82_FR_48700 82 FR 48500 - Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments; Turlock Irrigation District and Modesto Irrigation District, California

82 FR 48500 - Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments; Turlock Irrigation District and Modesto Irrigation District, California

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 200 (October 18, 2017)

Page Range48500-48501
FR Document2017-22531

Federal Register, Volume 82 Issue 200 (Wednesday, October 18, 2017)
[Federal Register Volume 82, Number 200 (Wednesday, October 18, 2017)]
[Notices]
[Pages 48500-48501]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-22531]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14581-002]


Notice of Application Tendered for Filing With the Commission and 
Establishing Procedural Schedule for Licensing and Deadline for 
Submission of Final Amendments; Turlock Irrigation District and Modesto 
Irrigation District, California

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original Major License.
    b. Project No.: 14581-002.
    c. Date Filed: October 11, 2017.
    d. Applicant: Turlock Irrigation District and Modesto Irrigation 
District, California.
    e. Name of Project: La Grange Hydropower Project.
    f. Location: The La Grange Project is located on the Tuolumne River 
in Stanislaus and Tuolumne Counties, California. Portions of the 
project occupy public lands managed by the Bureau of Land Management.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contacts: Steve Boyd, Turlock Irrigation District, 333 
East Canal Drive, Turlock, California 95381-0949, (209) 883-8300; and 
Anna Brathwaite, Modesto Irrigation District, P.O. Box 4060, Modesto, 
CA 95352, (209) 526-7384.
    i. FERC Contact: Jim Hastreiter at (503) 552-2760 or 
[email protected].
    j. This application is not ready for environmental analysis at this 
time.
    k. The Project Description:

La Grange Dam and Spillway

    The primary project feature is La Grange dam, a 310-foot-long, 131-
foot-high, masonry arch dam. The un-gated spillway crest of the dam is 
at elevation 296.5 feet mean sea level (msl). A slide gate in the face 
of La Grange dam can discharge about 200 cubic feet per second (cfs) to 
the Tuolumne River.

La Grange Reservoir

    La Grange reservoir extends upstream for approximately 11,352.5 
feet at a normal water surface elevation of 296.46 feet msl. The 
surface of the reservoir at the normal surface elevation is over 58 
acres and the storage capacity is over 500 acre-feet.

Intakes, Tunnels, Forebay, Canal Headgates, Powerhouse Intake

    The Modesto Irrigation District (MID) headworks, canal, and sluice 
gates are part of MID's retired irrigation canal facilities that 
currently discharge flow from the reservoir into the Tuolumne River on 
the right bank about 400 feet downstream of La Grange dam.
    The Turlock Irrigation District (TID) intake and tunnel is located 
on the left bank of the La Grange dam and spillway just upstream of the 
dam and consists of two separate structures. One structure contains two 
8-foot by 11-foot, 10-inch-high control gates driven by electric motor 
hoists. The second structure is located to the left of the first 
structure and contains a single 8-foot by 12-foot control gate. Water 
diverted at the intake control gates is conveyed to a 600-foot-long 
tunnel leading to the 110-foot-long concrete forebay for the TID non-
project Upper Main Canal. Water delivered to TID's irrigation system is 
regulated at the non-project canal headworks, consisting of six 5-foot-
wide by 8-foot-tall slide gates.
    Water delivered to the powerhouse is diverted at the west side of 
the canal through three 7.5-foot-wide by 14-foot-tall concrete intake 
bays protected by a trashrack structure. Manually operated steel gates 
are used to regulate the discharge of water through two intakes one 
leading to a 235-foot long, 5-foot-diameter penstock and the other 
leading to a 212-foot-long, 7-foot-diameter penstock. Immediately 
upstream and adjacent to the penstock intakes are two automated 5-foot-
high by 4-foot-wide sluice gates that discharge water over a steep rock 
outcrop to the tailrace channel just upstream of the powerhouse.

Powerhouse

    The 72-foot by 29-foot concrete powerhouse is located approximately 
0.2 miles downstream of La Grange dam on the left bank of the Tuolumne 
River. The powerhouse contains two Francis turbine-generator units with 
a maximum capacity of 4.9 megawatts. One turbine unit has a rated 
output of 1,650 horsepower (hp) at 140 cfs and 115 feet of net head and 
the other with a rated output of 4,950 hp at 440 cfs and 115 feet of 
net head. The powerhouse produces an average annual generation of 
19,638 megawatt-hours.
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at http://www.ferc.gov using 
the eLibrary link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in item (h) above.
    m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural Schedule:
    The application will be processed according to the following 
preliminary Hydro Licensing Schedule. Revisions to the schedule may be 
made as appropriate.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for     October 2017.
 Environmental Analysis.
Filing of recommendations, preliminary       December 2017.
 terms and conditions, and fishway
 prescriptions.

[[Page 48501]]

 
Commission issues Draft Environmental        July 2018.
 Impact Statement (EIS).
Comments on Draft EIS......................  September 2018.
Modified Terms and Conditions..............  November 2018.
Commission Issues Final EIS................  February 2019.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the Notice 
of Ready for Environmental Analysis.

    Dated: October 12, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-22531 Filed 10-17-17; 8:45 am]
 BILLING CODE 6717-01-P



                                               48500                        Federal Register / Vol. 82, No. 200 / Wednesday, October 18, 2017 / Notices

                                               LONGWAVE INFRARED IMAGING OF                                    g. Filed Pursuant to: Federal Power                            Water delivered to the powerhouse is
                                               A HIGH TEMPERATURE HIGH                                       Act, 16 U.S.C. 791(a)–825(r).                                 diverted at the west side of the canal
                                               INTENSITY LIGHT SOURCE.                                         h. Applicant Contacts: Steve Boyd,                          through three 7.5-foot-wide by 14-foot-
                                               DATES: Anyone wishing to object to the                        Turlock Irrigation District, 333 East                         tall concrete intake bays protected by a
                                               grant of this license has fifteen (15) days                   Canal Drive, Turlock, California 95381–                       trashrack structure. Manually operated
                                               from the date of this notice to file                          0949, (209) 883–8300; and Anna                                steel gates are used to regulate the
                                               written objections along with                                 Brathwaite, Modesto Irrigation District,                      discharge of water through two intakes
                                               supporting evidence, if any.                                  P.O. Box 4060, Modesto, CA 95352,                             one leading to a 235-foot long, 5-foot-
                                               ADDRESSES: Written objections are to be                       (209) 526–7384.                                               diameter penstock and the other leading
                                               filed with Carderock Division, Naval                            i. FERC Contact: Jim Hastreiter at                          to a 212-foot-long, 7-foot-diameter
                                               Surface Warfare Center, Code 00L, 9500                        (503) 552–2760 or james.hastreiter@                           penstock. Immediately upstream and
                                               MacArthur Boulevard, West Bethesda,                           ferc.gov.                                                     adjacent to the penstock intakes are two
                                               MD 20817–5700.                                                  j. This application is not ready for                        automated 5-foot-high by 4-foot-wide
                                               FOR FURTHER INFORMATION CONTACT:                              environmental analysis at this time.                          sluice gates that discharge water over a
                                               Joseph Teter Ph.D., Director,                                   k. The Project Description:                                 steep rock outcrop to the tailrace
                                               Technology Transfer Office, Carderock                                                                                       channel just upstream of the
                                                                                                             La Grange Dam and Spillway                                    powerhouse.
                                               Division, Naval Surface Warfare Center,
                                               Code 00T, 9500 MacArthur Boulevard,                             The primary project feature is La                           Powerhouse
                                               West Bethesda, MD 20817–5700,                                 Grange dam, a 310-foot-long, 131-foot-
                                               telephone 301 227–4299.                                       high, masonry arch dam. The un-gated                             The 72-foot by 29-foot concrete
                                               (Authority: 35 U.S.C. 207, 37 CFR part 404)                   spillway crest of the dam is at elevation                     powerhouse is located approximately
                                                                                                             296.5 feet mean sea level (msl). A slide                      0.2 miles downstream of La Grange dam
                                                 Dated: October 12, 2017.                                    gate in the face of La Grange dam can                         on the left bank of the Tuolumne River.
                                               A.M. Nichols,                                                 discharge about 200 cubic feet per                            The powerhouse contains two Francis
                                               Lieutenant Commander, Judge Advocate                          second (cfs) to the Tuolumne River.                           turbine-generator units with a maximum
                                               General’s Corps, U.S. Navy, Federal Register                                                                                capacity of 4.9 megawatts. One turbine
                                               Liaison Officer.                                              La Grange Reservoir
                                                                                                                                                                           unit has a rated output of 1,650
                                               [FR Doc. 2017–22576 Filed 10–17–17; 8:45 am]                    La Grange reservoir extends upstream                        horsepower (hp) at 140 cfs and 115 feet
                                               BILLING CODE 3810–FF–P                                        for approximately 11,352.5 feet at a                          of net head and the other with a rated
                                                                                                             normal water surface elevation of 296.46                      output of 4,950 hp at 440 cfs and 115
                                                                                                             feet msl. The surface of the reservoir at                     feet of net head. The powerhouse
                                               DEPARTMENT OF ENERGY                                          the normal surface elevation is over 58                       produces an average annual generation
                                                                                                             acres and the storage capacity is over                        of 19,638 megawatt-hours.
                                               Federal Energy Regulatory                                     500 acre-feet.
                                               Commission                                                                                                                     l. Locations of the Application: A
                                                                                                             Intakes, Tunnels, Forebay, Canal                              copy of the application is available for
                                               [Project No. 14581–002]                                       Headgates, Powerhouse Intake                                  review at the Commission in the Public
                                                                                                                                                                           Reference Room or may be viewed on
                                               Notice of Application Tendered for                              The Modesto Irrigation District (MID)                       the Commission’s Web site at http://
                                               Filing With the Commission and                                headworks, canal, and sluice gates are                        www.ferc.gov using the eLibrary link.
                                               Establishing Procedural Schedule for                          part of MID’s retired irrigation canal                        Enter the docket number excluding the
                                               Licensing and Deadline for                                    facilities that currently discharge flow                      last three digits in the docket number
                                               Submission of Final Amendments;                               from the reservoir into the Tuolumne                          field to access the document. For
                                               Turlock Irrigation District and Modesto                       River on the right bank about 400 feet                        assistance, please contact FERC Online
                                               Irrigation District, California                               downstream of La Grange dam.                                  Support at FERCOnlineSupport@
                                                                                                               The Turlock Irrigation District (TID)                       ferc.gov, (866) 208–3676 (toll free), or
                                                 Take notice that the following
                                                                                                             intake and tunnel is located on the left                      (202) 502–8659 (TTY). A copy is also
                                               hydroelectric application has been filed
                                                                                                             bank of the La Grange dam and spillway                        available for inspection and
                                               with the Commission and is available
                                                                                                             just upstream of the dam and consists of                      reproduction at the address in item (h)
                                               for public inspection.
                                                 a. Type of Application: Original Major                      two separate structures. One structure                        above.
                                               License.                                                      contains two 8-foot by 11-foot, 10-inch-
                                                                                                             high control gates driven by electric                            m. You may also register online at
                                                 b. Project No.: 14581–002.                                                                                                http://www.ferc.gov/docs-filing/
                                                 c. Date Filed: October 11, 2017.                            motor hoists. The second structure is
                                                                                                             located to the left of the first structure                    esubscription.asp to be notified via
                                                 d. Applicant: Turlock Irrigation                                                                                          email of new filings and issuances
                                               District and Modesto Irrigation District,                     and contains a single 8-foot by 12-foot
                                                                                                             control gate. Water diverted at the                           related to this or other pending projects.
                                               California.                                                                                                                 For assistance, contact FERC Online
                                                 e. Name of Project: La Grange                               intake control gates is conveyed to a
                                                                                                             600-foot-long tunnel leading to the 110-                      Support.
                                               Hydropower Project.
                                                 f. Location: The La Grange Project is                       foot-long concrete forebay for the TID                           n. Procedural Schedule:
                                               located on the Tuolumne River in                              non-project Upper Main Canal. Water                              The application will be processed
                                               Stanislaus and Tuolumne Counties,                             delivered to TID’s irrigation system is                       according to the following preliminary
                                               California. Portions of the project                           regulated at the non-project canal                            Hydro Licensing Schedule. Revisions to
ethrower on DSK3G9T082PROD with NOTICES




                                               occupy public lands managed by the                            headworks, consisting of six 5-foot-wide                      the schedule may be made as
                                               Bureau of Land Management.                                    by 8-foot-tall slide gates.                                   appropriate.

                                                                                                                      Milestone                                                                                 Target date

                                               Notice of Acceptance/Notice of Ready for Environmental Analysis ...........................................................................................   October 2017.
                                               Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ........................................................               December 2017.



                                          VerDate Sep<11>2014     17:50 Oct 17, 2017    Jkt 244001   PO 00000     Frm 00025     Fmt 4703    Sfmt 4703    E:\FR\FM\18OCN1.SGM        18OCN1


                                                                                 Federal Register / Vol. 82, No. 200 / Wednesday, October 18, 2017 / Notices                                                                                    48501

                                                                                                                                 Milestone                                                                                               Target date

                                               Commission issues Draft Environmental Impact Statement (EIS) .............................................................................................                             July 2018.
                                               Comments on Draft EIS ..............................................................................................................................................................   September 2018.
                                               Modified Terms and Conditions ..................................................................................................................................................       November 2018.
                                               Commission Issues Final EIS .....................................................................................................................................................      February 2019.



                                                 o. Final amendments to the                                            assistance, please contact FERC Online                                  Mountain, containing four reversible
                                               application must be filed with the                                      Support at FERCOnlineSupport@                                           pump turbines that each produce
                                               Commission no later than 30 days from                                   ferc.gov, (866) 208–3676 (toll free), or                                approximately 290 megawatts (MW) in
                                               the issuance date of the Notice of Ready                                (202) 502–8659 (TTY). In lieu of                                        generation mode, and have a total
                                               for Environmental Analysis.                                             electronic filing, please send a paper                                  maximum discharge of 12,800 cfs
                                                 Dated: October 12, 2017.                                              copy to: Secretary, Federal Energy                                      during generation and 10,200 cfs during
                                                                                                                       Regulatory Commission, 888 First Street                                 pumping; (5) a bottom trash rack with
                                               Nathaniel J. Davis, Sr.,
                                                                                                                       NE., Washington, DC 20426. The first                                    a clear spacing of 5.625 inches, and four
                                               Deputy Secretary.
                                                                                                                       page of any filing should include docket                                upper trash racks with a clear spacing
                                               [FR Doc. 2017–22531 Filed 10–17–17; 8:45 am]                            number P–2685–029.                                                      of 5.25 inches; (6) an 1,800-foot-long
                                               BILLING CODE 6717–01–P                                                     The Commission’s Rules of Practice                                   central core, rock-filled lower dam with
                                                                                                                       require all intervenors filing documents                                a maximum height of 100 feet that
                                                                                                                       with the Commission to serve a copy of                                  impounds Schoharie Creek to form the
                                               DEPARTMENT OF ENERGY                                                    that document on each person on the                                     413-acre Lower Reservoir (operating at
                                                                                                                       official service list for the project.                                  the maximum and minimum elevations
                                               Federal Energy Regulatory                                               Further, if an intervenor files comments                                of 900 feet and 860 feet NGVD 29,
                                               Commission                                                              or documents with the Commission                                        respectively) with 12,422 acre-feet of
                                               [Project No. 2685–029]                                                  relating to the merits of an issue that                                 usable storage and dead storage of 3,745
                                                                                                                       may affect the responsibilities of a                                    acre-feet below 860 feet NGVD 29; (7)
                                               Notice of Application Accepted for                                      particular resource agency, they must                                   three 38-foot-wide by 45.5-foot-high
                                               Filing and Soliciting Motions To                                        also serve a copy of the document on                                    Taintor gates at the left end of the lower
                                               Intervene and Protests; New York                                        that resource agency.                                                   dam; (8) a 425-foot-long, 134-foot-wide
                                               Power Authority                                                            k. This application has been accepted                                concrete spillway structure with a crest
                                                                                                                       for filing, but is not ready for                                        elevation of 855 feet NGVD 29; (9) a
                                                 Take notice that the following                                        environmental analysis at this time.                                    238-foot-long, 68.5-foot-deep concrete
                                               hydroelectric application has been filed                                   l. The existing Blenheim-Gilboa                                      stilling basin; (10) a low level outlet
                                               with the Commission and is available                                    Project consists of the following: (1) A                                with four discharge valves of 4, 6, 8, and
                                               for public inspection.                                                  2.25-mile-long, 30-foot-wide earth and                                  10 inches for release of 5 to 25 cfs, and
                                                 a. Type of Application: New Major                                     rock fill embankment dike with a                                        two 36-inch-diameter Howell-Bunger
                                               License.                                                                maximum height of 110 feet,                                             valves to release a combined flow of 25
                                                 b. Project No.: 2685–029.                                             constructed at Brown Mountain and                                       to 700 cfs; (11) a switchyard on the
                                                 c. Date filed: April 27, 2017.                                        forming the 399-acre Upper Reservoir                                    eastern bank of Schoharie Creek
                                                 d. Applicant: New York Power                                          (operating at the maximum and extreme                                   adjacent to the powerhouse; and (12)
                                               Authority (NYPA).                                                       minimum elevations of 2,003 feet and                                    appurtenant facilities.
                                                 e. Name of Project: Blenheim-Gilboa                                   1,955 feet National Geodetic Vertical                                      During operation, the Blenheim-
                                               Pumped Storage Project (Blenheim-                                       Datum of 1929 [NGVD 29], respectively)                                  Gilboa Project’s pump-turbines may be
                                               Gilboa Project).                                                        with 15,085 acre-feet of usable storage                                 turned on or off several times
                                                 f. Location: The existing project is                                  and dead storage of 3,706 acre-feet                                     throughout the day, but the project
                                               located on Schoharie Creek, in the                                      below elevation 1,955 feet NGVD 29; (2)                                 typically generates electricity during the
                                               Towns of Blenheim and Gilboa in                                         a 655-foot-long emergency spillway                                      day when consumer demand is high and
                                               Schoharie County, New York. The                                         with a 25-foot-wide asphaltic concrete                                  other power resources are more
                                               project does not affect federal lands.                                  crest at elevation 2,005 feet NGVD 29                                   expensive. Pumping usually occurs at
                                                 g. Filed Pursuant to: Federal Power                                   and a capacity of 10,200 cubic feet per                                 night and on weekends when there is
                                               Act 16 U.S.C. 791(a)–825(r).                                            second (cfs); (3) an intake system that                                 excess electricity in the system available
                                                  h. Applicant Contact: Mr. Robert                                     includes: (i) a 125-foot-wide hexagonal-                                for use. According to a July 30, 1975,
                                               Daly, Licensing Manager, New York                                       shaped intake cover with trash racks                                    settlement agreement, NYPA releases a
                                               Power Authority, 123 Main Street,                                       with a clear spacing of 5.25 inches; (ii)                               minimum flow of 10 cubic feet per
                                               White Plains, New York 10601.                                           a 1,042-foot-long, 28-foot-diameter,                                    second (cfs) during low-flow periods
                                               Telephone: (914) 681–6564, Email:                                       concrete-lined vertical shaft in the                                    when 1,500 acre-feet of water is in
                                               Rob.Daly@nypa.gov.                                                      bottom of the Upper Reservoir; (iii) a                                  storage, and 7 cfs when less than 1,500
                                                 i. FERC Contact: Andy Bernick,                                        906-foot-long horizontal, concrete-lined                                acre-feet is in storage. For the period
                                               Telephone (202) 502–8660, and email                                     rock tunnel; and (iv) a 460-foot-long                                   2007 through 2016, the project’s average
                                               andrew.bernick@ferc.gov.                                                concrete-lined manifold that distributes                                annual generation was about 374,854
                                                  j. Deadline for filing motions to                                    flow to four 12-foot-diameter steel-lined                               megawatt-hours (MWh) and average
ethrower on DSK3G9T082PROD with NOTICES




                                               intervene and protests: 60 days from the                                penstocks, each with a maximum length                                   annual energy consumption from
                                               issuance date of this notice.                                           of about 1,960 feet, to four pump-                                      pumping was about 540,217 MWh.
                                                  The Commission strongly encourages                                   turbines located at the powerhouse; (4)                                    m. A copy of the application is
                                               electronic filing. Please file motions to                               a 526-foot-long, 172-foot-wide, and 132-                                available for review at the Commission
                                               intervene and protests using the                                        foot-high multi-level powerhouse                                        in the Public Reference Room, or may be
                                               Commission’s eFiling system at http://                                  located along the east bank of the Lower                                viewed on the Commission’s Web site at
                                               www.ferc.gov/docs-filing/efiling.asp. For                               Reservoir at the base of Brown                                          http://www.ferc.gov using the eLibrary


                                          VerDate Sep<11>2014        19:03 Oct 17, 2017       Jkt 244001      PO 00000       Frm 00026       Fmt 4703      Sfmt 4703      E:\FR\FM\18OCN1.SGM             18OCN1



Document Created: 2017-10-18 01:38:01
Document Modified: 2017-10-18 01:38:01
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 48500 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR