In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the requirements and burden of information collections, FERC-505 (Small Hydropower Projects and Conduit Facilities including License/Relicense, Exemption and Qualifying Conduit Facility Determination) and FERC-512 (Preliminary Permit) which will be submitted to the Office of Management and Budget (OMB) for a review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission published a 60-day Notice in the Federal Register in Docket No. IC17-15-000, (82 FR 46231, 10/04/2017) requesting public comments. FERC received no comments in response to the Notice and is indicating that in its submittals to the OMB.

Federal Register, Volume 82 Issue 246 (Tuesday, December 26, 2017)
[Federal Register Volume 82, Number 246 (Tuesday, December 26, 2017)]
[Notices]
[Pages 60978-60980]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-27736]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC17-15-000]


Commission Information Collection Activities (FERC-505 and FERC-
512); Consolidated Comment Request; Extension

AGENCY: Federal Energy Regulatory Commission.

ACTION: Comment request.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on the requirements and burden of 
information collections, FERC-505 (Small Hydropower Projects and 
Conduit Facilities including License/Relicense, Exemption and 
Qualifying Conduit Facility Determination) and FERC-512 (Preliminary 
Permit) which will be submitted to the Office of Management and Budget 
(OMB) for a review of the information collection requirements. Any 
interested person may file comments directly with OMB and should 
address a copy of those comments to the Commission as explained below. 
The Commission published a 60-day Notice in the Federal Register in 
Docket No. IC17-15-000, (82 FR 46231, 10/04/2017) requesting public 
comments. FERC received no comments in response to the Notice and is 
indicating that in its submittals to the OMB.

DATES: Comments on the collections of information are due January 25, 
2018.

ADDRESSES: Comments filed with OMB, identified by OMB Control Nos. 
1902-0115 and 1902-0073, should be sent via email to the Office of 
Information and Regulatory Affairs: [email protected]. Attention: 
Federal Energy Regulatory Commission Desk Officer. The Desk Officer may 
also be reached via telephone at 202-395-0710. A copy of the comments 
should also be sent to the Commission, in Docket No. IC17-15-000 by 
either of the following methods:
     eFiling at Commission's website: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket

[[Page 60979]]

may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT:  Ellen Brown may be reached by email 
at [email protected], telephone at (202) 502-8663, and fax at 
(202) 273-0873.

SUPPLEMENTARY INFORMATION: 
    Type of Request: Three-year approval of the FERC-505 and FERC-512 
information collection requirements with no changes to the current 
reporting requirements. Please note that each collection is distinct 
from the next.
    Comments: Comments are invited on: (1) Whether the collections of 
information are necessary for the proper performance of the functions 
of the Commission, including whether the information will have 
practical utility; (2) the accuracy of the agency's estimate of the 
burden and cost of the collections of information, including the 
validity of the methodology and assumptions used; (3) ways to enhance 
the quality, utility and clarity of the information collections; and 
(4) ways to minimize the burden of the collections of information on 
those who are to respond, including the use of automated collection 
techniques or other forms of information technology.
    Title: FERC-505, Small Hydropower Projects and Conduit Facilities 
including License/Relicense, Exemption, and Qualifying Conduit Facility 
Determination.
    OMB Control No.: 1902-0115.
    Abstract: The Hydropower Efficiency Act amended statutory 
provisions pertaining to preliminary permits and to projects that are 
exempt from certain licensing requirements under the Federal Power Act 
(FPA) in order to reduce cost and regulatory burden, and in turn, 
promote hydropower development. Specifically, the Hydropower Efficiency 
Act gave the Commission authority to extend a preliminary permit once 
for not more than two additional years without requiring the permittee 
to apply for a successive preliminary permit. The Hydropower Efficiency 
Act also expanded the number of projects that may qualify for 
exemptions from certain licensing requirements under the FPA (i.e., 
small conduit hydroelectric facilities or small hydroelectric power 
projects), and allowed other projects to qualify to operate without 
Commission oversight (i.e., qualifying conduit hydropower facilities). 
While the Commission-approved revised regulations formally implement 
the Hydropower Efficiency Act, the Commission has complied with the Act 
since its enactment.
    Type of Respondents: Businesses or other for-profit and not-for-
profit institutions.
    Estimate of Annual Burden: The Commission estimates the annual 
public reporting burden for the information collection as:

    FERC-505 (Small Hydropower Projects and Conduit Facilities Including License/Relicense, Exemption, and Qualifying Conduit Facility Determination)
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                        Annual number
                                          Number of     of responses    Total number    Average burden and cost  Total annual burden and     Cost per
                                         respondents   per respondent   of responses         per response           total annual cost     respondent ($)
                                                  (1)             (2)     (1) * (2) =  (4).....................  (3) * (4) = (5)........       (5) / (1)
                                                                                  (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
FERC-505.............................              16               1              16  273 hrs.; $20,884.50....  4,368 hrs.; $334,152...       20,884.50
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Title: FERC-512, Preliminary Permit.
    OMB Control No.: 1902-0073.
    Abstract: The information collected under the requirements of FERC-
512, is used by the Commission to implement the statutory provisions of 
the Federal Power Act (FPA) 16 U.S.C. The purpose of obtaining a 
preliminary permit is to maintain priority of the application for a 
license for a hydropower facility while the applicant conducts surveys 
to prepare maps, plans, specifications and estimates; conducts 
engineering, economic and environmental feasibility studies; and made 
financial arrangements. The conditions under which the priority will be 
maintained are set forth in each permit.
    Type of Respondent: Businesses or other for-profit and not-for-
profit institutions.
    Estimate of Annual Burden: \1\ The Commission estimates the annual 
public reporting burden for the information collection as:
---------------------------------------------------------------------------

    \1\ Burden is the total time, effort, or financial resources 
expended by persons to generate, maintain, retain, or disclose or 
provide information to or for a Federal agency. For further 
explanation of what is included in the information collection 
burden, refer to 5 Code of Federal Regulations 1320.3.
    \2\ Subject matter experts found that industry employment costs 
closely resemble FERC's wage average wage figure. FERC's 2017 
average annual salary plus benefits per FTE (full-time equivalent) 
is $158,754 (or $76.50 per hour).

                                                              FERC-512 (Preliminary Permit)
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                        Annual number
                                          Number of     of responses    Total number     Average burden & cost    Total annual burden &      Cost per
                                         respondents   per respondent   of responses         per response           total annual cost     respondent ($)
                                                  (1)             (2)     (1) * (2) =  (4).....................  (3) * (4) = (5)........       (5) / (1)
                                                                                  (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
FERC-512.............................              50               1              50  24 hrs.; $1,836.........  1,200 hrs.; $91,800....           1,836
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection;

[[Page 60980]]

and (4) ways to minimize the burden of the collection of information on 
those who are to respond, including the use of automated collection 
techniques or other forms of information technology.

    Dated: December 18, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-27736 Filed 12-22-17; 8:45 am]
 BILLING CODE 6717-01-P



                                               60978                       Federal Register / Vol. 82, No. 246 / Tuesday, December 26, 2017 / Notices

                                                                         TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY—Continued
                                                                                                                                                                                             Satisfies
                                                              Statutory provision                                                          Description                                        (Y/N)

                                               FPA 30(a)(3)(C)(iii),      as   amended       by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-          Y
                                                 HREA.                                              censing requirements of Part I of the FPA.



                                                  Preliminary Determination: The                        at http://www.ferc.gov/docs-filing/                   (Commission or FERC) is soliciting
                                               proposed hydroelectric project will                      ecomment.asp. You must include your                   public comment on the requirements
                                               utilize an existing irrigation pipeline,                 name and contact information at the end               and burden of information collections,
                                               the primary purpose of which is to                       of your comments. For assistance,                     FERC–505 (Small Hydropower Projects
                                               irrigate Triple Creek Ranch’s farm. The                  please contact FERC Online Support at                 and Conduit Facilities including
                                               addition of the Triple Creek Ranch                       FERCOnlineSupport@ferc.gov, (866)                     License/Relicense, Exemption and
                                               Hydro Station Project will not alter the                 208–3676 (toll free), or (202) 502–8659               Qualifying Conduit Facility
                                               conduit’s primary purpose. Therefore,                    (TTY). In lieu of electronic filing, please           Determination) and FERC–512
                                               based upon the above criteria,                           send a paper copy to: Secretary, Federal              (Preliminary Permit) which will be
                                               Commission staff preliminarily                           Energy Regulatory Commission, 888                     submitted to the Office of Management
                                               determines that the proposal satisfies                   First Street NE, Washington, DC 20426.                and Budget (OMB) for a review of the
                                               the requirements for a qualifying                        A copy of all other filings in reference              information collection requirements.
                                               conduit hydropower facility, which is                    to this application must be accompanied               Any interested person may file
                                               not required to be licensed or exempted                  by proof of service on all persons listed             comments directly with OMB and
                                               from licensing.                                          in the service list prepared by the                   should address a copy of those
                                                  Comments and Motions To Intervene:                    Commission in this proceeding, in                     comments to the Commission as
                                               Deadline for filing comments contesting                  accordance with 18 CFR 4.34(b) and                    explained below. The Commission
                                               whether the facility meets the qualifying                385.2010.                                             published a 60-day Notice in the
                                               criteria is 45 days from the issuance                       Locations of Notice of Intent: Copies              Federal Register in Docket No. IC17–
                                               date of this notice.                                     of the notice of intent can be obtained               15–000, (82 FR 46231, 10/04/2017)
                                                  Deadline for filing motions to                        directly from the applicant or such                   requesting public comments. FERC
                                               intervene is 30 days from the issuance                   copies can be viewed and reproduced at                received no comments in response to
                                               date of this notice.                                     the Commission in its Public Reference                the Notice and is indicating that in its
                                                  Anyone may submit comments or a                       Room, Room 2A, 888 First Street NE,                   submittals to the OMB.
                                               motion to intervene in accordance with                   Washington, DC 20426. The filing may                  DATES: Comments on the collections of
                                               the requirements of Rules of Practice                    also be viewed on the web at http://                  information are due January 25, 2018.
                                               and Procedure, 18 CFR 385.210 and                        www.ferc.gov/docs-filing/elibrary.asp
                                               385.214. Any motions to intervene must                   using the ‘‘eLibrary’’ link. Enter the                ADDRESSES: Comments filed with OMB,
                                               be received on or before the specified                   docket number (i.e., CD18–4) in the                   identified by OMB Control Nos. 1902–
                                               deadline date for the particular                         docket number field to access the                     0115 and 1902–0073, should be sent via
                                               proceeding.                                              document. For assistance, call toll-free              email to the Office of Information and
                                                  Filing and Service of Responsive                      1–866–208–3676 or email                               Regulatory Affairs: oira_submission@
                                               Documents: All filings must (1) bear in                  FERCOnlineSupport@ferc.gov. For TTY,                  omb.gov. Attention: Federal Energy
                                               all capital letters the COMMENTS                         call (202) 502–8659.                                  Regulatory Commission Desk Officer.
                                               CONTESTING QUALIFICATION FOR A                                                                                 The Desk Officer may also be reached
                                                                                                          Dated: December 19, 2017.                           via telephone at 202–395–0710. A copy
                                               CONDUIT HYDROPOWER FACILITY or
                                                                                                        Kimberly D. Bose,                                     of the comments should also be sent to
                                               MOTION TO INTERVENE, as
                                               applicable; (2) state in the heading the                 Secretary.                                            the Commission, in Docket No. IC17–
                                               name of the applicant and the project                    [FR Doc. 2017–27728 Filed 12–22–17; 8:45 am]          15–000 by either of the following
                                               number of the application to which the                   BILLING CODE 6717–01–P                                methods:
                                               filing responds; (3) state the name,                                                                              • eFiling at Commission’s website:
                                               address, and telephone number of the                                                                           http://www.ferc.gov/docs-filing/
                                               person filing; and (4) otherwise comply                  DEPARTMENT OF ENERGY                                  efiling.asp.
                                               with the requirements of sections                                                                                 • Mail/Hand Delivery/Courier:
                                                                                                        Federal Energy Regulatory
                                               385.2001 through 385.2005 of the                                                                               Federal Energy Regulatory Commission,
                                                                                                        Commission
                                               Commission’s regulations.1 All                                                                                 Secretary of the Commission, 888 First
                                               comments contesting Commission staff’s                   [Docket No. IC17–15–000]                              Street NE, Washington, DC 20426.
                                               preliminary determination that the                                                                                Instructions: All submissions must be
                                               facility meets the qualifying criteria                   Commission Information Collection                     formatted and filed in accordance with
                                               must set forth their evidentiary basis.                  Activities (FERC–505 and FERC–512);                   submission guidelines at: http://
                                                  The Commission strongly encourages                    Consolidated Comment Request;                         www.ferc.gov/help/submission-
                                               electronic filing. Please file motions to                Extension                                             guide.asp. For user assistance contact
                                               intervene and comments using the                         AGENCY:  Federal Energy Regulatory                    FERC Online Support by email at
ethrower on DSK3G9T082PROD with NOTICES




                                               Commission’s eFiling system at http://                   Commission.                                           ferconlinesupport@ferc.gov, or by phone
                                               www.ferc.gov/docs-filing/efiling.asp.                    ACTION: Comment request.
                                                                                                                                                              at: (866) 208–3676 (toll-free), or (202)
                                               Commenters can submit brief comments                                                                           502–8659 for TTY.
                                               up to 6,000 characters, without prior                    SUMMARY: In compliance with the                          Docket: Users interested in receiving
                                               registration, using the eComment system                  requirements of the Paperwork                         automatic notification of activity in this
                                                                                                        Reduction Act of 1995, the Federal                    docket or in viewing/downloading
                                                 1 18   CFR 385.2001–2005 (2017).                       Energy Regulatory Commission                          comments and issuances in this docket


                                          VerDate Sep<11>2014    20:21 Dec 22, 2017   Jkt 244001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:\FR\FM\26DEN1.SGM   26DEN1


                                                                           Federal Register / Vol. 82, No. 246 / Tuesday, December 26, 2017 / Notices                                                        60979

                                               may do so at http://www.ferc.gov/docs-                   and clarity of the information                            than two additional years without
                                               filing/docs-filing.asp.                                  collections; and (4) ways to minimize                     requiring the permittee to apply for a
                                               FOR FURTHER INFORMATION CONTACT:                         the burden of the collections of                          successive preliminary permit. The
                                               Ellen Brown may be reached by email                      information on those who are to                           Hydropower Efficiency Act also
                                               at DataClearance@FERC.gov, telephone                     respond, including the use of automated                   expanded the number of projects that
                                               at (202) 502–8663, and fax at (202) 273–                 collection techniques or other forms of                   may qualify for exemptions from certain
                                               0873.                                                    information technology.                                   licensing requirements under the FPA
                                               SUPPLEMENTARY INFORMATION:                                  Title: FERC–505, Small Hydropower                      (i.e., small conduit hydroelectric
                                                  Type of Request: Three-year approval                  Projects and Conduit Facilities                           facilities or small hydroelectric power
                                               of the FERC–505 and FERC–512                             including License/Relicense,                              projects), and allowed other projects to
                                               information collection requirements                      Exemption, and Qualifying Conduit                         qualify to operate without Commission
                                               with no changes to the current reporting                 Facility Determination.                                   oversight (i.e., qualifying conduit
                                               requirements. Please note that each                         OMB Control No.: 1902–0115.                            hydropower facilities). While the
                                               collection is distinct from the next.                       Abstract: The Hydropower Efficiency                    Commission-approved revised
                                                  Comments: Comments are invited on:                    Act amended statutory provisions                          regulations formally implement the
                                               (1) Whether the collections of                           pertaining to preliminary permits and to                  Hydropower Efficiency Act, the
                                               information are necessary for the proper                 projects that are exempt from certain                     Commission has complied with the Act
                                               performance of the functions of the                      licensing requirements under the                          since its enactment.
                                               Commission, including whether the                        Federal Power Act (FPA) in order to                          Type of Respondents: Businesses or
                                               information will have practical utility;                 reduce cost and regulatory burden, and                    other for-profit and not-for-profit
                                               (2) the accuracy of the agency’s estimate                in turn, promote hydropower                               institutions.
                                               of the burden and cost of the collections                development. Specifically, the                               Estimate of Annual Burden: The
                                               of information, including the validity of                Hydropower Efficiency Act gave the                        Commission estimates the annual public
                                               the methodology and assumptions used;                    Commission authority to extend a                          reporting burden for the information
                                               (3) ways to enhance the quality, utility                 preliminary permit once for not more                      collection as:

                                                FERC–505 (SMALL HYDROPOWER PROJECTS AND CONDUIT FACILITIES INCLUDING LICENSE/RELICENSE, EXEMPTION, AND
                                                                            QUALIFYING CONDUIT FACILITY DETERMINATION)
                                                                                                       Annual                 Total                                                                      Cost per
                                                                                Number of             number of                              Average burden and            Total annual burden
                                                                                                                           number of                                                                    respondent
                                                                               respondents         responses per                              cost per response            and total annual cost
                                                                                                                           responses                                                                        ($)
                                                                                                     respondent

                                                                                      (1)                (2)           (1) * (2) = (3)                 (4)                     (3) * (4) = (5)            (5) ÷ (1)

                                               FERC–505 ....................                16                    1                   16   273 hrs.; $20,884.50 ...       4,368 hrs.; $334,152 ...          20,884.50



                                                 Title: FERC–512, Preliminary Permit.                   a license for a hydropower facility while                   Type of Respondent: Businesses or
                                                 OMB Control No.: 1902–0073.                            the applicant conducts surveys to                         other for-profit and not-for-profit
                                                 Abstract: The information collected                    prepare maps, plans, specifications and                   institutions.
                                               under the requirements of FERC–512, is                   estimates; conducts engineering,                            Estimate of Annual Burden: 1 The
                                               used by the Commission to implement                      economic and environmental feasibility                    Commission estimates the annual public
                                               the statutory provisions of the Federal                  studies; and made financial
                                                                                                                                                                  reporting burden for the information
                                               Power Act (FPA) 16 U.S.C. The purpose                    arrangements. The conditions under
                                                                                                                                                                  collection as:
                                               of obtaining a preliminary permit is to                  which the priority will be maintained
                                               maintain priority of the application for                 are set forth in each permit.

                                                                                                          FERC–512 (PRELIMINARY PERMIT)
                                                                                                       Annual                 Total                                                                      Cost per
                                                                                Number of             number of                             Average burden & cost         Total annual burden &
                                                                                                                           number of                                                                    respondent
                                                                               respondents         responses per                                per response                total annual cost
                                                                                                                           responses                                                                        ($)
                                                                                                     respondent

                                                                                      (1)                (2)           (1) * (2) = (3)                 (4)                     (3) * (4) = (5)            (5) ÷ (1)

                                               FERC–512 ....................                50                    1                   50   24 hrs.; $1,836 ............   1,200 hrs.; $91,800 .....              1,836



                                                 Comments: Comments are invited on:                     Commission, including whether the                         of information, including the validity of
                                               (1) Whether the collection of                            information will have practical utility;                  the methodology and assumptions used;
ethrower on DSK3G9T082PROD with NOTICES




                                               information is necessary for the proper                  (2) the accuracy of the agency’s estimate                 (3) ways to enhance the quality, utility
                                               performance of the functions of the                      of the burden and cost of the collection                  and clarity of the information collection;

                                                 1 Burden is the total time, effort, or financial       burden, refer to 5 Code of Federal Regulations            average wage figure. FERC’s 2017 average annual
                                               resources expended by persons to generate,               1320.3.                                                   salary plus benefits per FTE (full-time equivalent)
                                               maintain, retain, or disclose or provide information       2 Subject matter experts found that industry            is $158,754 (or $76.50 per hour).
                                               to or for a Federal agency. For further explanation
                                                                                                        employment costs closely resemble FERC’s wage
                                               of what is included in the information collection



                                          VerDate Sep<11>2014    20:21 Dec 22, 2017   Jkt 244001   PO 00000    Frm 00032   Fmt 4703    Sfmt 4703   E:\FR\FM\26DEN1.SGM     26DEN1


                                               60980                      Federal Register / Vol. 82, No. 246 / Tuesday, December 26, 2017 / Notices

                                               and (4) ways to minimize the burden of                  at (202) 502–8663, and fax at (202) 273–               November 4, 2014, in Docket No. RD14–
                                               the collection of information on those                  0873.                                                  13, the Commission approved revised
                                               who are to respond, including the use                   SUPPLEMENTARY INFORMATION:                             Reliability Standard NUC–001–3.6
                                               of automated collection techniques or                      Title: FERC 725F, Mandatory                            The purpose of Reliability Standard
                                               other forms of information technology.                  Reliability Standard for Nuclear Plant                 NUC–001–3 is to require ‘‘coordination
                                                 Dated: December 18, 2017.                             Interface Coordination.                                between nuclear plant generator
                                                                                                          OMB Control No.: 1902–0249.                         operators and transmission entities for
                                               Kimberly D. Bose,
                                                                                                          Type of Request: Three-year extension               the purpose of ensuring nuclear plant
                                               Secretary.                                              of the FERC–725F information                           safe operation and shutdown.’’ 7 The
                                               [FR Doc. 2017–27736 Filed 12–22–17; 8:45 am]            collection requirements with no changes                Nuclear Reliability Standard applies to
                                               BILLING CODE 6717–01–P                                  to the current reporting requirements.                 nuclear plant generator operators
                                                                                                          Abstract: The Commission requires                   (generally nuclear power plant owners
                                                                                                       the information collected by the FERC–                 and operators, including licensees) and
                                               DEPARTMENT OF ENERGY                                    725F to implement the statutory                        ‘‘transmission entities,’’ defined in the
                                                                                                       provisions of section 215 of the Federal               Reliability Standard as including a
                                               Federal Energy Regulatory                               Power Act (FPA) (16 U.S.C. 824o). On                   nuclear plant’s suppliers of off-site
                                               Commission                                              August 8, 2005, the Electricity                        power and related transmission and
                                               [Docket No. IC18–3–000]                                 Modernization Act of 2005, which is                    distribution services. To account for the
                                                                                                       Title XII, Subtitle A, of the Energy                   variations in nuclear plant design and
                                               Commission Information Collection                       Policy Act of 2005 (EPAct 2005), was                   grid interconnection characteristics, the
                                               Activities (FERC–725F); Comment                         enacted into law.1 EPAct 2005 added a                  Reliability Standard defines
                                               Request; Extension                                      new section 215 to the FPA, which                      transmission entities as ‘‘all entities that
                                                                                                       required a Commission-certified Electric               are responsible for providing services
                                               AGENCY: Federal Energy Regulatory                       Reliability Organization (ERO) to                      related to Nuclear Plant Interface
                                               Commission.                                             develop mandatory and enforceable                      Requirements (NPIRs),’’ and lists eleven
                                               ACTION: Notice of information collection                Reliability Standards, which are subject               types of functional entities (heretofore
                                               and request for comments.                               to Commission review and approval.                     described as ‘‘transmission entities’’)
                                                                                                       Once approved, the Reliability                         that could provide services related to
                                               SUMMARY:  In compliance with the                        Standards may be enforced by the ERO                   NPIRs.8
                                               requirements of the Paperwork                           subject to Commission oversight, or the                   FERC–725F information collection
                                               Reduction Act of 1995, the Federal                      Commission can independently enforce                   requirements include establishing and
                                               Energy Regulatory Commission                            Reliability Standards.2                                maintaining interface agreements,
                                               (Commission or FERC) is soliciting                         On February 3, 2006, the Commission                 including record retention
                                               public comment on the currently                         issued Order No. 672, implementing                     requirements. These agreements are not
                                               approved information collection, FERC                   section 215 of the FPA.3 Pursuant to                   filed with FERC, but with the
                                               725F (Mandatory Reliability Standard                    Order No. 672, the Commission certified                appropriate entities as established by
                                               for Nuclear Plant Interface                             one organization, North American                       the Reliability Standard.
                                               Coordination).                                          Electric Reliability Corporation (NERC),                  Type of Respondent: Nuclear
                                               DATES:  Comments on the collection of                   as the ERO. The Reliability Standards                  operators, nuclear plants, transmission
                                               information are due February 26, 2018.                  developed by the ERO and approved by                   entities.
                                                                                                       the Commission apply to users, owners                     Estimate of Annual Burden: 9 The
                                               ADDRESSES: You may submit comments                      and operators of the Bulk-Power System                 Commission estimates the average
                                               (identified by Docket No. IC18–3–000)                   as set forth in each Reliability Standard.             annual burden and cost 10 for this
                                               by either of the following methods:                        On November 19, 2007, NERC filed its                information collection as follows.
                                                  • eFiling at Commission’s website:                   petition for Commission approval of the
                                               http://www.ferc.gov/docs-filing/                        Nuclear Plant Interface Coordination                   Reliability Standard was approved, the Commission
                                               efiling.asp.                                            Reliability Standard, designated NUC–                  did not go to OMB for approval. It is assumed that
                                                  • Mail/Hand Delivery/Courier:                        001–1. In Order No. 716, issued October                the changes made did not substantively affect the
                                               Federal Energy Regulatory Commission,                                                                          information collection and therefore a formal
                                                                                                       16, 2008, the Commission approved the                  submission to OMB was not needed. The most
                                               Secretary of the Commission, 888 First                  standard while also directing certain                  recent OMB approval for FERC–725F was issued on
                                               Street NE, Washington, DC 20426.                        revisions.4 Revised Reliability Standard,              6/15/2015.
                                                  Instructions: All submissions must be                NUC–001–2, was filed with the                             6 The Letter Order is posted at https://

                                               formatted and filed in accordance with                                                                         elibrary.ferc.gov/idmws/common/OpenNat.asp?
                                                                                                       Commission by NERC in August 2009                      fileID=13675845.
                                               submission guidelines at: http://                       and subsequently approved by the                          7 See Reliability Standard NUC–001–2 at http://
                                               www.ferc.gov/help/submission-                           Commission January 21, 2010.5 On                       www.nerc.com/files/NUC-001-3.pdf.
                                               guide.asp. For user assistance, contact                                                                           8 The list of functional entities consists of

                                               FERC Online Support by email at                           1 Energy Policy Act of 2005, Public Law 109–58,      transmission operators, transmission owners,
                                               ferconlinesupport@ferc.gov, or by phone                 Title XII, Subtitle A, 119 Stat. 594, 941 (2005), 16   transmission planners, transmission service
                                                                                                       U.S.C. 824o.                                           providers, balancing authorities, reliability
                                               at: (866) 208–3676 (toll-free), or (202)                  2 16 U.S.C. 824o(e)(3).                              coordinators, planning authorities, distribution
                                               502–8659 for TTY.                                         3 Rules Concerning Certification of the Electric     providers, load-serving entities, generator owners
                                                  Docket: Users interested in receiving                Reliability Organization; and Procedures for the       and generator operators.
                                               automatic notification of activity in this              Establishment, Approval, and Enforcement of               9 Burden is defined as the total time, effort, or
ethrower on DSK3G9T082PROD with NOTICES




                                               docket or in viewing/downloading                        Electric Reliability Standards, Order No. 672, FERC    financial resources expended by persons to
                                                                                                       Stats. & Regs. ¶ 31,204, order on reh’g, Order No.     generate, maintain, retain, or disclose or provide
                                               comments and issuances in this docket                   672–A, FERC Stats. & Regs. ¶ 31,212 (2006).            information to or for a Federal agency. Refer to 5
                                               may do so at http://www.ferc.gov/docs-                    4 Mandatory Reliability Standard for Nuclear         CFR 1320.3 for additional information.
                                               filing/docs-filing.asp.                                 Plant Interface Coordination, Order No. 716, 125          10 The wage and benefit figures are based on the

                                                                                                       FERC ¶ 61,065, at P 189 & n.90 (2008), order on        Bureau of Labor Statistics (BLS) data (at https://
                                               FOR FURTHER INFORMATION CONTACT:                        reh’g, Order No. 716–A, 126 FERC ¶ 61,122 (2009).      www.bls.gov/oes/current/naics2_22.htm) for May
                                               Ellen Brown may be reached by email                       5 North American Electric Reliability Corporation,   2016 for Sector 22, Utilities. (The benefits figure is
                                               at DataClearance@FERC.gov, telephone                    130 FERC ¶ 61,051 (2010). When the revised             based on BLS data as of September 8, 2017, which



                                          VerDate Sep<11>2014   20:21 Dec 22, 2017   Jkt 244001   PO 00000   Frm 00033   Fmt 4703   Sfmt 4703   E:\FR\FM\26DEN1.SGM   26DEN1



Document Created: 2017-12-23 03:09:00
Document Modified: 2017-12-23 03:09:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionComment request.
DatesComments on the collections of information are due January 25, 2018.