BP Energy Company (BP Energy or Applicant) has applied to renew its authority to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act.

Federal Register, Volume 82 Issue 11 (Wednesday, January 18, 2017)
[Federal Register Volume 82, Number 11 (Wednesday, January 18, 2017)]
[Notices]
[Pages 5548-5549]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-01032]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. EA-315-B]


Application To Export Electric Energy; BP Energy Company

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: BP Energy Company (BP Energy or Applicant) has applied to 
renew its authority to transmit electric energy from the United States 
to Canada pursuant to section 202(e) of the Federal Power Act.

DATES: Comments, protests, or motions to intervene must be submitted on 
or before February 17, 2017.

ADDRESSES: Comments, protests, motions to intervene, or requests for 
more information should be addressed to: Office of Electricity Delivery 
and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 
1000 Independence Avenue SW., Washington, DC 20585-0350. Because of 
delays in handling conventional mail, it is recommended that documents 
be transmitted by overnight mail, by electronic mail to 
[email protected], or by facsimile to 202-586-8008.

SUPPLEMENTARY INFORMATION: Exports of electricity from the United 
States to a foreign country are regulated by the Department of Energy 
(DOE) pursuant to sections 301(b) and 402(f) of the Department of 
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require 
authorization under section 202(e) of the Federal Power Act (16 U.S.C. 
824a(e)).
    On January 17, 2012, DOE issued Order No. EA-315-A to BP Energy, 
which authorized the Applicant to transmit electric energy from the 
United States to Canada as a power marketer for a five-year term using 
existing international transmission facilities. That authority expires 
on January 17, 2017. On December 29, 2016, BP Energy filed an 
application with DOE for renewal of the export authority contained in 
Order No. EA-315 for an additional five-year term.
    In its application, BP Energy states that it does not own or 
operate any electric generation or transmission facilities, and it does 
not have a franchised service area. The electric energy that BP Energy 
proposes to export to Canada would be purchased from third parties such 
as electric utilities and Federal power marketing agencies pursuant to 
voluntary agreements. The existing international transmission 
facilities to be utilized by BP Energy have previously been authorized 
by Presidential Permits issued pursuant to Executive Order 10485, as 
amended, and are appropriate for open access transmission by third 
parties.
    Procedural Matters: Any person desiring to be heard in this 
proceeding should file a comment or protest to the application at the 
address provided above. Protests should be filed in accordance with 
Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of 
Practice and Procedures (18 CFR 385.211). Any person desiring to become 
a party to these proceedings should file a motion to intervene at the 
above address in accordance with FERC Rule 214 (18 CFR 385.214). Five 
copies of such comments, protests, or motions to intervene should be 
sent to the address provided above on or before the date listed above.
    Comments and other filings concerning BP Energy's application to 
export electric energy to Canada should be clearly marked with OE 
Docket No. EA-315-B. An additional copy is to be provided directly to 
both Betsy Carr, BP America Inc., 201 Helios Way, Houston, TX 77079, 
and Eric Schubert, BP Energy Company, 201 Helios Way, Houston, TX 
77079.
    A final decision will be made on this application after the 
environmental impacts have been evaluated pursuant to DOE's National 
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and 
after a determination is made by DOE that the proposed action will not 
have an adverse impact on the

[[Page 5549]]

sufficiency of supply or reliability of the U.S. electric power supply 
system.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above, by 
accessing the program Web site at http://energy.gov/node/11845, or by 
emailing Angela Troy at [email protected].

    Issued in Washington, DC, on January 11, 2017.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy 
Reliability.
[FR Doc. 2017-01032 Filed 1-17-17; 8:45 am]
 BILLING CODE 6450-01-P



                                                  5548                       Federal Register / Vol. 82, No. 11 / Wednesday, January 18, 2017 / Notices

                                                  opportunity to comment on proposed,                     implemented in 2000–01, and it collects                the Federal Power Act (16 U.S.C.
                                                  revised, and continuing collections of                  basic data from approximately 7,500                    824a(e)).
                                                  information. This helps the Department                  postsecondary institutions in the United                  On January 17, 2012, DOE issued
                                                  assess the impact of its information                    States and the other jurisdictions that                Order No. EA–315–A to BP Energy,
                                                  collection requirements and minimize                    are eligible to participate in Title IV                which authorized the Applicant to
                                                  the public’s reporting burden. It also                  Federal financial aid programs. All Title              transmit electric energy from the United
                                                  helps the public understand the                         IV institutions are required to respond                States to Canada as a power marketer for
                                                  Department’s information collection                     to IPEDS (Section 490 of the Higher                    a five-year term using existing
                                                  requirements and provide the requested                  Education Amendments of 1992 [Pub. L.                  international transmission facilities.
                                                  data in the desired format. ED is                       102–325]). IPEDS allows other (non-title               That authority expires on January 17,
                                                  soliciting comments on the proposed                     IV) institutions to participate on a                   2017. On December 29, 2016, BP Energy
                                                  information collection request (ICR) that               voluntary basis. About 200 elect to                    filed an application with DOE for
                                                  is described below. The Department of                   respond. IPEDS data are available to the               renewal of the export authority
                                                  Education is especially interested in                   public through the College Navigator                   contained in Order No. EA–315 for an
                                                  public comment addressing the                           and IPEDS Data Center Web sites. This                  additional five-year term.
                                                  following issues: (1) Is this collection                clearance package includes a number of                    In its application, BP Energy states
                                                  necessary to the proper functions of the                proposed changes to the data collection.               that it does not own or operate any
                                                  Department; (2) will this information be                                                                       electric generation or transmission
                                                                                                            Dated: January 11, 2017.
                                                  processed and used in a timely manner;                                                                         facilities, and it does not have a
                                                                                                          Kate Mullan,
                                                  (3) is the estimate of burden accurate;                                                                        franchised service area. The electric
                                                  (4) how might the Department enhance                    Acting Director, Information Collection
                                                                                                          Clearance Division, Office of the Chief Privacy        energy that BP Energy proposes to
                                                  the quality, utility, and clarity of the                                                                       export to Canada would be purchased
                                                                                                          Officer, Office of Management.
                                                  information to be collected; and (5) how                                                                       from third parties such as electric
                                                                                                          [FR Doc. 2017–00944 Filed 1–17–17; 8:45 am]
                                                  might the Department minimize the                                                                              utilities and Federal power marketing
                                                  burden of this collection on the                        BILLING CODE 4000–01–P
                                                                                                                                                                 agencies pursuant to voluntary
                                                  respondents, including through the use                                                                         agreements. The existing international
                                                  of information technology. Please note                                                                         transmission facilities to be utilized by
                                                  that written comments received in                       DEPARTMENT OF ENERGY                                   BP Energy have previously been
                                                  response to this notice will be                                                                                authorized by Presidential Permits
                                                                                                          [OE Docket No. EA–315–B]
                                                  considered public records.                                                                                     issued pursuant to Executive Order
                                                     Title of Collection: Integrated                      Application To Export Electric Energy;                 10485, as amended, and are appropriate
                                                  Postsecondary Education Data System                     BP Energy Company                                      for open access transmission by third
                                                  (IPEDS) 2017–18 through 2019–20.                                                                               parties.
                                                     OMB Control Number: 1850–0582.                       AGENCY: Office of Electricity Delivery
                                                     Type of Review: A revision of an                                                                               Procedural Matters: Any person
                                                                                                          and Energy Reliability, DOE.                           desiring to be heard in this proceeding
                                                  existing information collection.                        ACTION: Notice of application.
                                                     Respondents/Affected Public: State,                                                                         should file a comment or protest to the
                                                  Local, and Tribal Governments.                                                                                 application at the address provided
                                                                                                          SUMMARY:   BP Energy Company (BP
                                                     Total Estimated Number of Annual                                                                            above. Protests should be filed in
                                                                                                          Energy or Applicant) has applied to
                                                  Responses: 77,600.                                                                                             accordance with Rule 211 of the Federal
                                                                                                          renew its authority to transmit electric
                                                     Total Estimated Number of Annual                                                                            Energy Regulatory Commission’s (FERC)
                                                                                                          energy from the United States to Canada
                                                  Burden Hours: 1,030,893.                                                                                       Rules of Practice and Procedures (18
                                                                                                          pursuant to section 202(e) of the Federal
                                                     Abstract: The National Center for                                                                           CFR 385.211). Any person desiring to
                                                                                                          Power Act.
                                                  Education Statistics (NCES) seeks                                                                              become a party to these proceedings
                                                                                                          DATES: Comments, protests, or motions                  should file a motion to intervene at the
                                                  authorization from OMB to make a
                                                  change to the Integrated Postsecondary                  to intervene must be submitted on or                   above address in accordance with FERC
                                                  Education Data System (IPEDS) data                      before February 17, 2017.                              Rule 214 (18 CFR 385.214). Five copies
                                                  collection. Current authorization expires               ADDRESSES: Comments, protests,                         of such comments, protests, or motions
                                                  08/31/2019 (OMB# 1850–0582). NCES is                    motions to intervene, or requests for                  to intervene should be sent to the
                                                  requesting a new clearance for the                      more information should be addressed                   address provided above on or before the
                                                  2017–18, 2018–19, and 2019–20 data                      to: Office of Electricity Delivery and                 date listed above.
                                                  collections to enable us to make a                      Energy Reliability, Mail Code: OE–20,                     Comments and other filings
                                                  change to two of the IPEDS data                         U.S. Department of Energy, 1000                        concerning BP Energy’s application to
                                                  collection components and to continue                   Independence Avenue SW.,                               export electric energy to Canada should
                                                  the IPEDS collection of postsecondary                   Washington, DC 20585–0350. Because                     be clearly marked with OE Docket No.
                                                  data over the next 3 years. IPEDS is a                  of delays in handling conventional mail,               EA–315–B. An additional copy is to be
                                                  web-based data collection system                        it is recommended that documents be                    provided directly to both Betsy Carr, BP
                                                  designed to collect basic data from all                 transmitted by overnight mail, by                      America Inc., 201 Helios Way, Houston,
                                                  postsecondary institutions in the United                electronic mail to Electricity.Exports@                TX 77079, and Eric Schubert, BP Energy
                                                  States and the other jurisdictions. IPEDS               hq.doe.gov, or by facsimile to 202–586–                Company, 201 Helios Way, Houston, TX
                                                  enables NCES to report on key                           8008.                                                  77079.
                                                  dimensions of postsecondary education                   SUPPLEMENTARY INFORMATION: Exports of                     A final decision will be made on this
mstockstill on DSK3G9T082PROD with NOTICES




                                                  such as enrollments, degrees and other                  electricity from the United States to a                application after the environmental
                                                  awards earned, tuition and fees, average                foreign country are regulated by the                   impacts have been evaluated pursuant
                                                  net price, student financial aid,                       Department of Energy (DOE) pursuant to                 to DOE’s National Environmental Policy
                                                  graduation rates, student outcomes,                     sections 301(b) and 402(f) of the                      Act Implementing Procedures (10 CFR
                                                  revenues and expenditures, faculty                      Department of Energy Organization Act                  part 1021) and after a determination is
                                                  salaries, and staff employed. The IPEDS                 (42 U.S.C. 7151(b), 7172(f)) and require               made by DOE that the proposed action
                                                  web-based data collection system was                    authorization under section 202(e) of                  will not have an adverse impact on the


                                             VerDate Sep<11>2014   17:41 Jan 17, 2017   Jkt 241001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\18JAN1.SGM   18JAN1


                                                                             Federal Register / Vol. 82, No. 11 / Wednesday, January 18, 2017 / Notices                                                    5549

                                                  sufficiency of supply or reliability of the             expires on February 21, 2017. On                         Issued in Washington, DC, on January 11,
                                                  U.S. electric power supply system.                      December 29, 2016, BP Energy filed an                  2017.
                                                     Copies of this application will be                   application with DOE for renewal of the                Christopher Lawrence,
                                                  made available, upon request, for public                export authority contained in Order No.                Electricity Policy Analyst, Office of Electricity
                                                  inspection and copying at the address                   EA–314 for an additional five-year term.               Delivery and Energy Reliability.
                                                  provided above, by accessing the                           In its application, BP Energy states                [FR Doc. 2017–01031 Filed 1–17–17; 8:45 am]
                                                  program Web site at http://energy.gov/                  that it does not own or operate any                    BILLING CODE 6450–01–P
                                                  node/11845, or by emailing Angela Troy                  electric generation or transmission
                                                  at Angela.Troy@hq.doe.gov.                              facilities, and it does not have a
                                                    Issued in Washington, DC, on January 11,              franchised service area. The electric                  DEPARTMENT OF ENERGY
                                                  2017.                                                   energy that BP Energy proposes to                      Office of Energy Efficiency and
                                                  Christopher Lawrence,                                   export to Mexico would be purchased                    Renewable Energy
                                                  Electricity Policy Analyst, Office of Electricity       from third parties such as electric
                                                  Delivery and Energy Reliability.                        utilities and Federal power marketing                  Request for Information—Challenges
                                                  [FR Doc. 2017–01032 Filed 1–17–17; 8:45 am]             agencies pursuant to voluntary                         and Opportunities for Sustainable
                                                  BILLING CODE 6450–01–P                                  agreements. The existing international                 Development of Hydropower in
                                                                                                          transmission facilities to be utilized by              Undeveloped Stream Reaches of the
                                                                                                          BP Energy have previously been                         United States; Notice of Reopening of
                                                  DEPARTMENT OF ENERGY                                    authorized by Presidential Permits                     Comment Period
                                                                                                          issued pursuant to Executive Order
                                                  [OE Docket No. EA–314–B]                                                                                       AGENCY:  Water Power Technologies
                                                                                                          10485, as amended, and are appropriate
                                                                                                          for open access transmission by third                  Office, Office of Energy Efficiency and
                                                  Application To Export Electric Energy;                                                                         Renewable Energy, Department of
                                                  BP Energy Company                                       parties.
                                                                                                                                                                 Energy (DOE).
                                                                                                             Procedural Matters: Any person
                                                  AGENCY: Office of Electricity Delivery                                                                         ACTION: Notice of reopening of comment
                                                                                                          desiring to be heard in this proceeding                period.
                                                  and Energy Reliability, DOE.                            should file a comment or protest to the
                                                  ACTION: Notice of application.                          application at the address provided                    SUMMARY:    On November 9, 2016, the
                                                  SUMMARY:   BP Energy Company (BP                        above. Protests should be filed in                     Water Power Technologies Office
                                                  Energy or Applicant) has applied to                     accordance with Rule 211 of the Federal                (WPTO) within the Department of
                                                  renew its authority to transmit electric                Energy Regulatory Commission’s (FERC)                  Energy (DOE) issued a request for
                                                  energy from the United States to Mexico                 Rules of Practice and Procedures (18                   information (RFI) in the Federal
                                                  pursuant to section 202(e) of the Federal               CFR 385.211). Any person desiring to                   Register to invite input from the public
                                                  Power Act.                                              become a party to these proceedings                    regarding challenges and opportunities
                                                                                                          should file a motion to intervene at the               associated with hydropower
                                                  DATES: Comments, protests, or motions
                                                                                                          above address in accordance with FERC                  development in undeveloped stream-
                                                  to intervene must be submitted on or
                                                                                                          Rule 214 (18 CFR 385.214). Five copies                 reaches. The WPTO is reopening the
                                                  before February 17, 2017.
                                                                                                          of such comments, protests, or motions                 comment period until February 10,
                                                  ADDRESSES: Comments, protests,                          to intervene should be sent to the                     2017, to provide interested parties with
                                                  motions to intervene, or requests for                   address provided above on or before the                additional time to submit comments.
                                                  more information should be addressed                    date listed above.                                     DATES: Responses must be received no
                                                  to: Office of Electricity Delivery and
                                                                                                             Comments and other filings                          later than 5:00 p.m. (ET) on Friday,
                                                  Energy Reliability, Mail Code: OE–20,
                                                                                                          concerning BP Energy’s application to                  February 10, 2017.
                                                  U.S. Department of Energy, 1000
                                                  Independence Avenue SW.,                                export electric energy to Mexico should                ADDRESSES: Responses to this RFI must
                                                  Washington, DC 20585–0350. Because                      be clearly marked with OE Docket No.                   be submitted electronically to
                                                  of delays in handling conventional mail,                EA–314–B. An additional copy is to be                  HydroNextFOA@ee.doe.gov as Microsoft
                                                  it is recommended that documents be                     provided directly to both Betsy Carr, BP               Word (.docx) attachments to an email,
                                                  transmitted by overnight mail, by                       America Inc., 201 Helios Way, Houston,                 and be no more than 6 pages in length,
                                                  electronic mail to Electricity.Exports@                 TX 77079, and Eric Schubert, BP Energy                 12 point font, 1 inch margins. It is
                                                  hq.doe.gov, or by facsimile to 202–586–                 Company, 201 Helios Way, Houston, TX                   recommended that attachments with file
                                                  8008.                                                   77079.                                                 sizes exceeding 25 MB be compressed
                                                                                                             A final decision will be made on this               (i.e., zipped) to ensure message delivery.
                                                  SUPPLEMENTARY INFORMATION: Exports of
                                                                                                          application after the environmental                    Please include in the subject line
                                                  electricity from the United States to a
                                                                                                          impacts have been evaluated pursuant                   ‘‘Comments for RFI’’. Only electronic
                                                  foreign country are regulated by the
                                                                                                          to DOE’s National Environmental Policy                 responses will be accepted.
                                                  Department of Energy (DOE) pursuant to
                                                                                                          Act Implementing Procedures (10 CFR                    FOR FURTHER INFORMATION CONTACT:
                                                  sections 301(b) and 402(f) of the
                                                  Department of Energy Organization Act                   part 1021) and after a determination is                Questions may be directed to: Rajesh
                                                  (42 U.S.C. 7151(b), 7172(f)) and require                made by DOE that the proposed action                   Dham, Water Power Technologies
                                                  authorization under section 202(e) of                   will not have an adverse impact on the                 Office, U.S. Department of Energy, 1000
                                                  the Federal Power Act (16 U.S.C.                        sufficiency of supply or reliability of the            Independence Avenue SW.,
                                                  824a(e)).                                               U.S. electric power supply system.                     Washington, DC 20585, Phone: (202)
mstockstill on DSK3G9T082PROD with NOTICES




                                                     On May 3, 2012, DOE issued Order                        Copies of this application will be                  287–6675, Email: Rajesh.Dham@
                                                  No. EA–314–A to BP Energy, which                        made available, upon request, for public               ee.doe.gov.
                                                  authorized the Applicant to transmit                    inspection and copying at the address                  SUPPLEMENTARY INFORMATION: On
                                                  electric energy from the United States to               provided above, by accessing the                       November 9, 2016, the Water Power
                                                  Mexico as a power marketer for a five-                  program Web site at http://energy.gov/                 Technologies Office (WPTO) within the
                                                  year term using existing international                  node/11845, or by emailing Angela Troy                 Department of Energy (DOE) issued a
                                                  transmission facilities. That authority                 at Angela.Troy@hq.doe.gov.                             request for information (RFI) in the


                                             VerDate Sep<11>2014   19:04 Jan 17, 2017   Jkt 241001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\18JAN1.SGM   18JAN1



Document Created: 2018-02-01 15:18:54
Document Modified: 2018-02-01 15:18:54
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of application.
DatesComments, protests, or motions to intervene must be submitted on or before February 17, 2017.
FR Citation82 FR 5548 