82_FR_55882 82 FR 55658 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4, Inspections, Tests, Analyses, and Acceptance Criteria

82 FR 55658 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4, Inspections, Tests, Analyses, and Acceptance Criteria

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 224 (November 22, 2017)

Page Range55658-55659
FR Document2017-25298

The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.

Federal Register, Volume 82 Issue 224 (Wednesday, November 22, 2017)
[Federal Register Volume 82, Number 224 (Wednesday, November 22, 2017)]
[Notices]
[Pages 55658-55659]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-25298]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc., Vogtle Electric 
Generating Plant, Units 3 and 4, Inspections, Tests, Analyses, and 
Acceptance Criteria

AGENCY: Nuclear Regulatory Commission.

ACTION: Determination of the successful completion of inspections, 
tests, and analyses.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has 
determined that the inspections, tests, and analyses have been 
successfully completed, and that the specified acceptance criteria are 
met for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.

DATES: The applicable date for determining successful completion of 
inspections, tests, and analyses for VEGP Units 3 and 4 is November 22, 
2017.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-3025; email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Licensee Notification of Completion of ITAAC

    Southern Nuclear Operating Company, Inc. (SNC), Georgia Power 
Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC., MEAG 
Power SPVJ, LLC., MEAG Power SPVP, LLC., and the City of Dalton,

[[Page 55659]]

Georgia, (hereafter called the licensee) has submitted inspections, 
tests, analyses, and acceptance criteria (ITAAC) closure notifications 
(ICNs) under Sec.  52.99(c)(1) of title 10 of the Code of Federal 
Regulations (10 CFR), informing the NRC that the licensee has 
successfully performed the required inspections, tests, and analyses, 
and that the acceptance criteria are met for:

VEGP Unit 3 ITAAC

2.1.02.08a.i (28), 2.1.02.08d.iii (34), 2.2.04.08a.i (235), 
2.2.04.08a.ii (236), 2.5.01.03d (514), 2.5.02.07a (534), 2.5.02.07d 
(537), 2.5.02.07e (538), 2.5.02.14 (553), C.2.6.12.06 (676), 3.2.00.01a 
(739), and 3.2.00.01b (740)

VEGP Unit 4 ITAAC

2.1.02.08a.i (28), 2.1.02.08d.iii (34), 2.5.01.03d (514), 2.5.02.07a 
(534), 2.5.02.07d (537), 2.5.02.07e (538), 2.5.02.14 (553), 3.2.00.01a 
(739), and 3.2.00.01b (740)

    The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3 
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP 
Unit 4 are in Appendix C of VEGP Unit 4 combined license (ADAMS 
Accession No. ML14100A135).

II. NRC Staff Determination of Completion of ITAAC

    The NRC staff has determined that the specified inspections, tests, 
and analyses have been successfully completed, and that the specified 
acceptance criteria are met. The documentation of the NRC staff's 
determination is in the ITAAC Closure Verification Evaluation Form 
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's 
structured process for reviewing ICNs. Each ICN presents a narrative 
description of how the ITAAC was completed. The NRC's ICN review 
process involves a determination on whether, among other things: (1) 
Each ICN provides sufficient information, including a summary of the 
methodology used to perform the ITAAC, to demonstrate that the 
inspections, tests, and analyses have been successfully completed; (2) 
each ICN provides sufficient information to demonstrate that the 
acceptance criteria of the ITAAC are met; and (3) any NRC inspections 
for the ITAAC have been completed and any ITAAC findings associated 
with that ITAAC have been closed.
    The NRC staff's determination of the successful completion of these 
ITAAC is based on information available at this time and is subject to 
the licensee's ability to maintain the condition that the acceptance 
criteria are met. If the staff receives new information that suggests 
the staff's determination on any of these ITAAC is incorrect, then the 
staff will determine whether to reopen that ITAAC (including 
withdrawing the staff's determination on that ITAAC). The NRC staff's 
determination will be used to support a subsequent finding, pursuant to 
10 CFR 52.103(g), at the end of construction that all acceptance 
criteria in the combined license are met. The ITAAC closure process is 
not finalized for these ITAAC until the NRC makes an affirmative 
finding under 10 CFR 52.103(g). Any future updates to the status of 
these ITAAC will be reflected on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
    This notice fulfills the staff's obligations under 10 CFR 
52.99(e)(1) to publish a notice in the Federal Register of the NRC 
staff's determination of the successful completion of inspections, 
tests and analyses.

Vogtle Electric Generating Plant Unit 3, Docket No. 5200025

    A complete list of the review status for VEGP Unit 3 ITAAC, 
including the submission date and ADAMS Accession Number for each ICN 
received, the ADAMS Accession Number for each VEF, and the ADAMS 
Accession Numbers for the inspection reports associated with these 
specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog3-icnsr.pdf.

Vogtle Electric Generating Plant Unit 4, Docket No. 5200026

    A complete list of the review status for VEGP Unit 4 ITAAC, 
including the submission date and ADAMS Accession Number for each ICN 
received, the ADAMS Accession No. for each VEF, and the ADAMS Accession 
Numbers for the inspection reports associated with these specific 
ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog4-icnsr.pdf.

    Dated at Rockville, Maryland, this 17th day of November, 2017.

    For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2017-25298 Filed 11-21-17; 8:45 am]
 BILLING CODE 7590-01-P



                                                    55658                   Federal Register / Vol. 82, No. 224 / Wednesday, November 22, 2017 / Notices

                                                    1–800–397–4209, 301–415–4737, or by                     approach to extending the discretion.                 SUMMARY:   The U.S. Nuclear Regulatory
                                                    email to pdr.resource@nrc.gov. The ISG,                 The revisions to this ISG also revise                 Commission (NRC) staff has determined
                                                    ‘‘Clarification of Licensee Actions in                  provisions concerning reportability                   that the inspections, tests, and analyses
                                                    Receipt of Enforcement Discretion                       requirements under § 50.72 of title 10 of             have been successfully completed, and
                                                    Memorandum 15–002, ‘‘Enforcement                        the Code of Federal Regulations (10                   that the specified acceptance criteria are
                                                    Discretion for Tornado-Generated                        CFR), discusses enforcement discretion                met for the Vogtle Electric Generating
                                                    Missile Protection Noncompliance,’’                     for long-term design non conformances,                Plant (VEGP), Units 3 and 4.
                                                    Revision 1, is available in ADAMS                       and reinforces the need for licensees to              DATES: The applicable date for
                                                    under Accession No. ML17128A344.                        follow the corrective action program                  determining successful completion of
                                                    Enforcement Guidance Memorandum,                        when dispositioning the impact of                     inspections, tests, and analyses for
                                                    EGM 15–002, ‘‘Enforcement Discretion                    identified tornado missile non-                       VEGP Units 3 and 4 is November 22,
                                                    for Tornado-Generated Missile                           conformances on operability. This                     2017.
                                                    Protection Noncompliance,’’ Revision 1                  revised ISG will expire with the                      ADDRESSES: Please refer to Docket ID
                                                    is available in ADAMS under Accession                   expiration of EGM 15–002, Revision 1.                 NRC–2008–0252 when contacting the
                                                    No. ML16355A286.                                                                                              NRC about the availability of
                                                                                                            II. Backfit Discussion
                                                       • NRC’s PDR: You may examine and                                                                           information regarding this document.
                                                    purchase copies of public documents at                     Issuance of this ISG in final form does
                                                                                                                                                                  You may obtain publicly-available
                                                    the NRC’s PDR, Room O1–F21, One                         not constitute backfitting as defined in
                                                                                                                                                                  information related to this document
                                                    White Flint North, 11555 Rockville                      10 CFR 50.109 (the Backfit Rule). As
                                                                                                                                                                  using any of the following methods:
                                                    Pike, Rockville, Maryland 20852.                        discussed in the ‘‘Backfitting’’ section of              • Federal Rulemaking Web site: Go to
                                                    FOR FURTHER INFORMATION CONTACT:                        DSS–ISG- 2016–001, Revision 1, this                   http://www.regulations.gov and search
                                                    James Hickey, Office of Nuclear Reactor                 ISG contains guidance for the NRC staff               for Docket ID NRC–2008–0252. Address
                                                    Regulation, U.S. Nuclear Regulatory                     for implementing EGM–15–002. This                     questions about NRC dockets to Carol
                                                    Commission, Washington DC 20555–                        ISG does not constitute backfitting as                Gallagher; telephone: 301–415–3463;
                                                    0001; telephone: 301–415–2180, email:                   defined in the Backfit Rule and is not                email: Carol.Gallagher@nrc.gov. For
                                                    James.Hickey@nrc.gov.                                   otherwise inconsistent with the issue                 technical questions, contact the
                                                                                                            finality provisions in 10 CFR part 52,                individual listed in the FOR FURTHER
                                                    SUPPLEMENTARY INFORMATION: The NRC
                                                                                                            and the NRC staff did not prepare a                   INFORMATION CONTACT section of this
                                                    published a Federal Register notice
                                                                                                            backfit analysis. This because this ISG               document.
                                                    requesting public comment on this
                                                    interim staff guidance (ISG) on February
                                                                                                            requires no response by licensees, and                   • NRC’s Agencywide Documents
                                                                                                            concerns only NRC staff implementation                Access and Management System
                                                    23, 2017 (82 FR 11483). The agency
                                                                                                            of enforcement discretion pursuant to                 (ADAMS): You may obtain publicly-
                                                    received five total comments. The NRC
                                                                                                            EGM–15–002.                                           available documents online in the
                                                    considered the comments, which
                                                    resulted in no changes to the ISG. The                  III. Congressional Review Act                         ADAMS Public Documents collection at
                                                    evaluation of these comments is                                                                               http://www.nrc.gov/reading-rm/
                                                                                                               This ISG is a rule as defined in the               adams.html. To begin the search, select
                                                    discussed in the last appendix of the                   Congressional Review Act (5 U.S.C.
                                                    ISG.                                                                                                          ‘‘ADAMS Public Documents’’ and then
                                                                                                            801–808). However, the Office of                      select ‘‘Begin Web-based ADAMS
                                                    I. Background                                           Management and Budget has not found                   Search.’’ For problems with ADAMS,
                                                                                                            it to be a major rule as defined in the               please contact the NRC’s Public
                                                       The Office of Nuclear Reactor                        Congressional Review Act.
                                                    Regulation (NRR), Division of Risk                                                                            Document Room (PDR) reference staff at
                                                    Analysis (DRA) completed a generic                        Dated at Rockville, Maryland, this 16th day         1–800–397–4209, 301–415–4737, or by
                                                    bounding risk analysis (ADAMS                           of November, 2017.                                    email to pdr.resource@nrc.gov. The
                                                    Accession No. ML14114A556) that                           For the Nuclear Regulatory Commission.              ADAMS accession number for each
                                                    concluded that the issues associated                    Alexander H. Schwab,                                  document referenced (if it is available in
                                                    with the inoperability of a Structure,                  Project Manager, ROP Support and Generic              ADAMS) is provided the first time that
                                                    System, or Component due to a tornado-                  Communications Branch, Division of                    it is mentioned in this document.
                                                    generated missile are likely to be of low               Inspection and Regional Support, Office of               • NRC’s PDR: You may examine and
                                                    risk significance, and do not require                   Nuclear Reactor Regulation.                           purchase copies of public documents at
                                                    immediate plant shutdown. Based on                      [FR Doc. 2017–25271 Filed 11–21–17; 8:45 am]          the NRC’s PDR, Room O1–F21, One
                                                    the conclusions of the NRR/DRA                          BILLING CODE 7590–01–P                                White Flint North, 11555 Rockville
                                                    analysis, the staff issued EGM 15–002,                                                                        Pike, Rockville, Maryland 20852.
                                                    dated June 10, 2015. In its                                                                                   FOR FURTHER INFORMATION CONTACT:
                                                    implementation of EGM 15–002, the                       NUCLEAR REGULATORY                                    Chandu Patel, Office of New Reactors,
                                                    NRC staff found that additional                         COMMISSION                                            U.S. Nuclear Regulatory Commission,
                                                    refinements are needed to address                       [Docket Nos. 52–025 and 52–026; NRC–                  Washington, DC 20555–0001; telephone:
                                                    reportability, enforcement of long                      2008–0252]                                            301–415–3025; email: Chandu.Patel@
                                                    standing design issues, and the duration                                                                      nrc.gov.
                                                    of the enforcement discretion resulting                 Southern Nuclear Operating Company,                   SUPPLEMENTARY INFORMATION:
                                                                                                            Inc., Vogtle Electric Generating Plant,
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                    from all the non-conforming conditions
                                                    being assessed together. As a result, the               Units 3 and 4, Inspections, Tests,                    I. Licensee Notification of Completion
                                                    staff issued EGM 15–002, Revision 1,                    Analyses, and Acceptance Criteria                     of ITAAC
                                                    dated February 7, 2017.                                 AGENCY:  Nuclear Regulatory                              Southern Nuclear Operating
                                                       This revised ISG adds additional                     Commission.                                           Company, Inc. (SNC), Georgia Power
                                                    information for inspection and review                                                                         Company, Oglethorpe Power
                                                                                                            ACTION: Determination of the successful
                                                    staff to support implementation of the                                                                        Corporation, MEAG Power SPVM, LLC.,
                                                                                                            completion of inspections, tests, and
                                                    changes made in EGM 15–002, Revision                                                                          MEAG Power SPVJ, LLC., MEAG Power
                                                                                                            analyses.
                                                    1. This revised ISG provides an                                                                               SPVP, LLC., and the City of Dalton,


                                               VerDate Sep<11>2014   18:57 Nov 21, 2017   Jkt 244001   PO 00000   Frm 00106   Fmt 4703   Sfmt 4703   E:\FR\FM\22NON1.SGM   22NON1


                                                                            Federal Register / Vol. 82, No. 224 / Wednesday, November 22, 2017 / Notices                                            55659

                                                    Georgia, (hereafter called the licensee)                staff receives new information that                   POSTAL REGULATORY COMMISSION
                                                    has submitted inspections, tests,                       suggests the staff’s determination on any
                                                                                                                                                                  [Docket No. CP2018–55]
                                                    analyses, and acceptance criteria                       of these ITAAC is incorrect, then the
                                                    (ITAAC) closure notifications (ICNs)                    staff will determine whether to reopen                New Postal Product
                                                    under § 52.99(c)(1) of title 10 of the                  that ITAAC (including withdrawing the
                                                    Code of Federal Regulations (10 CFR),                   staff’s determination on that ITAAC).                 AGENCY:   Postal Regulatory Commission.
                                                    informing the NRC that the licensee has                 The NRC staff’s determination will be                 ACTION:   Notice.
                                                    successfully performed the required                     used to support a subsequent finding,
                                                    inspections, tests, and analyses, and that                                                                    SUMMARY:   The Commission is noticing a
                                                                                                            pursuant to 10 CFR 52.103(g), at the end              recent Postal Service filing for the
                                                    the acceptance criteria are met for:
                                                                                                            of construction that all acceptance                   Commission’s consideration concerning
                                                    VEGP Unit 3 ITAAC                                       criteria in the combined license are met.             a negotiated service agreement. This
                                                                                                            The ITAAC closure process is not                      notice informs the public of the filing,
                                                    2.1.02.08a.i (28), 2.1.02.08d.iii (34),
                                                      2.2.04.08a.i (235), 2.2.04.08a.ii (236),              finalized for these ITAAC until the NRC               invites public comment, and takes other
                                                      2.5.01.03d (514), 2.5.02.07a (534),                   makes an affirmative finding under 10                 administrative steps.
                                                      2.5.02.07d (537), 2.5.02.07e (538),                   CFR 52.103(g). Any future updates to                  DATES: Comments are due: November
                                                      2.5.02.14 (553), C.2.6.12.06 (676),                   the status of these ITAAC will be                     28, 2017.
                                                      3.2.00.01a (739), and 3.2.00.01b (740)                reflected on the NRC’s Web site at                    ADDRESSES: Submit comments
                                                                                                            http://www.nrc.gov/reactors/new-                      electronically via the Commission’s
                                                    VEGP Unit 4 ITAAC                                       reactors/oversight/itaac.html.                        Filing Online system at http://
                                                    2.1.02.08a.i (28), 2.1.02.08d.iii (34),                    This notice fulfills the staff’s                   www.prc.gov. Those who cannot submit
                                                      2.5.01.03d (514), 2.5.02.07a (534),                   obligations under 10 CFR 52.99(e)(1) to               comments electronically should contact
                                                      2.5.02.07d (537), 2.5.02.07e (538),                                                                         the person identified in the FOR FURTHER
                                                                                                            publish a notice in the Federal Register
                                                      2.5.02.14 (553), 3.2.00.01a (739), and                                                                      INFORMATION CONTACT section by
                                                                                                            of the NRC staff’s determination of the
                                                      3.2.00.01b (740)                                                                                            telephone for advice on filing
                                                                                                            successful completion of inspections,
                                                      The ITAAC for VEGP Unit 3 are in                                                                            alternatives.
                                                                                                            tests and analyses.
                                                    Appendix C of the VEGP Unit 3                                                                                 FOR FURTHER INFORMATION CONTACT:
                                                    combined license (ADAMS Accession                       Vogtle Electric Generating Plant Unit 3,              David A. Trissell, General Counsel, at
                                                    No. ML14100A106). The ITAAC for                         Docket No. 5200025                                    202–789–6820.
                                                    VEGP Unit 4 are in Appendix C of VEGP                                                                         SUPPLEMENTARY INFORMATION:
                                                    Unit 4 combined license (ADAMS                            A complete list of the review status
                                                    Accession No. ML14100A135).                             for VEGP Unit 3 ITAAC, including the                  Table of Contents
                                                                                                            submission date and ADAMS Accession                   I. Introduction
                                                    II. NRC Staff Determination of
                                                    Completion of ITAAC                                     Number for each ICN received, the                     II. Docketed Proceeding(s)
                                                                                                            ADAMS Accession Number for each
                                                       The NRC staff has determined that the                                                                      I. Introduction
                                                                                                            VEF, and the ADAMS Accession
                                                    specified inspections, tests, and                       Numbers for the inspection reports                       The Commission gives notice that the
                                                    analyses have been successfully                         associated with these specific ITAAC,                 Postal Service filed request(s) for the
                                                    completed, and that the specified                                                                             Commission to consider matters related
                                                                                                            can be found on the NRC’s Web site at
                                                    acceptance criteria are met. The                                                                              to negotiated service agreement(s). The
                                                                                                            http://www.nrc.gov/reactors/new-
                                                    documentation of the NRC staff’s                                                                              request(s) may propose the addition or
                                                    determination is in the ITAAC Closure                   reactors/new-licensing-files/vog3-
                                                                                                            icnsr.pdf.                                            removal of a negotiated service
                                                    Verification Evaluation Form (VEF) for                                                                        agreement from the market dominant or
                                                    each ITAAC. The VEF is a form that                      Vogtle Electric Generating Plant Unit 4,              the competitive product list, or the
                                                    represents the NRC staff’s structured                   Docket No. 5200026                                    modification of an existing product
                                                    process for reviewing ICNs. Each ICN                                                                          currently appearing on the market
                                                    presents a narrative description of how                   A complete list of the review status                dominant or the competitive product
                                                    the ITAAC was completed. The NRC’s                      for VEGP Unit 4 ITAAC, including the                  list.
                                                    ICN review process involves a                           submission date and ADAMS Accession                      Section II identifies the docket
                                                    determination on whether, among other                   Number for each ICN received, the                     number(s) associated with each Postal
                                                    things: (1) Each ICN provides sufficient                ADAMS Accession No. for each VEF,                     Service request, the title of each Postal
                                                    information, including a summary of the                 and the ADAMS Accession Numbers for                   Service request, the request’s acceptance
                                                    methodology used to perform the                         the inspection reports associated with                date, and the authority cited by the
                                                    ITAAC, to demonstrate that the                          these specific ITAAC, can be found on                 Postal Service for each request. For each
                                                    inspections, tests, and analyses have                   the NRC’s Web site at http://                         request, the Commission appoints an
                                                    been successfully completed; (2) each                                                                         officer of the Commission to represent
                                                                                                            www.nrc.gov/reactors/new-reactors/
                                                    ICN provides sufficient information to                                                                        the interests of the general public in the
                                                                                                            new-licensing-files/vog4-icnsr.pdf.
                                                    demonstrate that the acceptance criteria                                                                      proceeding, pursuant to 39 U.S.C. 505
                                                    of the ITAAC are met; and (3) any NRC                     Dated at Rockville, Maryland, this 17th day         (Public Representative). Section II also
                                                    inspections for the ITAAC have been                     of November, 2017.                                    establishes comment deadline(s)
asabaliauskas on DSKBBXCHB2PROD with NOTICES




                                                    completed and any ITAAC findings                          For the Nuclear Regulatory Commission.              pertaining to each request.
                                                    associated with that ITAAC have been                    Jennifer L. Dixon-Herrity,                               The public portions of the Postal
                                                    closed.                                                 Chief, Licensing Branch 4, Division of New
                                                                                                                                                                  Service’s request(s) can be accessed via
                                                       The NRC staff’s determination of the                 Reactor Licensing, Office of New Reactors.            the Commission’s Web site (http://
                                                    successful completion of these ITAAC is                                                                       www.prc.gov). Non-public portions of
                                                                                                            [FR Doc. 2017–25298 Filed 11–21–17; 8:45 am]
                                                    based on information available at this                                                                        the Postal Service’s request(s), if any,
                                                                                                            BILLING CODE 7590–01–P
                                                    time and is subject to the licensee’s                                                                         can be accessed through compliance
                                                    ability to maintain the condition that                                                                        with the requirements of 39 CFR
                                                    the acceptance criteria are met. If the                                                                       3007.40.


                                               VerDate Sep<11>2014   18:57 Nov 21, 2017   Jkt 244001   PO 00000   Frm 00107   Fmt 4703   Sfmt 4703   E:\FR\FM\22NON1.SGM   22NON1



Document Created: 2017-11-22 00:48:59
Document Modified: 2017-11-22 00:48:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDetermination of the successful completion of inspections, tests, and analyses.
DatesThe applicable date for determining successful completion of inspections, tests, and analyses for VEGP Units 3 and 4 is November 22, 2017.
ContactChandu Patel, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-3025; email: [email protected]
FR Citation82 FR 55658 