[Federal Register Volume 82, Number 12 (Thursday, January 19, 2017)]
[Notices]
[Pages 6495-6496]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-01136]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP15-499-001; CP15-499-000]


Texas Eastern Transmission, LP; Notice of Amendment to 
Application

    Take notice that on December 30, 2016, Texas Eastern Transmission, 
LP (Texas Eastern), 5400 Westheimer Court, Houston, Texas 77056, filed 
an amendment to its application in Docket No. CP15-499-000, pursuant to 
section 7(c) of the Natural Gas Act (NGA) and Part 157 of the 
Commission's regulations for its proposed South Texas Expansion Project 
(Project). Specifically, Texas Eastern requests, in addition to the 
authorizations requested in the previous application, authorization to 
(i) construct, install, own, operate, and maintain new gas release 
measurement equipment and associated enclosures at its existing Vidor 
and Mont Belvieu Compressor Stations in Orange and Chambers Counties, 
Texas, respectively, and at its proposed Petronila Compressor Station 
in Nueces County, Texas, new gas coolers at its existing Blessing 
Compressor Station in Matagorda County, Texas, and a new tie-in to 
Pomelo Connector at Texas Eastern's proposed Petronila Compressor 
Station; (ii) acquire, by lease, 400,000 dekatherms per day (Dth/d) of 
capacity on Pomelo Connector, LLC's proposed pipeline; (iii) change the 
Project's targeted in-service date from May 1, 2017 to October 1, 2018; 
(iv) change the Project's capacity from 400,000 Dth/d to 396,000 Dth/d; 
and (v) remove from the Project's scope the meter and regulating 
station at the proposed Petronila Compressor Station. Texas Eastern 
further proposes to amend its incremental project recourse rate and to 
modify its Exhibit K, all as more fully set forth in the application 
which is on file with the Commission and open to public inspection. The 
filing may be viewed on the web at http://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC at [email protected] or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
    Any questions concerning these applications may be directed to Berk 
Donaldson, General Manager, Rates & Certificates, Texas Eastern 
Transmission, LP, P.O. Box 1642, Houston, Texas 77251-1642, by 
telephone at (713) 627-4488, or by fax at (713) 627-5947.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental analysis (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule will serve to notify federal and state agencies of the timing 
for the completion of all necessary reviews, and the subsequent need to 
complete all federal authorizations within 90 days of the date of 
issuance of the Commission staff's EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 5 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 7 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.

[[Page 6496]]

    Comment Date: 5:00 p.m. Eastern Time on February 2, 2017.

    Dated: January 12, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-01136 Filed 1-18-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 82, No. 12 / Thursday, January 19, 2017 / Notices                                            6495

                                                     Applicants: Equitrans, L.P.                          Blessing Compressor Station in                         First Street NE., Washington, DC 20426,
                                                     Description: § 4(d) Rate Filing: Right               Matagorda County, Texas, and a new                     a motion to intervene in accordance
                                                  of First Refusal Update to be effective                 tie-in to Pomelo Connector at Texas                    with the requirements of the
                                                  2/11/2017.                                              Eastern’s proposed Petronila                           Commission’s Rules of Practice and
                                                     Filed Date: 1/11/17.                                 Compressor Station; (ii) acquire, by                   Procedure (18 CFR 385.214 or 385.211)
                                                     Accession Number: 20170111–5019.                     lease, 400,000 dekatherms per day (Dth/                and the Regulations under the NGA (18
                                                     Comments Due: 5 p.m. ET 1/23/17.                     d) of capacity on Pomelo Connector,                    CFR 157.10). A person obtaining party
                                                     The filings are accessible in the                    LLC’s proposed pipeline; (iii) change                  status will be placed on the service list
                                                  Commission’s eLibrary system by                         the Project’s targeted in-service date                 maintained by the Secretary of the
                                                  clicking on the links or querying the                   from May 1, 2017 to October 1, 2018;                   Commission and will receive copies of
                                                  docket number.                                          (iv) change the Project’s capacity from                all documents filed by the applicant and
                                                     Any person desiring to intervene or                  400,000 Dth/d to 396,000 Dth/d; and (v)                by all other parties. A party must submit
                                                  protest in any of the above proceedings                 remove from the Project’s scope the                    5 copies of filings made with the
                                                  must file in accordance with Rules 211                  meter and regulating station at the                    Commission and must mail a copy to
                                                  and 214 of the Commission’s                             proposed Petronila Compressor Station.                 the applicant and to every other party in
                                                  Regulations (18 CFR 385.211 and                         Texas Eastern further proposes to                      the proceeding. Only parties to the
                                                  385.214) on or before 5:00 p.m. Eastern                 amend its incremental project recourse                 proceeding can ask for court review of
                                                  time on the specified comment date.                     rate and to modify its Exhibit K, all as               Commission orders in the proceeding.
                                                  Protests may be considered, but                         more fully set forth in the application                   However, a person does not have to
                                                  intervention is necessary to become a                   which is on file with the Commission                   intervene in order to have comments
                                                  party to the proceeding.                                and open to public inspection. The                     considered. The second way to
                                                     eFiling is encouraged. More detailed                 filing may be viewed on the web at                     participate is by filing with the
                                                  information relating to filing                          http://www.ferc.gov using the                          Secretary of the Commission, as soon as
                                                  requirements, interventions, protests,                  ‘‘eLibrary’’ link. Enter the docket                    possible, an original and two copies of
                                                  service, and qualifying facilities filings              number excluding the last three digits in              comments in support of or in opposition
                                                                                                          the docket number field to access the                  to this project. The Commission will
                                                  can be found at: http://www.ferc.gov/
                                                                                                          document. For assistance, contact FERC                 consider these comments in
                                                  docs-filing/efiling/filing-req.pdf. For
                                                                                                          at FERCOnlineSupport@ferc.gov or call                  determining the appropriate action to be
                                                  other information, call (866) 208–3676
                                                                                                          toll-free, (886) 208–3676 or TYY, (202)                taken, but the filing of a comment alone
                                                  (toll free). For TTY, call (202) 502–8659.
                                                                                                          502–8659.                                              will not serve to make the filer a party
                                                    Dated: January 11, 2017.                                 Any questions concerning these                      to the proceeding. The Commission’s
                                                  Kimberly D. Bose,                                       applications may be directed to Berk                   rules require that persons filing
                                                  Secretary.                                              Donaldson, General Manager, Rates &                    comments in opposition to the project
                                                  [FR Doc. 2017–01132 Filed 1–18–17; 8:45 am]             Certificates, Texas Eastern                            provide copies of their protests only to
                                                  BILLING CODE 6717–01–P                                  Transmission, LP, P.O. Box 1642,                       the party or parties directly involved in
                                                                                                          Houston, Texas 77251–1642, by                          the protest.
                                                                                                          telephone at (713) 627–4488, or by fax                    Persons who wish to comment only
                                                  DEPARTMENT OF ENERGY                                    at (713) 627–5947.                                     on the environmental review of this
                                                                                                             Pursuant to section 157.9 of the                    project should submit an original and
                                                  Federal Energy Regulatory                               Commission’s rules, 18 CFR 157.9,                      two copies of their comments to the
                                                  Commission                                              within 90 days of this Notice the                      Secretary of the Commission.
                                                                                                          Commission staff will either: Complete                 Environmental commenters will be
                                                  [Docket Nos. CP15–499–001; CP15–499–
                                                  000]                                                    its environmental analysis (EA) and                    placed on the Commission’s
                                                                                                          place it into the Commission’s public                  environmental mailing list, will receive
                                                  Texas Eastern Transmission, LP;                         record (eLibrary) for this proceeding, or              copies of the environmental documents,
                                                  Notice of Amendment to Application                      issue a Notice of Schedule for                         and will be notified of meetings
                                                                                                          Environmental Review. If a Notice of                   associated with the Commission’s
                                                     Take notice that on December 30,                     Schedule for Environmental Review is                   environmental review process.
                                                  2016, Texas Eastern Transmission, LP                    issued, it will indicate, among other                  Environmental commenters will not be
                                                  (Texas Eastern), 5400 Westheimer Court,                 milestones, the anticipated date for the               required to serve copies of filed
                                                  Houston, Texas 77056, filed an                          Commission staff’s issuance of the EA                  documents on all other parties.
                                                  amendment to its application in Docket                  for this proposal. The filing of the EA                However, the non-party commenters
                                                  No. CP15–499–000, pursuant to section                   in the Commission’s public record for                  will not receive copies of all documents
                                                  7(c) of the Natural Gas Act (NGA) and                   this proceeding or the issuance of a                   filed by other parties or issued by the
                                                  Part 157 of the Commission’s                            Notice of Schedule will serve to notify                Commission (except for the mailing of
                                                  regulations for its proposed South Texas                federal and state agencies of the timing               environmental documents issued by the
                                                  Expansion Project (Project). Specifically,              for the completion of all necessary                    Commission) and will not have the right
                                                  Texas Eastern requests, in addition to                  reviews, and the subsequent need to                    to seek court review of the
                                                  the authorizations requested in the                     complete all federal authorizations                    Commission’s final order.
                                                  previous application, authorization to (i)              within 90 days of the date of issuance                    The Commission strongly encourages
                                                  construct, install, own, operate, and                   of the Commission staff’s EA.                          electronic filings of comments, protests
                                                  maintain new gas release measurement                       There are two ways to become                        and interventions in lieu of paper using
mstockstill on DSK3G9T082PROD with NOTICES




                                                  equipment and associated enclosures at                  involved in the Commission’s review of                 the ‘‘eFiling’’ link at http://
                                                  its existing Vidor and Mont Belvieu                     this project. First, any person wishing to             www.ferc.gov. Persons unable to file
                                                  Compressor Stations in Orange and                       obtain legal status by becoming a party                electronically should submit an original
                                                  Chambers Counties, Texas, respectively,                 to the proceedings for this project                    and 7 copies of the protest or
                                                  and at its proposed Petronila                           should, on or before the comment date                  intervention to the Federal Energy
                                                  Compressor Station in Nueces County,                    stated below, file with the Federal                    Regulatory Commission, 888 First Street
                                                  Texas, new gas coolers at its existing                  Energy Regulatory Commission, 888                      NE., Washington, DC 20426.


                                             VerDate Sep<11>2014   21:20 Jan 18, 2017   Jkt 241001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\19JAN1.SGM   19JAN1


                                                  6496                         Federal Register / Vol. 82, No. 12 / Thursday, January 19, 2017 / Notices

                                                    Comment Date: 5:00 p.m. Eastern                       (866) 208–3676 (toll free). For TTY, call                 Accession Number: 20170112–5055.
                                                  Time on February 2, 2017.                               (202) 502–8659.                                           Comments Due: 5 p.m. ET 2/2/17.
                                                    Dated: January 12, 2017.                                Comment Date: 5:00 p.m. Eastern                         Docket Number: ER17–784–000.
                                                  Kimberly D. Bose,
                                                                                                          Time on February 2, 2017.                                 Applicants: PJM Interconnection,
                                                  Secretary.                                                Dated: January 12, 2017.                             L.L.C.
                                                                                                          Kimberly D. Bose,                                         Description: § 205(d) Rate Filing:
                                                  [FR Doc. 2017–01136 Filed 1–18–17; 8:45 am]
                                                                                                          Secretary.
                                                                                                                                                                 Queue Position AB2–010/AB2–011,
                                                  BILLING CODE 6717–01–P
                                                                                                                                                                 Original Service Agreement No. 4601 to
                                                                                                          [FR Doc. 2017–01137 Filed 1–18–17; 8:45 am]
                                                                                                                                                                 be effective 12/13/2016.
                                                                                                          BILLING CODE 6717–01–P
                                                                                                                                                                    Filed Date: 1/12/17.
                                                  DEPARTMENT OF ENERGY                                                                                              Accession Number: 20170112–5120.
                                                  Federal Energy Regulatory                                                                                         Comments Due: 5 p.m. ET 2/2/17.
                                                                                                          DEPARTMENT OF ENERGY
                                                  Commission                                                                                                        Docket Number: ER17–785–000.
                                                                                                          Federal Energy Regulatory                                 Applicants: Southern California
                                                  [Docket No. EL16–17–000; EL16–18–000]                   Commission                                             Edison Company.
                                                                                                                                                                    Description: § 205(d) Rate Filing:
                                                  City of West Memphis, Arkansas;                         Combined Notice of Filings #1                          Amended LGIA AltaGas Sonoran Energy
                                                  Conway Corporation; Notice of Filing                                                                           Inc. to be effective 3/14/2017.
                                                                                                             Take notice that the Commission                        Filed Date: 1/12/17.
                                                     Take notice that on January 12, 2016,                received the following electric rate
                                                  Midcontinent Independent System                                                                                   Accession Number: 20170112–5143.
                                                                                                          filings:                                                  Comments Due: 5 p.m. ET 2/2/17.
                                                  Operator, Inc. submitted tariff filing per:
                                                                                                             Docket Number: ER17–405–000,                           The filings are accessible in the
                                                  Refund Report to be effective N/A,
                                                                                                          ER17–406–000.                                          Commission’s eLibrary system by
                                                  pursuant to the Federal Energy
                                                                                                             Applicants: American Electric Power                 clicking on the links or querying the
                                                  Regulatory Commission’s (Commission)
                                                                                                          Service Corporation, PJM                               docket number.
                                                  Order issued on October 4, 2016.1
                                                                                                          Interconnection, L.L.C.                                   Any person desiring to intervene or
                                                     Any person desiring to intervene or to
                                                                                                             Description: Supplement to November                 protest in any of the above proceedings
                                                  protest this filing must file in
                                                                                                          22 PJM Interconnection, L.L.C. rate                    must file in accordance with Rules 211
                                                  accordance with Rules 211 and 214 of
                                                                                                          filing.                                                and 214 of the Commission’s
                                                  the Commission’s Rules of Practice and
                                                                                                             Filed Date: 1/9/17.                                 Regulations (18 CFR 385.211 and
                                                  Procedure (18 CFR 385.211, 385.214).
                                                                                                             Accession Number: 20170109–5351.                    385.214) on or before 5:00 p.m. Eastern
                                                  Protests will be considered by the                         Comments Due: 5 p.m. ET 1/30/17.
                                                  Commission in determining the                                                                                  time on the specified comment date.
                                                  appropriate action to be taken, but will                   Docket Number: ER17–779–000.                        Protests may be considered, but
                                                  not serve to make protestants parties to                   Applicants: California Independent                  intervention is necessary to become a
                                                  the proceeding. Any person wishing to                   System Operator Corporation.                           party to the proceeding.
                                                  become a party must file a notice of                       Description: Compliance filing: 2017–                  eFiling is encouraged. More detailed
                                                  intervention or motion to intervene, as                 01–11 Petition for Limited Waiver of                   information relating to filing
                                                  appropriate. Such notices, motions, or                  RAAIM Advisory Period to be effective                  requirements, interventions, protests,
                                                  protests must be filed on or before the                 N/A.                                                   service, and qualifying facilities filings
                                                  comment date. On or before the                             Filed Date: 1/11/17.                                can be found at: http://www.ferc.gov/
                                                                                                             Accession Number: 20170111–5148.                    docs-filing/efiling/filing-req.pdf. For
                                                  comment date, it is not necessary to
                                                                                                             Comments Due: 5 p.m. ET 1/23/17.                    other information, call (866) 208–3676
                                                  serve motions to intervene or protests
                                                  on persons other than the Applicant.                       Docket Number: ER17–781–000.                        (toll free). For TTY, call (202) 502–8659.
                                                     The Commission encourages                               Applicants: NorthWestern                              Dated: January 12, 2017.
                                                  electronic submission of protests and                   Corporation.
                                                                                                                                                                 Kimberly D. Bose,
                                                  interventions in lieu of paper using the                   Description: Notice of Cancellation of
                                                                                                                                                                 Secretary.
                                                  ‘‘eFiling’’ link at http://www.ferc.gov.                Multiple Inactive Service Agreements
                                                                                                          and Rate Schedules of NorthWestern                     [FR Doc. 2017–01135 Filed 1–18–17; 8:45 am]
                                                  Persons unable to file electronically
                                                  should submit an original and 5 copies                  Corporation.                                           BILLING CODE 6717–01–P

                                                  of the protest or intervention to the                      Filed Date: 1/11/17.
                                                  Federal Energy Regulatory Commission,                      Accession Number: 20170111–5169.
                                                                                                             Comments Due: 5 p.m. ET 2/1/17.                     DEPARTMENT OF ENERGY
                                                  888 First Street NE., Washington, DC
                                                  20426.                                                     Docket Number: ER17–782–000.                        Federal Energy Regulatory
                                                     This filing is accessible on-line at                    Applicants: New York Independent                    Commission
                                                  http://www.ferc.gov, using the                          System Operator, Inc.
                                                                                                             Description: Order No. 825                          [Docket No. EL17–34–000]
                                                  ‘‘eLibrary’’ link and is available for
                                                  review in the Commission’s Public                       Compliance Filing of New York
                                                                                                          Independent System Operator, Inc.                      Alcoa Corporation; Notice of Petition
                                                  Reference Room in Washington, DC.                                                                              for Declaratory Order
                                                  There is an ‘‘eSubscription’’ link on the                  Filed Date: 1/11/17.
                                                  Web site that enables subscribers to                       Accession Number: 20170111–5173.                      Take notice that on December 22,
                                                                                                             Comments Due: 5 p.m. ET 2/1/17.                     2016, pursuant to section 385.207(a)(4)
mstockstill on DSK3G9T082PROD with NOTICES




                                                  receive email notification when a
                                                  document is added to a subscribed                          Docket Number: ER17–783–000.                        of the Federal Energy Regulatory
                                                  docket(s). For assistance with any FERC                    Applicants: Wabash Valley Power                     Commission’s (Commission) Rules of
                                                  Online service, please email                            Association, Inc.                                      Practice and Procedure, 18 CFR
                                                  FERCOnlineSupport@ferc.gov, or call                        Description: § 205(d) Rate Filing:                  385.207(a) (2016), and sections
                                                                                                          Revisions to Formulary Rate Tariff to be               366(b)(1), 366.3(d), and 366.4(b)(3) of
                                                    1 City of West Memphis, Arkansas and Conway           effective 3/12/2017.                                   Commission’s regulations under the
                                                  Corporation, 157 FERC ¶ 61,005 (2016).                     Filed Date: 1/12/17.                                Public Utility Holding Company Act of


                                             VerDate Sep<11>2014   21:20 Jan 18, 2017   Jkt 241001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\19JAN1.SGM   19JAN1



Document Created: 2018-02-01 15:15:20
Document Modified: 2018-02-01 15:15:20
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on February 2, 2017.
FR Citation82 FR 6495 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR