82_FR_53711 82 FR 53491 - America First Hydro, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Denying Use of the Traditional Licensing Process, Commencement of Licensing Proceeding, Scoping, and Solicitation of Study Requests and Comments on the PAD and Scoping Document

82 FR 53491 - America First Hydro, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Denying Use of the Traditional Licensing Process, Commencement of Licensing Proceeding, Scoping, and Solicitation of Study Requests and Comments on the PAD and Scoping Document

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 220 (November 16, 2017)

Page Range53491-53492
FR Document2017-24793

Federal Register, Volume 82 Issue 220 (Thursday, November 16, 2017)
[Federal Register Volume 82, Number 220 (Thursday, November 16, 2017)]
[Notices]
[Pages 53491-53492]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-24793]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14856-000]


America First Hydro, LLC; Notice of Intent To File License 
Application, Filing of Pre-Application Document (PAD), Denying Use of 
the Traditional Licensing Process, Commencement of Licensing 
Proceeding, Scoping, and Solicitation of Study Requests and Comments on 
the PAD and Scoping Document

    a. Type of Filing: Notice of Request To Use the Traditional 
Licensing Process.
    b. Project No.: 14856.
    c. Dated Filed: September 11, 2017.
    d. Submitted By: America First Hydro, LLC (America First Hydro).
    e. Name of Project: Lower Mousam Project.
    f. Location: On the Mousam River in York County, Maine. The project 
does not occupy federal land.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's Regulations.
    h. Potential Applicant Contact: Ian Clark, Managing Member, America 
First Hydro, LLC; 826 Scarsdale Ave, Scarsdale, New York 10583, (914) 
297-7645, or email at info@dichotomycapital.com.
    i. FERC Contact: Michael Watts at (202) 502-6123, or email at 
michael.watts@ferc.gov.
    j. The current license for the Lower Mousam Project was issued to 
Kennebunk Light and Power District (Kennebunk Light) under Project No. 
5362. On March 29, 2017, Kennebunk Light filed a notice stating that it 
does not intend to file an application for a subsequent license. In 
response to a solicitation issued by the Commission on May 15, 2017, 
America First Hydro filed a notice of intent to file an application for 
a license for the Lower Mousam Project and a Pre-Application Document 
(PAD), pursuant to 18 CFR 5.5 and 5.6 of the Commission's regulations. 
The licensing proceeding is commencing under Project No. 14856.
    k. America First Hydro filed a request to use the Traditional 
Licensing Process (TLP) on September 11, 2017, which the Commission 
denied on October 31, 2017. America First Hydro must use the Integrated 
Licensing Process to prepare a license application for the Lower Mousam 
Project.
    l. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item o below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See 94 FERC ] 
61,076 (2001).
    m. With this notice, we are initiating informal consultation with: 
(a) The U.S. Fish and Wildlife Service and NOAA Fisheries under section 
7 of the Endangered Species Act and the joint agency regulations 
thereunder at 50 CFR, part 402; (b) NOAA Fisheries under section 305(b) 
of the Magnuson-Stevens Fishery Conservation and Management Act and 
implementing regulations at 50 CFR 600.920; and (c) the Maine State 
Historic Preservation Officer, as required by section 106, National 
Historic Preservation Act, and the implementing regulations of the 
Advisory Council on Historic Preservation at 36 CFR 800.2.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(http://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. With this notice, we are soliciting comments on the PAD and 
Commission

[[Page 53492]]

staff's Scoping Document 1 (SD1), as well as study requests. All 
comments on the PAD and SD1, and study requests should be sent to the 
address above in paragraph h. In addition, all comments on the PAD and 
SD1, study requests, requests for cooperating agency status, and all 
communications to and from Commission staff related to the merits of 
the potential application must be filed with the Commission.
    The Commission strongly encourages electronic filing. Please file 
all documents using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov. In lieu of electronic filing, please send a 
paper copy to: Secretary, Federal Energy Regulatory Commission, 888 
First Street NE., Washington, DC 20426. The first page of any filing 
should include docket number P-14856-000.
    All filings with the Commission must bear the appropriate heading: 
``Comments on Pre-Application Document,'' ``Study Requests,'' 
``Comments on Scoping Document 1,'' ``Request for Cooperating Agency 
Status,'' or ``Communications to and from Commission Staff.'' Any 
individual or entity interested in submitting study requests, 
commenting on the PAD or SD1, and any agency requesting cooperating 
status must do so within 60 days of the issuance date of this notice.
    p. At this time, the Commission intends to prepare an environmental 
assessment (EA).

Scoping Meetings

    Commission staff will hold two scoping meetings in the vicinity of 
the project at the time and place noted below. The daytime meeting will 
focus on resource agency, Indian tribes, and non-governmental 
organization concerns, while the evening meeting is primarily for 
receiving input from the public. We invite all interested individuals, 
organizations, and agencies to attend one or both of the meetings, and 
to assist staff in identifying particular study needs, as well as the 
scope of environmental issues to be addressed in the environmental 
document. The times and locations of these meetings are as follows:

Daytime Scoping Meeting

    Date: Monday, December 11, 2017.
    Time: 1:00 p.m.
    Location: Kennebunk Town Hall Auditorium, 1 Summer Street, 
Kennebunk, ME 04043.
    Phone: (207) 985-3311.

Evening Scoping Meeting

    Date: Monday, December 11, 2017.
    Time: 6:00 p.m.
    Location: Kennebunk Town Hall Auditorium, 1 Summer Street, 
Kennebunk, ME 04043.
    Phone: (207) 985-3311.
    Scoping Document 1 (SD1), which outlines the subject areas to be 
addressed in the environmental document, was mailed to the individuals 
and entities on the Commission's mailing list. Copies of SD1 will be 
available at the scoping meetings, or may be viewed on the web at 
http://www.ferc.gov, using the ``eLibrary'' link. Follow the directions 
for accessing information in item n above. Based on all oral and 
written comments, a Scoping Document 2 (SD2) may be issued. SD2 may 
include a revised process plan and schedule, as well as a list of 
issues, identified through the scoping process.

Environmental Site Review

    The potential applicant, the existing licensee, and Commission 
staff will conduct an Environmental Site Review of the project on 
Tuesday, December 12, 2017, starting at 9:00 a.m. All participants 
should meet in the parking lot, located next to the Kesslen Dam on 
Berry Court Road, Kennebunk, ME 04043. All participants are responsible 
for their own transportation. Anyone with questions about the site 
visit should contact Mr. Todd Shea of Kennebunk Light and Power 
District at (207) 985-3311 on or before December 12, 2017.

Meeting Objectives

    At the scoping meetings, staff will: (1) Initiate scoping of the 
issues; (2) review and discuss existing conditions and resource 
management objectives; (3) review and discuss existing information and 
identify preliminary information and study needs; (4) review and 
discuss the process plan and schedule for pre-filing activity that 
incorporates the time frames provided for in Part 5 of the Commission's 
regulations and, to the extent possible, maximizes coordination of 
federal, state, and tribal permitting and certification processes; and 
(5) discuss the appropriateness of any federal or state agency or 
Indian tribe acting as a cooperating agency for development of an 
environmental document.
    Meeting participants should come prepared to discuss their issues 
and/or concerns. Please review the PAD in preparation for the scoping 
meetings. Directions on how to obtain a copy of the PAD and SD1 are 
included in item n of this document.

Meeting Procedures

    The meetings will be recorded by a stenographer and will be placed 
in the public records of the project.

    Dated: November 8, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-24793 Filed 11-15-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 82, No. 220 / Thursday, November 16, 2017 / Notices                                            53491

                                                       Filed Date: 11/9/17.                                 time on the specified comment date.                   application for a license for the Lower
                                                       Accession Number: 20171109–5154.                     Protests may be considered, but                       Mousam Project and a Pre-Application
                                                       Comments Due: 5 p.m. ET 11/30/17.                    intervention is necessary to become a                 Document (PAD), pursuant to 18 CFR
                                                       Docket Numbers: ER17–2488–001.                       party to the proceeding.                              5.5 and 5.6 of the Commission’s
                                                       Applicants: Palmco Power IL, LLC.                       eFiling is encouraged. More detailed               regulations. The licensing proceeding is
                                                       Description: Tariff Amendment:                       information relating to filing                        commencing under Project No. 14856.
                                                    Modify Tariff Language to be effective                  requirements, interventions, protests,                   k. America First Hydro filed a request
                                                    11/13/2017.                                             service, and qualifying facilities filings            to use the Traditional Licensing Process
                                                       Filed Date: 11/9/17.                                 can be found at: http://www.ferc.gov/                 (TLP) on September 11, 2017, which the
                                                       Accession Number: 20171109–5140.                     docs-filing/efiling/filing-req.pdf. For               Commission denied on October 31,
                                                       Comments Due: 5 p.m. ET 11/30/17.                    other information, call (866) 208–3676                2017. America First Hydro must use the
                                                                                                            (toll free). For TTY, call (202) 502–8659.            Integrated Licensing Process to prepare
                                                       Docket Numbers: ER17–2490–001.
                                                                                                                                                                  a license application for the Lower
                                                       Applicants: Palmco Power CA, LLC.                      Dated: November 9, 2017.
                                                                                                                                                                  Mousam Project.
                                                       Description: Tariff Amendment:                       Nathaniel J. Davis, Sr.,                                 l. Cooperating agencies: Federal, state,
                                                    Modify Tariff Language to be effective                  Deputy Secretary.                                     local, and tribal agencies with
                                                    11/13/2017.                                             [FR Doc. 2017–24796 Filed 11–15–17; 8:45 am]          jurisdiction and/or special expertise
                                                       Filed Date: 11/9/17.                                 BILLING CODE 6717–01–P                                with respect to environmental issues
                                                       Accession Number: 20171109–5133.                                                                           that wish to cooperate in the
                                                       Comments Due: 5 p.m. ET 11/30/17.                                                                          preparation of the environmental
                                                       Docket Numbers: ER18–18–000.                         DEPARTMENT OF ENERGY                                  document should follow the
                                                       Applicants: Arizona Public Service                                                                         instructions for filing such requests
                                                    Company.                                                Federal Energy Regulatory                             described in item o below. Cooperating
                                                       Description: Report Filing:                          Commission                                            agencies should note the Commission’s
                                                    Supplement to Unexecuted NITS and                       [Project No. 14856–000]                               policy that agencies that cooperate in
                                                    NOA with Navopache to be effective                                                                            the preparation of the environmental
                                                    N/A.                                                    America First Hydro, LLC; Notice of                   document cannot also intervene. See 94
                                                       Filed Date: 11/8/17.                                 Intent To File License Application,                   FERC ¶ 61,076 (2001).
                                                       Accession Number: 20171108–5065.                     Filing of Pre-Application Document                       m. With this notice, we are initiating
                                                       Comments Due: 5 p.m. ET 11/29/17.                    (PAD), Denying Use of the Traditional                 informal consultation with: (a) The U.S.
                                                       Docket Numbers: ER18–277–000.                        Licensing Process, Commencement of                    Fish and Wildlife Service and NOAA
                                                       Applicants: Midcontinent                             Licensing Proceeding, Scoping, and                    Fisheries under section 7 of the
                                                    Independent System Operator, Inc.                       Solicitation of Study Requests and                    Endangered Species Act and the joint
                                                       Description: Limited Waiver Request                  Comments on the PAD and Scoping                       agency regulations thereunder at 50
                                                    of Midcontinent Independent System                      Document                                              CFR, part 402; (b) NOAA Fisheries
                                                    Operator, Inc.                                                                                                under section 305(b) of the Magnuson-
                                                       Filed Date: 11/9/17.                                    a. Type of Filing: Notice of Request To            Stevens Fishery Conservation and
                                                       Accession Number: 20171109–5100.                     Use the Traditional Licensing Process.                Management Act and implementing
                                                       Comments Due: 5 p.m. ET 11/30/17.                       b. Project No.: 14856.                             regulations at 50 CFR 600.920; and (c)
                                                                                                               c. Dated Filed: September 11, 2017.                the Maine State Historic Preservation
                                                       Docket Numbers: ER18–278–000.                           d. Submitted By: America First Hydro,
                                                       Applicants: Gila River Power LLC.                                                                          Officer, as required by section 106,
                                                                                                            LLC (America First Hydro).                            National Historic Preservation Act, and
                                                       Description: Tariff Cancellation:                       e. Name of Project: Lower Mousam
                                                    Complete Cancellation of FERC Electric                                                                        the implementing regulations of the
                                                                                                            Project.                                              Advisory Council on Historic
                                                    Tariff to be effective 11/9/2017.                          f. Location: On the Mousam River in
                                                       Filed Date: 11/9/17.                                                                                       Preservation at 36 CFR 800.2.
                                                                                                            York County, Maine. The project does                     n. A copy of the PAD is available for
                                                       Accession Number: 20171109–5123.                     not occupy federal land.
                                                       Comments Due: 5 p.m. ET 11/30/17.                                                                          review at the Commission in the Public
                                                                                                               g. Filed Pursuant to: 18 CFR 5.3 of the            Reference Room or may be viewed on
                                                       Docket Numbers: ER18–279–000.                        Commission’s Regulations.                             the Commission’s Web site (http://
                                                       Applicants: Niagara Mohawk Power                        h. Potential Applicant Contact: Ian                www.ferc.gov), using the ‘‘eLibrary’’
                                                    Corporation, New York Independent                       Clark, Managing Member, America First                 link. Enter the docket number,
                                                    System Operator, Inc.                                   Hydro, LLC; 826 Scarsdale Ave,                        excluding the last three digits in the
                                                       Description: § 205(d) Rate Filing:                   Scarsdale, New York 10583, (914) 297–                 docket number field to access the
                                                    Reimbursement Agreement No. 2386                        7645, or email at info@                               document. For assistance, contact FERC
                                                    between NMPC and MAIT to be                             dichotomycapital.com.                                 Online Support at
                                                    effective 10/11/2017.                                      i. FERC Contact: Michael Watts at                  FERCOnlineSupport@ferc.gov, (866)
                                                       Filed Date: 11/9/17.                                 (202) 502–6123, or email at                           208–3676 (toll free), or (202) 502–8659
                                                       Accession Number: 20171109–5144.                     michael.watts@ferc.gov.                               (TTY). A copy is also available for
                                                       Comments Due: 5 p.m. ET 11/30/17.                       j. The current license for the Lower               inspection and reproduction at the
                                                       The filings are accessible in the                    Mousam Project was issued to                          address in paragraph h.
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                    Commission’s eLibrary system by                         Kennebunk Light and Power District                       Register online at http://
                                                    clicking on the links or querying the                   (Kennebunk Light) under Project No.                   www.ferc.gov/docs-filing/
                                                    docket number.                                          5362. On March 29, 2017, Kennebunk                    esubscription.asp to be notified via
                                                       Any person desiring to intervene or                  Light filed a notice stating that it does             email of new filing and issuances
                                                    protest in any of the above proceedings                 not intend to file an application for a               related to this or other pending projects.
                                                    must file in accordance with Rules 211                  subsequent license. In response to a                  For assistance, contact FERC Online
                                                    and 214 of the Commission’s                             solicitation issued by the Commission                 Support.
                                                    Regulations (18 CFR 385.211 and                         on May 15, 2017, America First Hydro                     o. With this notice, we are soliciting
                                                    385.214) on or before 5:00 p.m. Eastern                 filed a notice of intent to file an                   comments on the PAD and Commission


                                               VerDate Sep<11>2014   16:52 Nov 15, 2017   Jkt 244001   PO 00000   Frm 00042   Fmt 4703   Sfmt 4703   E:\FR\FM\16NON1.SGM   16NON1


                                                    53492                     Federal Register / Vol. 82, No. 220 / Thursday, November 16, 2017 / Notices

                                                    staff’s Scoping Document 1 (SD1), as                    Daytime Scoping Meeting                               development of an environmental
                                                    well as study requests. All comments on                   Date: Monday, December 11, 2017.                    document.
                                                    the PAD and SD1, and study requests                       Time: 1:00 p.m.                                       Meeting participants should come
                                                    should be sent to the address above in                    Location: Kennebunk Town Hall                       prepared to discuss their issues and/or
                                                    paragraph h. In addition, all comments                  Auditorium, 1 Summer Street,                          concerns. Please review the PAD in
                                                    on the PAD and SD1, study requests,                     Kennebunk, ME 04043.                                  preparation for the scoping meetings.
                                                    requests for cooperating agency status,                   Phone: (207) 985–3311.                              Directions on how to obtain a copy of
                                                    and all communications to and from                                                                            the PAD and SD1 are included in item
                                                    Commission staff related to the merits of               Evening Scoping Meeting                               n of this document.
                                                    the potential application must be filed                    Date: Monday, December 11, 2017.                   Meeting Procedures
                                                    with the Commission.                                       Time: 6:00 p.m.
                                                       The Commission strongly encourages                                                                           The meetings will be recorded by a
                                                                                                               Location: Kennebunk Town Hall
                                                    electronic filing. Please file all                                                                            stenographer and will be placed in the
                                                                                                            Auditorium, 1 Summer Street,
                                                    documents using the Commission’s                                                                              public records of the project.
                                                                                                            Kennebunk, ME 04043.
                                                    eFiling system at http://www.ferc.gov/                     Phone: (207) 985–3311.                               Dated: November 8, 2017.
                                                    docs-filing/efiling.asp. Commenters can                    Scoping Document 1 (SD1), which                    Nathaniel J. Davis, Sr.,
                                                    submit brief comments up to 6,000                       outlines the subject areas to be                      Deputy Secretary.
                                                    characters, without prior registration,                 addressed in the environmental                        [FR Doc. 2017–24793 Filed 11–15–17; 8:45 am]
                                                    using the eComment system at http://                    document, was mailed to the                           BILLING CODE 6717–01–P
                                                    www.ferc.gov/docs-filing/                               individuals and entities on the
                                                    ecomment.asp. You must include your                     Commission’s mailing list. Copies of
                                                    name and contact information at the end                 SD1 will be available at the scoping                  DEPARTMENT OF ENERGY
                                                    of your comments. For assistance,                       meetings, or may be viewed on the web
                                                    please contact FERC Online Support at                   at http://www.ferc.gov, using the                     Federal Energy Regulatory
                                                    FERCOnlineSupport@ferc.gov. In lieu of                  ‘‘eLibrary’’ link. Follow the directions              Commission
                                                    electronic filing, please send a paper                  for accessing information in item n                   [Docket No. CP18–11–000]
                                                    copy to: Secretary, Federal Energy                      above. Based on all oral and written
                                                    Regulatory Commission, 888 First Street                 comments, a Scoping Document 2 (SD2)                  East Cheyenne Gas Storage, LLC;
                                                    NE., Washington, DC 20426. The first                    may be issued. SD2 may include a                      Notice of Application
                                                    page of any filing should include docket                revised process plan and schedule, as
                                                    number P–14856–000.                                     well as a list of issues, identified                    Take notice that on October 27, 2017,
                                                       All filings with the Commission must                 through the scoping process.                          East Cheyenne Gas Storage, LLC (East
                                                    bear the appropriate heading:                                                                                 Cheyenne), 10370 Richmond Avenue,
                                                                                                            Environmental Site Review                             Suite 510, Houston, Texas 77042, filed
                                                    ‘‘Comments on Pre-Application
                                                    Document,’’ ‘‘Study Requests,’’                            The potential applicant, the existing              in the above referenced docket an
                                                    ‘‘Comments on Scoping Document 1,’’                     licensee, and Commission staff will                   application pursuant to section 7(c) of
                                                    ‘‘Request for Cooperating Agency                        conduct an Environmental Site Review                  the Natural Gas Act (NGA), and Part 157
                                                    Status,’’ or ‘‘Communications to and                    of the project on Tuesday, December 12,               of the Commission’s regulations
                                                    from Commission Staff.’’ Any                            2017, starting at 9:00 a.m. All                       requesting authorization to amend its
                                                    individual or entity interested in                      participants should meet in the parking               certificate of public convenience and
                                                    submitting study requests, commenting                   lot, located next to the Kesslen Dam on               necessity issued by the Commission in
                                                    on the PAD or SD1, and any agency                       Berry Court Road, Kennebunk, ME                       Docket No. CP10–34–000, as amended
                                                    requesting cooperating status must do so                04043. All participants are responsible               in Docket Nos. CP11–40–000, CP12–35–
                                                    within 60 days of the issuance date of                  for their own transportation. Anyone                  000, CP12–124–000, CP14–486–000,
                                                    this notice.                                            with questions about the site visit                   and CP16–25–000, to: (i) Consolidate
                                                                                                            should contact Mr. Todd Shea of                       the working gas capacity and cushion
                                                       p. At this time, the Commission                      Kennebunk Light and Power District at                 gas capacity of the West Peetz and
                                                    intends to prepare an environmental                     (207) 985–3311 on or before December                  Lewis Creek portions of the East
                                                    assessment (EA).                                        12, 2017.                                             Cheyenne Gas Storage Project (Project)
                                                    Scoping Meetings                                                                                              into one working gas capacity and one
                                                                                                            Meeting Objectives                                    cushion gas capacity, (ii) allow a unified
                                                      Commission staff will hold two                           At the scoping meetings, staff will: (1)           maximum bottom-hole pressure for the
                                                    scoping meetings in the vicinity of the                 Initiate scoping of the issues; (2) review            Project reservoir, (iii) reallocate the
                                                    project at the time and place noted                     and discuss existing conditions and                   storage gas capacity in the Project by
                                                    below. The daytime meeting will focus                   resource management objectives; (3)                   increasing the working gas capacity and
                                                    on resource agency, Indian tribes, and                  review and discuss existing information               decreasing the cushion gas capacity of
                                                    non-governmental organization                           and identify preliminary information                  the Project by 3.6 billion cubic feet (Bcf)
                                                    concerns, while the evening meeting is                  and study needs; (4) review and discuss               each, (iv) reconfigure certain facilities in
                                                    primarily for receiving input from the                  the process plan and schedule for pre-                the Lewis Creek portion of the Project,
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                    public. We invite all interested                        filing activity that incorporates the time            and (v) expand the buffer zone of the
                                                    individuals, organizations, and agencies                frames provided for in Part 5 of the                  Project. Also, East Cheyenne requests
                                                    to attend one or both of the meetings,                  Commission’s regulations and, to the                  the Commission to issue an order
                                                    and to assist staff in identifying                      extent possible, maximizes coordination               reaffirming its market-based rate
                                                    particular study needs, as well as the                  of federal, state, and tribal permitting              authorization in light of the increase in
                                                    scope of environmental issues to be                     and certification processes; and (5)                  working gas capacity of the Project, all
                                                    addressed in the environmental                          discuss the appropriateness of any                    as more fully set forth in the application
                                                    document. The times and locations of                    federal or state agency or Indian tribe               which is on file with the Commission
                                                    these meetings are as follows:                          acting as a cooperating agency for                    and open to public inspection. The


                                               VerDate Sep<11>2014   16:52 Nov 15, 2017   Jkt 244001   PO 00000   Frm 00043   Fmt 4703   Sfmt 4703   E:\FR\FM\16NON1.SGM   16NON1



Document Created: 2017-11-16 03:53:34
Document Modified: 2017-11-16 03:53:34
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesMonday, December 11, 2017.
FR Citation82 FR 53491 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR