DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 191 (October 4, 2017)

Page Range46233-46233
FR Document2017-21271

Federal Register, Volume 82 Issue 191 (Wednesday, October 4, 2017)
[Federal Register Volume 82, Number 191 (Wednesday, October 4, 2017)]
[Notices]
[Page 46233]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-21271]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14857-000]


Watterra Energy, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On September 11, 2017, Watterra Energy, LLC (Watterra Energy) filed 
a preliminary permit application pursuant to section 4(f) of the 
Federal Power Act proposing to study the feasibility of the proposed 
Saylorville Dam Hydroelectric Project No. 14857-000, to be located at 
the existing Saylorville Dam on the Des Moines River, near the City of 
Des Moines in Polk County, Iowa. Saylorville Dam is owned by the United 
States government and operated by the United States Army Corps of 
Engineers.
    The sole purpose of a preliminary permit, if issued, is to grant 
the permit holder priority to file a license application during the 
permit term. A preliminary permit does not authorize the permit holder 
to perform any land-disturbing activities or otherwise enter upon lands 
or waters owned by others without the owner's express permission.
    Watterra Energy's proposed project would consist of: (1) A new 20-
foot-diameter steel penstock that would be inserted into an existing 
22-foot-diameter by 640-foot-long concrete conduit; (2) a new 55-foot-
wide by 70-foot-long by 30-foot-high concrete powerhouse; (3) three new 
5.22-megawatt (MW) turbines, with a combined generating capacity of 
15.66 MW; (4) a new 70-foot-long by 55-foot-wide substation; (5) a new 
7,000-foot-long, 13.8-kilovolt transmission line; and (6) appurtenant 
facilities. The project would have an estimated annual generation of 58 
gigawatt-hours.
    Applicant Contact: Mr. Craig Dalton, 220 W. Main Street, Hamilton, 
MT 59840; (406) 384-0080.
    FERC Contact: Tyrone A. Williams, (202) 502-6331.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. The Commission strongly encourages electronic filing. 
Please file comments, motions to intervene, notices of intent, and 
competing applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14857-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the eLibrary link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14857) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: September 27, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-21271 Filed 10-3-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 82, No. 191 / Wednesday, October 4, 2017 / Notices                                            46233

                                                  Dated: September 28, 2017.                            CFR 4.36. The Commission strongly                     17–000; and Florida Southeast
                                                Nathaniel J. Davis, Sr.,                                encourages electronic filing. Please file             Connection, LLC’s Florida Southeast
                                                Deputy Secretary.                                       comments, motions to intervene, notices               Connection Project in Docket No. CP14–
                                                [FR Doc. 2017–21301 Filed 10–3–17; 8:45 am]             of intent, and competing applications                 554–000. Together, these projects
                                                BILLING CODE 6717–01–P                                  using the Commission’s eFiling system                 involve the construction and operation
                                                                                                        at http://www.ferc.gov/docs-filing/                   of approximately 685 miles of pipeline
                                                                                                        efiling.asp. Commenters can submit                    and associated facilities.
                                                DEPARTMENT OF ENERGY                                    brief comments up to 6,000 characters,                   The draft SEIS has been prepared to
                                                                                                        without prior registration, using the                 address the August 22, 2017 Opinion
                                                Federal Energy Regulatory                               eComment system at http://                            issued by the United States Court of
                                                Commission                                              www.ferc.gov/docs-filing/                             Appeals for the District of Columbia
                                                                                                        ecomment.asp. You must include your                   regarding the Commission’s
                                                [Project No. 14857–000]
                                                                                                        name and contact information at the end               environmental review of the SMP
                                                Watterra Energy, LLC; Notice of                         of your comments. For assistance,                     Project. The draft SEIS incorporates by
                                                Preliminary Permit Application                          please contact FERC Online Support at                 reference and expands upon the
                                                Accepted for Filing and Soliciting                      FERCOnlineSupport@ferc.gov, (866)                     analysis contained within the December
                                                Comments, Motions To Intervene, and                     208–3676 (toll free), or (202) 502–8659               2015 final environmental impact
                                                Competing Applications                                  (TTY). In lieu of electronic filing, please           statement (FEIS) for the SMP Project.
                                                                                                        send a paper copy to: Secretary, Federal              The draft SEIS estimates the greenhouse
                                                  On September 11, 2017, Watterra                       Energy Regulatory Commission, 888                     gas emissions generated by the SMP
                                                Energy, LLC (Watterra Energy) filed a                   First Street NE., Washington, DC 20426.               Project’s customers’ downstream
                                                preliminary permit application pursuant                 The first page of any filing should                   facilities, describes the methodology
                                                to section 4(f) of the Federal Power Act                include docket number P–14857–000.                    used to determine these estimates,
                                                proposing to study the feasibility of the                  More information about this project,               discusses context for understanding the
                                                proposed Saylorville Dam Hydroelectric                  including a copy of the application, can              magnitude of these emissions, and
                                                Project No. 14857–000, to be located at                 be viewed or printed on the eLibrary                  addresses the value of using the social
                                                the existing Saylorville Dam on the Des                 link of Commission’s Web site at http://              cost of carbon tool.
                                                Moines River, near the City of Des                      www.ferc.gov/docs-filing/elibrary.asp.                   As described in the executive
                                                Moines in Polk County, Iowa.                            Enter the docket number (P–14857) in                  summary of the FEIS, and based on the
                                                Saylorville Dam is owned by the United                  the docket number field to access the                 environmental analysis section of the
                                                States government and operated by the                   document. For assistance, contact FERC                FEIS and this draft SEIS, we conclude
                                                United States Army Corps of Engineers.                  Online Support.                                       that constructing and operating the SMP
                                                  The sole purpose of a preliminary                                                                           Project would result in temporary and
                                                permit, if issued, is to grant the permit                 Dated: September 27, 2017.                          permanent impacts on the environment.
                                                holder priority to file a license                       Kimberly D. Bose,                                     We also conclude that with the
                                                application during the permit term. A                   Secretary.                                            applicants’ implementation of their
                                                preliminary permit does not authorize                   [FR Doc. 2017–21271 Filed 10–3–17; 8:45 am]           respective impact avoidance,
                                                the permit holder to perform any land-                  BILLING CODE 6717–01–P                                minimization, and mitigation measures,
                                                disturbing activities or otherwise enter                                                                      as well as their adherence to the
                                                upon lands or waters owned by others                                                                          measures we have required to further
                                                without the owner’s express permission.                 DEPARTMENT OF ENERGY                                  avoid, minimize, and mitigate these
                                                  Watterra Energy’s proposed project                                                                          impacts, operating the SMP Project
                                                would consist of: (1) A new 20-foot-                    Federal Energy Regulatory                             would not result in a significant impact
                                                diameter steel penstock that would be                   Commission                                            on the environment.
                                                inserted into an existing 22-foot-                                                                               Commission staff has mailed copies of
                                                                                                        [Docket Nos. CP14–554–002; CP15–016–
                                                diameter by 640-foot-long concrete                                                                            the draft SEIS to federal, state, and local
                                                                                                        003; CP15–017–002]
                                                conduit; (2) a new 55-foot-wide by 70-                                                                        government representatives and
                                                foot-long by 30-foot-high concrete                      Florida Southeast Connection, LLC;                    agencies; elected officials;
                                                powerhouse; (3) three new 5.22-                         Transcontinental Gas Pipe Line                        environmental and public interest
                                                megawatt (MW) turbines, with a                          Company, LLC; Sabal Trail                             groups; Native American tribes;
                                                combined generating capacity of 15.66                   Transmission, LLC; Notice of                          potentially affected landowners, other
                                                MW; (4) a new 70-foot-long by 55-foot-                  Availability of the Draft Supplemental                interested individuals and groups; and
                                                wide substation; (5) a new 7,000-foot-                  Environmental Impact Statement for                    newspapers and libraries in the project
                                                long, 13.8-kilovolt transmission line;                  the Southeast Market Pipelines Project                area. Additionally, the draft SEIS is
                                                and (6) appurtenant facilities. The                                                                           available for public viewing on the
                                                project would have an estimated annual                    The staff of the Federal Energy                     FERC’s Web site (www.ferc.gov) using
                                                generation of 58 gigawatt-hours.                        Regulatory Commission (FERC or                        the eLibrary link. A limited number of
                                                  Applicant Contact: Mr. Craig Dalton,                  Commission) has prepared a draft                      copies of the draft EIS are available for
                                                220 W. Main Street, Hamilton, MT                        supplemental environmental impact                     distribution and public inspection at:
                                                59840; (406) 384–0080.                                  statement (SEIS) for the Southeast                    Federal Energy Regulatory Commission,
                                                  FERC Contact: Tyrone A. Williams,                     Market Pipelines Project (SMP Project).               Public Reference Room, 888 First Street
                                                                                                        The SMP Project is composed of three
sradovich on DSK3GMQ082PROD with NOTICES




                                                (202) 502–6331.                                                                                               NE., Room 2A, Washington, DC 20426,
                                                  Deadline for filing comments, motions                 separate, but related, interstate natural             (202) 502–8371.
                                                to intervene, competing applications                    gas transmission pipeline projects.                      Any person wishing to comment on
                                                (without notices of intent), or notices of              These projects are: Transcontinental Gas              the draft SEIS may do so. The
                                                intent to file competing applications: 60               Pipe Line Company, LLC’s Hillabee                     Commission will only consider
                                                days from the issuance of this notice.                  Expansion Project in Docket No. CP15–                 comments on the draft SEIS, and not on
                                                Competing applications and notices of                   16–000; Sabal Trail Transmission, LLC’s               the FEIS or the Commission’s orders in
                                                intent must meet the requirements of 18                 Sabal Trail Project in Docket No. CP15–               this proceeding, on which the public


                                           VerDate Sep<11>2014   20:18 Oct 03, 2017   Jkt 244001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\04OCN1.SGM   04OCN1



Document Created: 2018-10-25 09:55:27
Document Modified: 2018-10-25 09:55:27
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 46233 