The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from elements of the certification information of Tier 1 of the generic AP1000 design control document (DCD) and is issuing License Amendment Nos. 96 and 95 to Combined Licenses (COL), NPF-91 and NPF-92, respectively. The COLs were issued to Southern Nuclear Operating Company, Inc. (SNC), and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 82 Issue 236 (Monday, December 11, 2017)
[Federal Register Volume 82, Number 236 (Monday, December 11, 2017)]
[Notices]
[Pages 58224-58225]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-26602]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc., Vogtle Electric 
Generating Plant, Units 3 and 4; Addition of New Turbine Building Sump 
Pumps

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from elements of the certification 
information of Tier 1 of the generic AP1000 design control document 
(DCD) and is issuing License Amendment Nos. 96 and 95 to Combined 
Licenses (COL), NPF-91 and NPF-92, respectively. The COLs were issued 
to Southern Nuclear Operating Company, Inc. (SNC), and Georgia Power 
Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power 
SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of 
Dalton, Georgia (the licensee); for construction and operation of the 
Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke 
County, Georgia.
    The granting of the exemption allows the changes to Tier 1 
information asked for in the amendment. Because the acceptability of 
the exemption was determined in part by the acceptability of the 
amendment, the exemption and amendment are being issued concurrently.

DATES: The exemption and amendment were issued on November 6, 2017.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document. The request for the amendment and exemption was submitted by 
letter dated December 22, 2015, as revised by letters dated July 27, 
2016, May 19, 2017, and the response to the staff's request for 
additional information dated August 31, 2017, (ADAMS Accession Nos. 
ML15356A655, ML16209A477, ML17139D394, and ML17243A459, respectively), 
titled, ``Addition of Two Turbine Building Sump Pumps,'' and designated 
License Amendment Request (LAR) 15-019.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: William Gleaves, Office of New 
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-5848; email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Introduction

    The NRC is granting an exemption from paragraph B of section III, 
``Scope and Contents,'' of appendix D, ``Design Certification Rule for 
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations 
(10 CFR), and issuing License Amendment Nos. 96 and 95 to COLs, NPF-91 
and NPF-92, respectively, to the licensee. The exemption is required by 
paragraph A.4 of section III, ``Processes for Changes and Departures,'' 
appendix D, to 10 CFR part 52 to allow the licensee to depart from Tier 
1 information. With the requested amendment, the licensee sought 
proposed changes to the Updated Final Safety Analysis Report (UFSAR) in 
the form of departures from the incorporated plant-specific DCD Tier 2 
information and involves changes to COL Appendix C and COL Appendix A, 
Technical Specifications. The proposed changes revise the licensing 
basis documents to depart from COL Appendix C information (with 
corresponding changes to the associated plant-specific Tier 1 
information) and associated changes to Tier 2 information in the VEGP 
UFSAR. The proposed

[[Page 58225]]

changes were to accommodate increased flow to the turbine building main 
sumps during condensate polishing system rinsing operations. SNC also 
requested related exemptions from the Commission's regulations.
    Part of the justification for granting the exemption was provided 
by the review of the amendment. Because the exemption is necessary in 
order to issue the requested license amendment, the NRC granted the 
exemption and issued the amendment concurrently, rather than in 
sequence. This included issuing a combined safety evaluation containing 
the NRC staff's review of both the exemption request and the license 
amendment. The exemption met all applicable regulatory criteria set 
forth in Sec. Sec.  50.12, 52.7, and section VIII.A.4 of appendix D to 
10 CFR part 52. The license amendment was found to be acceptable as 
well. The combined safety evaluation is available in ADAMS under 
Accession No. ML17272A280.
    Identical exemption documents (except for referenced unit numbers 
and license numbers) were issued to the licensee for VEGP Units 3 and 4 
(COLs NPF-91 and NPF-92). The exemption documents for VEGP Units 3 and 
4 can be found in ADAMS under Accession Nos. ML17272A278 and 
ML17272A279, respectively. The exemption is reproduced (with the 
exception of abbreviated titles and additional citations) in Section II 
of this document. The amendment documents for COLs NPF-91 and NPF-92 
are available in ADAMS under Accession Nos. ML17272A275 and 
ML17272A276, respectively. A summary of the amendment documents is 
provided in Section III of this document.

II. Exemption

    Reproduced below is the exemption document issued to VEGP Units 3 
and Unit 4. It makes reference to the combined safety evaluation that 
provides the reasoning for the findings made by the NRC (and listed 
under Item 1) in order to grant the exemption:
    1. In a letter dated December 22, 2015, as revised by letters dated 
July 27, 2016, May 19, 2017, and the response to the staff's request 
for additional information dated August 31, 2017, Southern Nuclear 
Operating Company requested from the Nuclear Regulatory Commission (NRC 
or Commission) an exemption to allow departures from Tier 1 information 
in the certified DCD incorporated by reference in 10 CFR part 52, 
appendix D, ``Design Certification Rule for the AP1000 Design,'' as 
part of LAR 15-019, ``Addition of New Turbine Building Sump Pumps.''
    For the reasons set forth in Section 3.1 of the NRC staff's safety 
evaluation, which can be found at ADAMS Accession No. ML17272A280, the 
Commission finds that:
    A. The exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of the 
rule in this circumstance is not necessary to serve the underlying 
purpose of the rule;
    E. the special circumstances outweigh any decrease in safety that 
may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in the 
level of safety otherwise provided by the design.
    2. Accordingly, the licensee is granted an exemption from the 
certified DCD Tier 1 information, with corresponding changes to 
Appendix C of the Facility Combined Licenses as described in the 
request dated December 22, 2015, as revised by letters dated July 27, 
2016, May 19, 2017, and the response to the staff's request for 
additional information dated August 31, 2017. This exemption is related 
to, and necessary for, the granting of License Amendment Nos. 96 and 
95, which is being issued concurrently with this exemption.
    3. As explained in Section 6.0 of the NRC staff's Safety Evaluation 
(ADAMS Accession No. ML17272A280, this exemption meets the eligibility 
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment needs to be prepared in 
connection with the issuance of the exemption.
    4. This exemption is effective as of the date of its issuance.

III. License Amendment Request

    By letter dated December 22, 2015, as revised by letters dated July 
27, 2016, May 19, 2017, and the response to the staff's request for 
additional information dated August 31, 2017 (ADAMS Accession Nos. 
ML15356A655, ML16209A477, ML17139D394, and ML17243A459, respectively), 
the licensee requested that the NRC amend the COLs for VEGP, Units 3 
and 4, COLs NPF-91 and NPF-92. The proposed amendment is described in 
Section I of this Federal Register notice.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR Chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or COL, as applicable, proposed no significant 
hazards consideration determination, and opportunity for a hearing in 
connection with these actions, was published in the Federal Register on 
July 5, 2017 (82 FR 31089). No comments were received during the 30-day 
comment period.
    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemption and issued the amendment that the licensee 
requested on December 22, 2015, as revised by letters dated July 27, 
2016, May 19, 2017, and the response to the staff's request for 
additional information dated August 31, 2017.
    The exemption and amendment were issued on November 6, 2017, as 
part of a combined package to the licensee (ADAMS Accession No. 
ML17272A272).

    Dated at Rockville, Maryland, this 6th day of December 2017.

    For the Nuclear Regulatory Commission.
Jennifer L. Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2017-26602 Filed 12-8-17; 8:45 am]
 BILLING CODE 7590-01-P



                                               58224                      Federal Register / Vol. 82, No. 236 / Monday, December 11, 2017 / Notices

                                               period on this information collection on                NUCLEAR REGULATORY                                    adams.html. To begin the search, select
                                               September 22, 2017, 82 FR 44470.                        COMMISSION                                            ‘‘ADAMS Public Documents’’ and then
                                                 1. The title of the information                                                                             select ‘‘Begin Web-based ADAMS
                                                                                                       [Docket Nos. 52–025 and 52–026; NRC–
                                               collection: 10 CFR part 9, ‘‘Public                     2008–0252]
                                                                                                                                                             Search.’’ For problems with ADAMS,
                                               Records.’’                                                                                                    please contact the NRC’s Public
                                                                                                       Southern Nuclear Operating Company,                   Document Room (PDR) reference staff at
                                                 2. OMB approval number: 3150–0043.
                                                                                                       Inc., Vogtle Electric Generating Plant,               1–800–397–4209, 301–415–4737, or by
                                                 3. Type of submission: Extension.                                                                           email to pdr.resource@nrc.gov. The
                                                                                                       Units 3 and 4; Addition of New Turbine
                                                 4. The form number if applicable:                     Building Sump Pumps                                   ADAMS accession number for each
                                               NRC Form 509; NRC Form 507.                                                                                   document referenced (if it is available in
                                                                                                       AGENCY:  Nuclear Regulatory                           ADAMS) is provided the first time that
                                                 5. How often the collection is required
                                                                                                       Commission.                                           it is mentioned in this document. The
                                               or requested: On occasion.
                                                                                                       ACTION: Exemption and combined                        request for the amendment and
                                                 6. Who will be required or asked to                   license amendment; issuance.                          exemption was submitted by letter
                                               respond: FOIA Requesters who have                                                                             dated December 22, 2015, as revised by
                                               requests that require pre-payment or                    SUMMARY:    The U.S. Nuclear Regulatory               letters dated July 27, 2016, May 19,
                                               agree to pay for the processing of their                Commission (NRC) is granting an                       2017, and the response to the staff’s
                                               FOIA requests.                                          exemption to allow a departure from                   request for additional information dated
                                                 7. The estimated number of annual                     elements of the certification information             August 31, 2017, (ADAMS Accession
                                               responses: 2,490.                                       of Tier 1 of the generic AP1000 design                Nos. ML15356A655, ML16209A477,
                                                 8. The estimated number of annual                     control document (DCD) and is issuing                 ML17139D394, and ML17243A459,
                                               respondents: 2,490.                                     License Amendment Nos. 96 and 95 to                   respectively), titled, ‘‘Addition of Two
                                                                                                       Combined Licenses (COL), NPF–91 and                   Turbine Building Sump Pumps,’’ and
                                                 9. An estimate of the total number of                 NPF–92, respectively. The COLs were
                                               hours needed annually to comply with                                                                          designated License Amendment Request
                                                                                                       issued to Southern Nuclear Operating                  (LAR) 15–019.
                                               the information collection requirement                  Company, Inc. (SNC), and Georgia
                                               or request: 1,111.                                                                                               • NRC’s PDR: You may examine and
                                                                                                       Power Company, Oglethorpe Power                       purchase copies of public documents at
                                                 10. Abstract: The proposed                            Corporation, MEAG Power SPVM, LLC,                    the NRC’s PDR, Room O1–F21, One
                                               information collection activity provides                MEAG Power SPVJ, LLC, MEAG Power                      White Flint North, 11555 Rockville
                                               communication with FOIA requesters to                   SPVP, LLC, Authority of Georgia, and                  Pike, Rockville, Maryland 20852.
                                               have the opportunity to be notified                     the City of Dalton, Georgia (the                      FOR FURTHER INFORMATION CONTACT:
                                               about any fees to process their FOIA                    licensee); for construction and operation             William Gleaves, Office of New
                                               requests. Providing NRC Form 509 to a                   of the Vogtle Electric Generating Plant               Reactors, U.S. Nuclear Regulatory
                                               requester serves as notification of the                 (VEGP) Units 3 and 4, located in Burke                Commission, Washington, DC 20555–
                                               processing fees as it relates to search,                County, Georgia.                                      0001; telephone: 301–415–5848; email:
                                               review, and duplication. Pursuant to                       The granting of the exemption allows
                                                                                                                                                             Bill.Gleaves@nrc.gov.
                                               NRC’s regulations, 10 CFR 9.40, when                    the changes to Tier 1 information asked
                                               fees exceed $ 25.00 the requester has the               for in the amendment. Because the                     SUPPLEMENTARY INFORMATION:
                                               opportunity to re-scope their request.                  acceptability of the exemption was                    I. Introduction
                                               Additionally, in response to the FOIA                   determined in part by the acceptability
                                               Improvement Act of 2016, in accordance                                                                           The NRC is granting an exemption
                                                                                                       of the amendment, the exemption and
                                               with 10 CFR 9.39, the revised form                                                                            from paragraph B of section III, ‘‘Scope
                                                                                                       amendment are being issued
                                               notifies the requester that if the agency                                                                     and Contents,’’ of appendix D, ‘‘Design
                                                                                                       concurrently.
                                               fails to comply with statutory time                                                                           Certification Rule for the AP1000,’’ to
                                                                                                       DATES: The exemption and amendment                    part 52 of title 10 of the Code of Federal
                                               limits, the agency cannot charge the
                                                                                                       were issued on November 6, 2017.                      Regulations (10 CFR), and issuing
                                               requester any fees (except in unusual
                                               circumstances). In the event that fees are              ADDRESSES: Please refer to Docket ID                  License Amendment Nos. 96 and 95 to
                                               required, the requester can verify their                NRC–2008–0252 when contacting the                     COLs, NPF–91 and NPF–92,
                                               willingness to pay on this form, and                    NRC about the availability of                         respectively, to the licensee. The
                                               must submit payment within ten                          information regarding this document.                  exemption is required by paragraph A.4
                                               working days of the receipt of the form.                You may obtain publicly-available                     of section III, ‘‘Processes for Changes
                                               In addition, the NRC created Form 507                   information related to this document                  and Departures,’’ appendix D, to 10 CFR
                                               which allows the public to                              using any of the following methods:                   part 52 to allow the licensee to depart
                                               electronically submit FOIA requests                       • Federal Rulemaking Web site: Go to                from Tier 1 information. With the
                                               from the FOIA Web site. Unlike the                      http://www.regulations.gov and search                 requested amendment, the licensee
                                               previous online FOIA request                            for Docket ID NRC–2008–0252. Address                  sought proposed changes to the Updated
                                               submission form, requesters can provide                 questions about NRC dockets to Carol                  Final Safety Analysis Report (UFSAR)
                                               identification verification at the time the             Gallagher; telephone: 301–415–3463;                   in the form of departures from the
                                               request is made, which shortens the                     email: Carol.Gallagher@nrc.gov. For                   incorporated plant-specific DCD Tier 2
                                               processing time.                                        technical questions, contact the                      information and involves changes to
                                                                                                       individual listed in the FOR FURTHER                  COL Appendix C and COL Appendix A,
                                                 Dated at Rockville, Maryland, this 5th day            INFORMATION CONTACT section of this                   Technical Specifications. The proposed
daltland on DSKBBV9HB2PROD with NOTICES




                                               of December 2017.                                                                                             changes revise the licensing basis
                                                                                                       document.
                                                 For the Nuclear Regulatory Commission.                  • NRC’s Agencywide Documents                        documents to depart from COL
                                               David Cullison,                                         Access and Management System                          Appendix C information (with
                                               NRC Clearance Officer, Office of the Chief              (ADAMS): You may obtain publicly-                     corresponding changes to the associated
                                               Information Officer.                                    available documents online in the                     plant-specific Tier 1 information) and
                                               [FR Doc. 2017–26547 Filed 12–8–17; 8:45 am]             ADAMS Public Documents collection at                  associated changes to Tier 2 information
                                               BILLING CODE 7590–01–P                                  http://www.nrc.gov/reading-rm/                        in the VEGP UFSAR. The proposed


                                          VerDate Sep<11>2014   17:54 Dec 08, 2017   Jkt 244001   PO 00000   Frm 00058   Fmt 4703   Sfmt 4703   E:\FR\FM\11DEN1.SGM   11DEN1


                                                                          Federal Register / Vol. 82, No. 236 / Monday, December 11, 2017 / Notices                                                  58225

                                               changes were to accommodate increased                      For the reasons set forth in Section 3.1           Commission’s rules and regulations.
                                               flow to the turbine building main sumps                 of the NRC staff’s safety evaluation,                 The Commission has made appropriate
                                               during condensate polishing system                      which can be found at ADAMS                           findings as required by the Act and the
                                               rinsing operations. SNC also requested                  Accession No. ML17272A280, the                        Commission’s rules and regulations in
                                               related exemptions from the                             Commission finds that:                                10 CFR Chapter I, which are set forth in
                                               Commission’s regulations.                                  A. The exemption is authorized by                  the license amendment.
                                                  Part of the justification for granting               law;                                                     A notice of consideration of issuance
                                               the exemption was provided by the                          B. the exemption presents no undue                 of amendment to facility operating
                                               review of the amendment. Because the                    risk to public health and safety;                     license or COL, as applicable, proposed
                                               exemption is necessary in order to issue                   C. the exemption is consistent with                no significant hazards consideration
                                               the requested license amendment, the                    the common defense and security;                      determination, and opportunity for a
                                               NRC granted the exemption and issued                       D. special circumstances are present               hearing in connection with these
                                               the amendment concurrently, rather                      in that the application of the rule in this           actions, was published in the Federal
                                               than in sequence. This included issuing                 circumstance is not necessary to serve                Register on July 5, 2017 (82 FR 31089).
                                               a combined safety evaluation containing                 the underlying purpose of the rule;                   No comments were received during the
                                               the NRC staff’s review of both the                         E. the special circumstances outweigh              30-day comment period.
                                               exemption request and the license                       any decrease in safety that may result                   The Commission has determined that
                                               amendment. The exemption met all                        from the reduction in standardization                 these amendments satisfy the criteria for
                                               applicable regulatory criteria set forth in             caused by the exemption; and                          categorical exclusion in accordance
                                               §§ 50.12, 52.7, and section VIII.A.4 of                    F. the exemption will not result in a              with 10 CFR 51.22. Therefore, pursuant
                                               appendix D to 10 CFR part 52. The                       significant decrease in the level of safety           to 10 CFR 51.22(b), no environmental
                                               license amendment was found to be                       otherwise provided by the design.                     impact statement or environmental
                                               acceptable as well. The combined safety                    2. Accordingly, the licensee is granted            assessment need be prepared for these
                                               evaluation is available in ADAMS under                  an exemption from the certified DCD                   amendments.
                                               Accession No. ML17272A280.                              Tier 1 information, with corresponding
                                                  Identical exemption documents                        changes to Appendix C of the Facility                 IV. Conclusion
                                               (except for referenced unit numbers and                 Combined Licenses as described in the                    Using the reasons set forth in the
                                               license numbers) were issued to the                     request dated December 22, 2015, as                   combined safety evaluation, the staff
                                               licensee for VEGP Units 3 and 4 (COLs                   revised by letters dated July 27, 2016,               granted the exemption and issued the
                                               NPF–91 and NPF–92). The exemption                       May 19, 2017, and the response to the                 amendment that the licensee requested
                                               documents for VEGP Units 3 and 4 can                    staff’s request for additional information            on December 22, 2015, as revised by
                                               be found in ADAMS under Accession                       dated August 31, 2017. This exemption                 letters dated July 27, 2016, May 19,
                                               Nos. ML17272A278 and ML17272A279,                       is related to, and necessary for, the                 2017, and the response to the staff’s
                                               respectively. The exemption is                          granting of License Amendment Nos. 96                 request for additional information dated
                                               reproduced (with the exception of                       and 95, which is being issued                         August 31, 2017.
                                               abbreviated titles and additional                       concurrently with this exemption.                        The exemption and amendment were
                                               citations) in Section II of this document.                 3. As explained in Section 6.0 of the              issued on November 6, 2017, as part of
                                               The amendment documents for COLs                        NRC staff’s Safety Evaluation (ADAMS                  a combined package to the licensee
                                               NPF–91 and NPF–92 are available in                      Accession No. ML17272A280, this                       (ADAMS Accession No. ML17272A272).
                                               ADAMS under Accession Nos.                              exemption meets the eligibility criteria                Dated at Rockville, Maryland, this 6th day
                                               ML17272A275 and ML17272A276,                            for categorical exclusion set forth in 10             of December 2017.
                                               respectively. A summary of the                          CFR 51.22(c)(9). Therefore, pursuant to                 For the Nuclear Regulatory Commission.
                                               amendment documents is provided in                      10 CFR 51.22(b), no environmental                     Jennifer L. Dixon-Herrity,
                                               Section III of this document.                           impact statement or environmental
                                                                                                                                                             Chief, Licensing Branch 4, Division of New
                                                                                                       assessment needs to be prepared in                    Reactor Licensing, Office of New Reactors.
                                               II. Exemption
                                                                                                       connection with the issuance of the
                                                  Reproduced below is the exemption                                                                          [FR Doc. 2017–26602 Filed 12–8–17; 8:45 am]
                                                                                                       exemption.
                                               document issued to VEGP Units 3 and                        4. This exemption is effective as of the           BILLING CODE 7590–01–P

                                               Unit 4. It makes reference to the                       date of its issuance.
                                               combined safety evaluation that
                                               provides the reasoning for the findings                 III. License Amendment Request                        OFFICE OF PERSONNEL
                                               made by the NRC (and listed under Item                     By letter dated December 22, 2015, as              MANAGEMENT
                                               1) in order to grant the exemption:                     revised by letters dated July 27, 2016,
                                                  1. In a letter dated December 22, 2015,              May 19, 2017, and the response to the                 Submission for Review: Survivor
                                               as revised by letters dated July 27, 2016,              staff’s request for additional information            Annuity Election for a Spouse, RI 20–
                                               May 19, 2017, and the response to the                   dated August 31, 2017 (ADAMS                          63; Cover Letter Giving Information
                                               staff’s request for additional information              Accession Nos. ML15356A655,                           About the Cost To Elect Less Than the
                                               dated August 31, 2017, Southern                         ML16209A477, ML17139D394, and                         Maximum Survivor Annuity, RI 20–116;
                                               Nuclear Operating Company requested                     ML17243A459, respectively), the                       Cover Letter Giving Information About
                                               from the Nuclear Regulatory                             licensee requested that the NRC amend                 the Cost To Elect the Maximum
                                               Commission (NRC or Commission) an                       the COLs for VEGP, Units 3 and 4, COLs                Survivor Annuity, RI 20–117
                                               exemption to allow departures from Tier                 NPF–91 and NPF–92. The proposed                       AGENCY:  Office of Personnel
daltland on DSKBBV9HB2PROD with NOTICES




                                               1 information in the certified DCD                      amendment is described in Section I of                Management.
                                               incorporated by reference in 10 CFR                     this Federal Register notice.                         ACTION: 30-Day notice and request for
                                               part 52, appendix D, ‘‘Design                              The Commission has determined for                  comments.
                                               Certification Rule for the AP1000                       these amendments that the application
                                               Design,’’ as part of LAR 15–019,                        complies with the standards and                       SUMMARY:   The Retirement Services,
                                               ‘‘Addition of New Turbine Building                      requirements of the Atomic Energy Act                 Office of Personnel Management (OPM)
                                               Sump Pumps.’’                                           of 1954, as amended (the Act), and the                offers the general public and other


                                          VerDate Sep<11>2014   17:54 Dec 08, 2017   Jkt 244001   PO 00000   Frm 00059   Fmt 4703   Sfmt 4703   E:\FR\FM\11DEN1.SGM   11DEN1



Document Created: 2017-12-09 01:50:00
Document Modified: 2017-12-09 01:50:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
DatesThe exemption and amendment were issued on November 6, 2017.
ContactWilliam Gleaves, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555- 0001; telephone: 301-415-5848; email: [email protected]
FR Citation82 FR 58224 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR