82_FR_48701 82 FR 48501 - Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests; New York Power Authority

82 FR 48501 - Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests; New York Power Authority

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 200 (October 18, 2017)

Page Range48501-48502
FR Document2017-22534

Federal Register, Volume 82 Issue 200 (Wednesday, October 18, 2017)
[Federal Register Volume 82, Number 200 (Wednesday, October 18, 2017)]
[Notices]
[Pages 48501-48502]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-22534]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2685-029]


Notice of Application Accepted for Filing and Soliciting Motions 
To Intervene and Protests; New York Power Authority

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2685-029.
    c. Date filed: April 27, 2017.
    d. Applicant: New York Power Authority (NYPA).
    e. Name of Project: Blenheim-Gilboa Pumped Storage Project 
(Blenheim-Gilboa Project).
    f. Location: The existing project is located on Schoharie Creek, in 
the Towns of Blenheim and Gilboa in Schoharie County, New York. The 
project does not affect federal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Robert Daly, Licensing Manager, New York 
Power Authority, 123 Main Street, White Plains, New York 10601. 
Telephone: (914) 681-6564, Email: [email protected].
    i. FERC Contact: Andy Bernick, Telephone (202) 502-8660, and email 
[email protected].
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please 
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, please send a paper copy to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426. The 
first page of any filing should include docket number P-2685-029.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing, but is not ready 
for environmental analysis at this time.
    l. The existing Blenheim-Gilboa Project consists of the following: 
(1) A 2.25-mile-long, 30-foot-wide earth and rock fill embankment dike 
with a maximum height of 110 feet, constructed at Brown Mountain and 
forming the 399-acre Upper Reservoir (operating at the maximum and 
extreme minimum elevations of 2,003 feet and 1,955 feet National 
Geodetic Vertical Datum of 1929 [NGVD 29], respectively) with 15,085 
acre-feet of usable storage and dead storage of 3,706 acre-feet below 
elevation 1,955 feet NGVD 29; (2) a 655-foot-long emergency spillway 
with a 25-foot-wide asphaltic concrete crest at elevation 2,005 feet 
NGVD 29 and a capacity of 10,200 cubic feet per second (cfs); (3) an 
intake system that includes: (i) a 125-foot-wide hexagonal-shaped 
intake cover with trash racks with a clear spacing of 5.25 inches; (ii) 
a 1,042-foot-long, 28-foot-diameter, concrete-lined vertical shaft in 
the bottom of the Upper Reservoir; (iii) a 906-foot-long horizontal, 
concrete-lined rock tunnel; and (iv) a 460-foot-long concrete-lined 
manifold that distributes flow to four 12-foot-diameter steel-lined 
penstocks, each with a maximum length of about 1,960 feet, to four 
pump-turbines located at the powerhouse; (4) a 526-foot-long, 172-foot-
wide, and 132-foot-high multi-level powerhouse located along the east 
bank of the Lower Reservoir at the base of Brown Mountain, containing 
four reversible pump turbines that each produce approximately 290 
megawatts (MW) in generation mode, and have a total maximum discharge 
of 12,800 cfs during generation and 10,200 cfs during pumping; (5) a 
bottom trash rack with a clear spacing of 5.625 inches, and four upper 
trash racks with a clear spacing of 5.25 inches; (6) an 1,800-foot-long 
central core, rock-filled lower dam with a maximum height of 100 feet 
that impounds Schoharie Creek to form the 413-acre Lower Reservoir 
(operating at the maximum and minimum elevations of 900 feet and 860 
feet NGVD 29, respectively) with 12,422 acre-feet of usable storage and 
dead storage of 3,745 acre-feet below 860 feet NGVD 29; (7) three 38-
foot-wide by 45.5-foot-high Taintor gates at the left end of the lower 
dam; (8) a 425-foot-long, 134-foot-wide concrete spillway structure 
with a crest elevation of 855 feet NGVD 29; (9) a 238-foot-long, 68.5-
foot-deep concrete stilling basin; (10) a low level outlet with four 
discharge valves of 4, 6, 8, and 10 inches for release of 5 to 25 cfs, 
and two 36-inch-diameter Howell-Bunger valves to release a combined 
flow of 25 to 700 cfs; (11) a switchyard on the eastern bank of 
Schoharie Creek adjacent to the powerhouse; and (12) appurtenant 
facilities.
    During operation, the Blenheim-Gilboa Project's pump-turbines may 
be turned on or off several times throughout the day, but the project 
typically generates electricity during the day when consumer demand is 
high and other power resources are more expensive. Pumping usually 
occurs at night and on weekends when there is excess electricity in the 
system available for use. According to a July 30, 1975, settlement 
agreement, NYPA releases a minimum flow of 10 cubic feet per second 
(cfs) during low-flow periods when 1,500 acre-feet of water is in 
storage, and 7 cfs when less than 1,500 acre-feet is in storage. For 
the period 2007 through 2016, the project's average annual generation 
was about 374,854 megawatt-hours (MWh) and average annual energy 
consumption from pumping was about 540,217 MWh.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room, or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the eLibrary

[[Page 48502]]

link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, .211, and .214. In determining the appropriate action to 
take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
protests or motions to intervene must be received on or before the 
specified comment date for the particular application.
    All filings must: (1) Bear in all capital letters the title PROTEST 
or MOTION TO INTERVENE; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain 
copies of the application directly from the applicant. A copy of any 
protest or motion to intervene must be served upon each representative 
of the applicant specified in the particular application.
    o. Procedural Schedule: The application will be processed according 
to the following revised Hydro Licensing Schedule. Revisions to the 
schedule may be made as appropriate.

 
------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Filing of motions to intervene and protests  December 11, 2017.
Issuance of Ready for Environmental          January 4, 2018.
 Analysis notice.
Filing of recommendations, preliminary       March 5, 2018.
 terms and conditions, and preliminary
 fishway prescriptions.
Reply comments due.........................  April 19, 2018.
Commission Issues Draft EA.................  September 1, 2018.
Comments on Draft EA.......................  October 1, 2018.
Modified terms and conditions due..........  November 30, 2018.
Commission issues Final EA.................  February 28, 2019.
------------------------------------------------------------------------


    Dated: October 12, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-22534 Filed 10-17-17; 8:45 am]
BILLING CODE 6717-01-P



                                                                                 Federal Register / Vol. 82, No. 200 / Wednesday, October 18, 2017 / Notices                                                                                    48501

                                                                                                                                 Milestone                                                                                               Target date

                                               Commission issues Draft Environmental Impact Statement (EIS) .............................................................................................                             July 2018.
                                               Comments on Draft EIS ..............................................................................................................................................................   September 2018.
                                               Modified Terms and Conditions ..................................................................................................................................................       November 2018.
                                               Commission Issues Final EIS .....................................................................................................................................................      February 2019.



                                                 o. Final amendments to the                                            assistance, please contact FERC Online                                  Mountain, containing four reversible
                                               application must be filed with the                                      Support at FERCOnlineSupport@                                           pump turbines that each produce
                                               Commission no later than 30 days from                                   ferc.gov, (866) 208–3676 (toll free), or                                approximately 290 megawatts (MW) in
                                               the issuance date of the Notice of Ready                                (202) 502–8659 (TTY). In lieu of                                        generation mode, and have a total
                                               for Environmental Analysis.                                             electronic filing, please send a paper                                  maximum discharge of 12,800 cfs
                                                 Dated: October 12, 2017.                                              copy to: Secretary, Federal Energy                                      during generation and 10,200 cfs during
                                                                                                                       Regulatory Commission, 888 First Street                                 pumping; (5) a bottom trash rack with
                                               Nathaniel J. Davis, Sr.,
                                                                                                                       NE., Washington, DC 20426. The first                                    a clear spacing of 5.625 inches, and four
                                               Deputy Secretary.
                                                                                                                       page of any filing should include docket                                upper trash racks with a clear spacing
                                               [FR Doc. 2017–22531 Filed 10–17–17; 8:45 am]                            number P–2685–029.                                                      of 5.25 inches; (6) an 1,800-foot-long
                                               BILLING CODE 6717–01–P                                                     The Commission’s Rules of Practice                                   central core, rock-filled lower dam with
                                                                                                                       require all intervenors filing documents                                a maximum height of 100 feet that
                                                                                                                       with the Commission to serve a copy of                                  impounds Schoharie Creek to form the
                                               DEPARTMENT OF ENERGY                                                    that document on each person on the                                     413-acre Lower Reservoir (operating at
                                                                                                                       official service list for the project.                                  the maximum and minimum elevations
                                               Federal Energy Regulatory                                               Further, if an intervenor files comments                                of 900 feet and 860 feet NGVD 29,
                                               Commission                                                              or documents with the Commission                                        respectively) with 12,422 acre-feet of
                                               [Project No. 2685–029]                                                  relating to the merits of an issue that                                 usable storage and dead storage of 3,745
                                                                                                                       may affect the responsibilities of a                                    acre-feet below 860 feet NGVD 29; (7)
                                               Notice of Application Accepted for                                      particular resource agency, they must                                   three 38-foot-wide by 45.5-foot-high
                                               Filing and Soliciting Motions To                                        also serve a copy of the document on                                    Taintor gates at the left end of the lower
                                               Intervene and Protests; New York                                        that resource agency.                                                   dam; (8) a 425-foot-long, 134-foot-wide
                                               Power Authority                                                            k. This application has been accepted                                concrete spillway structure with a crest
                                                                                                                       for filing, but is not ready for                                        elevation of 855 feet NGVD 29; (9) a
                                                 Take notice that the following                                        environmental analysis at this time.                                    238-foot-long, 68.5-foot-deep concrete
                                               hydroelectric application has been filed                                   l. The existing Blenheim-Gilboa                                      stilling basin; (10) a low level outlet
                                               with the Commission and is available                                    Project consists of the following: (1) A                                with four discharge valves of 4, 6, 8, and
                                               for public inspection.                                                  2.25-mile-long, 30-foot-wide earth and                                  10 inches for release of 5 to 25 cfs, and
                                                 a. Type of Application: New Major                                     rock fill embankment dike with a                                        two 36-inch-diameter Howell-Bunger
                                               License.                                                                maximum height of 110 feet,                                             valves to release a combined flow of 25
                                                 b. Project No.: 2685–029.                                             constructed at Brown Mountain and                                       to 700 cfs; (11) a switchyard on the
                                                 c. Date filed: April 27, 2017.                                        forming the 399-acre Upper Reservoir                                    eastern bank of Schoharie Creek
                                                 d. Applicant: New York Power                                          (operating at the maximum and extreme                                   adjacent to the powerhouse; and (12)
                                               Authority (NYPA).                                                       minimum elevations of 2,003 feet and                                    appurtenant facilities.
                                                 e. Name of Project: Blenheim-Gilboa                                   1,955 feet National Geodetic Vertical                                      During operation, the Blenheim-
                                               Pumped Storage Project (Blenheim-                                       Datum of 1929 [NGVD 29], respectively)                                  Gilboa Project’s pump-turbines may be
                                               Gilboa Project).                                                        with 15,085 acre-feet of usable storage                                 turned on or off several times
                                                 f. Location: The existing project is                                  and dead storage of 3,706 acre-feet                                     throughout the day, but the project
                                               located on Schoharie Creek, in the                                      below elevation 1,955 feet NGVD 29; (2)                                 typically generates electricity during the
                                               Towns of Blenheim and Gilboa in                                         a 655-foot-long emergency spillway                                      day when consumer demand is high and
                                               Schoharie County, New York. The                                         with a 25-foot-wide asphaltic concrete                                  other power resources are more
                                               project does not affect federal lands.                                  crest at elevation 2,005 feet NGVD 29                                   expensive. Pumping usually occurs at
                                                 g. Filed Pursuant to: Federal Power                                   and a capacity of 10,200 cubic feet per                                 night and on weekends when there is
                                               Act 16 U.S.C. 791(a)–825(r).                                            second (cfs); (3) an intake system that                                 excess electricity in the system available
                                                  h. Applicant Contact: Mr. Robert                                     includes: (i) a 125-foot-wide hexagonal-                                for use. According to a July 30, 1975,
                                               Daly, Licensing Manager, New York                                       shaped intake cover with trash racks                                    settlement agreement, NYPA releases a
                                               Power Authority, 123 Main Street,                                       with a clear spacing of 5.25 inches; (ii)                               minimum flow of 10 cubic feet per
                                               White Plains, New York 10601.                                           a 1,042-foot-long, 28-foot-diameter,                                    second (cfs) during low-flow periods
                                               Telephone: (914) 681–6564, Email:                                       concrete-lined vertical shaft in the                                    when 1,500 acre-feet of water is in
                                               Rob.Daly@nypa.gov.                                                      bottom of the Upper Reservoir; (iii) a                                  storage, and 7 cfs when less than 1,500
                                                 i. FERC Contact: Andy Bernick,                                        906-foot-long horizontal, concrete-lined                                acre-feet is in storage. For the period
                                               Telephone (202) 502–8660, and email                                     rock tunnel; and (iv) a 460-foot-long                                   2007 through 2016, the project’s average
                                               andrew.bernick@ferc.gov.                                                concrete-lined manifold that distributes                                annual generation was about 374,854
                                                  j. Deadline for filing motions to                                    flow to four 12-foot-diameter steel-lined                               megawatt-hours (MWh) and average
ethrower on DSK3G9T082PROD with NOTICES




                                               intervene and protests: 60 days from the                                penstocks, each with a maximum length                                   annual energy consumption from
                                               issuance date of this notice.                                           of about 1,960 feet, to four pump-                                      pumping was about 540,217 MWh.
                                                  The Commission strongly encourages                                   turbines located at the powerhouse; (4)                                    m. A copy of the application is
                                               electronic filing. Please file motions to                               a 526-foot-long, 172-foot-wide, and 132-                                available for review at the Commission
                                               intervene and protests using the                                        foot-high multi-level powerhouse                                        in the Public Reference Room, or may be
                                               Commission’s eFiling system at http://                                  located along the east bank of the Lower                                viewed on the Commission’s Web site at
                                               www.ferc.gov/docs-filing/efiling.asp. For                               Reservoir at the base of Brown                                          http://www.ferc.gov using the eLibrary


                                          VerDate Sep<11>2014        19:03 Oct 17, 2017       Jkt 244001      PO 00000       Frm 00026       Fmt 4703      Sfmt 4703      E:\FR\FM\18OCN1.SGM             18OCN1


                                               48502                             Federal Register / Vol. 82, No. 200 / Wednesday, October 18, 2017 / Notices

                                               link. Enter the docket number excluding                                 and Procedure, 18 CFR 385.210, .211,                                     the name, address, and telephone
                                               the last three digits in the docket                                     and .214. In determining the appropriate                                 number of the person protesting or
                                               number field to access the document.                                    action to take, the Commission will                                      intervening; and (4) otherwise comply
                                               For assistance, contact FERC Online                                     consider all protests or other comments                                  with the requirements of 18 CFR
                                               Support. A copy is also available for                                   filed, but only those who file a motion                                  385.2001 through 385.2005. Agencies
                                               inspection and reproduction at the                                      to intervene in accordance with the                                      may obtain copies of the application
                                               address in item h above.                                                Commission’s Rules may become a                                          directly from the applicant. A copy of
                                                  Register online at http://                                           party to the proceeding. Any protests or                                 any protest or motion to intervene must
                                               www.ferc.gov/docs-filing/                                               motions to intervene must be received                                    be served upon each representative of
                                               esubscription.asp to be notified via                                    on or before the specified comment date
                                                                                                                                                                                                the applicant specified in the particular
                                               email of new filings and issuances                                      for the particular application.
                                                                                                                          All filings must: (1) Bear in all capital                             application.
                                               related to this or other pending projects.
                                               For assistance, contact FERC Online                                     letters the title PROTEST or MOTION                                        o. Procedural Schedule: The
                                               Support.                                                                TO INTERVENE; (2) set forth in the                                       application will be processed according
                                                  n. Anyone may submit a protest or a                                  heading the name of the applicant and                                    to the following revised Hydro
                                               motion to intervene in accordance with                                  the project number of the application to                                 Licensing Schedule. Revisions to the
                                               the requirements of Rules of Practice                                   which the filing responds; (3) furnish                                   schedule may be made as appropriate.



                                                                                                                                  Milestone                                                                                               Target date

                                               Filing of motions to intervene and protests .................................................................................................................................           December 11,
                                                                                                                                                                                                                                         2017.
                                               Issuance of Ready for Environmental Analysis notice ...............................................................................................................                     January 4, 2018.
                                               Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions ......................................                                               March 5, 2018.
                                               Reply comments due ..................................................................................................................................................................   April 19, 2018.
                                               Commission Issues Draft EA ......................................................................................................................................................       September 1, 2018.
                                               Comments on Draft EA ...............................................................................................................................................................    October 1, 2018.
                                               Modified terms and conditions due .............................................................................................................................................         November 30,
                                                                                                                                                                                                                                         2018.
                                               Commission issues Final EA ......................................................................................................................................................       February 28, 2019.



                                                 Dated: October 12, 2017.                                              From outside Local Wash, DC area 1–                                      more fully set forth in the request,
                                               Nathaniel J. Davis, Sr.,                                                  877–857–1347                                                           which is on file with the Commission
                                               Deputy Secretary.                                                       Meeting ID: 0255                                                         and open to public inspection. The
                                               [FR Doc. 2017–22534 Filed 10–17–17; 8:45 am]                              Dated: October 12, 2017.                                               proposed application is referred to as
                                               BILLING CODE 6717–01–P                                                  Nathaniel J. Davis, Sr.,
                                                                                                                                                                                                the CBD/DST Pipeline Abandonment
                                                                                                                                                                                                Project Application. The filing may also
                                                                                                                       Deputy Secretary.
                                                                                                                                                                                                be viewed on the web at http://
                                                                                                                       [FR Doc. 2017–22530 Filed 10–17–17; 8:45 am]
                                               DEPARTMENT OF ENERGY                                                                                                                             www.ferc.gov using the eLibrary link.
                                                                                                                       BILLING CODE 6717–01–P                                                   Enter the docket number excluding the
                                               Federal Energy Regulatory                                                                                                                        last three digits in the docket number
                                               Commission                                                                                                                                       field to access the document. For
                                                                                                                       DEPARTMENT OF ENERGY
                                                                                                                                                                                                assistance, contact FERC at
                                               [Docket No. IS17–522–000]                                               Federal Energy Regulatory                                                FERCOnlineSupport@ferc.gov or call
                                                                                                                       Commission                                                               toll-free, (866) 208–3676 or TTY, (202)
                                               Supplemental Notice of Technical                                                                                                                 502–8659.
                                               Conference; Colonial Pipeline                                           [Docket No. CP18–1–000]                                                     Specifically, Texas Gas proposes to (i)
                                               Company
                                                                                                                                                                                                abandon in place approximately 4.4
                                                  On September 29, 2017, a notice was                                  Notice of Request Under Blanket                                          miles and abandon by removal 2.4 miles
                                               issued stating that a technical                                         Authorization; Texas Gas                                                 of 8-inch pipeline designated as the
                                               conference will be held to address the                                  Transmission, LLC                                                        Calliou Bay—Dog Lake (CBD) Pipeline,
                                               effect of the tariff changes proposed by                                  Take notice that on October 3, 2017,                                   (ii) abandon in place approximately 10.1
                                               Colonial Pipeline Company in its June                                   Texas Gas Transmission, LLC. (Texas                                      miles and abandon by removal 1.7 miles
                                               23, 2017 filing in this docket. The                                     Gas), 9 Greenway Plaza, Suite 2800,                                      of 10-inch pipeline designated as the
                                               technical conference will be held on                                    Houston, Texas 77046, filed a prior                                      Deep Saline—Peltex (DST) Pipeline, and
                                               Wednesday, October 25, 2017 at 9:00                                     notice application pursuant to sections                                  (iii) abandon by removal two platforms
                                               a.m., in a room to be designated at the                                 157.205, 157.216(b) of the Federal                                       including associated boat landings, tube
                                               offices of the Federal Energy Regulatory                                Energy Regulatory Commission’s                                           turns, including risers, meter facilities,
                                               Commission, 888 First Street NE.,                                       (Commission) regulations under the                                       associated piping, and other auxiliary
ethrower on DSK3G9T082PROD with NOTICES




                                               Washington, DC 20426.                                                   Natural Gas Act (NGA), and Texas Gas’s                                   appurtenances.
                                                  For interested persons who cannot                                    blanket certificate issued in Docket No.                                    Any questions regarding this
                                               attend the technical conference, a call-                                CP82–407–000. Texas Gas requests to                                      application should be directed to Kathy
                                               in number has been established. Dial in                                 abandon certain natural gas pipeline                                     D. Fort, Manager, Certificates and
                                               from your phone:                                                        assets and ancillary auxiliary facilities                                Tariffs, 9 Greenway Plaza, Suite 2800,
                                               From within local Wash, DC area 202–                                    and appurtenances located in                                             Houston, Texas 77046 or phone (713)
                                                  502–6888                                                             Terrebonne Parish, Louisiana, all as                                     479–8033.


                                          VerDate Sep<11>2014        17:50 Oct 17, 2017        Jkt 244001      PO 00000      Frm 00027       Fmt 4703      Sfmt 4703      E:\FR\FM\18OCN1.SGM              18OCN1



Document Created: 2017-10-18 01:37:54
Document Modified: 2017-10-18 01:37:54
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 48501 

2025 Federal Register | Disclaimer | Privacy Policy