[Federal Register Volume 82, Number 200 (Wednesday, October 18, 2017)]
[Notices]
[Pages 48504-48505]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-22533]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2299-082]


Notice of Amended Application Tendered for Filing With the 
Commission and Establishing Procedural Schedule for Licensing and 
Deadline for Submission of Final Amendments; Turlock Irrigation 
District and Modesto Irrigation District, California

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2299-082.
    c. Date Filed: October 11, 2017.
    d. Applicant: Turlock Irrigation District and Modesto Irrigation 
District, California.
    e. Name of Project: Don Pedro Hydropower Project.
    f. Location: The Don Pedro Project is located on the Tuolumne River 
in Tuolumne County, California. Portions of the project occupy public 
lands managed by the Bureau of Land Management.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 79 (a)-825(r).
    h. Applicant Contacts: Steve Boyd, Turlock Irrigation District, 333 
East Canal Drive, Turlock, California 95381-0949, (209) 883-8300; and 
Anna Brathwaite, Modesto Irrigation District, P.O. Box 4060, Modesto, 
CA 95352, (209) 526-7384.
    i. FERC Contact: Jim Hastreiter at (503) 552-2760 or 
[email protected].
    j. This application is not ready for environmental analysis at this 
time.
    k. The Project Description:

Don Pedro Dam and Reservoir

    The primary project feature is Don Pedro Dam, a 1,900-foot-long and 
580-foot-high zoned earth and rockfill structure. The top of the dam is 
at elevation 855 feet mean sea level (msl).
    Don Pedro Reservoir extends upstream for approximately 24 miles at 
the normal maximum water surface elevation of 830 feet (msl). The 
surface area of the reservoir at the 830-foot elevation is 
approximately 12,960 acres and the gross storage capacity is 2,030,000 
acre-feet.

Don Pedro Spillway

    Don Pedro Spillway is divided into two sections, one gated and one 
ungated, located immediately adjacent to one another in a saddle area 
west of the main dam. The gated spillway section is 135-feet-long, with 
a permanent crest elevation of 800 feet, and includes three radial 
gates each 45 feet wide by 30 feet high. The ungated spillway is an 
ogee section 995 feet long with a crest elevation of 830 feet msl and a 
top of abutment elevation of 855 feet msl. The spillway capacity at a 
reservoir water level of 850 feet msl is 472,500 cubic feet per second 
(cfs). Flow releases over the ungated ogee-crest section of the 
spillway have occurred only once since project construction, in early 
January 1997. Flows at the spillway are released to Gasburg Creek, 
which in turn flows into Twin Gulch, and then back into the Tuolumne 
River approximately 1.5 miles downstream of the main dam.

Outlet Works

    The project facilities include a set of outlet works located at the 
left (east) abutment of the main dam. The outlet works consist of three 
individual gate housings, each containing two 4-feet-by-5-feet slide 
gates. The outlet works are situated in a 3,500-foot-long concrete 
lined tunnel that originally served as the water diversion tunnel 
during project construction. The inlet to the tunnel has an invert 
elevation of 342 feet msl and the outlet, which is located 
approximately 400 feet downstream of the powerhouse, has an invert of 
310 feet. At a reservoir water surface elevation of 830 feet msl, the 
total hydraulic capacity of the outlet works is 7,500 cfs.

Power Intake and Tunnel

    Flows are delivered from the reservoir to the powerhouse via a 
2,960-foot-long power tunnel located in the left (east) abutment of the 
main dam. The tunnel transitions from an 18-foot 6-inch concrete-lined 
section to a 16-foot steel-lined section. Emergency closure can be 
provided by a 21-foot-high by 12-foot-wide fixed-wheel gate that is 
operated from a chamber at the top of the gate shaft. Flows from the 
power tunnel are delivered to the four-unit powerhouse and a hollow-jet 
control valve in the powerhouse.

Powerhouse

    Located immediately downstream of the main dam, the Don Pedro 
powerhouse contains four turbine-generator units and a 72-inch hollow 
jet valve. The reinforced-concrete powerhouse is 171 feet long, 110 
feet high and 148 feet wide. It houses four Francis turbine generator 
units with a nameplate capacity of 168 megawatts (MW) and a maximum 
output at optimum conditions of approximately 203 MW. Combined 
hydraulic capacity of the four units under maximum head is 
approximately 5,500 cfs.
    The powerhouse also contains a 72-inch hollow jet valve located in 
the east end of the powerhouse with a centerline elevation at discharge 
of 299 feet msl. The hydraulic capacity of the hollow jet valve is 
3,000 cfs. While turbine Units 1 through 3 discharge directly to the 
river channel, Unit 4 discharges to the outlet works tunnel 
approximately 250 feet upstream of the tunnel outlet. Water to Unit 4 
is delivered through a bifurcation from the hollow jet valve pipe. With 
Unit 4 in operation, the hollow-jet valve capacity is reduced from 
3,000 cfs to 800 cfs. The powerhouse tailwater during turbine operation 
varies from a low elevation of about 298 feet msl to a high elevation 
of about 303 feet msl under normal operating conditions. The tailwater 
elevation at the outlet works tunnel is approximately 300 feet msl.

Switchyard

    The project switchyard is located atop the powerhouse at elevation 
340 feet msl. The switchyard provides power delivery and electrical 
protection to the Districts' transmission systems. The switchyard 
includes isolated phase buses, circuit breakers, and four transformers 
that raise the 13.8 kilovolt (kV) generator voltage to 69 kV 
transmission voltage.

[[Page 48505]]

Gasburg Creek Dike

    Don Pedro dam spillway discharges into Gasburg Creek. Gasburg Creek 
dike is located near the downstream end of the spillway, and directs 
flows from Gasburg Creek into Twin Gulch where spillway discharges join 
the Tuolumne River approximately 1.5 miles downstream of the Don Pedro 
powerhouse. Gasburg Creek dike consists of an impervious earth and 
rockfill dam approximately 75 feet in height, with a slide-gate 
controlled 18-inch-diameter conduit. The top of Gasburg Creek dike is 
at elevation 725 feet msl.

Dikes A, B, and C

    The project includes three small embankments--Dikes A, B, and C--
constructed in low saddles on the reservoir rim with top elevations of 
855 feet msl. Dike A is located between the main dam and spillway. 
Dikes B and C are located east of the main dam.

Recreation Facilities

    The project has three developed recreation areas, Fleming Meadows, 
Blue Oaks, and Moccasin Point. Primitive and semi-primitive lakeshore 
camping occurs on much of the rest of its shores. The project provides 
both floating and shoreline restrooms in addition to those at the 
developed recreation areas. Facilities also include hazard marking, 
regulatory buoy lines, and other open water-based features including 
houseboat marinas and a marked water-ski slalom course.
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at http://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in item (h) above.
    m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural Schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule may be made as appropriate.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for     October 2017.
 Environmental Analysis.
Filing of recommendations, preliminary       December 2017.
 terms and conditions, and fishway
 prescriptions.
Commission issues Draft Environmental        July 2018.
 Impact Statement (EIS).
Comments on Draft EIS......................  September 2018.
Modified Terms and Conditions..............  November 2018.
Commission Issues Final EIS................  February 2019.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the Notice 
of Ready for Environmental Analysis.

    Dated: October 12, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-22533 Filed 10-17-17; 8:45 am]
 BILLING CODE 6717-01-P



                                               48504                     Federal Register / Vol. 82, No. 200 / Wednesday, October 18, 2017 / Notices

                                                  Persons unable to file electronically                0949, (209) 883–8300; and Anna                        hydraulic capacity of the outlet works is
                                               should submit an original and 5 copies                  Brathwaite, Modesto Irrigation District,              7,500 cfs.
                                               of the intervention or protest to the                   P.O. Box 4060, Modesto, CA 95352,
                                                                                                                                                             Power Intake and Tunnel
                                               Federal Energy Regulatory Commission,                   (209) 526–7384.
                                               888 First Street NE., Washington, DC                      i. FERC Contact: Jim Hastreiter at                     Flows are delivered from the reservoir
                                               20426.                                                  (503) 552–2760 or james.hastreiter@                   to the powerhouse via a 2,960-foot-long
                                                  The filings in the above-referenced                  ferc.gov.                                             power tunnel located in the left (east)
                                               proceeding are accessible in the                          j. This application is not ready for                abutment of the main dam. The tunnel
                                               Commission’s eLibrary system by                         environmental analysis at this time.                  transitions from an 18-foot 6-inch
                                               clicking on the appropriate link in the                   k. The Project Description:                         concrete-lined section to a 16-foot steel-
                                               above list. They are also available for                 Don Pedro Dam and Reservoir                           lined section. Emergency closure can be
                                               electronic review in the Commission’s                                                                         provided by a 21-foot-high by 12-foot-
                                               Public Reference Room in Washington,                       The primary project feature is Don                 wide fixed-wheel gate that is operated
                                               DC. There is an eSubscription link on                   Pedro Dam, a 1,900-foot-long and 580-                 from a chamber at the top of the gate
                                               the Web site that enables subscribers to                foot-high zoned earth and rockfill                    shaft. Flows from the power tunnel are
                                               receive email notification when a                       structure. The top of the dam is at                   delivered to the four-unit powerhouse
                                               document is added to a subscribed                       elevation 855 feet mean sea level (msl).              and a hollow-jet control valve in the
                                                                                                          Don Pedro Reservoir extends
                                               docket(s). For assistance with any FERC                                                                       powerhouse.
                                                                                                       upstream for approximately 24 miles at
                                               Online service, please email
                                                                                                       the normal maximum water surface                      Powerhouse
                                               FERCOnlineSupport@ferc.gov or call
                                                                                                       elevation of 830 feet (msl). The surface
                                               (866) 208–3676 (toll free). For TTY, call                                                                        Located immediately downstream of
                                                                                                       area of the reservoir at the 830-foot
                                               (202) 502–8659.                                                                                               the main dam, the Don Pedro
                                                                                                       elevation is approximately 12,960 acres
                                                 Dated: October 12, 2017.                                                                                    powerhouse contains four turbine-
                                                                                                       and the gross storage capacity is
                                               Nathaniel J. Davis, Sr.,                                                                                      generator units and a 72-inch hollow jet
                                                                                                       2,030,000 acre-feet.
                                               Deputy Secretary.
                                                                                                                                                             valve. The reinforced-concrete
                                                                                                       Don Pedro Spillway                                    powerhouse is 171 feet long, 110 feet
                                               [FR Doc. 2017–22529 Filed 10–17–17; 8:45 am]
                                                                                                         Don Pedro Spillway is divided into                  high and 148 feet wide. It houses four
                                               BILLING CODE 6717–01–P
                                                                                                       two sections, one gated and one                       Francis turbine generator units with a
                                                                                                       ungated, located immediately adjacent                 nameplate capacity of 168 megawatts
                                                                                                       to one another in a saddle area west of               (MW) and a maximum output at
                                               DEPARTMENT OF ENERGY
                                                                                                       the main dam. The gated spillway                      optimum conditions of approximately
                                               Federal Energy Regulatory                               section is 135-feet-long, with a                      203 MW. Combined hydraulic capacity
                                               Commission                                              permanent crest elevation of 800 feet,                of the four units under maximum head
                                                                                                       and includes three radial gates each 45               is approximately 5,500 cfs.
                                               [Project No. 2299–082]                                                                                           The powerhouse also contains a 72-
                                                                                                       feet wide by 30 feet high. The ungated
                                               Notice of Amended Application                           spillway is an ogee section 995 feet long             inch hollow jet valve located in the east
                                               Tendered for Filing With the                            with a crest elevation of 830 feet msl                end of the powerhouse with a centerline
                                               Commission and Establishing                             and a top of abutment elevation of 855                elevation at discharge of 299 feet msl.
                                               Procedural Schedule for Licensing and                   feet msl. The spillway capacity at a                  The hydraulic capacity of the hollow jet
                                               Deadline for Submission of Final                        reservoir water level of 850 feet msl is              valve is 3,000 cfs. While turbine Units
                                               Amendments; Turlock Irrigation                          472,500 cubic feet per second (cfs).                  1 through 3 discharge directly to the
                                               District and Modesto Irrigation District,               Flow releases over the ungated ogee-                  river channel, Unit 4 discharges to the
                                               California                                              crest section of the spillway have                    outlet works tunnel approximately 250
                                                                                                       occurred only once since project                      feet upstream of the tunnel outlet. Water
                                                 Take notice that the following                        construction, in early January 1997.                  to Unit 4 is delivered through a
                                               hydroelectric application has been filed                Flows at the spillway are released to                 bifurcation from the hollow jet valve
                                               with the Commission and is available                    Gasburg Creek, which in turn flows into               pipe. With Unit 4 in operation, the
                                               for public inspection.                                  Twin Gulch, and then back into the                    hollow-jet valve capacity is reduced
                                                 a. Type of Application: New Major                     Tuolumne River approximately 1.5                      from 3,000 cfs to 800 cfs. The
                                               License.                                                miles downstream of the main dam.                     powerhouse tailwater during turbine
                                                 b. Project No.: 2299–082.                                                                                   operation varies from a low elevation of
                                                 c. Date Filed: October 11, 2017.                      Outlet Works                                          about 298 feet msl to a high elevation
                                                 d. Applicant: Turlock Irrigation                         The project facilities include a set of            of about 303 feet msl under normal
                                               District and Modesto Irrigation District,               outlet works located at the left (east)               operating conditions. The tailwater
                                               California.                                             abutment of the main dam. The outlet                  elevation at the outlet works tunnel is
                                                 e. Name of Project: Don Pedro                         works consist of three individual gate                approximately 300 feet msl.
                                               Hydropower Project.                                     housings, each containing two 4-feet-by-
                                                                                                                                                             Switchyard
                                                 f. Location: The Don Pedro Project is                 5-feet slide gates. The outlet works are
                                               located on the Tuolumne River in                        situated in a 3,500-foot-long concrete                   The project switchyard is located atop
                                               Tuolumne County, California. Portions                   lined tunnel that originally served as the            the powerhouse at elevation 340 feet
                                               of the project occupy public lands                      water diversion tunnel during project                 msl. The switchyard provides power
ethrower on DSK3G9T082PROD with NOTICES




                                               managed by the Bureau of Land                           construction. The inlet to the tunnel has             delivery and electrical protection to the
                                               Management.                                             an invert elevation of 342 feet msl and               Districts’ transmission systems. The
                                                 g. Filed Pursuant to: Federal Power                   the outlet, which is located                          switchyard includes isolated phase
                                               Act, 16 U.S.C. 79 (a)–825(r).                           approximately 400 feet downstream of                  buses, circuit breakers, and four
                                                 h. Applicant Contacts: Steve Boyd,                    the powerhouse, has an invert of 310                  transformers that raise the 13.8 kilovolt
                                               Turlock Irrigation District, 333 East                   feet. At a reservoir water surface                    (kV) generator voltage to 69 kV
                                               Canal Drive, Turlock, California 95381–                 elevation of 830 feet msl, the total                  transmission voltage.


                                          VerDate Sep<11>2014   17:50 Oct 17, 2017   Jkt 244001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\18OCN1.SGM   18OCN1


                                                                                 Federal Register / Vol. 82, No. 200 / Wednesday, October 18, 2017 / Notices                                                                                    48505

                                               Gasburg Creek Dike                                                      main dam and spillway. Dikes B and C                                    Enter the docket number excluding the
                                                  Don Pedro dam spillway discharges                                    are located east of the main dam.                                       last three digits in the docket number
                                               into Gasburg Creek. Gasburg Creek dike                                                                                                          field to access the document. For
                                                                                                                       Recreation Facilities
                                               is located near the downstream end of                                                                                                           assistance, please contact FERC Online
                                               the spillway, and directs flows from                                       The project has three developed                                      Support at FERCOnlineSupport@
                                               Gasburg Creek into Twin Gulch where                                     recreation areas, Fleming Meadows,                                      ferc.gov, (866) 208–3676 (toll free), or
                                               spillway discharges join the Tuolumne                                   Blue Oaks, and Moccasin Point.                                          (202) 502–8659 (TTY). A copy is also
                                               River approximately 1.5 miles                                           Primitive and semi-primitive lakeshore                                  available for inspection and
                                               downstream of the Don Pedro                                             camping occurs on much of the rest of                                   reproduction at the address in item (h)
                                               powerhouse. Gasburg Creek dike                                          its shores. The project provides both                                   above.
                                               consists of an impervious earth and                                     floating and shoreline restrooms in
                                                                                                                                                                                                  m. You may also register online at
                                               rockfill dam approximately 75 feet in                                   addition to those at the developed
                                                                                                                       recreation areas. Facilities also include                               http://www.ferc.gov/docs-filing/
                                               height, with a slide-gate controlled 18-                                                                                                        esubscription.asp to be notified via
                                               inch-diameter conduit. The top of                                       hazard marking, regulatory buoy lines,
                                                                                                                       and other open water-based features                                     email of new filings and issuances
                                               Gasburg Creek dike is at elevation 725                                                                                                          related to this or other pending projects.
                                               feet msl.                                                               including houseboat marinas and a
                                                                                                                       marked water-ski slalom course.                                         For assistance, contact FERC Online
                                               Dikes A, B, and C                                                          l. Locations of the Application: A                                   Support.
                                                 The project includes three small                                      copy of the application is available for                                   n. Procedural Schedule: The
                                               embankments—Dikes A, B, and C—                                          review at the Commission in the Public                                  application will be processed according
                                               constructed in low saddles on the                                       Reference Room or may be viewed on                                      to the following preliminary Hydro
                                               reservoir rim with top elevations of 855                                the Commission’s Web site at http://                                    Licensing Schedule. Revisions to the
                                               feet msl. Dike A is located between the                                 www.ferc.gov using the ‘‘eLibrary’’ link.                               schedule may be made as appropriate.

                                                                                                                                 Milestone                                                                                               Target date

                                               Notice of Acceptance/Notice of Ready for Environmental Analysis ...........................................................................................                            October 2017.
                                               Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ........................................................                                        December 2017.
                                               Commission issues Draft Environmental Impact Statement (EIS) .............................................................................................                             July 2018.
                                               Comments on Draft EIS ..............................................................................................................................................................   September 2018.
                                               Modified Terms and Conditions ..................................................................................................................................................       November 2018.
                                               Commission Issues Final EIS .....................................................................................................................................................      February 2019.



                                                 o. Final amendments to the                                               Applicants: Cleco Power LLC, Attala                                     Description: Notice of Non-Material
                                               application must be filed with the                                      Transmission LLC, Perryville Energy                                     Change in Status of MP2 Energy LLC, et
                                               Commission no later than 30 days from                                   Partners, L.L.C., Entergy Louisiana, LLC,                               al.
                                               the issuance date of the Notice of Ready                                Entergy Mississippi, Inc.                                                  Filed Date: 10/11/17.
                                               for Environmental Analysis.                                                Description: Joint Application for                                      Accession Number: 20171011–5212.
                                                                                                                       Section 203 Approval of Cleco Power                                        Comments Due: 5 p.m. ET 11/1/17.
                                                 Dated: October 12, 2017.
                                                                                                                       LLC, et al.                                                                Take notice that the Commission
                                               Nathaniel J. Davis, Sr.,
                                                                                                                          Filed Date: 10/11/17.                                                received the following qualifying
                                               Deputy Secretary.
                                                                                                                          Accession Number: 20171011–5205.                                     facility filings:
                                               [FR Doc. 2017–22533 Filed 10–17–17; 8:45 am]
                                                                                                                          Comments Due: 5 p.m. ET 11/1/17.                                        Docket Numbers: QF17–1529–000.
                                               BILLING CODE 6717–01–P                                                                                                                             Applicants: DOM Solar Lessor I, LP.
                                                                                                                          Docket Numbers: EC18–5–000.                                             Description: Refund Report of DOM
                                                                                                                          Applicants: RE Tranquillity LLC, RE                                  Solar Lessor I, LP [CMEEC—Bozrah].
                                               DEPARTMENT OF ENERGY                                                    Garland LLC, RE Garland A LLC, RE                                          Filed Date: 10/10/17.
                                                                                                                       Mustang LLC, RE Mustang 3 LLC, RE                                          Accession Number: 20171010–5401.
                                               Federal Energy Regulatory                                               Mustang 4 LLC.                                                             Comments Due: 5 p.m. ET 10/31/17.
                                               Commission
                                                                                                                          Description: Application for                                            The filings are accessible in the
                                               Combined Notice of Filings #1                                           Authorization under Section 203 of the                                  Commission’s eLibrary system by
                                                                                                                       Federal Power Act and Request for                                       clicking on the links or querying the
                                                  Take notice that the Commission                                      Waivers, Confidential Treatment,                                        docket number.
                                               received the following electric corporate                               Expedited Action and Shortened                                             Any person desiring to intervene or
                                               filings:                                                                Comment Period of RE Tranquillity                                       protest in any of the above proceedings
                                                  Docket Numbers: EC17–186–000.                                        LLC, et al.                                                             must file in accordance with Rules 211
                                                  Applicants: American Transmission                                       Filed Date: 10/11/17.                                                and 214 of the Commission’s
                                               Company LLC.                                                               Accession Number: 20171011–5206.                                     Regulations (18 CFR 385.211 and
                                                  Description: Amendment to                                               Comments Due: 5 p.m. ET 11/1/17.                                     385.214) on or before 5:00 p.m. Eastern
                                               Application (Exhibit N) for                                                                                                                     time on the specified comment date.
                                                                                                                          Take notice that the Commission                                      Protests may be considered, but
ethrower on DSK3G9T082PROD with NOTICES




                                               Authorization Under Section 203 of the                                  received the following electric rate
                                               Federal Power Act of American                                                                                                                   intervention is necessary to become a
                                                                                                                       filings:                                                                party to the proceeding.
                                               Transmission Company LLC.                                                  Docket Numbers: ER13–1069–005;                                          eFiling is encouraged. More detailed
                                                  Filed Date: 10/11/17.                                                ER12–2381–002; ER10–1484–016.                                           information relating to filing
                                                  Accession Number: 20171011–5155.                                        Applicants: MP2 Energy LLC, MP2                                      requirements, interventions, protests,
                                                  Comments Due: 5 p.m. ET 11/1/17.                                     Energy NE LLC, Shell Energy North                                       service, and qualifying facilities filings
                                                  Docket Numbers: EC18–4–000.                                          America (US), L.P.                                                      can be found at: http://www.ferc.gov/


                                          VerDate Sep<11>2014        17:50 Oct 17, 2017       Jkt 244001      PO 00000       Frm 00030       Fmt 4703      Sfmt 4703      E:\FR\FM\18OCN1.SGM             18OCN1



Document Created: 2017-10-18 01:38:05
Document Modified: 2017-10-18 01:38:05
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 48504 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR