82_FR_5564 82 FR 5553 - Sunshine Act Meeting Notice

82 FR 5553 - Sunshine Act Meeting Notice

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 11 (January 18, 2017)

Page Range5553-5555
FR Document2017-01138

Federal Register, Volume 82 Issue 11 (Wednesday, January 18, 2017)
[Federal Register Volume 82, Number 11 (Wednesday, January 18, 2017)]
[Notices]
[Pages 5553-5555]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-01138]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.

DATE AND TIME: January 19, 2017 10:00 a.m.

PLACE:  Room 2C, 888 First Street NE., Washington, DC 20426.

STATUS:  Open.

MATTERS TO BE CONSIDERED: 

Agenda

    * Note--Items listed on the agenda may be deleted without further 
notice.

CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at http://ferc.capitolconnection.org/ sing the 
eLibrary link, or may be examined in the Commission's Public Reference 
Room.

                    1034th--Meeting; Regular Meeting
                       [January 19, 2017, 10 a.m.]
------------------------------------------------------------------------
           Item No.               Docket No.             Company
------------------------------------------------------------------------
                             ADMINISTRATIVE
------------------------------------------------------------------------
A-1..........................  AD16-7-000......  Customer Matters,
                                                  Reliability, Security
                                                  and Market Operations.
A-2..........................  AD16-1-000......  Agency Administrative
                                                  Matters.

[[Page 5554]]

 
                                ELECTRIC
------------------------------------------------------------------------
E-1..........................  RM17-2-000......  Uplift Cost Allocation
                                                  and Transparency in
                                                  Markets Operated by
                                                  Regional Transmission
                                                  Organizations and
                                                  Independent System
                                                  Operators.
E-2..........................  PL17-2-000......  Utilization of Electric
E-3..........................  OMITTED.........   Storage Resources for
                                                  Multiple Services When
                                                  Receiving Cost-Based
                                                  Rate Recovery.
E-4..........................  OMITTED.........
E-5..........................  OMITTED.........
E-6..........................  OMITTED.........
E-7..........................  ER09-1256-002,..  Potomac-Appalachian
                               ER12-2708-003...   Transmission Highline,
                                                  LLC PJM
                                                  Interconnection,
                                                  L.L.C.
E-8..........................  ER13-2483-001...  Old Dominion Electric
                                                  Cooperative.
E-9..........................  ER16-1483-002,..  California Independent
                               ER16-1483-0004..   System Operator
                                                  Corporation.
E-10.........................  EL14-37-000.....  PJM Interconnection,
                                                  L.L.C.
E-11.........................  ER13-1654-001,..  PJM Interconnection,
                               ER13-1654-002...   L.L.C.
E-12.........................  RM16-7-000......  Disturbance Control
                                                  Standard--Contingency
                                                  Reserve for Recovery
                                                  from a Balancing
                                                  Contingency Event
                                                  Reliability Standard.
E-13.........................  RM16-20-000.....  Remedial Action Schemes
                                                  Reliability Standard.
E-14.........................  RM15-11-001.....  Reliability Standard
                                                  for Transmission
                                                  System Planned
                                                  Performance for
                                                  Geomagnetic
                                                  Disturbance Events.
E-15.........................  ER16-1807-000,..  FirstEnergy Solutions
                               ER10-1459-008...   Corp.
                               ER10-1469-004...  The Cleveland Electric
                                                  Illuminating Company.
                               ER10-1467-004...  Ohio Edison Company.
                               ER10-1468-004...  The Toledo Edison
                                                  Company.
                               ER13-785-003....  FirstEnergy Generation,
                                                  LLC.
                               ER13-713-003....  FirstEnergy Nuclear
                                                  Generation, LLC.
                               ER10-1453-004...  FirstEnergy Generation
                                                  Mansfield Unit 1 Corp.
E-16.........................  ER16-835-000....  New York Independent
                                                  System Operator, Inc.
E-17.........................  EL16-117-001....  Vote Solar Initiative
                                                  and
                               Montana
                                Environmental
                                Information
                                Center v.
                                Montana Public
                                Service
                                Commission..
E-18.........................  ER16-1904-001...  ISO New England Inc.
E-19.........................  EL13-88-001.....  Northern Indiana Public
                                                  Service Company v.
                                                  Midcontinent
                                                  Independent System
                                                  Operator, Inc. and PJM
                                                  Interconnection,
                                                  L.L.C.
                               ER16-1967-000...  PJM Interconnection,
                                                  L.L.C.
                               ER16-1969-000...  Midcontinent
                                                  Independent System
                                                  Operator, Inc.
                               ER16-1969-001
                                (Not
                                Consolidated).
E-20.........................  EL16-120-000....  New England Power
                                                  Generators
                                                  Association, Inc. v.
                                                  ISO New England Inc.
E-21.........................  ER17-408-000....  California Independent
                                                  System Operator
                                                  Corporation.
E-22.........................  ER17-411-000....  California Independent
                                                  System Operator
                                                  Corporation.
------------------------------------------------------------------------
                                   GAS
------------------------------------------------------------------------
G-1..........................  RP17-303-000....  Natural Gas Pipeline
                                                  Company of America
                                                  LLC.
G-2..........................  RP17-302-000....  Wyoming Interstate
                                                  Company, L.L.C.
------------------------------------------------------------------------
                                  HYDRO
------------------------------------------------------------------------
H-1..........................  P-1971-079......  Idaho Power Company.
H-2..........................  P-1864-164......  Upper Peninsula Power
                                                  Company.
H-3..........................  P-2114-277......  Public Utility District
                                                  No. 2 of Grant County,
                                                  Washington.
H-4..........................  P-4254-011......  Brentwood Dam Ventures,
                                                  LLC.
------------------------------------------------------------------------
                              CERTIFICATES
------------------------------------------------------------------------
C-1..........................  OMITTED.........
C-2..........................  OMITTED.........
C-3..........................  CP15-514-000....  Columbia Gas
                               CP15-539-000....   Transmission, LLC.
                                                 Columbia Gulf
                                                  Transmission, LLC.
------------------------------------------------------------------------



[[Page 5555]]

    Issued: January 12, 2017.
Kimberly D. Bose,
Secretary.

    A free webcast of this event is available through http://ferc.capitolconnection.org/. Anyone with Internet access who desires to 
view this event can do so by navigating to www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to its webcast. The Capitol Connection provides technical 
support for the free webcasts. It also offers access to this event via 
television in the DC area and via phone bridge for a fee. If you have 
any questions, visit http://ferc.capitolconnection.org/ or contact 
Danelle Springer or David Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2017-01138 Filed 1-13-17; 11:15 am]
 BILLING CODE 6717-01-P



                                                                                 Federal Register / Vol. 82, No. 11 / Wednesday, January 18, 2017 / Notices                                                             5553

                                                     Filed Date: 1/11/17.                                              Filed Date: 1/11/17.                                    requirements, interventions, protests,
                                                     Accession Number: 20170111–5096.                                  Accession Number: 20170111–5084.                        service, and qualifying facilities filings
                                                     Comments Due: 5 p.m. ET 2/1/17.                                   Comments Due: 5 p.m. ET 2/1/17.                         can be found at: http://www.ferc.gov/
                                                     Docket Numbers: ER16–1724–001.                                    Docket Numbers: ER17–775–000.                           docs-filing/efiling/filing-req.pdf. For
                                                     Applicants: Paulding Wind Farm III                                Applicants: PJM Interconnection,                        other information, call (866) 208–3676
                                                  LLC.                                                              L.L.C.                                                     (toll free). For TTY, call (202) 502–8659.
                                                     Description: Notice of Non-Material                               Description: Compliance filing:                           Dated: January 11, 2017.
                                                  Change in Status of Paulding Wind                                 Compliance Filing pursuant to
                                                                                                                                                                               Kimberly D. Bose,
                                                  Farm III LLC.                                                     Commission’s Final Rule in RM15–24;
                                                                                                                                                                               Secretary.
                                                     Filed Date: 1/11/17.                                           Order No. 825 to be effective 2/1/2018.
                                                                                                                       Filed Date: 1/11/17.                                    [FR Doc. 2017–00987 Filed 1–17–17; 8:45 am]
                                                     Accession Number: 20170111–5075.
                                                     Comments Due: 5 p.m. ET 2/1/17.                                   Accession Number: 20170111–5108.                        BILLING CODE 6717–01–P

                                                     Docket Numbers: ER17–204–001.                                     Comments Due: 5 p.m. ET 2/1/17.
                                                     Applicants: Quantum Power Corp.                                   Docket Numbers: ER17–776–000.
                                                                                                                       Applicants: San Diego Gas & Electric                    DEPARTMENT OF ENERGY
                                                     Description: Tariff Amendment: MBR
                                                  Tariff Amendment Filing to be effective                           Company.
                                                                                                                       Description: Initial rate filing:                       Federal Energy Regulatory
                                                  1/1/2017.                                                                                                                    Commission
                                                     Filed Date: 1/11/17.                                           Certificate of Concurrence in LGIA to be
                                                     Accession Number: 20170111–5046.                               effective 3/6/2017.                                        Sunshine Act Meeting Notice
                                                     Comments Due: 5 p.m. ET 2/1/17.                                   Filed Date: 1/11/17.
                                                                                                                       Accession Number: 20170111–5109.                          The following notice of meeting is
                                                     Docket Numbers: ER17–771–000.                                     Comments Due: 5 p.m. ET 2/1/17.
                                                     Applicants: PJM Interconnection,                                                                                          published pursuant to section 3(a) of the
                                                  L.L.C.                                                               Docket Numbers: ER17–777–000.                           government in the Sunshine Act (Pub.
                                                                                                                       Applicants: California Independent                      L. 94–409), 5 U.S.C. 552b:
                                                     Description: § 205(d) Rate Filing:
                                                                                                                    System Operator Corporation.
                                                  Queue Position AB1–098, Original                                                                                             AGENCY HOLDING MEETING: Federal
                                                                                                                       Description: Compliance filing: 2017–
                                                  Service Agreement No. 4595 to be                                                                                             Energy Regulatory Commission.
                                                                                                                    01–11 Order No. 825 Compliance to be
                                                  effective 12/12/2016.
                                                                                                                    effective N/A.                                             DATE AND TIME:    January 19, 2017 10:00
                                                     Filed Date: 1/11/17.                                              Filed Date: 1/11/17.
                                                     Accession Number: 20170111–5031.                                                                                          a.m.
                                                                                                                       Accession Number: 20170111–5112.
                                                     Comments Due: 5 p.m. ET 2/1/17.                                   Comments Due: 5 p.m. ET 2/1/17.                         PLACE:Room 2C, 888 First Street NE.,
                                                     Docket Numbers: ER17–772–000.                                     Docket Numbers: ER17–778–000.                           Washington, DC 20426.
                                                     Applicants: Southwest Power Pool,                                 Applicants: Midcontinent
                                                  Inc.                                                                                                                         STATUS:   Open.
                                                                                                                    Independent System Operator, Inc.
                                                     Description: Compliance filing: Order                             Description: Compliance filing: 2017–                   MATTERS TO BE CONSIDERED:
                                                  No. 825 Compliance Filing to be                                   01–11_Order 825 Price Formation
                                                  effective 5/11/2017.                                                                                                         Agenda
                                                                                                                    Compliance Filing to be effective 3/1/
                                                     Filed Date: 1/11/17.                                           2018.                                                       * Note—Items listed on the agenda
                                                     Accession Number: 20170111–5077.                                  Filed Date: 1/11/17.                                    may be deleted without further notice.
                                                     Comments Due: 5 p.m. ET 2/1/17.                                   Accession Number: 20170111–5125.
                                                                                                                                                                               CONTACT PERSON FOR MORE INFORMATION:
                                                     Docket Numbers: ER17–773–000.                                     Comments Due: 5 p.m. ET 2/1/17.
                                                     Applicants: Nevada Power Company.                                                                                         Kimberly D. Bose, Secretary, Telephone
                                                                                                                       The filings are accessible in the                       (202) 502–8400.
                                                     Description: § 205(d) Rate Filing: Rate                        Commission’s eLibrary system by
                                                  Schedule No. 154-Concurrence RS 76-                               clicking on the links or querying the                         For a recorded message listing items
                                                  Cancel RS 77 and RS147 to be effective                            docket number.                                             struck from or added to the meeting, call
                                                  1/1/2017.                                                            Any person desiring to intervene or                     (202) 502–8627.
                                                     Filed Date: 1/11/17.                                           protest in any of the above proceedings                       This is a list of matters to be
                                                     Accession Number: 20170111–5083.                               must file in accordance with Rules 211                     considered by the Commission. It does
                                                     Comments Due: 5 p.m. ET 2/1/17.                                and 214 of the Commission’s                                not include a listing of all documents
                                                     Docket Numbers: ER17–774–000.                                  Regulations (18 CFR 385.211 and                            relevant to the items on the agenda. All
                                                     Applicants: ISO New England Inc.,                              385.214) on or before 5:00 p.m. Eastern                    public documents, however, may be
                                                  New England Power Pool Participants                               time on the specified comment date.                        viewed on line at the Commission’s
                                                  Committee.                                                        Protests may be considered, but                            Web site at http://
                                                     Description: Compliance filing:                                intervention is necessary to become a                      ferc.capitolconnection.org/ sing the
                                                  Compliance with Order No. 825; Docket                             party to the proceeding.                                   eLibrary link, or may be examined in
                                                  No. RM15–24–000 to be effective 12/1/                                eFiling is encouraged. More detailed                    the Commission’s Public Reference
                                                  2017.                                                             information relating to filing                             Room.

                                                                                                                    1034th—MEETING; REGULAR MEETING
                                                                                                                                 [January 19, 2017, 10 a.m.]
mstockstill on DSK3G9T082PROD with NOTICES




                                                   Item                                 Docket No.                                                                              Company
                                                    No.

                                                                                                                                          ADMINISTRATIVE

                                                  A–1     AD16–7–000 ..................................................................    Customer Matters, Reliability, Security and Market Operations.
                                                  A–2     AD16–1–000 ..................................................................    Agency Administrative Matters.




                                             VerDate Sep<11>2014    17:41 Jan 17, 2017       Jkt 241001     PO 00000      Frm 00032       Fmt 4703   Sfmt 4703   E:\FR\FM\18JAN1.SGM   18JAN1


                                                  5554                            Federal Register / Vol. 82, No. 11 / Wednesday, January 18, 2017 / Notices

                                                                                                              1034th—MEETING; REGULAR MEETING—Continued
                                                                                                                                         [January 19, 2017, 10 a.m.]

                                                   Item                                   Docket No.                                                                                     Company
                                                    No.

                                                                                                                                                     ELECTRIC

                                                  E–1     RM17–2–000 .................................................................             Uplift Cost Allocation and Transparency in Markets Operated by Regional
                                                                                                                                                     Transmission Organizations and Independent System Operators.
                                                  E–2     PL17–2–000 ..................................................................            Utilization of Electric Storage Resources for Multiple Services When Receiving
                                                  E–3     OMITTED .......................................................................            Cost-Based Rate Recovery.
                                                  E–4     OMITTED.
                                                  E–5     OMITTED.
                                                  E–6     OMITTED.
                                                  E–7     ER09–1256–002, ...........................................................               Potomac-Appalachian Transmission Highline, LLC PJM Interconnection, L.L.C.
                                                          ER12–2708–003 ............................................................
                                                  E–8     ER13–2483–001 ............................................................               Old Dominion Electric Cooperative.
                                                  E–9     ER16–1483–002, ...........................................................               California Independent System Operator Corporation.
                                                          ER16–1483–0004 ..........................................................
                                                  E–10    EL14–37–000 ................................................................             PJM Interconnection, L.L.C.
                                                  E–11    ER13–1654–001, ...........................................................               PJM Interconnection, L.L.C.
                                                          ER13–1654–002 ............................................................
                                                  E–12    RM16–7–000 .................................................................             Disturbance Control Standard—Contingency Reserve for Recovery from a Bal-
                                                                                                                                                     ancing Contingency Event Reliability Standard.
                                                  E–13    RM16–20–000 ...............................................................              Remedial Action Schemes Reliability Standard.
                                                  E–14    RM15–11–001 ...............................................................              Reliability Standard for Transmission System Planned Performance for Geo-
                                                                                                                                                     magnetic Disturbance Events.
                                                  E–15    ER16–1807–000, ...........................................................               FirstEnergy Solutions Corp.
                                                          ER10–1459–008 ............................................................
                                                          ER10–1469–004 ............................................................               The Cleveland Electric Illuminating Company.
                                                          ER10–1467–004 ............................................................               Ohio Edison Company.
                                                          ER10–1468–004 ............................................................               The Toledo Edison Company.
                                                          ER13–785–003 ..............................................................              FirstEnergy Generation, LLC.
                                                          ER13–713–003 ..............................................................              FirstEnergy Nuclear Generation, LLC.
                                                          ER10–1453–004 ............................................................               FirstEnergy Generation Mansfield Unit 1 Corp.
                                                  E–16    ER16–835–000 ..............................................................              New York Independent System Operator, Inc.
                                                  E–17    EL16–117–001 ..............................................................              Vote Solar Initiative and
                                                          Montana Environmental Information Center v. Montana
                                                            Public Service Commission..
                                                  E–18    ER16–1904–001 ............................................................               ISO New England Inc.
                                                  E–19    EL13–88–001 ................................................................             Northern Indiana Public Service Company v. Midcontinent Independent System
                                                                                                                                                     Operator, Inc. and PJM Interconnection, L.L.C.
                                                          ER16–1967–000 ............................................................               PJM Interconnection, L.L.C.
                                                          ER16–1969–000 ............................................................               Midcontinent Independent System Operator, Inc.
                                                          ER16–1969–001 (Not Consolidated).
                                                  E–20    EL16–120–000 ..............................................................              New England Power Generators Association, Inc. v. ISO New England Inc.
                                                  E–21    ER17–408–000 ..............................................................              California Independent System Operator Corporation.
                                                  E–22    ER17–411–000 ..............................................................              California Independent System Operator Corporation.

                                                                                                                                                         GAS

                                                  G–1     RP17–303–000 ..............................................................              Natural Gas Pipeline Company of America LLC.
                                                  G–2     RP17–302–000 ..............................................................              Wyoming Interstate Company, L.L.C.

                                                                                                                                                       HYDRO

                                                  H–1     P–1971–079          ..................................................................   Idaho Power Company.
                                                  H–2     P–1864–164          ..................................................................   Upper Peninsula Power Company.
                                                  H–3     P–2114–277          ..................................................................   Public Utility District No. 2 of Grant County, Washington.
                                                  H–4     P–4254–011          ..................................................................   Brentwood Dam Ventures, LLC.

                                                                                                                                                   CERTIFICATES

                                                  C–1     OMITTED.
                                                  C–2     OMITTED.
                                                  C–3     CP15–514–000 ..............................................................              Columbia Gas Transmission, LLC.
                                                          CP15–539–000 ..............................................................              Columbia Gulf Transmission, LLC.
mstockstill on DSK3G9T082PROD with NOTICES




                                             VerDate Sep<11>2014    17:41 Jan 17, 2017         Jkt 241001        PO 00000        Frm 00033         Fmt 4703   Sfmt 4703   E:\FR\FM\18JAN1.SGM   18JAN1


                                                                             Federal Register / Vol. 82, No. 11 / Wednesday, January 18, 2017 / Notices                                              5555

                                                    Issued: January 12, 2017.                                g. Filed Pursuant to: Federal Power                 docs-filing/esubscription.asp to be
                                                  Kimberly D. Bose,                                       Act, 16 U.S.C. 791(a)–825(r).                          notified via email of new filings and
                                                  Secretary.                                                 h. Applicant Contact: Mr. Jim Brown,                issuances related to this or other
                                                                                                          Compliance Officer, Toledo Bend                        pending projects. For assistance, call 1–
                                                     A free webcast of this event is
                                                                                                          Project Joint Operation, Sabine River                  866–208- 3676 or email
                                                  available through http://
                                                                                                          Authority, Texas, P.O. Box 579, Orange,                FERCOnlineSupport@ferc.gov, for TTY,
                                                  ferc.capitolconnection.org/. Anyone
                                                                                                          TX 77631–0579, (409) 746–2192,                         call (202) 502–8659. A copy is also
                                                  with Internet access who desires to view
                                                                                                          jbrown@sratx.org.                                      available for inspection and
                                                  this event can do so by navigating to                      i. FERC Contact: Mr. John Aedo, (415)               reproduction at the address in item (h)
                                                  www.ferc.gov’s Calendar of Events and                   369–3335, or john.aedo@ferc.gov.                       above.
                                                  locating this event in the Calendar. The                   j. Deadline for filing comments,                       m. Individuals desiring to be included
                                                  event will contain a link to its webcast.               motions to intervene, protests, and                    on the Commission’s mailing list should
                                                  The Capitol Connection provides                         recommendations is February 9, 2017.                   so indicate by writing to the Secretary
                                                  technical support for the free webcasts.                The Commission strongly encourages                     of the Commission.
                                                  It also offers access to this event via                 electronic filing. Please file motions to                 n. Comments, Protests, or Motions to
                                                  television in the DC area and via phone                 intervene, protests, comments, or                      Intervene: Anyone may submit
                                                  bridge for a fee. If you have any                       recommendations using the                              comments, a protest, or a motion to
                                                  questions, visit http://                                Commission’s eFiling system at http://                 intervene in accordance with the
                                                  ferc.capitolconnection.org/ or contact                  www.ferc.gov/docs-filing/efiling.asp.                  requirements of Rules of Practice and
                                                  Danelle Springer or David Reininger at                  Commenters can submit brief comments                   Procedure, 18 CFR 385.210, .211, .214.
                                                  703–993–3100.                                           up to 6,000 characters, without prior                  In determining the appropriate action to
                                                     Immediately following the conclusion                 registration, using the eComment system                take, the Commission will consider all
                                                  of the Commission Meeting, a press                      at http://www.ferc.gov/docs-filing/                    protests or other comments filed, but
                                                  briefing will be held in the Commission                 ecomment.asp. You must include your                    only those who file a motion to
                                                  Meeting Room. Members of the public                     name and contact information at the end                intervene in accordance with the
                                                  may view this briefing in the designated                of your comments. For assistance,                      Commission’s Rules may become a
                                                  overflow room. This statement is                        please contact FERC Online Support at                  party to the proceeding. Any comments,
                                                  intended to notify the public that the                  FERCOnlineSupport@ferc.gov, (866)                      protests, or motions to intervene must
                                                  press briefings that follow Commission                  208–3676 (toll free), or (202) 502–8659                be received on or before the specified
                                                  meetings may now be viewed remotely                     (TTY). In lieu of electronic filing, please            comment date for the particular
                                                  at Commission headquarters, but will                    send a paper copy to: Secretary, Federal               application.
                                                  not be telecast through the Capitol                     Energy Regulatory Commission, 888                         o. Filing and Service of Responsive
                                                  Connection service.                                     First Street NE., Washington, DC 20426.                Documents: Any filing must (1) bear in
                                                  [FR Doc. 2017–01138 Filed 1–13–17; 11:15 am]            Please include the project number (P–                  all capital letters the title
                                                  BILLING CODE 6717–01–P                                  2305–058) on any comments, motions to                  ‘‘COMMENTS’’, ‘‘PROTEST’’, or
                                                                                                          intervene, protests, or recommendations                ‘‘MOTION TO INTERVENE’’ as
                                                                                                          filed. Comments emailed to Commission                  applicable; (2) set forth in the heading
                                                  DEPARTMENT OF ENERGY                                    staff are not considered part of the                   the name of the applicant and the
                                                                                                          Commission record.                                     project number of the application to
                                                  Federal Energy Regulatory                                  k. Description of Request: The                      which the filing responds; (3) furnish
                                                  Commission                                              licensee requests Commission approval                  the name, address, and telephone
                                                                                                          of its Drought Contingency Plan under                  number of the person protesting or
                                                  [Project No. 2305–058]
                                                                                                          License Article 416. The plan identifies               intervening; and (4) otherwise comply
                                                  Sabine River Authority of Texas,                        the public access measures and                         with the requirements of 18 CFR
                                                  Sabine River Authority, State of                        reservoir public access measures that                  385.2001 through 385.2005. All
                                                  Louisiana; Notice of Application                        the licensees would implement during                   comments, motions to intervene, or
                                                  Accepted for Filing, Soliciting                         drought conditions. Specifically, the                  protests must set forth their evidentiary
                                                  Comments, Motions To Intervene, and                     plan outlines actions that the licensee                basis and otherwise comply with the
                                                  Protests                                                would implement when reservoir                         requirements of 18 CFR 4.34(b). All
                                                                                                          elevations drop to 168 feet-msl and                    comments, motions to intervene, or
                                                    Take notice that the following                        lower, including changes to hydropower                 protests should relate to project works
                                                  hydroelectric application has been filed                generation and water deliveries,                       which are the subject of the license
                                                  with the Commission and is available                    implementation of conservation                         surrender. Agencies may obtain copies
                                                  for public inspection:                                  measures, public announcements, and                    of the application directly from the
                                                    a. Type of Application: Request for                   agency notification.                                   applicant. A copy of any protest or
                                                  approval of Final Drought Contingency                      l. Locations of the Application: A                  motion to intervene must be served
                                                  Plan.                                                   copy of the application is available for               upon each representative of the
                                                    b. Project No.: 2305–058.                             inspection and reproduction at the                     applicant specified in the particular
                                                    c. Date Filed: December 15, 2016.                     Commission’s Public Reference Room,                    application. If an intervener files
                                                    d. Applicant: Sabine River Authority                  located at 888 First Street NE., Room                  comments or documents with the
                                                  of Texas, Sabine River Authority, State                 2A, Washington, DC 20426, or by calling                Commission relating to the merits of an
                                                  of Louisiana.                                           (202) 502–8371. This filing may also be                issue that may affect the responsibilities
mstockstill on DSK3G9T082PROD with NOTICES




                                                    e. Name of Project: Toledo Bend                       viewed on the Commission’s Web site at                 of a particular resource agency, they
                                                  Hydroelectric Project.                                  http://www.ferc.gov/docs-filing/                       must also serve a copy of the document
                                                    f. Location: Sabine River on the                      elibrary.asp. Enter the docket number                  on that resource agency. A copy of all
                                                  Texas-Louisiana border in Panola,                       excluding the last three digits in the                 other filings in reference to this
                                                  Shelby, Sabine, and Newton Counties in                  docket number field to access the                      application must be accompanied by
                                                  Texas and DeSoto, Sabine, and Vernon                    document (P–2305–058). You may also                    proof of service on all persons listed in
                                                  Parishes in Louisiana.                                  register online at http://www.ferc.gov/                the service list prepared by the


                                             VerDate Sep<11>2014   17:41 Jan 17, 2017   Jkt 241001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\18JAN1.SGM   18JAN1



Document Created: 2018-02-01 15:19:34
Document Modified: 2018-02-01 15:19:34
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 5553 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR