The
     for the particular application.                            i. FERC Contact: Navreet Deo, (202)                minimum flow is achieved via a sluice
        All filings must: (1) Bear in all capital            502–6304, or navreet.deo@ferc.gov.                    gate in the dam. The project operates
     letters the title protest or motion to                     j. Deadline for filing motions to                  under an estimated average head of 40
     intervene; (2) set forth in the heading                 intervene and protests and requests for               feet, including the 4-foot spillway
     the name of the applicant and the                       cooperating agency status: 60 days from               flashboards. The impoundment water
     project number of the application to                    the issuance date of this notice.                     surface elevation is maintained at 693


VerDate Sep<11>2014   18:44 Sep 27, 2017   Jkt 241001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\28SEN1.SGM   28SEN1



Document Created: 2017-09-28 01:32:56
Document Modified: 2017-09-28 01:32:56
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 45283 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR