82_FR_61222 82 FR 60976 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

82 FR 60976 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 246 (December 26, 2017)

Page Range60976-60977
FR Document2017-27734

Federal Register, Volume 82 Issue 246 (Tuesday, December 26, 2017)
[Federal Register Volume 82, Number 246 (Tuesday, December 26, 2017)]
[Notices]
[Pages 60976-60977]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-27734]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-25-000]


Columbia Gas Transmission, LLC; Notice of Request Under Blanket 
Authorization

    Take notice that on December 8, 2017, Columbia Gas Transmission, 
LLC (Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002-
2700, filed in Docket No. CP18-25-000 a prior notice request pursuant 
to sections 157.205 and 157.213(b) of the Commission's regulations 
under the Natural Gas Act (NGA), as amended, requesting authorization 
to construct and operate one new horizontal storage well (Donegal 
Storage Well 12618), approximately 703 feet of eight-inch-diameter of 
related pipeline, and appurtenances at its existing Donegal Storage 
Field in Washington County, Pennsylvania. Columbia proposes to 
construct Donegal Storage Well 12618 in lieu of multiple well 
recompletions and stimulations. Columbia states that Donegal Storage 
Well 12618 could provide 15 million cubic feet per day or more during a 
design flow day, dependent on certain parameters. Columbia estimates 
the cost of the project to be approximately $3,300,000. Columbia avers 
that there will be no change in the certificated physical parameters of 
the Donegal Storage Field, including maximum reservoir pressure, 
reservoir and buffer boundaries, and certificated storage capacity as a 
result of the proposal, all as more fully set

[[Page 60977]]

forth in the application which is on file with the Commission and open 
to public inspection. The filing may also be viewed on the web at 
http://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, please contact FERC Online Support 
at [email protected] or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to Robert 
D. Jackson, Manager, Certificates & Regulatory Administration, Columbia 
Gas Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas 
77002-2700, by telephone at (832) 320-5487, by fax at (832) 320-6487, 
or by email at [email protected].
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenter's will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenter's will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 7 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE, Washington, 
DC 20426.

    Dated: December 18, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-27734 Filed 12-22-17; 8:45 am]
BILLING CODE 6717-01-P



                                               60976                              Federal Register / Vol. 82, No. 246 / Tuesday, December 26, 2017 / Notices

                                                                                                                     FERC–725Y IN DOCKET NO. IC18–2–000
                                                                                                                                               Annual                                                Average                Total annual
                                                                                                          Number and type                     number of                Total number                  burden &               burden hours       Cost per
                                                                                                          of respondents 2                 responses per               of responses                  cost per                  & total        respondent
                                                                                                                                             respondent                                             response 3               annual cost

                                                                                                                      (1)                           (2)                (1) * (2) = (3)                    (4)               (3) * (4) = (5)    (5) ÷ (1)

                                               Annual Evaluation and Update of                            TO (331), GOP                                          1                4 1,064                   6 hrs.,            6,384 hrs.,          $68.12
                                                 Training Program and Task List.                            (890).                                                                                         $408.72              $434,878
                                               Retention of Records .........................             TO (331), GOP                                         1                 4 1,064                  10 hrs.,           10,640 hrs.,           40.89
                                                                                                            (890).                                                                                         $408.90              $435,070
                                               Verification and Retention of Evi-                         TO (331) ..............                               1                       331                10 hrs.,            3,310 hrs.,           40.89
                                                 dence of capabilities of personnel                                                                                                                        $408.90              $135,346
                                                 [R3, M3, C1.2], and Creation and
                                                 Retention of Records on Simula-
                                                 tion Training.

                                                     Total ............................................   ..............................   ........................   ........................   ........................     20,334 hrs.;
                                                                                                                                                                                                                               $1,005,294
                                                  2 TO=Transmission    Owner; RC=Reliability Coordinator; BA=Balancing Authority; TOP=Transmission Operator; GOP=Generator Operator.
                                                  3 The  estimates for cost per response are loaded hourly wage figure (includes benefits) is based on the average of three occupational cat-
                                               egories for 2016 found on the Bureau of Labor Statistics website (http://www.bls.gov/oes/current/naics2l22.htm): Electrical Engineer (Occupa-
                                               tional Code: 17–2071): $68.12; Office and Administrative Support (Occupation Code: 43–0000): $40.89.
                                                  4 Some transmission owners are also generator operators. To eliminate double counting some entities, this figure reflects the number of unique
                                               entities (1064) within the group of TOs and GOPs. That approach is used throughout the table.


                                                 Comments: Comments are invited on:                                     announcing its intent to revoke the                                          DEPARTMENT OF ENERGY
                                               (1) Whether the collection of                                            market-based rate authority of the
                                               information is necessary for the proper                                  public utilities listed in the caption of                                    Federal Energy Regulatory
                                               performance of the functions of the                                      that order, which had failed to file their                                   Commission
                                               Commission, including whether the                                        required Electric Quarterly Reports.1                                        [Docket No. CP18–25–000]
                                               information will have practical utility;                                 The Commission directed those public
                                               (2) the accuracy of the agency’s estimate                                utilities to file the required Electric                                      Columbia Gas Transmission, LLC;
                                               of the burden and cost of the collection                                 Quarterly Reports within 15 days of the                                      Notice of Request Under Blanket
                                               of information, including the validity of                                date of issuance of the order or face                                        Authorization
                                               the methodology and assumptions used;                                    revocation of their authority to sell
                                               (3) ways to enhance the quality, utility                                                                                                                 Take notice that on December 8, 2017,
                                                                                                                        power at market-based rates and                                              Columbia Gas Transmission, LLC
                                               and clarity of the information collection;                               termination of their electric market-
                                               and (4) ways to minimize the burden of                                                                                                                (Columbia), 700 Louisiana Street, Suite
                                                                                                                        based rate tariffs.2                                                         700, Houston, Texas 77002–2700, filed
                                               the collection of information on those
                                               who are to respond, including the use                                      The time period for compliance with                                        in Docket No. CP18–25–000 a prior
                                                                                                                        the November 20 Order has elapsed.                                           notice request pursuant to sections
                                               of automated collection techniques or
                                                                                                                        The above-captioned companies failed                                         157.205 and 157.213(b) of the
                                               other forms of information technology.
                                                                                                                        to file their delinquent Electric                                            Commission’s regulations under the
                                                 Dated: December 19, 2017.                                                                                                                           Natural Gas Act (NGA), as amended,
                                                                                                                        Quarterly Reports. The Commission
                                               Kimberly D. Bose,                                                                                                                                     requesting authorization to construct
                                                                                                                        hereby revokes the market-based rate
                                               Secretary.                                                                                                                                            and operate one new horizontal storage
                                                                                                                        authority and terminates the electric                                        well (Donegal Storage Well 12618),
                                               [FR Doc. 2017–27731 Filed 12–22–17; 8:45 am]
                                                                                                                        market-based rate tariff of each of the                                      approximately 703 feet of eight-inch-
                                               BILLING CODE 6717–01–P
                                                                                                                        companies who are named in the                                               diameter of related pipeline, and
                                                                                                                        caption of this order.                                                       appurtenances at its existing Donegal
                                               DEPARTMENT OF ENERGY                                                       Dated: December 19, 2017.                                                  Storage Field in Washington County,
                                                                                                                        Kimberly D. Bose,                                                            Pennsylvania. Columbia proposes to
                                               Federal Energy Regulatory                                                                                                                             construct Donegal Storage Well 12618 in
                                                                                                                        Secretary.
                                               Commission                                                                                                                                            lieu of multiple well recompletions and
                                                                                                                        [FR Doc. 2017–27730 Filed 12–22–17; 8:45 am]
                                                                                                                                                                                                     stimulations. Columbia states that
                                               Notice of Revocation of Market-Based                                     BILLING CODE 6717–01–P                                                       Donegal Storage Well 12618 could
                                               Rate Tariff                                                                                                                                           provide 15 million cubic feet per day or
                                                                                                 Docket Nos.
                                                                                                                                                                                                     more during a design flow day,
                                                                                                                                                                                                     dependent on certain parameters.
                                               Electric Quarterly Reports ...........        ER02–2001–020                                                                                           Columbia estimates the cost of the
                                               Niagara Generation, LLC ............          ER10–3154–000                                                                                           project to be approximately $3,300,000.
ethrower on DSK3G9T082PROD with NOTICES




                                               C2K Energy, LLC ........................      ER14–1751–001
                                               Castlebridge Energy Group LLC                 ER11–4629–000                                                                                           Columbia avers that there will be no
                                               Intercom Energy, Inc. ..................      ER11–125–000                                                                                            change in the certificated physical
                                               Chesapeake Renewable Energy                   ER13–28–001                                                                                             parameters of the Donegal Storage Field,
                                                  LLC.                                                                                                                                               including maximum reservoir pressure,
                                                                                                                          1 Electric Quarterly Reports, 161 FERC ¶ 61,208                            reservoir and buffer boundaries, and
                                                 On November 20, 2017, the                                              (2017) (November 20 Order).                                                  certificated storage capacity as a result
                                               Commission issued an order                                                 2 Id. at Ordering Paragraph A.                                             of the proposal, all as more fully set


                                          VerDate Sep<11>2014        20:21 Dec 22, 2017         Jkt 244001      PO 00000        Frm 00029       Fmt 4703        Sfmt 4703      E:\FR\FM\26DEN1.SGM               26DEN1


                                                                          Federal Register / Vol. 82, No. 246 / Tuesday, December 26, 2017 / Notices                                              60977

                                               forth in the application which is on file               milestones, the anticipated date for the              DEPARTMENT OF ENERGY
                                               with the Commission and open to                         Commission staff’s issuance of the final
                                               public inspection. The filing may also                  environmental impact statement (FEIS)                 Federal Energy Regulatory
                                               be viewed on the web at http://                         or EA for this proposal. The filing of the            Commission
                                               www.ferc.gov using the ‘‘eLibrary’’ link.               EA in the Commission’s public record
                                               Enter the docket number excluding the                   for this proceeding or the issuance of a              [Docket No. CD18–4–000]
                                               last three digits in the docket number                  Notice of Schedule for Environmental
                                               field to access the document. For                       Review will serve to notify federal and               Wallowa Resources Community
                                               assistance, please contact FERC Online                  state agencies of the timing for the                  Solutions Inc.; Notice of Preliminary
                                               Support at FERCOnlineSupport@                           completion of all necessary reviews, and              Determination of a Qualifying Conduit
                                               ferc.gov or toll free at (866) 208–3676, or             the subsequent need to complete all                   Hydropower Facility and Soliciting
                                               TTY, contact (202) 502–8659.                            federal authorizations within 90 days of              Comments and Motions To Intervene
                                                  Any questions concerning this                        the date of issuance of the Commission
                                               application may be directed to Robert D.                staff’s FEIS or EA.                                      On December 11, 2017, Wallowa
                                               Jackson, Manager, Certificates &                           Persons who wish to comment only                   Resources Community Solutions Inc.
                                               Regulatory Administration, Columbia                     on the environmental review of this                   filed a notice of intent to construct a
                                               Gas Transmission, LLC, 700 Louisiana                    project should submit an original and                 qualifying conduit hydropower facility,
                                               Street, Suite 700, Houston, Texas                       two copies of their comments to the                   pursuant to section 30 of the Federal
                                               77002–2700, by telephone at (832) 320–                  Secretary of the Commission.                          Power Act (FPA), as amended by section
                                               5487, by fax at (832) 320–6487, or by                   Environmental commenter’s will be                     4 of the Hydropower Regulatory
                                               email at robert_jackson@                                placed on the Commission’s                            Efficiency Act of 2013 (HREA). The
                                               transcanada.com.                                        environmental mailing list, will receive              proposed Triple Creek Ranch Hydro
                                                  Any person or the Commission’s staff                 copies of the environmental documents,                Station Project would have an installed
                                               may, within 60 days after issuance of                   and will be notified of meetings                      capacity of 85 kilowatts (kW), and
                                               the instant notice by the Commission,                   associated with the Commission’s                      would be located along the 18-inch-
                                               file pursuant to Rule 214 of the                        environmental review process.                         diameter Triple Creek Ranch irrigation
                                               Commission’s Procedural Rules (18 CFR                   Environmental commenter’s will not be                 pipeline. The project would be located
                                               385.214) a motion to intervene or notice                required to serve copies of filed                     near the Town of Joseph in Wallowa
                                               of intervention and pursuant to section                 documents on all other parties.                       County, Oregon.
                                               157.205 of the regulations under the                    However, the non-party commentary,                       Applicant Contact: Kyle Petrocine,
                                               NGA (18 CFR 157.205), a protest to the                  will not receive copies of all documents              Wallowa Resources Community
                                               request. If no protest is filed within the              filed by other parties or issued by the               Solutions Inc., 401 NE First Street,
                                               time allowed therefore, the proposed                    Commission (except for the mailing of                 Enterprise, OR 97828; Phone No. (541)
                                               activity shall be deemed to be                          environmental documents issued by the                 426–8053.
                                               authorized effective the day after the                  Commission) and will not have the right                  FERC Contact: Robert Bell, Phone No.
                                               time allowed for filing a protest. If a                 to seek court review of the                           (202) 502–6062; Email: robert.bell@
                                               protest is filed and not withdrawn                      Commission’s final order.                             ferc.gov.
                                               within 30 days after the allowed time                      The Commission strongly encourages
                                               for filing a protest, the instant request                                                                        Qualifying Conduit Hydropower
                                                                                                       electronic filings of comments, protests
                                               shall be treated as an application for                                                                        Facility Description: The proposed
                                                                                                       and interventions in lieu of paper using
                                               authorization pursuant to section 7 of                                                                        project would consist of: (1) A new
                                                                                                       the ‘‘eFiling’’ link at http://
                                               the NGA.                                                                                                      generating unit, having a generating
                                                                                                       www.ferc.gov. Persons unable to file
                                                  Pursuant to section 157.9 of the                                                                           capacity of 85 kW, housed in a new 13-
                                                                                                       electronically should submit an original
                                               Commission’s rules, 18 CFR 157.9,                                                                             foot by 17-foot powerhouse, connected
                                                                                                       and 7 copies of the protest or
                                               within 90 days of this Notice the                                                                             to the existing 18-inch-diameter Triple
                                                                                                       intervention to the Federal Energy
                                               Commission staff will either: Complete                                                                        Creek Ranch irrigation pipeline, and (2)
                                                                                                       regulatory Commission, 888 First Street
                                               its environmental assessment (EA) and                                                                         appurtenant facilities. The proposed
                                                                                                       NE, Washington, DC 20426.
                                               place it into the Commission’s public                                                                         project would have an estimated annual
                                               record (eLibrary) for this proceeding; or                 Dated: December 18, 2017.                           generation of 153 megawatt-hours.
                                               issue a Notice of Schedule for                          Kimberly D. Bose,                                        A qualifying conduit hydropower
                                               Environmental Review. If a Notice of                    Secretary.                                            facility is one that is determined or
                                               Schedule for Environmental Review is                    [FR Doc. 2017–27734 Filed 12–22–17; 8:45 am]          deemed to meet all of the criteria shown
                                               issued, it will indicate, among other                   BILLING CODE 6717–01–P                                in the table below.

                                                                                 TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                               Satisfies
                                                           Statutory provision                                                            Description                                           (Y/N)

                                               FPA 30(a)(3)(A), as amended by HREA ..             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or          Y
                                                                                                    similar manmade water conveyance that is operated for the distribution of water
                                                                                                    for agricultural, municipal, or industrial consumption and not primarily for the gen-
ethrower on DSK3G9T082PROD with NOTICES




                                                                                                    eration of electricity.
                                               FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric             Y
                                                                                                    power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                    erally owned conduit.
                                               FPA 30(a)(3)(C)(ii),     as    amended       by    The facility has an installed capacity that does not exceed 5 megawatts ..................      Y
                                                 HREA.




                                          VerDate Sep<11>2014   20:21 Dec 22, 2017   Jkt 244001   PO 00000   Frm 00030   Fmt 4703   Sfmt 4703   E:\FR\FM\26DEN1.SGM   26DEN1



Document Created: 2017-12-23 03:08:58
Document Modified: 2017-12-23 03:08:58
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 60976 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR