82_FR_57481 82 FR 57250 - Town of Canton, Connecticut; Notice of Application for License Reinstatement, Amendment, Transfer, Extension of License Term, and Soliciting Comments, Motions To Intervene, Protests, Recommendations, Terms and Conditions, and Fishway Prescriptions

82 FR 57250 - Town of Canton, Connecticut; Notice of Application for License Reinstatement, Amendment, Transfer, Extension of License Term, and Soliciting Comments, Motions To Intervene, Protests, Recommendations, Terms and Conditions, and Fishway Prescriptions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 231 (December 4, 2017)

Page Range57250-57251
FR Document2017-26036

Federal Register, Volume 82 Issue 231 (Monday, December 4, 2017)
[Federal Register Volume 82, Number 231 (Monday, December 4, 2017)]
[Notices]
[Pages 57250-57251]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-26036]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 10822-013]


Town of Canton, Connecticut; Notice of Application for License 
Reinstatement, Amendment, Transfer, Extension of License Term, and 
Soliciting Comments, Motions To Intervene, Protests, Recommendations, 
Terms and Conditions, and Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Reinstatement, Amendment, and Transfer.
    b. Project No.: 10822-013.
    c. Date filed: October 12, 2017.
    d. Applicant: Town of Canton, Connecticut.
    e. Name of Project: Upper Collinsville Project.
    f. Location: On the Farmington River near the village of 
Collinsville in Hartford County, Connecticut.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r) and 
Public Law 113-122.
    h. Applicant Contact: Robert Skinner, Chief Administrative Officer, 
Town of Canton, Connecticut, P.O. Box 168, 4 Market Street, 
Collinsville, CT, (860) 693-7837 or [email protected].
    i. FERC Contact: Diana Shannon, (202) 502-6136 or 
[email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, terms and conditions, and fishway prescriptions is 60 
days from the issuance date of this notice by the Commission; reply 
comments are due 105 days from the issuance date of this notice by the 
Commission. The Commission strongly encourages electronic filing.
    Please file any motion to intervene, protest, comments, and/or 
recommendations using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-10822-013.
    k. Description of Request: On October 12, 2017, the Town of Canton, 
Connecticut, filed a request to reinstate, amend, and transfer the 
license for the Upper Collinsville Project No. 10822. The project was 
previously licensed to Summit Hydropower, but the license was 
terminated by Commission order dated December 4, 2007, for failure to 
start construction pursuant to Article 301 of the license and section 
13 of the Federal Power Act. By Public Law 113-122, dated June 30, 
2014, Congress approved the Collinsville Renewable Energy Production 
Act, which at the request of the Town of Canton, and after reasonable 
notice, allows the Commission to: (1) Reinstate the license; (2) extend 
for two years after the date on which the license is reinstated the 
time period during which the licensee is required to commence 
construction of the project; and (3) allows the license to be 
transferred to the town of Canton. The Town of Canton proposes to 
rehabilitate the project, provide upstream and downstream fish and eel 
passage, and provide additional environmental measures, including water 
quality monitoring, mussel relocation, and recreation. The Town 
requests the Commission to reinstate the license with a new term of 40-
50 years.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov/docs-filing/efiling.asp. Enter the docket number excluding the last three digits in 
the docket number field to access the document. You may also register 
online at http://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the addresses in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
and .214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as 
applicable; (2) set forth in the heading the name of the applicant and 
the project number of the application to which the filing responds; (3) 
furnish the name, address, and telephone number of the person 
protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may 
obtain copies of the application directly from the applicant. A copy of 
any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. If an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource

[[Page 57251]]

agency, they must also serve a copy of the document on that resource 
agency. A copy of all other filings in reference to this application 
must be accompanied by proof of service on all persons listed in the 
service list prepared by the Commission in this proceeding, in 
accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: November 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-26036 Filed 12-1-17; 8:45 am]
BILLING CODE 6717-01-P



                                                57250                       Federal Register / Vol. 82, No. 231 / Monday, December 4, 2017 / Notices

                                                   The filings are accessible in the                       i. FERC Contact: Diana Shannon,                    inspection and reproduction at the
                                                Commission’s eLibrary system by                         (202) 502–6136 or diana.shannon@                      Commission’s Public Reference Room,
                                                clicking on the links or querying the                   ferc.gov.                                             located at 888 First Street NE., Room
                                                docket number.                                             j. Deadline for filing motions to                  2A, Washington, DC 20426, or by calling
                                                   Any person desiring to intervene or                  intervene and protests, comments,                     (202) 502–8371. This filing may also be
                                                protest in any of the above proceedings                 recommendations, terms and                            viewed on the Commission’s Web site at
                                                must file in accordance with Rules 211                  conditions, and fishway prescriptions is              http://www.ferc.gov/docs-filing/
                                                and 214 of the Commission’s                             60 days from the issuance date of this                efiling.asp. Enter the docket number
                                                Regulations (18 CFR 385.211 and                         notice by the Commission; reply                       excluding the last three digits in the
                                                385.214) on or before 5:00 p.m. Eastern                 comments are due 105 days from the                    docket number field to access the
                                                time on the specified comment date.                     issuance date of this notice by the                   document. You may also register online
                                                Protests may be considered, but                         Commission. The Commission strongly                   at http://www.ferc.gov/docs-filing/
                                                intervention is necessary to become a                   encourages electronic filing.                         esubscription.asp to be notified via
                                                party to the proceeding.                                   Please file any motion to intervene,               email of new filings and issuances
                                                   eFiling is encouraged. More detailed                 protest, comments, and/or                             related to this or other pending projects.
                                                information relating to filing                          recommendations using the                             For assistance, call 1–866–208–3676 or
                                                requirements, interventions, protests,                  Commission’s eFiling system at http://                email FERCOnlineSupport@ferc.gov, for
                                                service, and qualifying facilities filings              www.ferc.gov/docs-filing/efiling.asp.                 TTY, call (202) 502–8659. A copy is also
                                                can be found at: http://www.ferc.gov/                   Commenters can submit brief comments                  available for inspection and
                                                docs-filing/efiling/filing-req.pdf. For                 up to 6,000 characters, without prior                 reproduction at the addresses in item (h)
                                                other information, call (866) 208–3676                  registration, using the eComment system               above.
                                                (toll free). For TTY, call (202) 502–8659.              at http://www.ferc.gov/docs-filing/                      m. Individuals desiring to be included
                                                                                                        ecomment.asp. You must include your                   on the Commission’s mailing list should
                                                  Dated: November 27, 2017.                             name and contact information at the end               so indicate by writing to the Secretary
                                                Kimberly D. Bose,                                       of your comments. For assistance,                     of the Commission.
                                                Secretary.                                              please contact FERC Online Support at                    n. Comments, Protests, or Motions to
                                                [FR Doc. 2017–25997 Filed 12–1–17; 8:45 am]             FERCOnlineSupport@ferc.gov, (866)                     Intervene: Anyone may submit
                                                BILLING CODE 6717–01–P                                  208–3676 (toll free), or (202) 502–8659               comments, a protest, or a motion to
                                                                                                        (TTY). In lieu of electronic filing, please           intervene in accordance with the
                                                                                                        send a paper copy to: Secretary, Federal              requirements of Rules of Practice and
                                                DEPARTMENT OF ENERGY                                    Energy Regulatory Commission, 888                     Procedure, 18 CFR 385.210, .211, and
                                                                                                        First Street NE., Washington, DC 20426.               .214. In determining the appropriate
                                                Federal Energy Regulatory                               The first page of any filing should                   action to take, the Commission will
                                                Commission                                              include docket number P–10822–013.                    consider all protests or other comments
                                                [Project No. 10822–013]                                    k. Description of Request: On October              filed, but only those who file a motion
                                                                                                        12, 2017, the Town of Canton,                         to intervene in accordance with the
                                                Town of Canton, Connecticut; Notice                     Connecticut, filed a request to reinstate,            Commission’s Rules may become a
                                                of Application for License                              amend, and transfer the license for the               party to the proceeding. Any comments,
                                                Reinstatement, Amendment, Transfer,                     Upper Collinsville Project No. 10822.                 protests, or motions to intervene must
                                                Extension of License Term, and                          The project was previously licensed to                be received on or before the specified
                                                Soliciting Comments, Motions To                         Summit Hydropower, but the license                    comment date for the particular
                                                Intervene, Protests,                                    was terminated by Commission order                    application.
                                                Recommendations, Terms and                              dated December 4, 2007, for failure to                   o. Filing and Service of Documents:
                                                Conditions, and Fishway Prescriptions                   start construction pursuant to Article                Any filing must (1) bear in all capital
                                                                                                        301 of the license and section 13 of the              letters the title COMMENTS, PROTEST,
                                                  Take notice that the following                        Federal Power Act. By Public Law 113–                 or MOTION TO INTERVENE as
                                                hydroelectric application has been filed                122, dated June 30, 2014, Congress                    applicable; (2) set forth in the heading
                                                with the Commission and is available                    approved the Collinsville Renewable                   the name of the applicant and the
                                                for public inspection.                                  Energy Production Act, which at the                   project number of the application to
                                                  a. Type of Application: Reinstatement,                request of the Town of Canton, and after              which the filing responds; (3) furnish
                                                Amendment, and Transfer.                                reasonable notice, allows the                         the name, address, and telephone
                                                  b. Project No.: 10822–013.                            Commission to: (1) Reinstate the license;             number of the person protesting or
                                                  c. Date filed: October 12, 2017.                      (2) extend for two years after the date on            intervening; and (4) otherwise comply
                                                  d. Applicant: Town of Canton,                         which the license is reinstated the time              with the requirements of 18 CFR
                                                Connecticut.                                            period during which the licensee is                   385.2001 through 385.2005. All
                                                  e. Name of Project: Upper Collinsville                required to commence construction of                  comments, motions to intervene, or
                                                Project.                                                the project; and (3) allows the license to            protests must set forth their evidentiary
                                                  f. Location: On the Farmington River                  be transferred to the town of Canton.                 basis and otherwise comply with the
                                                near the village of Collinsville in                     The Town of Canton proposes to                        requirements of 18 CFR 4.34(b).
                                                Hartford County, Connecticut.                           rehabilitate the project, provide                     Agencies may obtain copies of the
                                                  g. Filed Pursuant to: Federal Power                   upstream and downstream fish and eel                  application directly from the applicant.
                                                Act 16 U.S.C. 791(a)–825(r) and Public                                                                        A copy of any protest or motion to
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        passage, and provide additional
                                                Law 113–122.                                            environmental measures, including                     intervene must be served upon each
                                                  h. Applicant Contact: Robert Skinner,                 water quality monitoring, mussel                      representative of the applicant specified
                                                Chief Administrative Officer, Town of                   relocation, and recreation. The Town                  in the particular application. If an
                                                Canton, Connecticut, P.O. Box 168, 4                    requests the Commission to reinstate the              intervenor files comments or documents
                                                Market Street, Collinsville, CT, (860)                  license with a new term of 40–50 years.               with the Commission relating to the
                                                693–7837 or rskinner@                                      l. Locations of the Application: A                 merits of an issue that may affect the
                                                townofcantonct.org.                                     copy of the application is available for              responsibilities of a particular resource


                                           VerDate Sep<11>2014   18:22 Dec 01, 2017   Jkt 244001   PO 00000   Frm 00056   Fmt 4703   Sfmt 4703   E:\FR\FM\04DEN1.SGM   04DEN1


                                                                            Federal Register / Vol. 82, No. 231 / Monday, December 4, 2017 / Notices                                                    57251

                                                agency, they must also serve a copy of                     The Bureau of Land Management                      docket number (CP17–471–000) with
                                                the document on that resource agency.                   (BLM) and the Consolidated                            your submission. The Commission
                                                A copy of all other filings in reference                Municipality of Carson City, Nevada                   encourages electronic filing of
                                                to this application must be accompanied                 (Carson City) participated as                         comments and has expert staff available
                                                by proof of service on all persons listed               cooperating agencies in the preparation               to assist you at 202–502–8258 or
                                                in the service list prepared by the                     of the EA. Cooperating agencies have                  FercOnlineSupport@ferc.gov.
                                                Commission in this proceeding, in                       jurisdiction by law or special expertise                 (1) You can file your comments
                                                accordance with 18 CFR 4.34(b) and                      with respect to resources potentially                 electronically using the eComment
                                                385.2010.                                               affected by the proposal and participate              feature located on the Commission’s
                                                                                                        in the NEPA analysis. The BLM intends                 Web site (www.ferc.gov) under the link
                                                  Dated: November 28, 2017.
                                                                                                        to adopt and use the EA to consider the               to Documents and Filings. This is an
                                                Kimberly D. Bose,
                                                                                                        issuance of a right-of-way grant for the              easy method for submitting brief, text-
                                                Secretary.                                              portion of the project on federal lands.              only comments on a project;
                                                [FR Doc. 2017–26036 Filed 12–1–17; 8:45 am]                Specifically, the 2018 Expansion                      (2) You can also file your comments
                                                BILLING CODE 6717–01–P                                  Project would include:                                electronically using the eFiling feature
                                                                                                           • Construction of 0.42 miles of new                on the Commission’s Web site
                                                                                                        12-inch-diameter pipeline paralleling                 (www.ferc.gov) under the link to
                                                DEPARTMENT OF ENERGY                                    Paiute’s existing South Tahoe Lateral                 Documents and Filings. With eFiling,
                                                                                                        pipeline (Segment 1);                                 you can provide comments in a variety
                                                Federal Energy Regulatory                                  • replacement of 1.58 miles of                     of formats by attaching them as a file
                                                Commission                                              existing 8-inch-diameter Carson Lateral               with your submission. New eFiling
                                                                                                        Loop pipeline with 12-inch-diameter                   users must first create an account by
                                                [Docket No. CP17–471–000]                               pipeline (Segment 2);                                 clicking on eRegister. You must select
                                                                                                           • replacement of 2.27 miles of                     the type of filing you are making. If you
                                                Paiute Pipeline Company; Notice of                      existing 10-inch-diameter pipeline along              are filing a comment on a particular
                                                Availability of the Environmental                       Paiute’s existing Carson Lateral pipeline             project, please select Comment on a
                                                Assessment for the Proposed 2018                        with 20-inch-diameter pipeline                        Filing; or
                                                Expansion Project                                       (Segment 3); and                                         (3) You can file a paper copy of your
                                                                                                           • construction of 4.19 miles of new                comments by mailing them to the
                                                   The staff of the Federal Energy                      20-inch-diameter pipeline loop                        following address: Kimberly D. Bose,
                                                Regulatory Commission (FERC or                          paralleling Paiute’s existing Carson                  Secretary, Federal Energy Regulatory
                                                Commission) has prepared an                             Lateral pipeline (Segment 4).                         Commission, 888 First Street NE., Room
                                                environmental assessment (EA) for the                      The FERC staff mailed copies of the                1A, Washington, DC 20426.
                                                2018 Expansion Project (Project)                        EA to federal, state, and local                          Any person seeking to become a party
                                                proposed by Paiute Pipeline Company                     government representatives and                        to the proceeding must file a motion to
                                                (Paiute) in the above-referenced docket.                agencies; elected officials;                          intervene pursuant to Rule 214 of the
                                                Paiute requests authorization to                        environmental and public interest                     Commission’s Rules of Practice and
                                                construct approximately 8.46 miles of                   groups; Native American tribes;                       Procedures (18 CFR 385.214).1 Only
                                                pipeline to upsize or loop four segments                potentially affected landowners and                   intervenors have the right to seek
                                                of Paiute’s Carson and South Tahoe                      other interested individuals and groups;              rehearing of the Commission’s decision.
                                                Laterals in Douglas and Lyon Counties                   and newspapers and libraries in the                   The Commission grants affected
                                                and Carson City, Nevada. The Project                    project area. In addition, the EA is                  landowners and others with
                                                would provide up to 4,604 dekatherms                    available for public viewing on the                   environmental concerns intervenor
                                                per day of new natural gas delivery                     FERC’s Web site (www.ferc.gov) using                  status upon showing good cause by
                                                capacity from Paiute’s Tuscarora Gas                    the eLibrary link. A limited number of                stating that they have a clear and direct
                                                Transmission Company’s Interconnect                     copies of the EA are available for                    interest in this proceeding which no
                                                (Tuscarora) at Wadsworth, Nevada to                     distribution and public inspection at:                other party can adequately represent.
                                                delivery points along Paiute’s Carson                   Federal Energy Regulatory Commission,                 Simply filing environmental comments
                                                and South Tahoe Laterals. The                           Public Reference Room, 888 First Street               will not give you intervenor status, but
                                                requested pipeline facilities would also                NE., Room 2A, Washington, DC 20426,                   you do not need intervenor status to
                                                allow 1,031 dekatherms per day of                       (202) 502–8371.                                       have your comments considered.
                                                existing delivery capacity to be shifted                   Any person wishing to comment on                      Additional information about the
                                                from Paiute’s Minden/Gardnerville                       the EA may do so. Your comments                       project is available from the
                                                Delivery Point on its Carson Lateral to                 should focus on the potential                         Commission’s Office of External Affairs,
                                                the South Lake Tahoe City Gate, a point                 environmental effects, reasonable                     at (866) 208–FERC, or on the FERC Web
                                                farther downstream on the South Tahoe                   alternatives, and measures to avoid or                site (www.ferc.gov) using the eLibrary
                                                Lateral.                                                lessen environmental impacts. The more                link. Click on the eLibrary link, click on
                                                   The EA assesses the potential                        specific your comments, the more useful               General Search, and enter the docket
                                                environmental effects of the                            they will be. To ensure that the                      number excluding the last three digits in
                                                construction and operation of the 2018                  Commission has the opportunity to                     the Docket Number field (i.e., CP17–
                                                Expansion Project in accordance with                    consider your comments prior to                       471). Be sure you have selected an
                                                the requirements of the National
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        making its decision on this project, it is            appropriate date range. For assistance,
                                                Environmental Policy Act (NEPA). The                    important that we receive your                        please contact FERC Online Support at
                                                FERC staff concludes that approval of                   comments in Washington, DC, on or                     FercOnlineSupport@ferc.gov or toll free
                                                the proposed Project, with appropriate                  before December 27, 2017.                             at (866) 208–3676, or for TTY, contact
                                                mitigating measures, would not                             For your convenience, there are three              (202) 502–8659. The eLibrary link also
                                                constitute a major federal action                       methods you can use to file your
                                                significantly affecting the quality of the              comments with the Commission. In all                     1 See the previous discussion on the methods for

                                                human environment.                                      instances please reference the project                filing comments.



                                           VerDate Sep<11>2014   18:22 Dec 01, 2017   Jkt 244001   PO 00000   Frm 00057   Fmt 4703   Sfmt 4703   E:\FR\FM\04DEN1.SGM   04DEN1



Document Created: 2017-12-02 00:41:25
Document Modified: 2017-12-02 00:41:25
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 57250 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR