82_FR_45539 82 FR 45352 - Scrap Metal Services Terminal Railroad Company (Illinois), LLC-Lease and Operation Exemption-Rail Line of Scrap Metal Services, LLC

82 FR 45352 - Scrap Metal Services Terminal Railroad Company (Illinois), LLC-Lease and Operation Exemption-Rail Line of Scrap Metal Services, LLC

SURFACE TRANSPORTATION BOARD

Federal Register Volume 82, Issue 187 (September 28, 2017)

Page Range45352-45353
FR Document2017-20784

Federal Register, Volume 82 Issue 187 (Thursday, September 28, 2017)
[Federal Register Volume 82, Number 187 (Thursday, September 28, 2017)]
[Notices]
[Pages 45352-45353]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-20784]


=======================================================================
-----------------------------------------------------------------------

SURFACE TRANSPORTATION BOARD

[Docket No. FD 36144]


Scrap Metal Services Terminal Railroad Company (Illinois), LLC--
Lease and Operation Exemption--Rail Line of Scrap Metal Services, LLC

    Scrap Metal Services Terminal Railroad Company (Illinois), LLC 
(SMSRRIL), a noncarrier, has filed a verified notice of exemption under 
49 CFR 1150.31 to acquire by lease from Scrap Metal Services, LLC 
(SMS), and to operate,\1\ approximately 1,613 linear feet (0.305 mile) 
of railroad right-of-way and trackage located at the Burnham Transload 
Facility at the intersection of Brainard Avenue and the Indiana Harbor 
Belt Railroad right-of-way in Burnham, Ill. (the Burnham Transload 
Facility trackage), pursuant to an agreement. SMS Realty (Burnham), 
LLC, owns the Burnham Transload Facility trackage, which is leased to 
SMS.
---------------------------------------------------------------------------

    \1\ A draft copy of the operating agreement was submitted with 
the notice of exemption.
---------------------------------------------------------------------------

    According to SMSRRIL, there are no mileposts associated with the 
Burnham Transload Facility trackage. SMSRRIL states that the trackage 
is used in conjunction with interchanging to and from Indiana Harbor 
Belt Railroad carloads of scrap metals for transloading into trucks for 
delivery to steel producing mills.
    SMSRRIL asserts that, because the trackage in question will 
constitute the entire line of railroad of SMSRRIL, this trackage is a 
line of railroad under 49 U.S.C. 10901, rather than spur, switching, or 
side tracks excepted from Board acquisition and operation authority by 
virtue of 49 U.S.C. 10906.\2\
---------------------------------------------------------------------------

    \2\ See Effingham R.R.--Pet. for Declaratory Order--Constr. at 
Effingham, Ill., 2 S.T.B. 606, 609-10 (STB served Sept. 12, 1997), 
aff'd sub nom. United Transp. Union-Illinois Legislative Bd. v. STB, 
183 F.3d 606 (7th Cir. 1999).
---------------------------------------------------------------------------

    Although SMSRRIL states in its verified notice that the operations 
were proposed to be consummated on or about September 1, 2017, this 
transaction may not be consummated until October 12, 2017 (30 days 
after the verified notice was filed).
    SMSRRIL certifies that its projected annual revenues as a result of 
this transaction do not exceed those that would qualify it as a Class 
III rail carrier and will not exceed $5 million. SMSRRIL also certifies 
that there are no provisions or agreements that may limit future 
interchange commitments.
    If the verified notice contains false or misleading information, 
the exemption is void ab initio. Petitions to revoke the exemption 
under 49 U.S.C. 10502(d) may be filed at any time. The filing of a 
petition to revoke will not automatically stay the effectiveness of the 
exemption. Petitions to stay must be filed no later than October 5, 
2017 (at least seven days before the exemption becomes effective).
    An original and 10 copies of all pleadings, referring to Docket No. 
FD 36144, must be filed with the Surface Transportation Board, 395 E 
Street SW., Washington, DC 20423-0001. In addition, a copy of each 
pleading must be served on SMSRRIL's representative, David C. Dillon, 
Dillon & Nash, Ltd.,

[[Page 45353]]

3100 Dundee Road, Suite 508, Northbrook, IL 60062.
    According to SMSRRIL, this action is categorically excluded from 
environmental review under 49 CFR 1105.6(c).
    Board decisions and notices are available on our Web site at 
``WWW.STB.GOV.''

    Decided: September 25, 2017.

    By the Board, Scott M. Zimmerman, Acting Director, Office of 
Proceedings.
Kenyatta Clay,
Clearance Clerk.
[FR Doc. 2017-20784 Filed 9-27-17; 8:45 am]
 BILLING CODE 4915-01-P



     45352                    Federal Register / Vol. 82, No. 187 / Thursday, September 28, 2017 / Notices

     DATES:   Submit comments directly to the                use of automated collection techniques                operate,1 approximately 1,613 linear
     Office of Management and Budget                         or other forms of information                         feet (0.305 mile) of railroad right-of-way
     (OMB) up to October 30, 2017.                           technology.                                           and trackage located at the Burnham
     ADDRESSES: Direct comments to the                         Please note that comments submitted                 Transload Facility at the intersection of
     Department of State Desk Officer in the                 in response to this Notice are public                 Brainard Avenue and the Indiana
     Office of Information and Regulatory                    record. Before including any detailed                 Harbor Belt Railroad right-of-way in
     Affairs at the Office of Management and                 personal information, you should be                   Burnham, Ill. (the Burnham Transload
     Budget (OMB). You may submit                            aware that your comments as submitted,                Facility trackage), pursuant to an
     comments by the following methods:                      including your personal information,                  agreement. SMS Realty (Burnham), LLC,
        • Email: oira_submission@                            will be available for public review.                  owns the Burnham Transload Facility
     omb.eop.gov. You must include the DS                                                                          trackage, which is leased to SMS.
                                                             Abstract of Proposed Collection                          According to SMSRRIL, there are no
     form number, information collection
     title, and the OMB control number in                      The collection is the continuation of               mileposts associated with the Burnham
     the subject line of your message.                       information collected and needed by the               Transload Facility trackage. SMSRRIL
        • Fax: 202–395–5806. Attention: Desk                 Bureau of Educational and Cultural                    states that the trackage is used in
     Officer for Department of State.                        Affairs in administering the Exchange                 conjunction with interchanging to and
                                                             Visitor Program (J-Nonimmigrant) under                from Indiana Harbor Belt Railroad
     FOR FURTHER INFORMATION CONTACT:
                                                             the provisions of the Mutual                          carloads of scrap metals for transloading
     Direct requests for additional                                                                                into trucks for delivery to steel
     information regarding the collection                    Educational and Cultural Exchange Act,
                                                             as amended (22 U.S.C. 2451 et seq.). The              producing mills.
     listed in this notice, including requests                                                                        SMSRRIL asserts that, because the
     for copies of the proposed collection                   Form DS–2019 is the document that
                                                             provides the information needed to                    trackage in question will constitute the
     instrument and supporting documents,                                                                          entire line of railroad of SMSRRIL, this
     to G. Kevin Saba, Director, Office of                   identify an individual (and spouse and
                                                             dependents, where applicable) seeking                 trackage is a line of railroad under 49
     Policy and Program Support, ECA/EC,                                                                           U.S.C. 10901, rather than spur,
     SA–5, Floor 5, U.S. Department of State,                to enter the U.S. as an Exchange Visitor
                                                             in J-Nonimmigrant status. Changes have                switching, or side tracks excepted from
     2200 C Street NW., Washington, DC                                                                             Board acquisition and operation
     20522–0505, who may be reached at                       been made to Section 6 of the DS–2019
                                                             to include a responsible officer/alternate            authority by virtue of 49 U.S.C. 10906.2
     JExchanges@state.gov.                                                                                            Although SMSRRIL states in its
                                                             responsible officer attestation that the
     SUPPLEMENTARY INFORMATION:                                                                                    verified notice that the operations were
                                                             sponsor has complied with
        • Title of Information Collection:                   requirements in 22 CFR 62.12(b). In the               proposed to be consummated on or
     Certificate of Eligibility for Exchange                 instructions to Form DS–2019, Section 2               about September 1, 2017, this
     Visitor Status (J–NONIMMIGRANT).                        of the instructions has been reworded to              transaction may not be consummated
        • OMB Control Number: 1405–0119.                     ensure that exchange visitors and their               until October 12, 2017 (30 days after the
        • Type of Request: Revision of a                     accompanying spouses and dependents                   verified notice was filed).
     Currently Approved Collection.                          remain in compliance with insurance                      SMSRRIL certifies that its projected
        • Originating Office: Bureau of                                                                            annual revenues as a result of this
                                                             requirements under 22 CFR 62.14
     Educational and Cultural Affairs, Office                                                                      transaction do not exceed those that
                                                             during the course of the exchange.
     of Policy and Program Support (ECA/                                                                           would qualify it as a Class III rail carrier
     EC).                                                    Methodology                                           and will not exceed $5 million.
        • Form Number: DS–2019.                                Access to Form DS–2019 is made                      SMSRRIL also certifies that there are no
        • Respondents: U.S. Department of                    available to Department-designated                    provisions or agreements that may limit
     State designated sponsors.                              sponsors electronically via the Student               future interchange commitments.
        • Estimated Number of Respondents:                   and Exchange Visitor Information                         If the verified notice contains false or
     1,500.                                                  System (SEVIS).                                       misleading information, the exemption
        • Estimated Number of Responses:                                                                           is void ab initio. Petitions to revoke the
     325,000.                                                G. Kevin Saba,                                        exemption under 49 U.S.C. 10502(d)
        • Average Time per Response: 45                      Director, Office of Policy and Program                may be filed at any time. The filing of
     minutes.                                                Support Office of Private Sector Exchange,            a petition to revoke will not
        • Total Estimated Burden Time:                       Bureau of Educational and Cultural Affairs,           automatically stay the effectiveness of
     243,750 hours.                                          U.S. Department of State.                             the exemption. Petitions to stay must be
        • Frequency: On occasion.                            [FR Doc. 2017–20701 Filed 9–27–17; 8:45 am]           filed no later than October 5, 2017 (at
        • Obligation to Respond: Required to                 BILLING CODE 4710–05–P                                least seven days before the exemption
     Obtain or Retain a Benefit.                                                                                   becomes effective).
        We are soliciting public comments to                                                                          An original and 10 copies of all
     permit the Department to:                               SURFACE TRANSPORTATION BOARD                          pleadings, referring to Docket No. FD
        • Evaluate whether the proposed                                                                            36144, must be filed with the Surface
                                                             [Docket No. FD 36144]
     information collection is necessary for                                                                       Transportation Board, 395 E Street SW.,
     the proper functions of the Department.                 Scrap Metal Services Terminal                         Washington, DC 20423–0001. In
        • Evaluate the accuracy of our                       Railroad Company (Illinois), LLC—                     addition, a copy of each pleading must
     estimate of the time and cost burden for                Lease and Operation Exemption—Rail                    be served on SMSRRIL’s representative,
     this proposed collection, including the                 Line of Scrap Metal Services, LLC                     David C. Dillon, Dillon & Nash, Ltd.,
     validity of the methodology and
     assumptions used.                                         Scrap Metal Services Terminal                         1 A draft copy of the operating agreement was

        • Enhance the quality, utility, and                  Railroad Company (Illinois), LLC                      submitted with the notice of exemption.
                                                                                                                     2 See Effingham R.R.—Pet. for Declaratory
     clarity of the information to be                        (SMSRRIL), a noncarrier, has filed a
                                                                                                                   Order—Constr. at Effingham, Ill., 2 S.T.B. 606, 609–
     collected.                                              verified notice of exemption under 49                 10 (STB served Sept. 12, 1997), aff’d sub nom.
        • Minimize the reporting burden on                   CFR 1150.31 to acquire by lease from                  United Transp. Union-Illinois Legislative Bd. v.
     those who are to respond, including the                 Scrap Metal Services, LLC (SMS), and to               STB, 183 F.3d 606 (7th Cir. 1999).



VerDate Sep<11>2014   18:44 Sep 27, 2017   Jkt 241001   PO 00000   Frm 00097   Fmt 4703   Sfmt 4703   E:\FR\FM\28SEN1.SGM   28SEN1


                              Federal Register / Vol. 82, No. 187 / Thursday, September 28, 2017 / Notices                                           45353

     3100 Dundee Road, Suite 508,                               e. Approval of Agenda                              Mesquite, Nevada asking the FAA to
     Northbrook, IL 60062.                                      f. Future Meeting Scheduling                       suspend any further work on the EIS.
       According to SMSRRIL, this action is                  2. Report From WG–75                                  The reasons for this action include the
     categorically excluded from                             3. SESAR Updates                                      local economic conditions in Mesquite
     environmental review under 49 CFR                       4. Working Group Report                               and other local fiscal and budgetary
     1105.6(c).                                                 a. Report From Coordination                        constraints. The Mesquite Lands Act of
       Board decisions and notices are                             Subgroup                                        1988 (the Act), as amended, provided
     available on our Web site at                               b. Report From Threat Resolution                   land to the City of Mesquite for the
     ‘‘WWW.STB.GOV.’’                                              Working Group                                   replacement airport, expired on
       Decided: September 25, 2017.                             c. Report From Surveillance Working                November 14, 2011 and was not
       By the Board, Scott M. Zimmerman, Acting
                                                                   Group                                           extended or renewed by Congress. The
     Director, Office of Proceedings.                           d. Report From ACAS Xu Subgroup                    original purpose and need for the
                                                             5. CAS Interoperability MASPS: Status,                proposed relocated airport no longer
     Kenyatta Clay,
                                                                   Schedule, and SC–147 TORS                       exists. The City of Mesquite, the owner
     Clearance Clerk.
                                                             6. Status Of Mitigations for Transponder              and operator of the existing Mesquite
     [FR Doc. 2017–20784 Filed 9–27–17; 8:45 am]                   Failures                                        Municipal Airport, has not included a
     BILLING CODE 4915–01–P                                  7. ACAS Xa/Xo MOPS Status &                           replacement airport in its 5-year Airport
                                                                   Approval to conduct Final Review                Capital Improvement Program. As a
                                                                   and Comment (FRAC) Process                      result, FAA has determined the
     DEPARTMENT OF TRANSPORTATION                            8. Other Business                                     proposed replacement General Aviation
                                                             9. New Business                                       Airport for Mesquite, Nevada is not ripe
     Federal Aviation Administration
                                                                Attendance is open to the interested               for decision at this time.
     Eighty Sixth RTCA SC–147 Plenary                        public but limited to space availability.             FOR FURTHER INFORMATION CONTACT:
     Session                                                 With the approval of the chairman,                    David B. Kessler, AICP, Regional
                                                             members of the public may present oral                Environmental Protection Specialist,
     AGENCY:  Federal Aviation                               statements at the meeting. Persons                    AWP–610.1, Airports Division, Federal
     Administration, Department of                           wishing to present statements or obtain               Aviation Administration, Western-
     Transportation.                                         information should contact the person                 Pacific Region, 15000 Aviation
     ACTION: Eighty Sixth RTCA SC–147                        listed in the FOR FURTHER INFORMATION                 Boulevard, Lawndale, California 90261,
     Plenary Session.                                        CONTACT section. Members of the public                Telephone: 310–725–3615.
                                                             may present a written statement to the                SUPPLEMENTARY INFORMATION: On
     SUMMARY:   The FAA is issuing this notice               committee at any time.                                December 8, 2004, the Federal Aviation
     to advise the public of a meeting of
                                                               Issued in Washington, DC on September               Administration (FAA) issued a Notice of
     Eighty Sixth RTCA SC–147 Plenary
                                                             25, 2017.                                             Intent in the Federal Register (69 FR
     Session. This is a subcommittee to
                                                             Mohannad Dawoud,                                      71097) to prepare an EIS for the
     RTCA.
                                                             Management and Program Analyst,                       proposed construction and operation of
     DATES:  December 7, 2017.                               Partnership Contracts Branch, ANG–A17,                a Replacement General Aviation (GA)
     ADDRESSES:   The meeting will be held at:               NextGen, Procurement Services Division,               Airport, for the City of Mesquite, in
     Johns Hopkins Applied Physics                           Federal Aviation Administration.                      eastern Clark County, Nevada. The City
     Laboratory at 11100 Johns Hopkins Rd,                   [FR Doc. 2017–20827 Filed 9–27–17; 8:45 am]           of Mesquite proposed to build the
     Laurel, MD 20723.                                       BILLING CODE 4910–13–P                                replacement airport south of Interstate
     FOR FURTHER INFORMATION CONTACT: Al                                                                           Highway 15 between Exit 108 and 109
     Secen at asecen@rtca.org or 202–330–                                                                          on the Mormon Mesa, about 15 miles
     0647, or The RTCA Secretariat, 1150                     DEPARTMENT OF TRANSPORTATION                          west of the exiting Mesquite Municipal
     18th Street NW., Suite 910, Washington,                                                                       Airport and change the airport land use
     DC 20036, or by telephone at (202) 833–                 Federal Aviation Administration                       to residential land use, including
     9339, fax at (202) 833–9434, or Web site                                                                      construction of a new arterial roadway
                                                             Notice of Cancellation of Preparation
     at http://www.rtca.org.                                                                                       through the existing airport property. To
                                                             of Environmental Impact Statement for
     SUPPLEMENTARY INFORMATION: Pursuant                                                                           maintain access to the National Air
                                                             Replacement General Aviation Airport,
     to section 10(a)(2) of the Federal                                                                            Transportation System, the city also
                                                             Mesquite, Clark County, Nevada
     Advisory Committee Act (Pub. L. 92–                                                                           proposed to design, fund, and build a
     463, 5 U.S.C., App.), notice is hereby                  AGENCY:  Federal Aviation                             replacement GA airport at Mormon
     given for a meeting of the Eighty Sixth                 Administration, DOT.                                  Mesa that would provide GA facilities
     RTCA SC–147 Plenary Session. The                        ACTION: Notice of cancellation of                     and services to the flying public,
     agenda will include the following:                      preparation of Environmental Impact                   support regional economic development
                                                             Statement.                                            at no cost to the FAA. The City
     December 7, 2017                                                                                              proposed to build the replacement GA
     1. Opening Plenary Session—Co-Chairs                    SUMMARY:   The Federal Aviation                       airport to meet FAA Airport Reference
        a. Chairmen’s Opening Remarks/                       Administration (FAA) announces that it                Code (ARC) B–II standards with a new
           Introductions                                     has discontinued preparation of an                    runway 7,500 feet long by 100 feet wide.
        b. RTCA Federal Advisory Act and                     Environmental Impact Statement (EIS)                  On May 16, 2008, the Notice of
           Proprietary Material Policies                     for a construction of a Replacement                   Availability of FAA’s Draft EIS was
           Review                                            General Aviation Airport for Mesquite,                published in the Federal Register (73
        c. Approval of Minutes From 85th                     Nevada. On November 14, 2011, FAA                     FR 28461). The FAA received 34
           Meeting of SC–147                                 published a notice of suspension of the               comment letters on the Draft EIS from
        d. Approval of Minutes From                          EIS in the Federal Register (76 FR                    federal, state and local agencies, as well
           September 2017 Joint Working                      70530). The FAA received a letter dated               as the general public. In March 2009, as
           Group Meeting                                     September 27, 2011, from the City of                  FAA was preparing responses to


VerDate Sep<11>2014   18:44 Sep 27, 2017   Jkt 241001   PO 00000   Frm 00098   Fmt 4703   Sfmt 4703   E:\FR\FM\28SEN1.SGM   28SEN1



Document Created: 2017-09-28 01:32:48
Document Modified: 2017-09-28 01:32:48
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 45352 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR