82_FR_46419 82 FR 46228 - KEI (Maine) Power Management (III) LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

82 FR 46228 - KEI (Maine) Power Management (III) LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 191 (October 4, 2017)

Page Range46228-46229
FR Document2017-21288

Federal Register, Volume 82 Issue 191 (Wednesday, October 4, 2017)
[Federal Register Volume 82, Number 191 (Wednesday, October 4, 2017)]
[Notices]
[Pages 46228-46229]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-21288]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2809-034]


KEI (Maine) Power Management (III) LLC; Notice of Application 
Accepted for Filing, Soliciting Motions To Intervene and Protests, 
Ready for Environmental Analysis, and Soliciting Comments, 
Recommendations, Terms and Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent Minor License.
    b. Project No.: 2809-034.
    c. Date filed: April 28, 2017.
    d. Applicant: KEI (Maine) Power Management (III) LLC (KEI Power).
    e. Name of Project: American Tissue Hydroelectric Project.
    f. Location: On Cobbosseecontee Stream, in the Town of Gardiner, 
Kennebec County, Maine. There are no federal or tribal lands within the 
project boundary.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Lewis C. Loon, Operations and Maintenance 
Manager--USA, KEI (Maine) Power Management (III) LLC, 423 Brunswick 
Avenue, Gardiner, ME 04345; (207) 203-3026.
    i. FERC Contact: John Baummer, 202-502-6837, or 
[email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, terms and conditions, and prescriptions: 60 days from 
the issuance date of this notice; reply comments are due 105 days from 
the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests, comments, recommendations, terms and 
conditions, and prescriptions using the Commission's eFiling system at 
http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-2809-034.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now is 
ready for environmental analysis.
    l. The existing American Tissue Project consists of: (1) A 256-
foot-long, 23-foot-high cut granite, stone and brick masonry dam that 
includes a 61-foot-long, 26-foot-high west abutment section with 2-
foot-high permanent flashboards, a 100-foot-long, 19- to 23-foot-high 
spillway section with 12-inch-high flashboards and a crest elevation of 
122.3 feet mean sea level (msl), and a 95-foot-long, 27-foot-high east 
abutment section with a 34-foot-wide, 19-foot-high intake structure 
that includes: (a) A 17-foot-wide, 25.5-foot- high trashrack with 2-
inch clear spacing, (b) a manually-operated headgate that controls flow 
to the penstock, and (c) three 4.67-foot-diameter low level outlets at 
an elevation of about 100 feet msl for releasing minimum flows to the 
bypassed reach; (2) an approximately 5.5-acre, 1,000-foot-long 
impoundment with a normal maximum water surface elevation of 123.3 feet 
msl; (3) a 280-foot-long, 7-foot-diameter underground steel penstock; 
(4) a 37-foot-long, 34-foot-wide concrete and wooden powerhouse 
containing a single 1.0-megawatt turbine-generator unit; (5) a 250-
foot-long, 12-kilovolt transmission line; (6) a tailrace; and (7) 
appurtenant facilities. KEI Power operates the project in a run-of-
river mode, with an average annual generation of 5,430 megawatt-hours.
    KEI Power proposes to release the following minimum flows from the 
dam to provide downstream passage in the bypassed reach for alewives 
and adult eels: 10 cubic feet per second (cfs) from January 1 to May 
31; 29 cfs from June 1 to August 31; 69 cfs from September 1 to 
November 15; and 10 cfs from November 16 to December 31, or inflow to 
the impoundment, whichever is less. KEI Power also proposes to release 
a minimum flow of 52 cfs (or inflow, whichever is less) to the 
tailrace, which includes the minimum flows to the bypassed reach, to 
protect aquatic resources in the downstream reach. In addition, KEI 
Power proposes to

[[Page 46229]]

upgrade the existing downstream fish passage facility; reduce or cease 
generation during nighttime hours during the downstream eel passage 
season if dead/injured or entrained eels are observed; and construct 
and operate a new upstream passage facility for American eel. KEI Power 
also proposes to revise the project boundary by removing most of the 
bypassed reach, except for a small portion of the reach necessary to 
accommodate the proposed upstream eel passage facility and existing 
downstream fish passage facilities.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC 
Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title PROTEST, 
MOTION TO INTERVENE, COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS 
AND CONDITIONS, or PRESCRIPTIONS; (2) set forth in the heading the name 
of the applicant and the project number of the application to which the 
filing responds; (3) furnish the name, address, and telephone number of 
the person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. A copy of any protest or motion to intervene must 
be served upon each representative of the applicant specified in the 
particular application. A copy of all other filings in reference to 
this application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.

    Dated: September 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-21288 Filed 10-3-17; 8:45 am]
BILLING CODE 6717-01-P



                                                46228                      Federal Register / Vol. 82, No. 191 / Wednesday, October 4, 2017 / Notices

                                                   Applicants: PacifiCorp.                              DEPARTMENT OF ENERGY                                  The first page of any filing should
                                                   Description: Tariff Cancellation:                                                                          include docket number P–2809–034.
                                                Termination of Lower Valley Energy?                     Federal Energy Regulatory                                The Commission’s Rules of Practice
                                                Ancillary Services Agreement to be                      Commission                                            require all intervenors filing documents
                                                effective 9/30/2017.                                                                                          with the Commission to serve a copy of
                                                   Filed Date: 9/28/17.                                 [Project No. 2809–034]                                that document on each person on the
                                                   Accession Number: 20170928–5104.                                                                           official service list for the project.
                                                                                                        KEI (Maine) Power Management (III)                    Further, if an intervenor files comments
                                                   Comments Due: 5 p.m. ET 10/19/17.                    LLC; Notice of Application Accepted                   or documents with the Commission
                                                   Docket Numbers: ER17–2556–000.                       for Filing, Soliciting Motions To                     relating to the merits of an issue that
                                                   Applicants: PacifiCorp.                              Intervene and Protests, Ready for                     may affect the responsibilities of a
                                                   Description: Tariff Cancellation:                    Environmental Analysis, and Soliciting                particular resource agency, they must
                                                Termination of UAMPS Price Construct                    Comments, Recommendations, Terms                      also serve a copy of the document on
                                                Agmt to be effective 11/29/2017.                        and Conditions, and Prescriptions                     that resource agency.
                                                   Filed Date: 9/28/17.                                                                                          k. This application has been accepted
                                                                                                           Take notice that the following
                                                   Accession Number: 20170928–5105.                                                                           for filing and is now is ready for
                                                                                                        hydroelectric application has been filed
                                                   Comments Due: 5 p.m. ET 10/19/17.                                                                          environmental analysis.
                                                                                                        with the Commission and is available                     l. The existing American Tissue
                                                   Docket Numbers: ER17–2557–000.                       for public inspection.
                                                   Applicants: New England Power                                                                              Project consists of: (1) A 256-foot-long,
                                                                                                           a. Type of Application: Subsequent                 23-foot-high cut granite, stone and brick
                                                Company.                                                Minor License.                                        masonry dam that includes a 61-foot-
                                                   Description: § 205(d) Rate Filing:                      b. Project No.: 2809–034.                          long, 26-foot-high west abutment
                                                Large Generator Interconnection Agrmnt                     c. Date filed: April 28, 2017.                     section with 2-foot-high permanent
                                                with Wheelabrator Millbury & CEII                          d. Applicant: KEI (Maine) Power                    flashboards, a 100-foot-long, 19- to 23-
                                                Request to be effective 9/26/2017.                      Management (III) LLC (KEI Power).                     foot-high spillway section with 12-inch-
                                                   Filed Date: 9/28/17.                                    e. Name of Project: American Tissue                high flashboards and a crest elevation of
                                                   Accession Number: 20170928–5132.                     Hydroelectric Project.                                122.3 feet mean sea level (msl), and a
                                                   Comments Due: 5 p.m. ET 10/19/17.                       f. Location: On Cobbosseecontee                    95-foot-long, 27-foot-high east abutment
                                                   Take notice that the Commission                      Stream, in the Town of Gardiner,                      section with a 34-foot-wide, 19-foot-
                                                received the following electric securities              Kennebec County, Maine. There are no                  high intake structure that includes: (a) A
                                                filings:                                                federal or tribal lands within the project            17-foot-wide, 25.5-foot- high trashrack
                                                                                                        boundary.                                             with 2-inch clear spacing, (b) a
                                                   Docket Numbers: ES17–59–000.
                                                                                                           g. Filed Pursuant to: Federal Power                manually-operated headgate that
                                                   Applicants: Portland General Electric                Act 16 U.S.C. 791(a)–825(r).
                                                Company.                                                                                                      controls flow to the penstock, and (c)
                                                                                                           h. Applicant Contact: Lewis C. Loon,               three 4.67-foot-diameter low level
                                                   Description: Application of Portland                 Operations and Maintenance Manager—
                                                General Electric Company for Authority                                                                        outlets at an elevation of about 100 feet
                                                                                                        USA, KEI (Maine) Power Management                     msl for releasing minimum flows to the
                                                to Issue Short-Term Debt Securities.                    (III) LLC, 423 Brunswick Avenue,
                                                   Filed Date: 9/28/17.                                                                                       bypassed reach; (2) an approximately
                                                                                                        Gardiner, ME 04345; (207) 203–3026.                   5.5-acre, 1,000-foot-long impoundment
                                                   Accession Number: 20170928–5129.                        i. FERC Contact: John Baummer, 202–                with a normal maximum water surface
                                                   Comments Due: 5 p.m. ET 10/19/17.                    502–6837, or john.baummer@ferc.gov.                   elevation of 123.3 feet msl; (3) a 280-
                                                   The filings are accessible in the                       j. Deadline for filing motions to                  foot-long, 7-foot-diameter underground
                                                Commission’s eLibrary system by                         intervene and protests, comments,                     steel penstock; (4) a 37-foot-long, 34-
                                                clicking on the links or querying the                   recommendations, terms and                            foot-wide concrete and wooden
                                                docket number.                                          conditions, and prescriptions: 60 days                powerhouse containing a single 1.0-
                                                   Any person desiring to intervene or                  from the issuance date of this notice;                megawatt turbine-generator unit; (5) a
                                                protest in any of the above proceedings                 reply comments are due 105 days from                  250-foot-long, 12-kilovolt transmission
                                                must file in accordance with Rules 211                  the issuance date of this notice.                     line; (6) a tailrace; and (7) appurtenant
                                                and 214 of the Commission’s                                The Commission strongly encourages                 facilities. KEI Power operates the project
                                                Regulations (18 CFR 385.211 and                         electronic filing. Please file motions to             in a run-of-river mode, with an average
                                                385.214) on or before 5:00 p.m. Eastern                 intervene and protests, comments,                     annual generation of 5,430 megawatt-
                                                time on the specified comment date.                     recommendations, terms and                            hours.
                                                Protests may be considered, but                         conditions, and prescriptions using the                  KEI Power proposes to release the
                                                intervention is necessary to become a                   Commission’s eFiling system at http://                following minimum flows from the dam
                                                party to the proceeding.                                www.ferc.gov/docs-filing/efiling.asp.                 to provide downstream passage in the
                                                   eFiling is encouraged. More detailed                 Commenters can submit brief comments                  bypassed reach for alewives and adult
                                                information relating to filing                          up to 6,000 characters, without prior                 eels: 10 cubic feet per second (cfs) from
                                                requirements, interventions, protests,                  registration, using the eComment system               January 1 to May 31; 29 cfs from June
                                                service, and qualifying facilities filings              at http://www.ferc.gov/docs-filing/                   1 to August 31; 69 cfs from September
                                                can be found at: http://www.ferc.gov/                   ecomment.asp. You must include your                   1 to November 15; and 10 cfs from
                                                docs-filing/efiling/filing-req.pdf. For                 name and contact information at the end               November 16 to December 31, or inflow
                                                                                                        of your comments. For assistance,                     to the impoundment, whichever is less.
sradovich on DSK3GMQ082PROD with NOTICES




                                                other information, call (866) 208–3676
                                                (toll free). For TTY, call (202) 502–8659.              please contact FERC Online Support at                 KEI Power also proposes to release a
                                                                                                        FERCOnlineSupport@ferc.gov, (866)                     minimum flow of 52 cfs (or inflow,
                                                  Dated: September 28, 2017.                            208–3676 (toll free), or (202) 502–8659               whichever is less) to the tailrace, which
                                                Nathaniel J. Davis, Sr.,                                (TTY). In lieu of electronic filing, please           includes the minimum flows to the
                                                Deputy Secretary.                                       send a paper copy to: Secretary, Federal              bypassed reach, to protect aquatic
                                                [FR Doc. 2017–21298 Filed 10–3–17; 8:45 am]             Energy Regulatory Commission, 888                     resources in the downstream reach. In
                                                BILLING CODE 6717–01–P                                  First Street NE., Washington, DC 20426.               addition, KEI Power proposes to


                                           VerDate Sep<11>2014   20:18 Oct 03, 2017   Jkt 244001   PO 00000   Frm 00018   Fmt 4703   Sfmt 4703   E:\FR\FM\04OCN1.SGM   04OCN1


                                                                           Federal Register / Vol. 82, No. 191 / Wednesday, October 4, 2017 / Notices                                         46229

                                                upgrade the existing downstream fish                    persons listed in the service list                    West Virginia Transmission Company,
                                                passage facility; reduce or cease                       prepared by the Commission in this                    PATH Allegheny Transmission
                                                generation during nighttime hours                       proceeding, in accordance with 18 CFR                 Company, LLC.
                                                during the downstream eel passage                       4.34(b) and 385.2010.                                    Description: Response of Potomac-
                                                season if dead/injured or entrained eels                   You may also register online at http://            Appalachian Transmission Highline,
                                                are observed; and construct and operate                 www.ferc.gov/docs-filing/                             LLC and its operating companies to July
                                                a new upstream passage facility for                     esubscription.asp to be notified via                  27, 2017 letter requesting additional
                                                American eel. KEI Power also proposes                   email of new filings and issuances                    information.
                                                to revise the project boundary by                       related to this or other pending projects.               Filed Date: 9/27/17.
                                                removing most of the bypassed reach,                    For assistance, contact FERC Online                      Accession Number: 20170927–5122.
                                                except for a small portion of the reach                 Support.                                                 Comments Due: 5 p.m. ET 10/18/17.
                                                necessary to accommodate the proposed                      o. A license applicant must file no                   Docket Numbers: ER15–1456–005;
                                                upstream eel passage facility and                       later than 60 days following the date of              ER11–3859–013; ER16–999–005; ER11–
                                                existing downstream fish passage                        issuance of this notice: (1) A copy of the            4634–005; ER17–436–003; ER17–437–
                                                facilities.                                             water quality certification; (2) a copy of            006; ER14–1699–005; ER15–1457–005.
                                                   m. A copy of the application is                      the request for certification, including                 Applicants: Beaver Falls, L.L.C.,
                                                available for review at the Commission                  proof of the date on which the certifying             Dighton Power, LLC, Greenleaf Energy
                                                in the Public Reference Room or may be                  agency received the request; or (3)                   Unit 1 LLC, Hazleton Generation LLC,
                                                viewed on the Commission’s Web site at                  evidence of waiver of water quality                   Marcus Hook Energy, L.P., Marcus Hook
                                                http://www.ferc.gov using the eLibrary                  certification.                                        50, L.P., Milford Power, LLC, Syracuse,
                                                link. Enter the docket number excluding
                                                                                                          Dated: September 28, 2017.                          L.L.C.
                                                the last three digits in the docket
                                                                                                        Kimberly D. Bose,                                        Description: Notice of Change in
                                                number field to access the document.
                                                                                                        Secretary.                                            Status of Beaver Falls, L.L.C., et al.
                                                For assistance, contact FERC Online
                                                                                                                                                                 Filed Date: 9/27/17.
                                                Support. A copy is also available for                   [FR Doc. 2017–21288 Filed 10–3–17; 8:45 am]
                                                                                                                                                                 Accession Number: 20170927–5126.
                                                inspection and reproduction at the                      BILLING CODE 6717–01–P
                                                                                                                                                                 Comments Due: 5 p.m. ET 10/18/17.
                                                address in item h above.
                                                   n. Anyone may submit comments, a                                                                              Docket Numbers: ER17–1639–003.
                                                protest, or a motion to intervene in                    DEPARTMENT OF ENERGY                                     Applicants: AEP Generation
                                                accordance with the requirements of                                                                           Resources Inc.
                                                Rules of Practice and Procedure, 18 CFR                 Federal Energy Regulatory                                Description: Compliance filing: AEP
                                                385.210, .211, and .214. In determining                 Commission                                            GR Deficency Letter Response to be
                                                the appropriate action to take, the                                                                           effective 5/9/2017.
                                                Commission will consider all protests or                Combined Notice of Filings #1                            Filed Date: 9/27/17.
                                                other comments filed, but only those                       Take notice that the Commission                       Accession Number: 20170927–5108.
                                                who file a motion to intervene in                       received the following electric corporate                Comments Due: 5 p.m. ET 10/18/17.
                                                accordance with the Commission’s                        filings:                                                 Docket Numbers: ER17–2553–000.
                                                Rules may become a party to the                            Docket Numbers: EC17–194–000.                         Applicants: Wabash Valley Power
                                                proceeding. Any comments, protests, or                     Applicants: Northern States Power                  Association, Inc.
                                                motions to intervene must be received                   Company, a Minnesota corporation.                        Description: § 205(d) Rate Filing:
                                                on or before the specified comment date                    Description: Application for                       Amendments to Rate Schedules—Jay
                                                for the particular application.                         Authorization Under Section 203 of the                REMC to be effective 11/27/2017.
                                                   All filings must (1) bear in all capital             FPA to Acquire Jurisdictional                            Filed Date: 9/27/17.
                                                letters the title PROTEST, MOTION TO                                                                             Accession Number: 20170927–5102.
                                                                                                        Transmission Facilities of Northern
                                                INTERVENE, COMMENTS, REPLY                                                                                       Comments Due: 5 p.m. ET 10/18/17.
                                                                                                        States Power Company, a Minnesota
                                                COMMENTS, RECOMMENDATIONS,
                                                                                                        corporation.                                             Take notice that the Commission
                                                TERMS AND CONDITIONS, or
                                                                                                           Filed Date: 9/27/17.                               received the following public utility
                                                PRESCRIPTIONS; (2) set forth in the
                                                                                                           Accession Number: 20170927–5121.                   holding company filings:
                                                heading the name of the applicant and                      Comments Due: 5 p.m. ET 10/18/17.
                                                the project number of the application to                                                                         Docket Numbers: PH17–4–003.
                                                which the filing responds; (3) furnish                     Docket Numbers: EC17–195–000.                         Applicants: Starwood Energy Group
                                                the name, address, and telephone                           Applicants: Radford’s Run Wind                     Global, L.L.C.
                                                number of the person protesting or                      Farm, LLC.                                               Description: Starwood Energy Group
                                                intervening; and (4) otherwise comply                      Description: Application For                       Global, L.L.C. submits FERC 65–B
                                                with the requirements of 18 CFR                         Authorization Under Section 203 of The                Change in Status of Waiver Notification.
                                                385.2001 through 385.2005. All                          Federal Power Act, Requests for Waivers                  Filed Date: 9/27/17.
                                                comments, recommendations, terms and                    of Filing Requirements, Expedited                        Accession Number: 20170927–5118.
                                                conditions or prescriptions must set                    Review and Confidential Treatment of                     Comments Due: 5 p.m. ET 10/18/17.
                                                forth their evidentiary basis and                       Radford’s Run Wind Farm, LLC.                            The filings are accessible in the
                                                otherwise comply with the requirements                     Filed Date: 9/28/17.                               Commission’s eLibrary system by
                                                of 18 CFR 4.34(b). Agencies may obtain                     Accession Number: 20170928–5026.                   clicking on the links or querying the
                                                copies of the application directly from                    Comments Due: 5 p.m. ET 10/19/17.                  docket number.
sradovich on DSK3GMQ082PROD with NOTICES




                                                the applicant. A copy of any protest or                    Take notice that the Commission                       Any person desiring to intervene or
                                                motion to intervene must be served                      received the following electric rate                  protest in any of the above proceedings
                                                upon each representative of the                         filings:                                              must file in accordance with Rules 211
                                                applicant specified in the particular                      Docket Numbers: ER09–1256–004;                     and 214 of the Commission’s
                                                application. A copy of all other filings                ER12–2708–006.                                        Regulations (18 CFR 385.211 and
                                                in reference to this application must be                   Applicants: Potomac-Appalachian                    385.214) on or before 5:00 p.m. Eastern
                                                accompanied by proof of service on all                  Transmission Highline, LLC, PATH                      time on the specified comment date.


                                           VerDate Sep<11>2014   20:18 Oct 03, 2017   Jkt 244001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\04OCN1.SGM   04OCN1



Document Created: 2018-10-25 09:56:07
Document Modified: 2018-10-25 09:56:07
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 46228 