The U.S. Nuclear Regulatory Commission (NRC) is issuing a Confirmatory Order to Dominion Energy Nuclear Connecticut, Inc. (Dominion) to memorialize the agreement reached during an alternative dispute resolution mediation session held on September 20, 2017. This Order will resolve the issue that was identified during an NRC investigation of actions by a (former) contractor security officer at Dominion's Millstone Power Station whom the NRC determined did not: (1) Perform required maintenance of site weapons; and (2) properly conduct monthly inventories of out of service weapons. The Confirmatory Order is effective upon issuance.

Federal Register, Volume 82 Issue 230 (Friday, December 1, 2017)
[Federal Register Volume 82, Number 230 (Friday, December 1, 2017)]
[Notices]
[Pages 57004-57010]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-25866]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-336 and 50-423; License Nos. DPR-65 and NPF-49; EA-17-
077; NRC-2017-0224]


Dominion Energy Nuclear Connecticut, Inc.; Millstone Power 
Station

AGENCY: Nuclear Regulatory Commission.

ACTION: Confirmatory order; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a 
Confirmatory Order to Dominion Energy Nuclear Connecticut, Inc. 
(Dominion) to memorialize the agreement reached during an alternative 
dispute resolution mediation session held on September 20, 2017. This 
Order will resolve the issue that was identified during an NRC 
investigation of actions by a (former) contractor security officer at 
Dominion's Millstone Power Station whom the NRC determined did not: (1) 
Perform required maintenance of site weapons; and (2) properly conduct 
monthly inventories of out of service weapons. The Confirmatory Order 
is effective upon issuance.

DATES: The Order was issued on November 21, 2017.

ADDRESSES: Please refer to Docket ID NRC-2017-0224 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0224. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the

[[Page 57005]]

ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Marjorie M. McLaughlin, Region I, U.S. 
Nuclear Regulatory Commission, 2100 Renaissance Blvd. King of Prussia, 
PA 19140; telephone: 610-337-5240, email: [email protected].

SUPPLEMENTARY INFORMATION: The text of the Order is attached.


    Dated at Rockville, Maryland, this 21st day of November 2017.

    For the Nuclear Regulatory Commission.
Daniel H. Dorman,
Regional Administrator.

United States of America

Nuclear Regulatory Commission

In the Matter of: Dominion Energy Nuclear Connecticut, Inc.

Docket Nos. 05000336 & 05000423

License Nos. DPR-65 and NPF-49

EA-17-077

Confirmatory Order
(Effective Immediately)

I

    Dominion Nuclear Connecticut, Inc. (Dominion) \1\ is the holder of 
operating reactor License No. DPR-65 issued by the Nuclear Regulatory 
Commission (NRC) pursuant to 10 CFR part 50 on September 26, 1975, and 
renewed on November 28, 2005, and NPF-49 issued by the NRC pursuant to 
10 CFR part 50 on January 31, 1986, and renewed on November 28, 2005. 
The licenses authorize the operation of Millstone Power Station Units 2 
and 3 (Millstone) in accordance with conditions specified therein. 
Millstone is located on the Licensee's site in Waterford, Connecticut.
---------------------------------------------------------------------------

    \1\ In a letter dated June 15, 2017 (ML17171A232), Dominion 
Nuclear Connecticut, Inc. notified the NRC that the company was 
changing its name to Dominion Energy Nuclear Connecticut, Inc., and 
requested that the NRC amend the Millstone operating licenses to 
reflect this change. The amendment request is currently under review 
by the NRC. The commitments in this Order apply to the entity that 
owns the licensed facilities, regardless of the entity's name.
---------------------------------------------------------------------------

    This Confirmatory Order is the result of an agreement reached 
during an Alternative Dispute Resolution (ADR) mediation session 
conducted on September 20, 2017.

II

    On August 31, 2016, the NRC Office of Investigations (OI), Region I 
Field Office opened an investigation (OI Case No. 1-2016-019) to 
evaluate whether a contract security officer working for G4S Secure 
Solutions USA, Inc. as an Armorer at Millstone deliberately failed to 
perform assigned duties pertaining to the accountability, testing, and 
maintenance of site response weapons and falsified related records. The 
investigation was completed on April 27, 2017, and the results 
documented in OI Report No. 1-2016-019. Based on the evidence developed 
during the investigation, the NRC concluded that the contract security 
officer: (1) Deliberately failed to perform assigned duties pertaining 
to the testing, maintenance, and accountability of site response 
weapons; and (2) deliberately falsified related records.
    Specifically, OI identified numerous discrepancies on a number of 
weapons maintenance records from between January 2015 and June 2016, 
where the contract security officer indicated that (s)he had performed 
test-firing, cleaning, or maintenance activities for weapons on dates 
when (s)he, in fact, either had not worked or had not accessed the site 
Protected Area to retrieve the weapons from their staged locations.
    The contract security officer indicated to OI that (s)he had been 
unable to keep up with his/her increasing workload, which led to his/
her decision to not perform required tasks and to falsify related 
records. The contract officer testified to OI that (s)he had requested 
help with the Armorer function. The contract officer admitted to OI 
that (s)he had falsified some records to indicate that (s)he was 
meeting the required maintenance timeframes, without having performed 
the maintenance activities. The contract officer stated that (s)he 
usually performed the maintenance at some later point, but admitted 
that this may not have always happened. OI concluded that the contract 
officer deliberately failed to perform the required activities during 
this timeframe and created false records to indicate that (s)he had 
performed them.
    OI also identified discrepancies with the out-of-service weapons 
inventory records for January 2016, March 2016, April 2016, and May 
2016. Specifically, OI identified that the recorded dates on which the 
January, March, and April inventories were completed were dates on 
which the contract security officer did not work. Additionally, OI 
identified that the April and May inventories listed weapons as being 
present at Millstone that were no longer on site.
    The contract security officer testified to OI that (s)he must have 
made a mistake when (s)he documented the wrong dates. The contract 
officer also acknowledged to OI that (s)he had not individually 
reviewed the serial numbers of all out-of-service weapons when 
conducting the inventories and had just assumed the weapons were still 
onsite. The contract officer said this assumption had been based on the 
fact that the weapons had been packaged for shipment, and had been 
stored in a locked room to which only the contract officer possessed a 
key. However, the contract officer was the individual who had 
transported the weapons offsite, and should have known that they were 
no longer there. The contract officer acknowledged to OI that (s)he 
should have taken the time to account for the weapons that had already 
been transferred, but that (s)he had not done that. OI concluded that 
the contract officer deliberately failed to perform the inventories for 
those months and created false records when (s)he prepared the 
inventory logs.
    The NRC determined that the contract security officer's deliberate 
actions caused Dominion to be in violation of 10 CFR 73, Appendix B, 
Section VI.G, ``Weapons, Personal Equipment, and Maintenance,'' and the 
Millstone Security Plan. Specifically, 10 CFR 73, Appendix B, Section 
VI.G, ``Weapons, Personal Equipment, and Maintenance,'' Section 3(a), 
``Firearms maintenance program,'' requires that each licensee shall 
implement a firearms maintenance and accountability program in 
accordance with the Commission regulations and the Commission-approved 
training and qualification plan. The Millstone Training and 
Qualification Plan is Appendix B to the site's Physical Security Plan. 
Section 20, ``Maintenance, Testing, and Calibration,'' part 20.5, 
``Firearms,'' states that a testing and maintenance program for all 
assigned firearms is established to ensure that the firearms and 
related accessories function as intended. The program is described in 
facility procedures. In particular, Dominion Security General Order GO-
MP-0215, Rev. 5, ``Weapons Maintenance Program,'' constitutes the

[[Page 57006]]

Millstone facility procedure for the testing, cleaning, and inspecting 
of security weapons, and requires that: all in-service weapons assigned 
to Millstone will be test fired on a semi-annual basis; weapons 
cleaning and maintenance shall occur after all test firing and also 
semi-annually by the Armorer; and the Armorer shall perform semi-annual 
weapons inspections. Additionally, Dominion Security General Order GO-
MP-0202, Rev. 0, ``Out of Service Weapons and Ammunition 
Accountability,'' constitutes the Millstone facility procedure for 
ensuring the accurate accountability of out of service weapons, 
magazines, and ammunition, and requires that the Armorer perform a 
monthly accountability of all out of service firearms, magazines, and 
ammunition.
    The NRC determined that the contract security officer's deliberate 
actions also caused Dominion to be in violation of 10 CFR 50.9, which 
requires, in part, that information required by the Commission's 
regulations, orders, or license conditions to be maintained by the 
licensee shall be complete and accurate in all material respects. 
Specifically, 10 CFR 73.70(e) requires that nuclear power reactor 
licensees shall keep documentation of all tests, inspections, and 
maintenance performed on required security related equipment for three 
years from the date of documenting the event. Information related to 
tests, inspections, and maintenance performed on weapons is material to 
the NRC because it is relied upon as documentation that they are in 
acceptable working condition. Information relating to the 
accountability of out of service weapons is material to the NRC because 
the proper accounting of weapons helps to ensure that these items have 
not been stolen or misplaced such that they could be used to defeat the 
Licensee's protective strategy.
    By letter dated July 20, 2017, the NRC notified the Licensee of the 
results of the investigation with an opportunity to: (1) Provide a 
response in writing; (2) attend a pre-decisional enforcement 
conference; or (3) participate in an ADR mediation session in an effort 
to resolve these concerns.
    In response to the NRC's offer, the Licensee requested the use of 
the NRC's ADR process. On September 20, 2017, the NRC and the Licensee 
met in an ADR session mediated by a professional mediator, arranged 
through Cornell University's Institute on Conflict Resolution. The ADR 
process is one in which a neutral mediator, with no decision-making 
authority, assists the parties in reaching an agreement on resolving 
any differences regarding the dispute. This Confirmatory Order is 
issued pursuant to the agreement reached during the ADR process.

III

    During the ADR session, the Licensee and the NRC reached a 
preliminary settlement agreement. The elements of the agreement include 
the following:

A. Items To Assure Restoration of Compliance

    1. Within 30 days of the date of the Confirmatory Order, Dominion 
shall prepare a full inventory of all in-service and out-of-service 
weapons on-site. Within 30 days of completing this action, Dominion 
shall inform the NRC that the action is complete by sending a letter to 
the Region I Administrator and shall make the inventory list available 
to the NRC for review during an inspection.
    2. Within 30 days of the date of the Confirmatory Order, Dominion 
shall prepare a report of the maintenance status of all in-service 
weapons that are on-site as of the date of the Confirmatory Order. The 
report shall specify the dates on which each weapon was last test-
fired, cleaned, serviced, and inspected. Within 30 days of completing 
this action, Dominion shall inform the NRC that the action is complete 
by sending a letter to the Region I Administrator and shall make the 
report available to the NRC for review during an inspection.

B. Items To Address Wrongdoing

    1. Within 30 days of the date of the Confirmatory Order, Dominion 
shall communicate this issue to all personnel at Millstone and other 
Dominion Energy, Inc. nuclear sites. The communication (which may be 
verbal or via written communication) shall specify that falsification 
of records is unacceptable and shall also explain the specific actions 
staff are expected to take when unable to fulfill NRC requirements. 
Within 30 days of completing this action, Dominion shall inform the NRC 
that the action is complete by sending a letter to the Region I 
Administrator and shall make the content of the communication available 
to the NRC for review during an inspection.
    2. Within 10 days of the date of the Confirmatory Order, Dominion 
shall ensure that Dominion's records related to the former contract 
security officer's entry in the Personnel Access Data System includes 
information related to this case. Within 10 days of completing this 
action, Dominion shall inform the NRC that the action is complete by 
notifying the Chief, Plant Support Branch 1, NRC Region I via 
telephone.

C. Items To Address Security Organization Weaknesses

    1. Within 180 days of the date of the Confirmatory Order, Dominion 
shall perform an evaluation of its oversight of the security contract 
organization. The evaluation shall review reporting relationships, 
Licensee and contractor responsibilities for individual performance 
management, and the means in place to verify that regulatory 
requirements are being met. The evaluation shall consider what 
improvements can be made in these areas and specify any identified 
corrective actions. Within 30 days of completing this action, Dominion 
shall inform the NRC that the action is complete by sending a letter to 
the Region I Administrator and shall make the results of the evaluation 
available to the NRC for review during an inspection.
    2. Within 90 days of completing the evaluation described in Item 
C.1, Dominion shall administer training to Dominion Security management 
staff at Millstone that focuses on roles and expectations for managing 
contractor staff and that reinforces Dominion's responsibility for 
assuring regulatory compliance. Within 30 days of completing this 
action, Dominion shall inform the NRC that the action is complete by 
sending a letter to the Region I Administrator and shall make the 
training materials available to the NRC for review during an 
inspection.
    3. Within 120 days of the date of this Confirmatory Order, Dominion 
shall administer a safety culture survey to the Millstone security 
organization. Prior to administering the survey, Dominion shall retain 
a safety culture expert, external to the Dominion Energy Inc. 
organization, to review Dominion's root cause evaluation of this issue 
and evaluate the need to append to the survey additional questions to 
assess the current state of individual and organizational behaviors 
related to the root cause evaluation. The survey questions and results 
shall be retained by Dominion for one year after administration of the 
survey and shall be made available to the NRC for review during an 
inspection.
    4. Within 240 days of the date of the Confirmatory Order, Dominion 
shall perform an organizational effectiveness evaluation of the 
Millstone security organization. The evaluation team shall be comprised 
of no more than 50% Dominion Energy Inc. nuclear employees, and the 
remaining

[[Page 57007]]

participants shall be from an outside organization (such as another 
utility or an industry group). The safety culture expert retained as 
described in Item C.3 shall be part of the evaluation team. The 
evaluation shall include a review of the results of the safety culture 
survey, including trending within the Millstone security organization 
and benchmarking with other Dominion Energy Inc. nuclear sites, along 
with the root cause evaluation, with particular emphasis on the traits 
of a healthy nuclear safety culture. It shall also include a review of 
the clarity for the security staff about lines of responsibility and 
reporting, and the performance and quality of how individual job 
performance results are evaluated, documented, and communicated. The 
evaluation shall result in an Action Plan that includes measures of 
effectiveness. Within 30 days of completing this action, Dominion shall 
inform the NRC that the action is complete by sending a letter to the 
Region I Administrator and shall make the results of the evaluation and 
a copy of the Action Plan available to the NRC for review during an 
inspection.

D. Items To Address Armorer Function Weaknesses

    1. Within 180 days of the date of the Confirmatory Order, Dominion 
shall evaluate its implementation of the Armorer function at Millstone. 
The evaluation shall include review of the staffing and 
responsibilities of the position, the methodology for tracking weapons 
maintenance status and activities, and supervisory involvement in 
verifying completion of required activities. The evaluation shall also 
include a comparison of Millstone's weapons maintenance processes 
(including the process for performing functionality checks and the 
standards for identifying degradation) versus other Dominion Energy 
Inc. nuclear sites and a sample of non-Dominion Energy Inc. nuclear 
sites. The evaluation shall identify best practices and consider any 
changes needed at Millstone and specify any identified corrective 
actions. Within 30 days of completing this action, Dominion shall 
inform the NRC that the action is complete by sending a letter to the 
Region I Administrator and shall make the results of the evaluation 
available to the NRC for review during an inspection.
    2. Within 90 days of completing the evaluation described in Item 
D.1, Dominion shall communicate (which may be verbal or in writing) to 
Dominion Security management staff at Millstone the results of the 
evaluation and any completed or pending corrective actions. Within 30 
days of completing this action, Dominion shall inform the NRC that the 
action is complete by sending a letter to the Region I Administrator 
and shall make the content of the communication available to the NRC 
for review during an inspection.

E. Items To Address Weapons Accountability Process Weaknesses

    1. Within 180 days of the date of the Confirmatory Order, Dominion 
shall review its process for performing and recording in-service and 
out-of-service weapons inventory. The review shall include a comparison 
of Millstone's process versus other Dominion Energy Inc. nuclear sites 
and a sample of non-Dominion Energy Inc. nuclear sites. The evaluation 
shall identify best practices and consider any changes needed at 
Millstone and specify any identified corrective actions. Within 30 days 
of completing this action, Dominion shall inform the NRC that the 
action is complete by sending a letter to the Region I Administrator 
and shall make the results of the evaluation available to the NRC for 
review during an inspection.

F. Effectiveness Reviews

    1. Within 90 days of the date of the Confirmatory Order, Dominion 
shall complete the first of four quarterly reviews of the effectiveness 
of the weapons maintenance program and of the corrective actions 
implemented in response to this issue. Within 30 days of completing the 
first such review, Dominion shall inform the NRC of the completion of 
the review by sending a letter to the Region I Administrator.
    2. The effectiveness reviews discussed in Item F.1 shall be 
conducted by a team that includes an individual from outside the 
Dominion Energy Inc. nuclear fleet. For a period of one year after 
completion of the fourth review, the documented effectiveness reviews 
shall be made available to the NRC for review during an inspection.

G. External Communication

    1. By December 31, 2019, Dominion shall discuss this issue, 
including the results of all of the above-listed evaluations and 
resulting corrective actions, to the following industry working groups: 
(a) The Nuclear Security Working Group; and (b) the 2019 National 
Nuclear Security Conference. The discussion shall include reference to 
any identified organizational weaknesses that Dominion determined 
contributed to the issue. Within 30 days of completing each discussion, 
Dominion shall inform the NRC that the action is complete by sending a 
letter to the Region I Administrator and shall make the presentation 
materials available to the NRC for one year after the presentation for 
review during an inspection.

H. Items to Which the NRC Has Agreed

    1. In consideration of the above actions, the NRC agrees not to 
pursue any further enforcement action (including issuance of a civil 
penalty) relating to the notice of apparent violations (Case no. EA-17-
077, Inspection Report Nos. 05000336/2017405 & 05000423/2017405, Office 
of Investigations Report No. 1-2016-019), dated July 20, 2017.
    2. The NRC agrees that the Confirmatory Order documenting the above 
items will not be considered an escalated enforcement action by the NRC 
for future assessment of violations occurring at Millstone Power 
Station Units 2 and 3.
    3. In the event of the transfer of the operating licenses of 
Millstone Power Station Units 2 and 3 to another entity, the 
commitments hereunder shall survive any transfer of ownership and will 
be binding on the new Licensee.
    On November 13, 2017, Dominion consented to issuing this Order with 
the commitments, as described in Section V below. Dominion further 
agreed that this Order is to be effective upon issuance, the agreement 
memorialized in this Confirmatory Order settles the matter between the 
parties, and that it has waived its right to a hearing.

IV

    I find that Dominion's commitments as set forth in Section V are 
acceptable and necessary, and conclude that with these commitments the 
public health and safety are reasonably assured. In view of the 
foregoing, I have determined that public health and safety require that 
Dominion's commitments be confirmed by this Confirmatory Order. Based 
on the above and Dominion's consent, this Confirmatory Order is 
effective upon issuance.

V

    Accordingly, pursuant to Sections 104b, 161b, 161i, 161o, 182 and 
186 of the Atomic Energy Act of 1954, as amended, and the Commission's 
regulations in 10 CFR 2.202 and 10 CFR part 50 and 10 CFR part 73, IT 
IS HEREBY ORDERED, EFFECTIVE UPON ISSUANCE, THAT LICENSE NO. DPR-65 AND 
LICENSE NO. NPF-49 ARE MODIFIED AS FOLLOWS:

[[Page 57008]]

A. Items To Assure Restoration of Compliance

    1. Within 30 days of the date of the Confirmatory Order, Dominion 
shall prepare a full inventory of all in-service and out-of-service 
weapons on-site. Within 30 days of completing this action, Dominion 
shall inform the NRC that the action is complete by sending a letter to 
the Region I Administrator and shall make the inventory list available 
to the NRC for review during an inspection.
    2. Within 30 days of the date of the Confirmatory Order, Dominion 
shall prepare a report of the maintenance status of all in-service 
weapons that are on-site as of the date of the Confirmatory Order. The 
report shall specify the dates on which each weapon was last test-
fired, cleaned, serviced, and inspected. Within 30 days of completing 
this action, Dominion shall inform the NRC that the action is complete 
by sending a letter to the Region I Administrator and shall make the 
report available to the NRC for review during an inspection.

B. Items To Address Wrongdoing

    1. Within 30 days of the date of the Confirmatory Order, Dominion 
shall communicate this issue to all personnel at Millstone and other 
Dominion Energy Inc. nuclear sites. The communication (which may be 
verbal or via written communication) shall specify that falsification 
of records is unacceptable and shall also explain the specific actions 
staff are expected to take when unable to fulfill NRC requirements. 
Within 30 days of completing this action, Dominion shall inform the NRC 
that the action is complete by sending a letter to the Region I 
Administrator and shall make the content of the communication available 
to the NRC for review during an inspection.
    2. Within 10 days of the date of the Confirmatory Order, Dominion 
shall ensure that Dominion's records related to the former contract 
security officer's entry in the Personnel Access Data System includes 
information related to this case. Within 10 days of completing this 
action, Dominion shall inform the NRC that the action is complete by 
notifying the Chief, Plant Support Branch 1, NRC Region I via 
telephone.

C. Items To Address Security Organization Weaknesses

    1. Within 180 days of the date of the Confirmatory Order, Dominion 
shall perform an evaluation of its oversight of the security contract 
organization. The evaluation shall review reporting relationships, 
Licensee and contractor responsibilities for individual performance 
management, and the means in place to verify that regulatory 
requirements are being met. The evaluation shall consider what 
improvements can be made in these areas and specify any identified 
corrective actions. Within 30 days of completing this action, Dominion 
shall inform the NRC that the action is complete by sending a letter to 
the Region I Administrator and shall make the results of the evaluation 
available to the NRC for review during an inspection.
    2. Within 90 days of completing the evaluation described in Item 
C.1, Dominion shall administer training to Dominion Security management 
staff at Millstone that focuses on roles and expectations for managing 
contractor staff and that reinforces Dominion's responsibility for 
assuring regulatory compliance. Within 30 days of completing this 
action, Dominion shall inform the NRC that the action is complete by 
sending a letter to the Region I Administrator and shall make the 
training materials available to the NRC for review during an 
inspection.
    3. Within 120 days of the date of this Confirmatory Order, Dominion 
shall administer a safety culture survey to the Millstone security 
organization. Prior to administering the survey, Dominion shall retain 
a safety culture expert, external to the Dominion Energy Inc. 
organization, to review Dominion's root cause evaluation of this issue 
and evaluate the need to append to the survey additional questions to 
assess the current state of individual and organizational behaviors 
related to the root cause evaluation. The survey questions and results 
shall be retained by Dominion for one year after administration of the 
survey and shall be made available to the NRC for review during an 
inspection.
    4. Within 240 days of the date of the Confirmatory Order, Dominion 
shall perform an organizational effectiveness evaluation of the 
Millstone security organization. The evaluation team shall be comprised 
of no more than 50% Dominion Energy Inc. nuclear employees, and the 
remaining participants shall be from an outside organization (such as 
another utility or an industry group). The safety culture expert 
retained as described in Item C.3 shall be part of the evaluation team. 
The evaluation shall include a review of the results of the safety 
culture survey, including trending within the Millstone security 
organization and benchmarking with other Dominion Energy Inc. nuclear 
sites, along with the root cause evaluation, with particular emphasis 
on the traits of a healthy nuclear safety culture. It shall also 
include a review of the clarity for the security staff about lines of 
responsibility and reporting, and the performance and quality of how 
individual job performance results are evaluated, documented, and 
communicated. The evaluation shall result in an Action Plan that 
includes measures of effectiveness. Within 30 days of completing this 
action, Dominion shall inform the NRC that the action is complete by 
sending a letter to the Region I Administrator and shall make the 
results of the evaluation and a copy of the Action Plan available to 
the NRC for review during an inspection.

5. Items To Address Armorer Function Weaknesses

    1. Within 180 days of the date of the Confirmatory Order, Dominion 
shall evaluate its implementation of the Armorer function at Millstone. 
The evaluation shall include review of the staffing and 
responsibilities of the position, the methodology for tracking weapons 
maintenance status and activities, and supervisory involvement in 
verifying completion of required activities. The evaluation shall also 
include a comparison of Millstone's weapons maintenance processes 
(including the process for performing functionality checks and the 
standards for identifying degradation) versus other Dominion Energy 
Inc. nuclear sites and a sample of non-Dominion Energy Inc. nuclear 
sites. The evaluation shall identify best practices and consider any 
changes needed at Millstone and specify any identified corrective 
actions. Within 30 days of completing this action, Dominion shall 
inform the NRC that the action is complete by sending a letter to the 
Region I Administrator and shall make the results of the evaluation 
available to the NRC for review during an inspection.
    2. Within 90 days of completing the evaluation described in Item 
D.1, Dominion shall communicate (which may be verbal or in writing) to 
Dominion Security management staff at Millstone the results of the 
evaluation and any completed or pending corrective actions. Within 30 
days of completing this action, Dominion shall inform the NRC that the 
action is complete by sending a letter to the Region I Administrator 
and shall make the content of the communication available to the NRC 
for review during an inspection.

[[Page 57009]]

D. Items To Address Weapons Accountability Process Weaknesses

    1. Within 180 days of the date of the Confirmatory Order, Dominion 
shall review its process for performing and recording in-service and 
out-of-service weapons inventory. The review shall include a comparison 
of Millstone's process versus other Dominion Energy Inc. nuclear sites 
and a sample of non-Dominion Energy Inc. nuclear sites. The evaluation 
shall identify best practices and consider any changes needed at 
Millstone and specify any identified corrective actions. Within 30 days 
of completing this action, Dominion shall inform the NRC that the 
action is complete by sending a letter to the Region I Administrator 
and shall make the results of the evaluation available to the NRC for 
review during an inspection.

E. Effectiveness Reviews

    1. Within 90 days of the date of the Confirmatory Order, Dominion 
shall complete the first of four quarterly reviews of the effectiveness 
of the weapons maintenance program and of the corrective actions 
implemented in response to this issue. Within 30 days of completing the 
first such review, Dominion shall inform the NRC of the completion of 
the review by sending a letter to the Region I Administrator.
    2. The effectiveness reviews discussed in Item F.1 shall be 
conducted by a team that includes an individual from outside the 
Dominion Energy Inc. nuclear fleet. For a period of one year after 
completion of the fourth review, the documented effectiveness reviews 
shall be made available to the NRC for review during an inspection.

F. External Communication

    1. By December 31, 2019, Dominion shall discuss this issue, 
including the results of all of the above-listed evaluations and 
resulting corrective actions, to the following industry working groups: 
(a) The Nuclear Security Working Group; and (b) the 2019 National 
Nuclear Security Conference. The discussion shall include reference to 
any identified organizational weaknesses that Dominion determined 
contributed to the issue. Within 30 days of completing each discussion, 
Dominion shall inform the NRC that the action is complete by sending a 
letter to the Region I Administrator and shall make the presentation 
materials available to the NRC for one year after the presentation for 
review during an inspection.
    In the event of the transfer of the operating licenses of Millstone 
Power Station Units 2 and 3 to another entity, the commitments set 
forth hereunder shall continue to apply to the new entity and 
accordingly survive any transfer of ownership or license. The Regional 
Administrator, Region I may, in writing, relax or rescind any of the 
above conditions upon demonstration by the Licensee of good cause.

VI

    In accordance with 10 CFR 2.202 and 10 CFR 2.309, any person 
adversely affected by this Confirmatory Order, other than Dominion, may 
request a hearing within thirty (30) calendar days of the date of 
issuance of this Confirmatory Order. Where good cause is shown, 
consideration will be given to extending the time to request a hearing. 
A request for extension of time must be made in writing to the 
Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555, and include a statement of good cause for the 
extension.
    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene (hereinafter 
``petition''), and documents filed by interested governmental entities 
participating under 10 CFR 2.315(c), must be filed in accordance with 
the NRC's E-Filing rule (72 FR 49139; August 28, 2007, as amended at 77 
FR 46562, August 3, 2012). The E-Filing process requires participants 
to submit and serve all adjudicatory documents over the internet, or in 
some cases to mail copies on electronic storage media. Participants may 
not submit paper copies of their filings unless they seek an exemption 
in accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 
ten (10) days prior to the filing deadline, the participant should 
contact the Office of the Secretary by email at [email protected], 
or by telephone at 301-415-1677, to (1) request a digital 
identification (ID) certificate, which allows the participant (or its 
counsel or representative) to digitally sign submissions and access the 
E-Filing system for any proceeding in which it is participating; and 
(2) advise the Secretary that the participant will be submitting a 
petition or other adjudicatory document (Even in instances in which the 
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the 
Secretary will establish an electronic docket for the hearing in this 
proceeding if the Secretary has not already established an electronic 
docket.
    Information about applying for a digital ID certificate is 
available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/getting-started.html. Once a participant has obtained a 
digital ID certificate and a docket has been created, the participant 
can then submit adjudicatory documents. Submissions must be in Portable 
Document Format (PDF). Additional guidance on PDF submissions is 
available on the NRC's public Web site at http://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the 
time the document is submitted through the NRC's E-Filing system. To be 
timely, an electronic filing must be submitted to the E-Filing system 
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of 
a transmission, the E-Filing system time-stamps the document and sends 
the submitter an email notice confirming receipt of the document. The 
E-Filing system also distributes an email notice that provides access 
to the document to the NRC's Office of the General Counsel and any 
others who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
document on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before adjudicatory documents are 
filed so that they can obtain access to the documents via the E-Filing 
system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC's Electronic 
Filing Help Desk through the ``Contact Us'' link located on the NRC's 
Public Web site at http://www.nrc.gov/site-help/e-submittals.html, by 
email to [email protected], or by a toll-free call at 1-866-672-
7640. The NRC Electronic Filing Help Desk is available between 9 a.m. 
and 6 p.m., Eastern Time, Monday through Friday, excluding government 
holidays.
    Participants who believe that they have good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
stating why there is good cause for not filing electronically and 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S.

[[Page 57010]]

Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, 11555 
Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and 
Adjudications Staff. Participants filing adjudicatory documents in this 
manner are responsible for serving the document on all other 
participants. Filing is considered complete by first-class mail as of 
the time of deposit in the mail, or by courier, express mail, or 
expedited delivery service upon depositing the document with the 
provider of the service. A presiding officer, having granted an 
exemption request from using E-Filing, may require a participant or 
party to use E-Filing if the presiding officer subsequently determines 
that the reason for granting the exemption from use of E-Filing no 
longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket which is available to the public at 
https://adams.nrc.gov/ehd, unless excluded pursuant to an Order of the 
Commission or the presiding officer. If you do not have an NRC-issued 
digital ID certificate as described above, click ``Cancel'' when the 
link requests certificates and you will be automatically directed to 
the NRC's electronic hearing dockets where you will be able to access 
any publicly-available documents in a particular hearing docket. 
Participants are requested not to include personal privacy information, 
such as social security numbers, home addresses, or personal phone 
numbers in their filings, unless an NRC regulation or other law 
requires submission of such information. For example, in some 
instances, individuals provide home addresses in order to demonstrate 
proximity to a facility or site. With respect to copyrighted works, 
except for limited excerpts that serve the purpose of the adjudicatory 
filings and would constitute a Fair Use application, participants are 
requested not to include copyrighted materials in their submission.
    The Commission will issue a notice or order granting or denying a 
hearing request or intervention petition, designating the issues for 
any hearing that will be held and designating the Presiding Officer. A 
notice granting a hearing will be published in the Federal Register and 
served on the parties prior to the hearing.
    If a person (other than Dominion) requests a hearing, that person 
shall set forth with particularity the manner in which his interest is 
adversely affected by this Confirmatory Order and shall address the 
criteria set forth in 10 CFR 2.309(d) and (f).
    If a hearing is requested by a person whose interest is adversely 
affected, the Commission will issue an order designating the time and 
place of any hearing. If a hearing is held, the issue to be considered 
at such hearing shall be whether this Confirmatory Order should be 
sustained.
    In the absence of any request for hearing, or written approval of 
an extension of time in which to request a hearing, the provisions 
specified in Section V above shall be final 30 days from the date of 
this Confirmatory Order without further order or proceedings. If an 
extension of time for requesting a hearing has been approved, the 
provisions specified in Section V shall be final when the extension 
expires if a hearing request has not been received.


    For the Nuclear Regulatory Commission

    Dated this 21st day of November, 2017.
Daniel H. Dorman,
Regional Administrator.
[FR Doc. 2017-25866 Filed 11-30-17; 8:45 am]
 BILLING CODE 7590-01-P



                                                57004                        Federal Register / Vol. 82, No. 230 / Friday, December 1, 2017 / Notices

                                                license numbers) were issued to the                     as supplemented by letter dated August                   The exemption and amendment were
                                                licensee for VEGP Units 3 and 4 (COLs                   3, 2017. This exemption is related to,                issued on October 20, 2017, as part of
                                                NPF–91 and NPF–92). The exemption                       and necessary for the granting of                     a combined package to the licensee
                                                documents for VEGP Units 3 and 4 can                    License Amendment Nos. 93 (Unit 3)                    (ADAMS Accession No. ML17205A473).
                                                be found in ADAMS under Accession                       and 92 (Unit 4), which is being issued                  Dated at Rockville, Maryland, this 28th day
                                                Nos. ML17205A478 and ML17205A479,                       concurrently with this exemption.                     of November 2017.
                                                respectively. The exemption is                             3. As explained in Section 6.0 of the                For the Nuclear Regulatory Commission.
                                                reproduced (with the exception of                       NRC staff’s Safety Evaluation (ADAMS                  Jennifer L. Dixon-Herrity,
                                                abbreviated titles and additional                       Accession No. ML17208A163), this                      Chief, Licensing Branch 4, Division of New
                                                citations) in Section II of this document.              exemption meets the eligibility criteria              Reactor Licensing, Office of New Reactors.
                                                The amendment documents for COLs                        for categorical exclusion set forth in 10             [FR Doc. 2017–25924 Filed 11–30–17; 8:45 am]
                                                NPF–91 and NPF–92 are available in                      CFR 51.22(c)(9). Therefore, pursuant to               BILLING CODE 7590–01–P
                                                ADAMS under Accession Nos.                              10 CFR 51.22(b), no environmental
                                                ML17205A476 and ML17205A477,                            impact statement or environmental
                                                respectively. A summary of the                          assessment needs to be prepared in                    NUCLEAR REGULATORY
                                                amendment documents is provided in                      connection with the issuance of the                   COMMISSION
                                                Section III of this document.                           exemption.
                                                                                                                                                              [Docket Nos. 50–336 and 50–423; License
                                                II. Exemption                                              4. This exemption is effective as of the
                                                                                                                                                              Nos. DPR–65 and NPF–49; EA–17–077;
                                                                                                        date of its issuance.                                 NRC–2017–0224]
                                                   Reproduced below is the exemption
                                                document issued to VEGP Units 3 and                     III. License Amendment Request
                                                                                                                                                              Dominion Energy Nuclear Connecticut,
                                                Unit 4. It makes reference to the                          By letter dated April 27, 2017                     Inc.; Millstone Power Station
                                                combined safety evaluation that                         (ADAMS Accession No. ML17118A049),
                                                provides the reasoning for the findings                 as supplemented by letter dated August                AGENCY:  Nuclear Regulatory
                                                made by the NRC (and listed under Item                  3, 2017 (ADAMS Accession No.                          Commission.
                                                1) in order to grant the exemption:                     ML17215B187), the licensee requested                  ACTION: Confirmatory order; issuance.
                                                   1. In a letter dated April 27, 2017, as              that the NRC amend the COLs for VEGP,
                                                supplemented by letter dated August 3,                  Units 3 and 4, COLs NPF–91 and NPF–                   SUMMARY:   The U.S. Nuclear Regulatory
                                                2017, Southern Nuclear Operating                        92. The proposed amendment is                         Commission (NRC) is issuing a
                                                Company, Inc., (licensee) requested                     described in Section I of this Federal                Confirmatory Order to Dominion Energy
                                                from the NRC an exemption to allow                      Register notice.                                      Nuclear Connecticut, Inc. (Dominion) to
                                                departures from Tier 1 information in                      The Commission has determined for                  memorialize the agreement reached
                                                the certified Design Control Document                   these amendments that the application                 during an alternative dispute resolution
                                                (DCD) incorporated by reference in part                 complies with the standards and                       mediation session held on September
                                                52 of title 10 of the Code of Federal                   requirements of the Atomic Energy Act                 20, 2017. This Order will resolve the
                                                Regulations (10 CFR), appendix D,                       of 1954, as amended (the Act), and the                issue that was identified during an NRC
                                                ‘‘Design Certification Rule for the                     Commission’s rules and regulations.                   investigation of actions by a (former)
                                                AP1000 Design,’’ as part of license                     The Commission has made appropriate                   contractor security officer at Dominion’s
                                                amendment request (LAR) 17–015,                         findings as required by the Act and the               Millstone Power Station whom the NRC
                                                ‘‘Central Chilled Water System (VWS)                    Commission’s rules and regulations in                 determined did not: (1) Perform
                                                Optimization Changes.’’                                 10 CFR chapter I, which are set forth in              required maintenance of site weapons;
                                                   For the reasons set forth in Section 3.1             the license amendment.                                and (2) properly conduct monthly
                                                of the NRC staff’s Safety Evaluation,                                                                         inventories of out of service weapons.
                                                                                                           A notice of consideration of issuance
                                                which can be found in ADAMS under                                                                             The Confirmatory Order is effective
                                                                                                        of amendment to facility operating
                                                Accession No. ML17208A163, the                                                                                upon issuance.
                                                                                                        license or COL, as applicable, proposed
                                                Commission finds that:                                                                                        DATES: The Order was issued on
                                                   A. The exemption is authorized by                    no significant hazards consideration
                                                                                                        determination, and opportunity for a                  November 21, 2017.
                                                law;
                                                   B. the exemption presents no undue                   hearing in connection with these                      ADDRESSES: Please refer to Docket ID
                                                risk to public health and safety;                       actions, was published in the Federal                 NRC–2017–0224 when contacting the
                                                   C. the exemption is consistent with                  Register on June 19, 2017 (82 FR 27891).              NRC about the availability of
                                                the common defense and security;                        No comments were received during the                  information regarding this document.
                                                   D. special circumstances are present                 30-day comment period.                                You may obtain publicly-available
                                                in that the application of the rule in this                The Commission has determined that                 information related to this document
                                                circumstance is not necessary to serve                  these amendments satisfy the criteria for             using any of the following methods:
                                                the underlying purpose of the rule;                     categorical exclusion in accordance                      • Federal Rulemaking Web site: Go to
                                                   E. the special circumstances outweigh                with 10 CFR 51.22. Therefore, pursuant                http://www.regulations.gov and search
                                                any decrease in safety that may result                  to 10 CFR 51.22(b), no environmental                  for Docket ID NRC–2017–0224. Address
                                                from the reduction in standardization                   impact statement or environmental                     questions about NRC dockets to Carol
                                                caused by the exemption; and                            assessment need be prepared for these                 Gallagher; telephone: 301–415–3463;
                                                   F. the exemption will not result in a                amendments.                                           email: Carol.Gallagher@nrc.gov. For
                                                                                                                                                              technical questions, contact the
sradovich on DSK3GMQ082PROD with NOTICES




                                                significant decrease in the level of safety
                                                                                                        IV. Conclusion
                                                otherwise provided by the design.                                                                             individual(s) listed in the FOR FURTHER
                                                   2. Accordingly, the licensee is granted                 Using the reasons set forth in the                 INFORMATION CONTACT section of this
                                                an exemption from the certified DCD                     combined safety evaluation, the staff                 document.
                                                Tier 1 information, with corresponding                  granted the exemption and issued the                     • NRC’s Agencywide Documents
                                                changes to Appendix C of the Facility                   amendment that the licensee requested                 Access and Management System
                                                Combined License, as described in the                   on April 27, 2017, as supplemented by                 (ADAMS): You may obtain publicly-
                                                licensee’s request dated April 27, 2017,                letter dated August 3, 2017.                          available documents online in the


                                           VerDate Sep<11>2014   16:44 Nov 30, 2017   Jkt 244001   PO 00000   Frm 00064   Fmt 4703   Sfmt 4703   E:\FR\FM\01DEN1.SGM   01DEN1


                                                                             Federal Register / Vol. 82, No. 230 / Friday, December 1, 2017 / Notices                                           57005

                                                ADAMS Public Documents collection at                    therein. Millstone is located on the                  records for January 2016, March 2016,
                                                http://www.nrc.gov/reading-rm/                          Licensee’s site in Waterford,                         April 2016, and May 2016. Specifically,
                                                adams.html. To begin the search, select                 Connecticut.                                          OI identified that the recorded dates on
                                                ‘‘ADAMS Public Documents’’ and then                       This Confirmatory Order is the result               which the January, March, and April
                                                select ‘‘Begin Web-based ADAMS                          of an agreement reached during an                     inventories were completed were dates
                                                Search.’’ For problems with ADAMS,                      Alternative Dispute Resolution (ADR)                  on which the contract security officer
                                                please contact the NRC’s Public                         mediation session conducted on                        did not work. Additionally, OI
                                                Document Room (PDR) reference staff at                  September 20, 2017.                                   identified that the April and May
                                                1–800–397–4209, 301–415–4737, or by                     II                                                    inventories listed weapons as being
                                                email to pdr.resource@nrc.gov. The                                                                            present at Millstone that were no longer
                                                ADAMS accession number for each                            On August 31, 2016, the NRC Office                 on site.
                                                document referenced (if it is available in              of Investigations (OI), Region I Field                   The contract security officer testified
                                                ADAMS) is provided the first time that                  Office opened an investigation (OI Case               to OI that (s)he must have made a
                                                it is mentioned in this document.                       No. 1–2016–019) to evaluate whether a                 mistake when (s)he documented the
                                                   • NRC’s PDR: You may examine and                     contract security officer working for G4S             wrong dates. The contract officer also
                                                purchase copies of public documents at                  Secure Solutions USA, Inc. as an                      acknowledged to OI that (s)he had not
                                                the NRC’s PDR, Room O1–F21, One                         Armorer at Millstone deliberately failed              individually reviewed the serial
                                                White Flint North, 11555 Rockville                      to perform assigned duties pertaining to              numbers of all out-of-service weapons
                                                Pike, Rockville, Maryland 20852.                        the accountability, testing, and                      when conducting the inventories and
                                                                                                        maintenance of site response weapons                  had just assumed the weapons were still
                                                FOR FURTHER INFORMATION CONTACT:
                                                                                                        and falsified related records. The                    onsite. The contract officer said this
                                                Marjorie M. McLaughlin, Region I, U.S.
                                                                                                        investigation was completed on April                  assumption had been based on the fact
                                                Nuclear Regulatory Commission, 2100
                                                                                                        27, 2017, and the results documented in               that the weapons had been packaged for
                                                Renaissance Blvd. King of Prussia, PA
                                                                                                        OI Report No. 1–2016–019. Based on the                shipment, and had been stored in a
                                                19140; telephone: 610–337–5240, email:                  evidence developed during the
                                                Marjorie.Mclaughlin@nrc.gov.                                                                                  locked room to which only the contract
                                                                                                        investigation, the NRC concluded that                 officer possessed a key. However, the
                                                SUPPLEMENTARY INFORMATION: The text of                  the contract security officer: (1)                    contract officer was the individual who
                                                the Order is attached.                                  Deliberately failed to perform assigned               had transported the weapons offsite,
                                                  Dated at Rockville, Maryland, this 21st day           duties pertaining to the testing,                     and should have known that they were
                                                of November 2017.                                       maintenance, and accountability of site               no longer there. The contract officer
                                                  For the Nuclear Regulatory Commission.                response weapons; and (2) deliberately                acknowledged to OI that (s)he should
                                                Daniel H. Dorman,                                       falsified related records.                            have taken the time to account for the
                                                                                                           Specifically, OI identified numerous               weapons that had already been
                                                Regional Administrator.
                                                                                                        discrepancies on a number of weapons                  transferred, but that (s)he had not done
                                                United States of America                                maintenance records from between                      that. OI concluded that the contract
                                                                                                        January 2015 and June 2016, where the                 officer deliberately failed to perform the
                                                Nuclear Regulatory Commission
                                                                                                        contract security officer indicated that              inventories for those months and
                                                In the Matter of: Dominion Energy Nuclear               (s)he had performed test-firing,                      created false records when (s)he
                                                  Connecticut, Inc.                                     cleaning, or maintenance activities for               prepared the inventory logs.
                                                Docket Nos. 05000336 & 05000423                         weapons on dates when (s)he, in fact,                    The NRC determined that the contract
                                                License Nos. DPR–65 and NPF–49                          either had not worked or had not                      security officer’s deliberate actions
                                                                                                        accessed the site Protected Area to                   caused Dominion to be in violation of
                                                EA–17–077                                               retrieve the weapons from their staged                10 CFR 73, Appendix B, Section VI.G,
                                                Confirmatory Order                                      locations.                                            ‘‘Weapons, Personal Equipment, and
                                                (Effective Immediately)                                    The contract security officer indicated            Maintenance,’’ and the Millstone
                                                I                                                       to OI that (s)he had been unable to keep              Security Plan. Specifically, 10 CFR 73,
                                                                                                        up with his/her increasing workload,                  Appendix B, Section VI.G, ‘‘Weapons,
                                                  Dominion Nuclear Connecticut, Inc.                    which led to his/her decision to not                  Personal Equipment, and Maintenance,’’
                                                (Dominion) 1 is the holder of operating                 perform required tasks and to falsify                 Section 3(a), ‘‘Firearms maintenance
                                                reactor License No. DPR–65 issued by                    related records. The contract officer                 program,’’ requires that each licensee
                                                the Nuclear Regulatory Commission                       testified to OI that (s)he had requested              shall implement a firearms maintenance
                                                (NRC) pursuant to 10 CFR part 50 on                     help with the Armorer function. The                   and accountability program in
                                                September 26, 1975, and renewed on                      contract officer admitted to OI that (s)he            accordance with the Commission
                                                November 28, 2005, and NPF–49 issued                    had falsified some records to indicate                regulations and the Commission-
                                                by the NRC pursuant to 10 CFR part 50                   that (s)he was meeting the required                   approved training and qualification
                                                on January 31, 1986, and renewed on                     maintenance timeframes, without                       plan. The Millstone Training and
                                                November 28, 2005. The licenses                         having performed the maintenance                      Qualification Plan is Appendix B to the
                                                authorize the operation of Millstone                    activities. The contract officer stated               site’s Physical Security Plan. Section 20,
                                                Power Station Units 2 and 3 (Millstone)                 that (s)he usually performed the                      ‘‘Maintenance, Testing, and
                                                in accordance with conditions specified                 maintenance at some later point, but                  Calibration,’’ part 20.5, ‘‘Firearms,’’
                                                                                                        admitted that this may not have always                states that a testing and maintenance
                                                  1 In a letter dated June 15, 2017 (ML17171A232),
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        happened. OI concluded that the                       program for all assigned firearms is
                                                Dominion Nuclear Connecticut, Inc. notified the
                                                NRC that the company was changing its name to           contract officer deliberately failed to               established to ensure that the firearms
                                                Dominion Energy Nuclear Connecticut, Inc., and          perform the required activities during                and related accessories function as
                                                requested that the NRC amend the Millstone              this timeframe and created false records              intended. The program is described in
                                                operating licenses to reflect this change. The          to indicate that (s)he had performed                  facility procedures. In particular,
                                                amendment request is currently under review by
                                                the NRC. The commitments in this Order apply to         them.                                                 Dominion Security General Order GO–
                                                the entity that owns the licensed facilities,              OI also identified discrepancies with              MP–0215, Rev. 5, ‘‘Weapons
                                                regardless of the entity’s name.                        the out-of-service weapons inventory                  Maintenance Program,’’ constitutes the


                                           VerDate Sep<11>2014   16:44 Nov 30, 2017   Jkt 244001   PO 00000   Frm 00065   Fmt 4703   Sfmt 4703   E:\FR\FM\01DEN1.SGM   01DEN1


                                                57006                        Federal Register / Vol. 82, No. 230 / Friday, December 1, 2017 / Notices

                                                Millstone facility procedure for the                    parties in reaching an agreement on                   NRC that the action is complete by
                                                testing, cleaning, and inspecting of                    resolving any differences regarding the               notifying the Chief, Plant Support
                                                security weapons, and requires that: all                dispute. This Confirmatory Order is                   Branch 1, NRC Region I via telephone.
                                                in-service weapons assigned to                          issued pursuant to the agreement
                                                                                                                                                              C. Items To Address Security
                                                Millstone will be test fired on a semi-                 reached during the ADR process.
                                                                                                                                                              Organization Weaknesses
                                                annual basis; weapons cleaning and
                                                                                                        III                                                     1. Within 180 days of the date of the
                                                maintenance shall occur after all test
                                                firing and also semi-annually by the                       During the ADR session, the Licensee               Confirmatory Order, Dominion shall
                                                Armorer; and the Armorer shall perform                  and the NRC reached a preliminary                     perform an evaluation of its oversight of
                                                semi-annual weapons inspections.                        settlement agreement. The elements of                 the security contract organization. The
                                                Additionally, Dominion Security                         the agreement include the following:                  evaluation shall review reporting
                                                General Order GO–MP–0202, Rev. 0,                                                                             relationships, Licensee and contractor
                                                                                                        A. Items To Assure Restoration of
                                                ‘‘Out of Service Weapons and                                                                                  responsibilities for individual
                                                                                                        Compliance
                                                Ammunition Accountability,’’                                                                                  performance management, and the
                                                constitutes the Millstone facility                         1. Within 30 days of the date of the               means in place to verify that regulatory
                                                procedure for ensuring the accurate                     Confirmatory Order, Dominion shall                    requirements are being met. The
                                                accountability of out of service                        prepare a full inventory of all in-service            evaluation shall consider what
                                                weapons, magazines, and ammunition,                     and out-of-service weapons on-site.                   improvements can be made in these
                                                and requires that the Armorer perform                   Within 30 days of completing this                     areas and specify any identified
                                                a monthly accountability of all out of                  action, Dominion shall inform the NRC                 corrective actions. Within 30 days of
                                                service firearms, magazines, and                        that the action is complete by sending                completing this action, Dominion shall
                                                ammunition.                                             a letter to the Region I Administrator                inform the NRC that the action is
                                                   The NRC determined that the contract                 and shall make the inventory list                     complete by sending a letter to the
                                                security officer’s deliberate actions also              available to the NRC for review during                Region I Administrator and shall make
                                                caused Dominion to be in violation of                   an inspection.                                        the results of the evaluation available to
                                                10 CFR 50.9, which requires, in part,                      2. Within 30 days of the date of the               the NRC for review during an
                                                that information required by the                        Confirmatory Order, Dominion shall                    inspection.
                                                Commission’s regulations, orders, or                    prepare a report of the maintenance                     2. Within 90 days of completing the
                                                license conditions to be maintained by                  status of all in-service weapons that are             evaluation described in Item C.1,
                                                the licensee shall be complete and                      on-site as of the date of the                         Dominion shall administer training to
                                                accurate in all material respects.                      Confirmatory Order. The report shall                  Dominion Security management staff at
                                                Specifically, 10 CFR 73.70(e) requires                  specify the dates on which each weapon                Millstone that focuses on roles and
                                                that nuclear power reactor licensees                    was last test-fired, cleaned, serviced,               expectations for managing contractor
                                                shall keep documentation of all tests,                  and inspected. Within 30 days of                      staff and that reinforces Dominion’s
                                                inspections, and maintenance                            completing this action, Dominion shall                responsibility for assuring regulatory
                                                performed on required security related                  inform the NRC that the action is                     compliance. Within 30 days of
                                                equipment for three years from the date                 complete by sending a letter to the                   completing this action, Dominion shall
                                                of documenting the event. Information                   Region I Administrator and shall make                 inform the NRC that the action is
                                                related to tests, inspections, and                      the report available to the NRC for                   complete by sending a letter to the
                                                maintenance performed on weapons is                     review during an inspection.                          Region I Administrator and shall make
                                                material to the NRC because it is relied                                                                      the training materials available to the
                                                                                                        B. Items To Address Wrongdoing                        NRC for review during an inspection.
                                                upon as documentation that they are in
                                                acceptable working condition.                              1. Within 30 days of the date of the                 3. Within 120 days of the date of this
                                                Information relating to the                             Confirmatory Order, Dominion shall                    Confirmatory Order, Dominion shall
                                                accountability of out of service weapons                communicate this issue to all personnel               administer a safety culture survey to the
                                                is material to the NRC because the                      at Millstone and other Dominion                       Millstone security organization. Prior to
                                                proper accounting of weapons helps to                   Energy, Inc. nuclear sites. The                       administering the survey, Dominion
                                                ensure that these items have not been                   communication (which may be verbal or                 shall retain a safety culture expert,
                                                stolen or misplaced such that they could                via written communication) shall                      external to the Dominion Energy Inc.
                                                be used to defeat the Licensee’s                        specify that falsification of records is              organization, to review Dominion’s root
                                                protective strategy.                                    unacceptable and shall also explain the               cause evaluation of this issue and
                                                   By letter dated July 20, 2017, the NRC               specific actions staff are expected to                evaluate the need to append to the
                                                notified the Licensee of the results of                 take when unable to fulfill NRC                       survey additional questions to assess the
                                                the investigation with an opportunity to:               requirements. Within 30 days of                       current state of individual and
                                                (1) Provide a response in writing; (2)                  completing this action, Dominion shall                organizational behaviors related to the
                                                attend a pre-decisional enforcement                     inform the NRC that the action is                     root cause evaluation. The survey
                                                conference; or (3) participate in an ADR                complete by sending a letter to the                   questions and results shall be retained
                                                mediation session in an effort to resolve               Region I Administrator and shall make                 by Dominion for one year after
                                                these concerns.                                         the content of the communication                      administration of the survey and shall
                                                   In response to the NRC’s offer, the                  available to the NRC for review during                be made available to the NRC for review
                                                Licensee requested the use of the NRC’s                 an inspection.                                        during an inspection.
                                                ADR process. On September 20, 2017,                        2. Within 10 days of the date of the                 4. Within 240 days of the date of the
sradovich on DSK3GMQ082PROD with NOTICES




                                                the NRC and the Licensee met in an                      Confirmatory Order, Dominion shall                    Confirmatory Order, Dominion shall
                                                ADR session mediated by a professional                  ensure that Dominion’s records related                perform an organizational effectiveness
                                                mediator, arranged through Cornell                      to the former contract security officer’s             evaluation of the Millstone security
                                                University’s Institute on Conflict                      entry in the Personnel Access Data                    organization. The evaluation team shall
                                                Resolution. The ADR process is one in                   System includes information related to                be comprised of no more than 50%
                                                which a neutral mediator, with no                       this case. Within 10 days of completing               Dominion Energy Inc. nuclear
                                                decision-making authority, assists the                  this action, Dominion shall inform the                employees, and the remaining


                                           VerDate Sep<11>2014   16:44 Nov 30, 2017   Jkt 244001   PO 00000   Frm 00066   Fmt 4703   Sfmt 4703   E:\FR\FM\01DEN1.SGM   01DEN1


                                                                             Federal Register / Vol. 82, No. 230 / Friday, December 1, 2017 / Notices                                          57007

                                                participants shall be from an outside                   corrective actions. Within 30 days of                 the NRC that the action is complete by
                                                organization (such as another utility or                completing this action, Dominion shall                sending a letter to the Region I
                                                an industry group). The safety culture                  inform the NRC that the action is                     Administrator and shall make the
                                                expert retained as described in Item C.3                complete by sending a letter to the                   presentation materials available to the
                                                shall be part of the evaluation team. The               Region I Administrator and shall make                 NRC for one year after the presentation
                                                evaluation shall include a review of the                the content of the communication                      for review during an inspection.
                                                results of the safety culture survey,                   available to the NRC for review during
                                                including trending within the Millstone                 an inspection.                                        H. Items to Which the NRC Has Agreed
                                                security organization and benchmarking                                                                           1. In consideration of the above
                                                                                                        E. Items To Address Weapons
                                                with other Dominion Energy Inc.                                                                               actions, the NRC agrees not to pursue
                                                                                                        Accountability Process Weaknesses
                                                nuclear sites, along with the root cause
                                                                                                          1. Within 180 days of the date of the               any further enforcement action
                                                evaluation, with particular emphasis on
                                                                                                        Confirmatory Order, Dominion shall                    (including issuance of a civil penalty)
                                                the traits of a healthy nuclear safety
                                                                                                        review its process for performing and                 relating to the notice of apparent
                                                culture. It shall also include a review of
                                                                                                        recording in-service and out-of-service               violations (Case no. EA–17–077,
                                                the clarity for the security staff about
                                                lines of responsibility and reporting,                  weapons inventory. The review shall                   Inspection Report Nos. 05000336/
                                                and the performance and quality of how                  include a comparison of Millstone’s                   2017405 & 05000423/2017405, Office of
                                                individual job performance results are                  process versus other Dominion Energy                  Investigations Report No. 1–2016–019),
                                                evaluated, documented, and                              Inc. nuclear sites and a sample of non-               dated July 20, 2017.
                                                communicated. The evaluation shall                      Dominion Energy Inc. nuclear sites. The                  2. The NRC agrees that the
                                                result in an Action Plan that includes                  evaluation shall identify best practices              Confirmatory Order documenting the
                                                measures of effectiveness. Within 30                    and consider any changes needed at                    above items will not be considered an
                                                days of completing this action,                         Millstone and specify any identified                  escalated enforcement action by the
                                                Dominion shall inform the NRC that the                  corrective actions. Within 30 days of                 NRC for future assessment of violations
                                                action is complete by sending a letter to               completing this action, Dominion shall                occurring at Millstone Power Station
                                                the Region I Administrator and shall                    inform the NRC that the action is                     Units 2 and 3.
                                                make the results of the evaluation and                  complete by sending a letter to the
                                                                                                                                                                 3. In the event of the transfer of the
                                                a copy of the Action Plan available to                  Region I Administrator and shall make
                                                                                                                                                              operating licenses of Millstone Power
                                                the NRC for review during an                            the results of the evaluation available to
                                                                                                                                                              Station Units 2 and 3 to another entity,
                                                inspection.                                             the NRC for review during an
                                                                                                                                                              the commitments hereunder shall
                                                                                                        inspection.
                                                D. Items To Address Armorer Function                                                                          survive any transfer of ownership and
                                                Weaknesses                                              F. Effectiveness Reviews                              will be binding on the new Licensee.
                                                   1. Within 180 days of the date of the                   1. Within 90 days of the date of the                  On November 13, 2017, Dominion
                                                Confirmatory Order, Dominion shall                      Confirmatory Order, Dominion shall                    consented to issuing this Order with the
                                                evaluate its implementation of the                      complete the first of four quarterly                  commitments, as described in Section V
                                                Armorer function at Millstone. The                      reviews of the effectiveness of the                   below. Dominion further agreed that
                                                evaluation shall include review of the                  weapons maintenance program and of                    this Order is to be effective upon
                                                staffing and responsibilities of the                    the corrective actions implemented in                 issuance, the agreement memorialized
                                                position, the methodology for tracking                  response to this issue. Within 30 days                in this Confirmatory Order settles the
                                                weapons maintenance status and                          of completing the first such review,                  matter between the parties, and that it
                                                activities, and supervisory involvement                 Dominion shall inform the NRC of the                  has waived its right to a hearing.
                                                in verifying completion of required                     completion of the review by sending a
                                                activities. The evaluation shall also                   letter to the Region I Administrator.                 IV
                                                include a comparison of Millstone’s                        2. The effectiveness reviews discussed
                                                                                                                                                                 I find that Dominion’s commitments
                                                weapons maintenance processes                           in Item F.1 shall be conducted by a team
                                                                                                                                                              as set forth in Section V are acceptable
                                                (including the process for performing                   that includes an individual from outside
                                                                                                                                                              and necessary, and conclude that with
                                                functionality checks and the standards                  the Dominion Energy Inc. nuclear fleet.
                                                                                                                                                              these commitments the public health
                                                for identifying degradation) versus other               For a period of one year after
                                                                                                                                                              and safety are reasonably assured. In
                                                Dominion Energy Inc. nuclear sites and                  completion of the fourth review, the
                                                a sample of non-Dominion Energy Inc.                                                                          view of the foregoing, I have determined
                                                                                                        documented effectiveness reviews shall
                                                nuclear sites. The evaluation shall                                                                           that public health and safety require
                                                                                                        be made available to the NRC for review
                                                identify best practices and consider any                                                                      that Dominion’s commitments be
                                                                                                        during an inspection.
                                                changes needed at Millstone and specify                                                                       confirmed by this Confirmatory Order.
                                                any identified corrective actions. Within               G. External Communication                             Based on the above and Dominion’s
                                                30 days of completing this action,                         1. By December 31, 2019, Dominion                  consent, this Confirmatory Order is
                                                Dominion shall inform the NRC that the                  shall discuss this issue, including the               effective upon issuance.
                                                action is complete by sending a letter to               results of all of the above-listed                    V
                                                the Region I Administrator and shall                    evaluations and resulting corrective
                                                make the results of the evaluation                      actions, to the following industry                      Accordingly, pursuant to Sections
                                                available to the NRC for review during                  working groups: (a) The Nuclear                       104b, 161b, 161i, 161o, 182 and 186 of
                                                                                                        Security Working Group; and (b) the                   the Atomic Energy Act of 1954, as
sradovich on DSK3GMQ082PROD with NOTICES




                                                an inspection.
                                                   2. Within 90 days of completing the                  2019 National Nuclear Security                        amended, and the Commission’s
                                                evaluation described in Item D.1,                       Conference. The discussion shall                      regulations in 10 CFR 2.202 and 10 CFR
                                                Dominion shall communicate (which                       include reference to any identified                   part 50 and 10 CFR part 73, IT IS
                                                may be verbal or in writing) to                         organizational weaknesses that                        HEREBY ORDERED, EFFECTIVE UPON
                                                Dominion Security management staff at                   Dominion determined contributed to the                ISSUANCE, THAT LICENSE NO. DPR–
                                                Millstone the results of the evaluation                 issue. Within 30 days of completing                   65 AND LICENSE NO. NPF–49 ARE
                                                and any completed or pending                            each discussion, Dominion shall inform                MODIFIED AS FOLLOWS:


                                           VerDate Sep<11>2014   16:44 Nov 30, 2017   Jkt 244001   PO 00000   Frm 00067   Fmt 4703   Sfmt 4703   E:\FR\FM\01DEN1.SGM   01DEN1


                                                57008                        Federal Register / Vol. 82, No. 230 / Friday, December 1, 2017 / Notices

                                                A. Items To Assure Restoration of                       responsibilities for individual                       the traits of a healthy nuclear safety
                                                Compliance                                              performance management, and the                       culture. It shall also include a review of
                                                   1. Within 30 days of the date of the                 means in place to verify that regulatory              the clarity for the security staff about
                                                Confirmatory Order, Dominion shall                      requirements are being met. The                       lines of responsibility and reporting,
                                                prepare a full inventory of all in-service              evaluation shall consider what                        and the performance and quality of how
                                                                                                        improvements can be made in these                     individual job performance results are
                                                and out-of-service weapons on-site.
                                                                                                        areas and specify any identified                      evaluated, documented, and
                                                Within 30 days of completing this
                                                                                                        corrective actions. Within 30 days of                 communicated. The evaluation shall
                                                action, Dominion shall inform the NRC
                                                                                                        completing this action, Dominion shall                result in an Action Plan that includes
                                                that the action is complete by sending
                                                                                                        inform the NRC that the action is
                                                a letter to the Region I Administrator                                                                        measures of effectiveness. Within 30
                                                                                                        complete by sending a letter to the
                                                and shall make the inventory list                                                                             days of completing this action,
                                                                                                        Region I Administrator and shall make
                                                available to the NRC for review during                                                                        Dominion shall inform the NRC that the
                                                                                                        the results of the evaluation available to
                                                an inspection.                                                                                                action is complete by sending a letter to
                                                                                                        the NRC for review during an
                                                   2. Within 30 days of the date of the                                                                       the Region I Administrator and shall
                                                                                                        inspection.
                                                Confirmatory Order, Dominion shall                        2. Within 90 days of completing the                 make the results of the evaluation and
                                                prepare a report of the maintenance                     evaluation described in Item C.1,                     a copy of the Action Plan available to
                                                status of all in-service weapons that are               Dominion shall administer training to                 the NRC for review during an
                                                on-site as of the date of the                           Dominion Security management staff at                 inspection.
                                                Confirmatory Order. The report shall                    Millstone that focuses on roles and
                                                specify the dates on which each weapon                                                                        5. Items To Address Armorer Function
                                                                                                        expectations for managing contractor
                                                was last test-fired, cleaned, serviced,                 staff and that reinforces Dominion’s                  Weaknesses
                                                and inspected. Within 30 days of                        responsibility for assuring regulatory
                                                completing this action, Dominion shall                                                                           1. Within 180 days of the date of the
                                                                                                        compliance. Within 30 days of                         Confirmatory Order, Dominion shall
                                                inform the NRC that the action is                       completing this action, Dominion shall
                                                complete by sending a letter to the                                                                           evaluate its implementation of the
                                                                                                        inform the NRC that the action is
                                                Region I Administrator and shall make                                                                         Armorer function at Millstone. The
                                                                                                        complete by sending a letter to the
                                                the report available to the NRC for                                                                           evaluation shall include review of the
                                                                                                        Region I Administrator and shall make
                                                review during an inspection.                            the training materials available to the               staffing and responsibilities of the
                                                                                                        NRC for review during an inspection.                  position, the methodology for tracking
                                                B. Items To Address Wrongdoing                                                                                weapons maintenance status and
                                                                                                          3. Within 120 days of the date of this
                                                   1. Within 30 days of the date of the                 Confirmatory Order, Dominion shall                    activities, and supervisory involvement
                                                Confirmatory Order, Dominion shall                      administer a safety culture survey to the             in verifying completion of required
                                                communicate this issue to all personnel                 Millstone security organization. Prior to             activities. The evaluation shall also
                                                at Millstone and other Dominion Energy                  administering the survey, Dominion                    include a comparison of Millstone’s
                                                Inc. nuclear sites. The communication                   shall retain a safety culture expert,                 weapons maintenance processes
                                                (which may be verbal or via written                     external to the Dominion Energy Inc.                  (including the process for performing
                                                communication) shall specify that                       organization, to review Dominion’s root               functionality checks and the standards
                                                falsification of records is unacceptable                cause evaluation of this issue and                    for identifying degradation) versus other
                                                and shall also explain the specific                     evaluate the need to append to the                    Dominion Energy Inc. nuclear sites and
                                                actions staff are expected to take when                 survey additional questions to assess the             a sample of non-Dominion Energy Inc.
                                                unable to fulfill NRC requirements.                     current state of individual and                       nuclear sites. The evaluation shall
                                                Within 30 days of completing this                       organizational behaviors related to the               identify best practices and consider any
                                                action, Dominion shall inform the NRC                   root cause evaluation. The survey                     changes needed at Millstone and specify
                                                that the action is complete by sending                  questions and results shall be retained
                                                a letter to the Region I Administrator                                                                        any identified corrective actions. Within
                                                                                                        by Dominion for one year after
                                                and shall make the content of the                                                                             30 days of completing this action,
                                                                                                        administration of the survey and shall
                                                communication available to the NRC for                  be made available to the NRC for review               Dominion shall inform the NRC that the
                                                review during an inspection.                            during an inspection.                                 action is complete by sending a letter to
                                                   2. Within 10 days of the date of the                   4. Within 240 days of the date of the               the Region I Administrator and shall
                                                Confirmatory Order, Dominion shall                      Confirmatory Order, Dominion shall                    make the results of the evaluation
                                                ensure that Dominion’s records related                  perform an organizational effectiveness               available to the NRC for review during
                                                to the former contract security officer’s               evaluation of the Millstone security                  an inspection.
                                                entry in the Personnel Access Data                      organization. The evaluation team shall                  2. Within 90 days of completing the
                                                System includes information related to                  be comprised of no more than 50%                      evaluation described in Item D.1,
                                                this case. Within 10 days of completing                 Dominion Energy Inc. nuclear                          Dominion shall communicate (which
                                                this action, Dominion shall inform the                  employees, and the remaining                          may be verbal or in writing) to
                                                NRC that the action is complete by                      participants shall be from an outside                 Dominion Security management staff at
                                                notifying the Chief, Plant Support                      organization (such as another utility or
                                                                                                                                                              Millstone the results of the evaluation
                                                Branch 1, NRC Region I via telephone.                   an industry group). The safety culture
                                                                                                                                                              and any completed or pending
                                                                                                        expert retained as described in Item C.3
                                                C. Items To Address Security                            shall be part of the evaluation team. The             corrective actions. Within 30 days of
sradovich on DSK3GMQ082PROD with NOTICES




                                                Organization Weaknesses                                 evaluation shall include a review of the              completing this action, Dominion shall
                                                  1. Within 180 days of the date of the                 results of the safety culture survey,                 inform the NRC that the action is
                                                Confirmatory Order, Dominion shall                      including trending within the Millstone               complete by sending a letter to the
                                                perform an evaluation of its oversight of               security organization and benchmarking                Region I Administrator and shall make
                                                the security contract organization. The                 with other Dominion Energy Inc.                       the content of the communication
                                                evaluation shall review reporting                       nuclear sites, along with the root cause              available to the NRC for review during
                                                relationships, Licensee and contractor                  evaluation, with particular emphasis on               an inspection.


                                           VerDate Sep<11>2014   16:44 Nov 30, 2017   Jkt 244001   PO 00000   Frm 00068   Fmt 4703   Sfmt 4703   E:\FR\FM\01DEN1.SGM   01DEN1


                                                                             Federal Register / Vol. 82, No. 230 / Friday, December 1, 2017 / Notices                                           57009

                                                D. Items To Address Weapons                             Station Units 2 and 3 to another entity,              docket for the hearing in this proceeding
                                                Accountability Process Weaknesses                       the commitments set forth hereunder                   if the Secretary has not already
                                                  1. Within 180 days of the date of the                 shall continue to apply to the new entity             established an electronic docket.
                                                                                                        and accordingly survive any transfer of                  Information about applying for a
                                                Confirmatory Order, Dominion shall
                                                                                                        ownership or license. The Regional                    digital ID certificate is available on the
                                                review its process for performing and
                                                                                                        Administrator, Region I may, in writing,              NRC’s public Web site at http://
                                                recording in-service and out-of-service
                                                                                                        relax or rescind any of the above                     www.nrc.gov/site-help/e-submittals/
                                                weapons inventory. The review shall
                                                                                                        conditions upon demonstration by the                  getting-started.html. Once a participant
                                                include a comparison of Millstone’s                                                                           has obtained a digital ID certificate and
                                                                                                        Licensee of good cause.
                                                process versus other Dominion Energy                                                                          a docket has been created, the
                                                Inc. nuclear sites and a sample of non-                 VI                                                    participant can then submit
                                                Dominion Energy Inc. nuclear sites. The                    In accordance with 10 CFR 2.202 and                adjudicatory documents. Submissions
                                                evaluation shall identify best practices                10 CFR 2.309, any person adversely                    must be in Portable Document Format
                                                and consider any changes needed at                      affected by this Confirmatory Order,                  (PDF). Additional guidance on PDF
                                                Millstone and specify any identified                    other than Dominion, may request a                    submissions is available on the NRC’s
                                                corrective actions. Within 30 days of                   hearing within thirty (30) calendar days              public Web site at http://www.nrc.gov/
                                                completing this action, Dominion shall                  of the date of issuance of this                       site-help/electronic-sub-ref-mat.html. A
                                                inform the NRC that the action is                       Confirmatory Order. Where good cause                  filing is considered complete at the time
                                                complete by sending a letter to the                     is shown, consideration will be given to              the document is submitted through the
                                                Region I Administrator and shall make                   extending the time to request a hearing.              NRC’s E-Filing system. To be timely, an
                                                the results of the evaluation available to              A request for extension of time must be               electronic filing must be submitted to
                                                the NRC for review during an                            made in writing to the Director, Office               the E-Filing system no later than 11:59
                                                inspection.                                             of Enforcement, U.S. Nuclear Regulatory               p.m. Eastern Time on the due date.
                                                E. Effectiveness Reviews                                Commission, Washington, DC 20555,                     Upon receipt of a transmission, the E-
                                                                                                        and include a statement of good cause                 Filing system time-stamps the document
                                                   1. Within 90 days of the date of the                 for the extension.                                    and sends the submitter an email notice
                                                Confirmatory Order, Dominion shall                         All documents filed in NRC                         confirming receipt of the document. The
                                                complete the first of four quarterly                    adjudicatory proceedings, including a                 E-Filing system also distributes an email
                                                reviews of the effectiveness of the                     request for hearing, a petition for leave             notice that provides access to the
                                                weapons maintenance program and of                      to intervene, any motion or other                     document to the NRC’s Office of the
                                                the corrective actions implemented in                   document filed in the proceeding prior                General Counsel and any others who
                                                response to this issue. Within 30 days                  to the submission of a request for                    have advised the Office of the Secretary
                                                of completing the first such review,                    hearing or petition to intervene                      that they wish to participate in the
                                                Dominion shall inform the NRC of the                    (hereinafter ‘‘petition’’), and documents             proceeding, so that the filer need not
                                                completion of the review by sending a                   filed by interested governmental entities             serve the document on those
                                                letter to the Region I Administrator.                   participating under 10 CFR 2.315(c),                  participants separately. Therefore,
                                                   2. The effectiveness reviews discussed               must be filed in accordance with the                  applicants and other participants (or
                                                in Item F.1 shall be conducted by a team                NRC’s E-Filing rule (72 FR 49139;                     their counsel or representative) must
                                                that includes an individual from outside                August 28, 2007, as amended at 77 FR                  apply for and receive a digital ID
                                                the Dominion Energy Inc. nuclear fleet.                 46562, August 3, 2012). The E-Filing                  certificate before adjudicatory
                                                For a period of one year after                          process requires participants to submit               documents are filed so that they can
                                                completion of the fourth review, the                    and serve all adjudicatory documents                  obtain access to the documents via the
                                                documented effectiveness reviews shall                  over the internet, or in some cases to                E-Filing system.
                                                be made available to the NRC for review                 mail copies on electronic storage media.                 A person filing electronically using
                                                during an inspection.                                   Participants may not submit paper                     the NRC’s adjudicatory E-Filing system
                                                                                                        copies of their filings unless they seek              may seek assistance by contacting the
                                                F. External Communication
                                                                                                        an exemption in accordance with the                   NRC’s Electronic Filing Help Desk
                                                   1. By December 31, 2019, Dominion                    procedures described below.                           through the ‘‘Contact Us’’ link located
                                                shall discuss this issue, including the                    To comply with the procedural                      on the NRC’s Public Web site at http://
                                                results of all of the above-listed                      requirements of E-Filing, at least ten                www.nrc.gov/site-help/e-
                                                evaluations and resulting corrective                    (10) days prior to the filing deadline, the           submittals.html, by email to
                                                actions, to the following industry                      participant should contact the Office of              MSHD.Resource@nrc.gov, or by a toll-
                                                working groups: (a) The Nuclear                         the Secretary by email at                             free call at 1–866–672–7640. The NRC
                                                Security Working Group; and (b) the                     hearing.docket@nrc.gov, or by telephone               Electronic Filing Help Desk is available
                                                2019 National Nuclear Security                          at 301–415–1677, to (1) request a digital             between 9 a.m. and 6 p.m., Eastern
                                                Conference. The discussion shall                        identification (ID) certificate, which                Time, Monday through Friday,
                                                include reference to any identified                     allows the participant (or its counsel or             excluding government holidays.
                                                organizational weaknesses that                          representative) to digitally sign                        Participants who believe that they
                                                Dominion determined contributed to the                  submissions and access the E-Filing                   have good cause for not submitting
                                                issue. Within 30 days of completing                     system for any proceeding in which it                 documents electronically must file an
                                                each discussion, Dominion shall inform                  is participating; and (2) advise the                  exemption request, in accordance with
                                                the NRC that the action is complete by                  Secretary that the participant will be                10 CFR 2.302(g), with their initial paper
sradovich on DSK3GMQ082PROD with NOTICES




                                                sending a letter to the Region I                        submitting a petition or other                        filing stating why there is good cause for
                                                Administrator and shall make the                        adjudicatory document (Even in                        not filing electronically and requesting
                                                presentation materials available to the                 instances in which the participant, or its            authorization to continue to submit
                                                NRC for one year after the presentation                 counsel or representative, already holds              documents in paper format. Such filings
                                                for review during an inspection.                        an NRC-issued digital ID certificate).                must be submitted by: (1) First class
                                                   In the event of the transfer of the                  Based upon this information, the                      mail addressed to the Office of the
                                                operating licenses of Millstone Power                   Secretary will establish an electronic                Secretary of the Commission, U.S.


                                           VerDate Sep<11>2014   16:44 Nov 30, 2017   Jkt 244001   PO 00000   Frm 00069   Fmt 4703   Sfmt 4703   E:\FR\FM\01DEN1.SGM   01DEN1


                                                57010                        Federal Register / Vol. 82, No. 230 / Friday, December 1, 2017 / Notices

                                                Nuclear Regulatory Commission,                          by this Confirmatory Order and shall                     The granting of the exemption allows
                                                Washington, DC 20555–0001, Attention:                   address the criteria set forth in 10 CFR              the changes to Tier 1 information asked
                                                Rulemaking and Adjudications Staff; or                  2.309(d) and (f).                                     for in the amendment. Because the
                                                (2) courier, express mail, or expedited                   If a hearing is requested by a person               acceptability of the exemption was
                                                delivery service to the Office of the                   whose interest is adversely affected, the             determined in part by the acceptability
                                                Secretary, 11555 Rockville Pike,                        Commission will issue an order                        of the amendment, the exemption and
                                                Rockville, Maryland, 20852, Attention:                  designating the time and place of any                 amendment are being issued
                                                Rulemaking and Adjudications Staff.                     hearing. If a hearing is held, the issue to           concurrently.
                                                Participants filing adjudicatory                        be considered at such hearing shall be                DATES: The exemption and amendment
                                                documents in this manner are                            whether this Confirmatory Order should                were issued on September 27, 2017.
                                                responsible for serving the document on                 be sustained.
                                                                                                                                                              ADDRESSES: Please refer to Docket ID
                                                all other participants. Filing is                         In the absence of any request for
                                                                                                                                                              NRC–2008–0252 when contacting the
                                                considered complete by first-class mail                 hearing, or written approval of an
                                                                                                                                                              NRC about the availability of
                                                as of the time of deposit in the mail, or               extension of time in which to request a
                                                                                                                                                              information regarding this document.
                                                by courier, express mail, or expedited                  hearing, the provisions specified in
                                                                                                                                                              You may access information related to
                                                delivery service upon depositing the                    Section V above shall be final 30 days
                                                document with the provider of the                                                                             this document, which the NRC
                                                                                                        from the date of this Confirmatory Order
                                                service. A presiding officer, having                                                                          possesses and is publicly-available,
                                                                                                        without further order or proceedings. If
                                                granted an exemption request from                                                                             using any of the following methods:
                                                                                                        an extension of time for requesting a                    • Federal Rulemaking Web site: Go to
                                                using E-Filing, may require a participant               hearing has been approved, the                        http://www.regulations.gov and search
                                                or party to use E-Filing if the presiding               provisions specified in Section V shall               for Docket ID NRC–2008–0252. Address
                                                officer subsequently determines that the                be final when the extension expires if a              questions about NRC dockets to Carol
                                                reason for granting the exemption from                  hearing request has not been received.                Gallagher; telephone: 301–415–3463;
                                                use of E-Filing no longer exists.
                                                   Documents submitted in adjudicatory                    For the Nuclear Regulatory Commission               email: Carol.Gallagher@nrc.gov. For
                                                proceedings will appear in the NRC’s                      Dated this 21st day of November, 2017.              technical questions, contact the
                                                electronic hearing docket which is                      Daniel H. Dorman,                                     individual listed in the FOR FURTHER
                                                available to the public at https://                     Regional Administrator.                               INFORMATION CONTACT section of this
                                                adams.nrc.gov/ehd, unless excluded                                                                            document.
                                                                                                        [FR Doc. 2017–25866 Filed 11–30–17; 8:45 am]
                                                pursuant to an Order of the Commission                                                                           • NRC’s Agencywide Documents
                                                                                                        BILLING CODE 7590–01–P
                                                or the presiding officer. If you do not                                                                       Access and Management System
                                                have an NRC-issued digital ID certificate                                                                     (ADAMS): You may obtain publicly-
                                                as described above, click ‘‘Cancel’’                                                                          available documents online in the
                                                                                                        NUCLEAR REGULATORY
                                                when the link requests certificates and                                                                       ADAMS Public Documents collection at
                                                                                                        COMMISSION
                                                you will be automatically directed to the                                                                     http://www.nrc.gov/reading-rm/
                                                NRC’s electronic hearing dockets where                  [Docket Nos. 52–025 and 52–026; NRC–                  adams.html. To begin the search, select
                                                                                                        2008–0252]                                            ‘‘ADAMS Public Documents’’ and then
                                                you will be able to access any publicly-
                                                available documents in a particular                                                                           select ‘‘Begin Web-based ADAMS
                                                                                                        Southern Nuclear Operating Company,                   Search.’’ For problems with ADAMS,
                                                hearing docket. Participants are                        Inc., Vogtle Electric Generating Plant,
                                                requested not to include personal                                                                             please contact the NRC’s Public
                                                                                                        Units 3 and 4; Consistency Update to                  Document Room (PDR) reference staff at
                                                privacy information, such as social                     the Raceway Separation Requirements
                                                security numbers, home addresses, or                                                                          1–800–397–4209, 301–415–4737, or by
                                                                                                        in the Main Control Room and Remote                   email to pdr.resource@nrc.gov. The
                                                personal phone numbers in their filings,                Shutdown Room
                                                unless an NRC regulation or other law                                                                         ADAMS accession number for each
                                                requires submission of such                             AGENCY:  Nuclear Regulatory                           document referenced (if it is available in
                                                information. For example, in some                       Commission.                                           ADAMS) is provided the first time that
                                                instances, individuals provide home                     ACTION: Exemption and combined                        it is mentioned in this document. The
                                                addresses in order to demonstrate                       license amendment; issuance.                          request for the amendment and
                                                proximity to a facility or site. With                                                                         exemption was submitted by letter
                                                respect to copyrighted works, except for                SUMMARY:    The U.S. Nuclear Regulatory               dated March 8, 2017 (ADAMS
                                                limited excerpts that serve the purpose                 Commission (NRC) is granting an                       Accession No. ML17067A517).
                                                of the adjudicatory filings and would                   exemption to allow a departure from the                  • NRC’s PDR: You may examine and
                                                constitute a Fair Use application,                      certification information of Tier 1 of the            purchase copies of public documents at
                                                participants are requested not to include               generic design control document (DCD)                 the NRC’s PDR, Room O1–F21, One
                                                copyrighted materials in their                          and is issuing License Amendment Nos.                 White Flint North, 11555 Rockville
                                                submission.                                             88 and 87 to Combined Licenses (COL),                 Pike, Rockville, Maryland 20852.
                                                   The Commission will issue a notice or                NPF–91 and NPF–92, for the Vogtle                     FOR FURTHER INFORMATION CONTACT:
                                                order granting or denying a hearing                     Electric Generating Plant (VEGP) Units                William (Billy) Gleaves, Office of New
                                                request or intervention petition,                       3 and 4, respectively. The COLs were                  Reactors, U.S. Nuclear Regulatory
                                                designating the issues for any hearing                  issued to Southern Nuclear Operating                  Commission, Washington, DC 20555–
                                                that will be held and designating the                   Company, Inc., and Georgia Power                      0001; telephone: 301–415–5848; email:
                                                                                                        Company, Oglethorpe Power
sradovich on DSK3GMQ082PROD with NOTICES




                                                Presiding Officer. A notice granting a                                                                        Bill.Gleaves@nrc.gov.
                                                hearing will be published in the Federal                Corporation, MEAG Power SPVM, LLC,                    SUPPLEMENTARY INFORMATION:
                                                Register and served on the parties prior                MEAG Power SPVJ, LLC, MEAG Power
                                                to the hearing.                                         SPVP, LLC, Authority of Georgia, and                  I. Introduction
                                                   If a person (other than Dominion)                    the City of Dalton, Georgia (the                         The NRC is granting an exemption
                                                requests a hearing, that person shall set               licensee); for construction and operation             from paragraph B of section III, ‘‘Scope
                                                forth with particularity the manner in                  of the VEGP Units 3 and 4, located in                 and Contents,’’ of appendix D, ‘‘Design
                                                which his interest is adversely affected                Burke County, Georgia.                                Certification Rule for the AP1000,’’ to


                                           VerDate Sep<11>2014   16:44 Nov 30, 2017   Jkt 244001   PO 00000   Frm 00070   Fmt 4703   Sfmt 4703   E:\FR\FM\01DEN1.SGM   01DEN1



Document Created: 2018-10-25 10:45:44
Document Modified: 2018-10-25 10:45:44
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionConfirmatory order; issuance.
DatesThe Order was issued on November 21, 2017.
ContactMarjorie M. McLaughlin, Region I, U.S. Nuclear Regulatory Commission, 2100 Renaissance Blvd. King of Prussia, PA 19140; telephone: 610-337-5240, email: [email protected]