82_FR_47168 82 FR 46974 - Texas Eastern Transmission, LP; Notice of Request Under Blanket Authorization

82 FR 46974 - Texas Eastern Transmission, LP; Notice of Request Under Blanket Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 194 (October 10, 2017)

Page Range46974-46974
FR Document2017-21832

Federal Register, Volume 82 Issue 194 (Tuesday, October 10, 2017)
[Federal Register Volume 82, Number 194 (Tuesday, October 10, 2017)]
[Notices]
[Page 46974]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-21832]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-496-000]


Texas Eastern Transmission, LP; Notice of Request Under Blanket 
Authorization

    Take notice that on September 28, 2017, Texas Eastern Transmission, 
LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056-5310, 
filed in Docket No. CP17-496-000 a prior notice request pursuant to 
sections 157.205 and 157.208 of the Commission's regulations under the 
Natural Gas Act (NGA), and Columbia's blanket certificate issued in 
Docket No. CP82-535-000, to offset and replace a segment of its 20-
inch-diameter Line 1 pipeline in Linden and Woodbridge, New Jersey at a 
crossing of the Rahway River (Rahway River Pipe Replacement Project).
    Specifically, Texas Eastern proposes to install a new, approximate 
1,250-foot section of 20-inch diameter pipeline beneath the Rahway 
River. The new segment will replace the existing segment of Line 1 
pipeline, only a small portion of which will be removed.
    Texas Eastern states that the Rahway River Pipe Replacement Project 
is designed to ensure the continued safe operation of Texas Eastern's 
pipeline facilities. Texas Eastern asserts that the project will have 
no impact on the certificated capacity of its system, and there will be 
no abandonment or reduction in service to its customers. Texas Eastern 
estimates the cost of the project to be approximately $20 million, all 
as more fully set forth in the application which is on file with the 
Commission and open to public inspection. The filing may also be viewed 
on the web at http://www.ferc.gov using the ``eLibrary'' link. Enter 
the docket number excluding the last three digits in the docket number 
field to access the document. For assistance, please contact FERC 
Online Support at [email protected] or toll free at (866) 208-
3676, or TTY, contact (202) 502-8659.
    Any questions concerning this application may be directed to Lisa 
A. Connolly, Director Rates and Certificates, Texas Eastern 
Transmission, LP, P.O. Box 1642, Houston, Texas 77251-1642, by 
telephone at (713) 627-4102, by facsimile at (713) 627-5947, or by 
email at [email protected].
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
http://www.ferc.gov. Persons unable to file electronically should 
submit an original and seven copies of the protest or intervention to 
the Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426.

    Dated: October 4, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-21832 Filed 10-6-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                46974                        Federal Register / Vol. 82, No. 194 / Tuesday, October 10, 2017 / Notices

                                                interventions in lieu of paper using the                facilities. Texas Eastern asserts that the            completion of all necessary reviews, and
                                                ‘‘eFiling’’ link at http://www.ferc.gov.                project will have no impact on the                    the subsequent need to complete all
                                                Persons unable to file electronically                   certificated capacity of its system, and              federal authorizations within 90 days of
                                                should submit an original and 14 copies                 there will be no abandonment or                       the date of issuance of the Commission
                                                of the protest or intervention to the                   reduction in service to its customers.                staff’s FEIS or EA.
                                                Federal Energy Regulatory Commission,                   Texas Eastern estimates the cost of the                  Persons who wish to comment only
                                                888 First Street NE., Washington, DC                    project to be approximately $20 million,              on the environmental review of this
                                                20426.                                                  all as more fully set forth in the                    project should submit an original and
                                                   This filing is accessible online at                  application which is on file with the                 two copies of their comments to the
                                                http://www.ferc.gov, using the                          Commission and open to public                         Secretary of the Commission.
                                                ‘‘eLibrary’’ link and is available for                  inspection. The filing may also be                    Environmental commenters will be
                                                review in the Commission’s Public                       viewed on the web at http://                          placed on the Commission’s
                                                Reference Room in Washington, DC                        www.ferc.gov using the ‘‘eLibrary’’ link.             environmental mailing list, will receive
                                                There is an ‘‘eSubscription’’ link on the               Enter the docket number excluding the                 copies of the environmental documents,
                                                Web site that enables subscribers to                    last three digits in the docket number                and will be notified of meetings
                                                receive email notification when a                       field to access the document. For                     associated with the Commission’s
                                                document is added to a subscribed                       assistance, please contact FERC Online                environmental review process.
                                                docket(s). For assistance with any FERC                 Support at FERCOnlineSupport@                         Environmental commenters will not be
                                                Online service, please email                            ferc.gov or toll free at (866) 208–3676, or           required to serve copies of filed
                                                FERCOnlineSupport@ferc.gov, or call                     TTY, contact (202) 502–8659.                          documents on all other parties.
                                                (866) 208–3676 (toll free). For TTY, call                  Any questions concerning this                      However, the non-party commenters,
                                                (202) 502–8659.                                         application may be directed to Lisa A.                will not receive copies of all documents
                                                   Comment Date: 5:00 p.m. Eastern                      Connolly, Director Rates and                          filed by other parties or issued by the
                                                Time on October 19, 2017.                               Certificates, Texas Eastern                           Commission (except for the mailing of
                                                                                                        Transmission, LP, P.O. Box 1642,                      environmental documents issued by the
                                                  Dated: October 2, 2017.                               Houston, Texas 77251–1642, by
                                                Kimberly D. Bose,                                                                                             Commission) and will not have the right
                                                                                                        telephone at (713) 627–4102, by                       to seek court review of the
                                                Secretary.                                              facsimile at (713) 627–5947, or by email              Commission’s final order.
                                                [FR Doc. 2017–21725 Filed 10–6–17; 8:45 am]             at lisa.connolly@enbridge.com.
                                                                                                           Any person or the Commission’s staff                  The Commission strongly encourages
                                                BILLING CODE 6717–01–P
                                                                                                        may, within 60 days after issuance of                 electronic filings of comments, protests
                                                                                                        the instant notice by the Commission,                 and interventions in lieu of paper using
                                                DEPARTMENT OF ENERGY                                    file pursuant to Rule 214 of the                      the eFiling link at http://www.ferc.gov.
                                                                                                        Commission’s Procedural Rules (18 CFR                 Persons unable to file electronically
                                                Federal Energy Regulatory                               385.214) a motion to intervene or notice              should submit an original and seven
                                                Commission                                              of intervention and pursuant to section               copies of the protest or intervention to
                                                                                                        157.205 of the regulations under the                  the Federal Energy Regulatory
                                                [Docket No. CP17–496–000]                                                                                     Commission, 888 First Street NE.,
                                                                                                        NGA (18 CFR 157.205), a protest to the
                                                Texas Eastern Transmission, LP;                         request. If no protest is filed within the            Washington, DC 20426.
                                                Notice of Request Under Blanket                         time allowed therefore, the proposed                    Dated: October 4, 2017.
                                                Authorization                                           activity shall be deemed to be                        Kimberly D. Bose,
                                                                                                        authorized effective the day after the                Secretary.
                                                   Take notice that on September 28,                    time allowed for filing a protest. If a               [FR Doc. 2017–21832 Filed 10–6–17; 8:45 am]
                                                2017, Texas Eastern Transmission, LP                    protest is filed and not withdrawn                    BILLING CODE 6717–01–P
                                                (Texas Eastern), 5400 Westheimer Court,                 within 30 days after the allowed time
                                                Houston, Texas 77056–5310, filed in                     for filing a protest, the instant request
                                                Docket No. CP17–496–000 a prior notice                  shall be treated as an application for                DEPARTMENT OF ENERGY
                                                request pursuant to sections 157.205                    authorization pursuant to section 7 of
                                                and 157.208 of the Commission’s                         the NGA.                                              Federal Energy Regulatory
                                                regulations under the Natural Gas Act                      Pursuant to section 157.9 of the                   Commission
                                                (NGA), and Columbia’s blanket                           Commission’s rules, 18 CFR 157.9,
                                                certificate issued in Docket No. CP82–                  within 90 days of this Notice the
                                                                                                                                                              [Docket No. ER17–2577–000]
                                                535–000, to offset and replace a segment                Commission staff will either: Complete
                                                of its 20-inch-diameter Line 1 pipeline                 its environmental assessment (EA) and                 Supplemental Notice That Initial
                                                in Linden and Woodbridge, New Jersey                    place it into the Commission’s public                 Market-Based Rate Filing Includes
                                                at a crossing of the Rahway River                       record (eLibrary) for this proceeding, or             Request for Blanket Section 204
                                                (Rahway River Pipe Replacement                          issue a Notice of Schedule for                        Authorization; York Haven Power
                                                Project).                                               Environmental Review. If a Notice of                  Company, LLC
                                                   Specifically, Texas Eastern proposes                 Schedule for Environmental Review is
                                                to install a new, approximate 1,250-foot                issued, it will indicate, among other                   This is a supplemental notice in the
                                                section of 20-inch diameter pipeline                    milestones, the anticipated date for the              above-referenced proceeding of York
                                                beneath the Rahway River. The new                       Commission staff’s issuance of the final              Haven Power Company, LLC’s
sradovich on DSK3GMQ082PROD with NOTICES




                                                segment will replace the existing                       environmental impact statement (FEIS)                 application for market-based rate
                                                segment of Line 1 pipeline, only a small                or EA for this proposal. The filing of the            authority, with an accompanying rate
                                                portion of which will be removed.                       EA in the Commission’s public record                  tariff, noting that such application
                                                   Texas Eastern states that the Rahway                 for this proceeding or the issuance of a              includes a request for blanket
                                                River Pipe Replacement Project is                       Notice of Schedule for Environmental                  authorization, under 18 CFR part 34, of
                                                designed to ensure the continued safe                   Review will serve to notify federal and               future issuances of securities and
                                                operation of Texas Eastern’s pipeline                   state agencies of the timing for the                  assumptions of liability.


                                           VerDate Sep<11>2014   17:26 Oct 06, 2017   Jkt 244001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\10OCN1.SGM   10OCN1



Document Created: 2017-10-07 10:32:16
Document Modified: 2017-10-07 10:32:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 46974 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR