82_FR_48703 82 FR 48503 - Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization; CXA La Paloma, LLC

82 FR 48503 - Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization; CXA La Paloma, LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 200 (October 18, 2017)

Page Range48503-48504
FR Document2017-22529

Federal Register, Volume 82 Issue 200 (Wednesday, October 18, 2017)
[Federal Register Volume 82, Number 200 (Wednesday, October 18, 2017)]
[Notices]
[Pages 48503-48504]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-22529]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER18-53-000]


Supplemental Notice That Initial Market-Based Rate Filing 
Includes Request for Blanket Section 204 Authorization; CXA La Paloma, 
LLC

    This is a supplemental notice in the above-referenced proceeding 
CXA La Paloma, LLC's application for market-based rate authority, with 
an accompanying rate tariff, noting that such application includes a 
request for blanket authorization, under 18 CFR part 34, of future 
issuances of securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is November 1, 2017.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.

[[Page 48504]]

    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the Web site that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
[email protected] or call (866) 208-3676 (toll free). For TTY, 
call (202) 502-8659.

    Dated: October 12, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-22529 Filed 10-17-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                         Federal Register / Vol. 82, No. 200 / Wednesday, October 18, 2017 / Notices                                                48503

                                                  Any person or the Commission’s staff                   The Commission strongly encourages                  time on the specified date(s). Protests
                                               may, within 60 days after issuance of                   electronic filings of comments, protests              may be considered, but intervention is
                                               the instant notice by the Commission,                   and interventions in lieu of paper using              necessary to become a party to the
                                               file pursuant to Rule 214 of the                        the eFiling link at http://www.ferc.gov.              proceeding.
                                               Commission’s Procedural Rules (18 CFR                   Persons unable to file electronically                    eFiling is encouraged. More detailed
                                               385.214) a motion to intervene or notice                should submit an original and 5 copies                information relating to filing
                                               of intervention and pursuant to Section                 of the protest or intervention to the                 requirements, interventions, protests,
                                               157.205 of the regulations under the                    Federal Energy Regulatory Commission,                 service, and qualifying facilities filings
                                               NGA (18 CFR 157.205), a protest to the                  888 First Street NE., Washington, DC                  can be found at: http://www.ferc.gov/
                                               request. If no protest is filed within the              20426.                                                docs-filing/efiling/filing-req.pdf. For
                                               time allowed therefore, the proposed                                                                          other information, call (866) 208–3676
                                                                                                         Dated: October 12, 2017.
                                               activity shall be deemed to be                                                                                (toll free). For TTY, call (202) 502–8659.
                                                                                                       Nathaniel J. Davis, Sr.,
                                               authorized effective the day after the                                                                          Dated: October 11, 2017.
                                                                                                       Deputy Secretary.
                                               time allowed for filing a protest. If a                                                                       Nathaniel J. Davis, Sr.,
                                                                                                       [FR Doc. 2017–22535 Filed 10–17–17; 8:45 am]
                                               protest is filed and not withdrawn                                                                            Deputy Secretary.
                                               within 30 days after the allowed time                   BILLING CODE 6717–01–P
                                                                                                                                                             [FR Doc. 2017–22528 Filed 10–17–17; 8:45 am]
                                               for filing a protest, the instant request                                                                     BILLING CODE 6717–01–P
                                               shall be treated as an application for
                                                                                                       DEPARTMENT OF ENERGY
                                               authorization pursuant to section 7 of
                                               the NGA.                                                Federal Energy Regulatory                             DEPARTMENT OF ENERGY
                                                  Pursuant to section 157.9 of the                     Commission
                                               Commission’s rules, 18 CFR 157.9,                                                                             Federal Energy Regulatory
                                               within 90 days of this Notice the                       Combined Notice of Filings                            Commission
                                               Commission staff will either: Complete                                                                        [Docket No. ER18–53–000]
                                               its environmental assessment (EA) and                     Take notice that the Commission has
                                               place it into the Commission’s public                   received the following Natural Gas
                                                                                                                                                             Supplemental Notice That Initial
                                               record (eLibrary) for this proceeding, or               Pipeline Rate and Refund Report filings:
                                                                                                                                                             Market-Based Rate Filing Includes
                                               issue a Notice of Schedule for                          Filings Instituting Proceedings                       Request for Blanket Section 204
                                               Environmental Review. If a Notice of                                                                          Authorization; CXA La Paloma, LLC
                                                                                                          Docket Number: PR18–1–000.
                                               Schedule for Environmental Review is
                                                                                                          Applicants: Columbia Gas of Ohio,                     This is a supplemental notice in the
                                               issued, it will indicate, among other
                                                                                                       Inc.                                                  above-referenced proceeding CXA La
                                               milestones, the anticipated date for the
                                                                                                          Description: Tariff filing per                     Paloma, LLC’s application for market-
                                               Commission staff’s issuance of the final
                                                                                                       284.123(b),(e)/: COH SOC effective                    based rate authority, with an
                                               environmental impact statement (FEIS)
                                                                                                       9–28–2017; Filing Type: 980.                          accompanying rate tariff, noting that
                                               or EA for this proposal. The filing of the
                                                                                                          Filed Date: 10/10/17.                              such application includes a request for
                                               EA in the Commission’s public record
                                                                                                          Accession Number: 201710105248.                    blanket authorization, under 18 CFR
                                               for this proceeding or the issuance of a
                                                                                                          Comments/Protests Due: 5 p.m. ET                   part 34, of future issuances of securities
                                               Notice of Schedule for Environmental
                                                                                                       10/31/17.                                             and assumptions of liability.
                                               Review will serve to notify federal and
                                                                                                          Docket Number: PR18–2–000.                            Any person desiring to intervene or to
                                               state agencies of the timing for the
                                                                                                          Applicants: Acacia Natural Gas, L.L.C.             protest should file with the Federal
                                               completion of all necessary reviews, and
                                                                                                          Description: Tariff filing per                     Energy Regulatory Commission, 888
                                               the subsequent need to complete all                                                                           First Street NE., Washington, DC 20426,
                                               federal authorizations within 90 days of                284.123(b)(2)+(g): Acacia Natural Gas
                                                                                                       Petition for Rate Approval to be                      in accordance with Rules 211 and 214
                                               the date of issuance of the Commission                                                                        of the Commission’s Rules of Practice
                                               staff’s FEIS or EA.                                     effective 11/1/2017; Filing Type: 1310.
                                                                                                          Filed Date: 10/10/17.                              and Procedure (18 CFR 385.211 and
                                                  Persons who wish to comment only                                                                           385.214). Anyone filing a motion to
                                                                                                          Accession Number: 201710105329.
                                               on the environmental review of this                                                                           intervene or protest must serve a copy
                                                                                                          Comments Due: 5 p.m. ET 10/31/17.
                                               project should submit an original and                                                                         of that document on the Applicant.
                                               two copies of their comments to the                        284.123(g) Protests Due: 5 p.m. ET
                                                                                                                                                                Notice is hereby given that the
                                               Secretary of the Commission.                            12/11/17.
                                                                                                                                                             deadline for filing protests with regard
                                               Environmental commenters will be                           Docket Numbers: RP18–27–000.                       to the applicant’s request for blanket
                                               placed on the Commission’s                                 Applicants: Empire Pipeline, Inc.                  authorization, under 18 CFR part 34, of
                                               environmental mailing list, will receive                   Description: § 4(d) Rate Filing: GT&C              future issuances of securities and
                                               copies of the environmental documents,                  18 and Other Minor Changes to be                      assumptions of liability, is November 1,
                                               and will be notified of meetings                        effective 11/9/2017.                                  2017.
                                               associated with the Commission’s                           Filed Date: 10/10/17.                                 The Commission encourages
                                               environmental review process.                              Accession Number: 20171010–5290.                   electronic submission of protests and
                                               Environmental commenters will not be                       Comments Due: 5 p.m. ET 10/23/17.                  interventions in lieu of paper, using the
                                               required to serve copies of filed                          The filings are accessible in the                  FERC Online links at http://
                                               documents on all other parties.                         Commission’s eLibrary system by                       www.ferc.gov. To facilitate electronic
                                               However, the non-party commenter will                   clicking on the links or querying the                 service, persons with Internet access
ethrower on DSK3G9T082PROD with NOTICES




                                               not receive copies of all documents filed               docket number.                                        who will eFile a document and/or be
                                               by other parties or issued by the                          Any person desiring to intervene or                listed as a contact for an intervenor
                                               Commission (except for the mailing of                   protest in any of the above proceedings               must create and validate an
                                               environmental documents issued by the                   must file in accordance with Rules 211                eRegistration account using the
                                               Commission) and will not have the right                 and 214 of the Commission’s                           eRegistration link. Select the eFiling
                                               to seek court review of the                             Regulations (18 CFR 385.211 and                       link to log on and submit the
                                               Commission’s final order.                               § 385.214) on or before 5:00 p.m. Eastern             intervention or protests.


                                          VerDate Sep<11>2014   17:50 Oct 17, 2017   Jkt 244001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\18OCN1.SGM   18OCN1


                                               48504                     Federal Register / Vol. 82, No. 200 / Wednesday, October 18, 2017 / Notices

                                                  Persons unable to file electronically                0949, (209) 883–8300; and Anna                        hydraulic capacity of the outlet works is
                                               should submit an original and 5 copies                  Brathwaite, Modesto Irrigation District,              7,500 cfs.
                                               of the intervention or protest to the                   P.O. Box 4060, Modesto, CA 95352,
                                                                                                                                                             Power Intake and Tunnel
                                               Federal Energy Regulatory Commission,                   (209) 526–7384.
                                               888 First Street NE., Washington, DC                      i. FERC Contact: Jim Hastreiter at                     Flows are delivered from the reservoir
                                               20426.                                                  (503) 552–2760 or james.hastreiter@                   to the powerhouse via a 2,960-foot-long
                                                  The filings in the above-referenced                  ferc.gov.                                             power tunnel located in the left (east)
                                               proceeding are accessible in the                          j. This application is not ready for                abutment of the main dam. The tunnel
                                               Commission’s eLibrary system by                         environmental analysis at this time.                  transitions from an 18-foot 6-inch
                                               clicking on the appropriate link in the                   k. The Project Description:                         concrete-lined section to a 16-foot steel-
                                               above list. They are also available for                 Don Pedro Dam and Reservoir                           lined section. Emergency closure can be
                                               electronic review in the Commission’s                                                                         provided by a 21-foot-high by 12-foot-
                                               Public Reference Room in Washington,                       The primary project feature is Don                 wide fixed-wheel gate that is operated
                                               DC. There is an eSubscription link on                   Pedro Dam, a 1,900-foot-long and 580-                 from a chamber at the top of the gate
                                               the Web site that enables subscribers to                foot-high zoned earth and rockfill                    shaft. Flows from the power tunnel are
                                               receive email notification when a                       structure. The top of the dam is at                   delivered to the four-unit powerhouse
                                               document is added to a subscribed                       elevation 855 feet mean sea level (msl).              and a hollow-jet control valve in the
                                                                                                          Don Pedro Reservoir extends
                                               docket(s). For assistance with any FERC                                                                       powerhouse.
                                                                                                       upstream for approximately 24 miles at
                                               Online service, please email
                                                                                                       the normal maximum water surface                      Powerhouse
                                               FERCOnlineSupport@ferc.gov or call
                                                                                                       elevation of 830 feet (msl). The surface
                                               (866) 208–3676 (toll free). For TTY, call                                                                        Located immediately downstream of
                                                                                                       area of the reservoir at the 830-foot
                                               (202) 502–8659.                                                                                               the main dam, the Don Pedro
                                                                                                       elevation is approximately 12,960 acres
                                                 Dated: October 12, 2017.                                                                                    powerhouse contains four turbine-
                                                                                                       and the gross storage capacity is
                                               Nathaniel J. Davis, Sr.,                                                                                      generator units and a 72-inch hollow jet
                                                                                                       2,030,000 acre-feet.
                                               Deputy Secretary.
                                                                                                                                                             valve. The reinforced-concrete
                                                                                                       Don Pedro Spillway                                    powerhouse is 171 feet long, 110 feet
                                               [FR Doc. 2017–22529 Filed 10–17–17; 8:45 am]
                                                                                                         Don Pedro Spillway is divided into                  high and 148 feet wide. It houses four
                                               BILLING CODE 6717–01–P
                                                                                                       two sections, one gated and one                       Francis turbine generator units with a
                                                                                                       ungated, located immediately adjacent                 nameplate capacity of 168 megawatts
                                                                                                       to one another in a saddle area west of               (MW) and a maximum output at
                                               DEPARTMENT OF ENERGY
                                                                                                       the main dam. The gated spillway                      optimum conditions of approximately
                                               Federal Energy Regulatory                               section is 135-feet-long, with a                      203 MW. Combined hydraulic capacity
                                               Commission                                              permanent crest elevation of 800 feet,                of the four units under maximum head
                                                                                                       and includes three radial gates each 45               is approximately 5,500 cfs.
                                               [Project No. 2299–082]                                                                                           The powerhouse also contains a 72-
                                                                                                       feet wide by 30 feet high. The ungated
                                               Notice of Amended Application                           spillway is an ogee section 995 feet long             inch hollow jet valve located in the east
                                               Tendered for Filing With the                            with a crest elevation of 830 feet msl                end of the powerhouse with a centerline
                                               Commission and Establishing                             and a top of abutment elevation of 855                elevation at discharge of 299 feet msl.
                                               Procedural Schedule for Licensing and                   feet msl. The spillway capacity at a                  The hydraulic capacity of the hollow jet
                                               Deadline for Submission of Final                        reservoir water level of 850 feet msl is              valve is 3,000 cfs. While turbine Units
                                               Amendments; Turlock Irrigation                          472,500 cubic feet per second (cfs).                  1 through 3 discharge directly to the
                                               District and Modesto Irrigation District,               Flow releases over the ungated ogee-                  river channel, Unit 4 discharges to the
                                               California                                              crest section of the spillway have                    outlet works tunnel approximately 250
                                                                                                       occurred only once since project                      feet upstream of the tunnel outlet. Water
                                                 Take notice that the following                        construction, in early January 1997.                  to Unit 4 is delivered through a
                                               hydroelectric application has been filed                Flows at the spillway are released to                 bifurcation from the hollow jet valve
                                               with the Commission and is available                    Gasburg Creek, which in turn flows into               pipe. With Unit 4 in operation, the
                                               for public inspection.                                  Twin Gulch, and then back into the                    hollow-jet valve capacity is reduced
                                                 a. Type of Application: New Major                     Tuolumne River approximately 1.5                      from 3,000 cfs to 800 cfs. The
                                               License.                                                miles downstream of the main dam.                     powerhouse tailwater during turbine
                                                 b. Project No.: 2299–082.                                                                                   operation varies from a low elevation of
                                                 c. Date Filed: October 11, 2017.                      Outlet Works                                          about 298 feet msl to a high elevation
                                                 d. Applicant: Turlock Irrigation                         The project facilities include a set of            of about 303 feet msl under normal
                                               District and Modesto Irrigation District,               outlet works located at the left (east)               operating conditions. The tailwater
                                               California.                                             abutment of the main dam. The outlet                  elevation at the outlet works tunnel is
                                                 e. Name of Project: Don Pedro                         works consist of three individual gate                approximately 300 feet msl.
                                               Hydropower Project.                                     housings, each containing two 4-feet-by-
                                                                                                                                                             Switchyard
                                                 f. Location: The Don Pedro Project is                 5-feet slide gates. The outlet works are
                                               located on the Tuolumne River in                        situated in a 3,500-foot-long concrete                   The project switchyard is located atop
                                               Tuolumne County, California. Portions                   lined tunnel that originally served as the            the powerhouse at elevation 340 feet
                                               of the project occupy public lands                      water diversion tunnel during project                 msl. The switchyard provides power
ethrower on DSK3G9T082PROD with NOTICES




                                               managed by the Bureau of Land                           construction. The inlet to the tunnel has             delivery and electrical protection to the
                                               Management.                                             an invert elevation of 342 feet msl and               Districts’ transmission systems. The
                                                 g. Filed Pursuant to: Federal Power                   the outlet, which is located                          switchyard includes isolated phase
                                               Act, 16 U.S.C. 79 (a)–825(r).                           approximately 400 feet downstream of                  buses, circuit breakers, and four
                                                 h. Applicant Contacts: Steve Boyd,                    the powerhouse, has an invert of 310                  transformers that raise the 13.8 kilovolt
                                               Turlock Irrigation District, 333 East                   feet. At a reservoir water surface                    (kV) generator voltage to 69 kV
                                               Canal Drive, Turlock, California 95381–                 elevation of 830 feet msl, the total                  transmission voltage.


                                          VerDate Sep<11>2014   17:50 Oct 17, 2017   Jkt 244001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\18OCN1.SGM   18OCN1



Document Created: 2017-10-18 01:37:45
Document Modified: 2017-10-18 01:37:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 48503 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR