82 FR 55658 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4, Inspections, Tests, Analyses, and Acceptance Criteria

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 224 (November 22, 2017)

Page Range55658-55659
FR Document2017-25298

The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.

Federal Register, Volume 82 Issue 224 (Wednesday, November 22, 2017)
[Federal Register Volume 82, Number 224 (Wednesday, November 22, 2017)]
[Notices]
[Pages 55658-55659]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-25298]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc., Vogtle Electric 
Generating Plant, Units 3 and 4, Inspections, Tests, Analyses, and 
Acceptance Criteria

AGENCY: Nuclear Regulatory Commission.

ACTION: Determination of the successful completion of inspections, 
tests, and analyses.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has 
determined that the inspections, tests, and analyses have been 
successfully completed, and that the specified acceptance criteria are 
met for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.

DATES: The applicable date for determining successful completion of 
inspections, tests, and analyses for VEGP Units 3 and 4 is November 22, 
2017.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-3025; email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Licensee Notification of Completion of ITAAC

    Southern Nuclear Operating Company, Inc. (SNC), Georgia Power 
Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC., MEAG 
Power SPVJ, LLC., MEAG Power SPVP, LLC., and the City of Dalton,

[[Page 55659]]

Georgia, (hereafter called the licensee) has submitted inspections, 
tests, analyses, and acceptance criteria (ITAAC) closure notifications 
(ICNs) under Sec.  52.99(c)(1) of title 10 of the Code of Federal 
Regulations (10 CFR), informing the NRC that the licensee has 
successfully performed the required inspections, tests, and analyses, 
and that the acceptance criteria are met for:

VEGP Unit 3 ITAAC

2.1.02.08a.i (28), 2.1.02.08d.iii (34), 2.2.04.08a.i (235), 
2.2.04.08a.ii (236), 2.5.01.03d (514), 2.5.02.07a (534), 2.5.02.07d 
(537), 2.5.02.07e (538), 2.5.02.14 (553), C.2.6.12.06 (676), 3.2.00.01a 
(739), and 3.2.00.01b (740)

VEGP Unit 4 ITAAC

2.1.02.08a.i (28), 2.1.02.08d.iii (34), 2.5.01.03d (514), 2.5.02.07a 
(534), 2.5.02.07d (537), 2.5.02.07e (538), 2.5.02.14 (553), 3.2.00.01a 
(739), and 3.2.00.01b (740)

    The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3 
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP 
Unit 4 are in Appendix C of VEGP Unit 4 combined license (ADAMS 
Accession No. ML14100A135).

II. NRC Staff Determination of Completion of ITAAC

    The NRC staff has determined that the specified inspections, tests, 
and analyses have been successfully completed, and that the specified 
acceptance criteria are met. The documentation of the NRC staff's 
determination is in the ITAAC Closure Verification Evaluation Form 
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's 
structured process for reviewing ICNs. Each ICN presents a narrative 
description of how the ITAAC was completed. The NRC's ICN review 
process involves a determination on whether, among other things: (1) 
Each ICN provides sufficient information, including a summary of the 
methodology used to perform the ITAAC, to demonstrate that the 
inspections, tests, and analyses have been successfully completed; (2) 
each ICN provides sufficient information to demonstrate that the 
acceptance criteria of the ITAAC are met; and (3) any NRC inspections 
for the ITAAC have been completed and any ITAAC findings associated 
with that ITAAC have been closed.
    The NRC staff's determination of the successful completion of these 
ITAAC is based on information available at this time and is subject to 
the licensee's ability to maintain the condition that the acceptance 
criteria are met. If the staff receives new information that suggests 
the staff's determination on any of these ITAAC is incorrect, then the 
staff will determine whether to reopen that ITAAC (including 
withdrawing the staff's determination on that ITAAC). The NRC staff's 
determination will be used to support a subsequent finding, pursuant to 
10 CFR 52.103(g), at the end of construction that all acceptance 
criteria in the combined license are met. The ITAAC closure process is 
not finalized for these ITAAC until the NRC makes an affirmative 
finding under 10 CFR 52.103(g). Any future updates to the status of 
these ITAAC will be reflected on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
    This notice fulfills the staff's obligations under 10 CFR 
52.99(e)(1) to publish a notice in the Federal Register of the NRC 
staff's determination of the successful completion of inspections, 
tests and analyses.

Vogtle Electric Generating Plant Unit 3, Docket No. 5200025

    A complete list of the review status for VEGP Unit 3 ITAAC, 
including the submission date and ADAMS Accession Number for each ICN 
received, the ADAMS Accession Number for each VEF, and the ADAMS 
Accession Numbers for the inspection reports associated with these 
specific ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog3-icnsr.pdf.

Vogtle Electric Generating Plant Unit 4, Docket No. 5200026

    A complete list of the review status for VEGP Unit 4 ITAAC, 
including the submission date and ADAMS Accession Number for each ICN 
received, the ADAMS Accession No. for each VEF, and the ADAMS Accession 
Numbers for the inspection reports associated with these specific 
ITAAC, can be found on the NRC's Web site at http://www.nrc.gov/reactors/new-reactors/new-licensing-files/vog4-icnsr.pdf.

    Dated at Rockville, Maryland, this 17th day of November, 2017.

    For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2017-25298 Filed 11-21-17; 8:45 am]
 BILLING CODE 7590-01-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDetermination of the successful completion of inspections, tests, and analyses.
DatesThe applicable date for determining successful completion of inspections, tests, and analyses for VEGP Units 3 and 4 is November 22, 2017.
ContactChandu Patel, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-3025; email: [email protected]
FR Citation82 FR 55658 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR