82 FR 7913 - Environmental Impact Statement-Transmission System Vegetation Management Program

TENNESSEE VALLEY AUTHORITY

Federal Register Volume 82, Issue 13 (January 23, 2017)

Page Range7913-7915
FR Document2017-01448

The Tennessee Valley Authority (``TVA'') intends to prepare an Environmental Impact Statement (``EIS'') to address the management of vegetation on its transmission system. In order to ensure that electric service to the public is not disrupted by outages on its transmission lines, TVA must control the vegetation on about 260,000 acres of the rights of way (``ROW'') for those lines. This EIS will programmatically consider the impacts of vegetation management activities on approximately 17,000 miles of transmission line.

Federal Register, Volume 82 Issue 13 (Monday, January 23, 2017)
[Federal Register Volume 82, Number 13 (Monday, January 23, 2017)]
[Notices]
[Pages 7913-7915]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-01448]


=======================================================================
-----------------------------------------------------------------------

TENNESSEE VALLEY AUTHORITY


Environmental Impact Statement--Transmission System Vegetation 
Management Program

AGENCY: Tennessee Valley Authority.

ACTION: Notice of intent.

-----------------------------------------------------------------------

SUMMARY: The Tennessee Valley Authority (``TVA'') intends to prepare an 
Environmental Impact Statement (``EIS'') to address the management of 
vegetation on its transmission system. In order to ensure that electric 
service to the public is not disrupted by outages on its transmission 
lines, TVA must control the vegetation on about 260,000 acres of the 
rights of way (``ROW'') for those lines. This EIS will programmatically 
consider the impacts of vegetation management activities on 
approximately 17,000 miles of transmission line.

DATES: Comments on the scope of the EIS must be received on or before 
March 20, 2017.

ADDRESSES: Written comments on the scope of the EIS should be sent to 
Anita E. Masters, Tennessee Valley Authority, 1101 Market Street, BR 
4A, Chattanooga, Tennessee 37402. Comments also may be submitted online 
at tva.com/nepa or by email to [email protected].

FOR FURTHER INFORMATION CONTACT: For further nepa information, contact 
Anita Masters, 1101 Market Street BR 4A, Chattanooga, TN 37402, 
[email protected]. For information on current row maintenance 
practices, see TVA's Transmission Web page (https://www.tva.gov/Energy/Transmission-System/Right-of-Way-Maintenance).

SUPPLEMENTARY INFORMATION: This notice is provided in accordance with 
the regulations promulgated by the Council on Environmental Quality (40 
CFR parts 1500 to 1508) and TVA's procedures implementing the National 
Environmental Policy Act (NEPA) (https://www.tva.com/Environment/Environmental-Stewardship/Environmental-Reviews/NEPA-at-TVA.)

TVA Power System and ROW Maintenance

    TVA is a federal agency and instrumentality of the United States 
created by and existing pursuant to the TVA Act of 1933. Its broad 
mission is to foster the social and economic welfare of the people of 
the Tennessee Valley region and to promote the proper use and 
conservation of the region's natural resources. One component of this 
mission is the generation, transmission, and sale of reliable and 
affordable electric energy.
    TVA operates the nation's largest public power system, producing 
approximately four percent of all of the electricity in the nation. TVA 
provides electricity to most of Tennessee and parts of Virginia, North 
Carolina, Georgia, Alabama, Mississippi, and Kentucky. Currently, it 
serves more than nine million people in this seven-state region. The 
TVA Act requires the TVA power system to be self-supporting and 
operated on a nonprofit basis and directs TVA to sell electricity at 
rates as low as are feasible. TVA receives no taxpayer funding, 
deriving virtually all of its revenues from sales of electricity.
    Most of the electricity is generated on the TVA system from 3 
nuclear plants, 8 coal-fired plants, 9 simple-cycle combustion turbine 
plants, 7 combined-cycle combustion turbine plants, 29 hydroelectric 
dams, a pumped-storage facility, a methane-gas cofiring facility, a 
diesel-fired facility, non-TVA owned facilities under power purchase 
agreements, and various small solar photovoltaic facilities. The 
electricity generated by these resources is transmitted along high-
voltage transmission lines to TVA business customers and local power 
companies. The local power companies then distribute the electricity to 
end users such as residents, business owners, and public entities like 
school systems and hospitals. Distribution lines are owned and operated 
by local power companies and are the power lines typically seen along 
streets in neighborhoods.
    TVA transmission lines are high-voltage (46-kilovolts or more, with 
161-kilovolt most common) and typically have three conductors (wires) 
suspended from large structures (towers or tall poles) in ROWs that are 
cleared of buildings and tall vegetation. In most cases, transmission 
line ROWs vary in width from about 75 feet to 200 feet, with the width 
increasing with the voltage of the line. Most of TVA's ROWs

[[Page 7914]]

are located on easements that TVA acquired from property owners who 
still can use easement areas in ways consistent with TVA's operation 
and maintenance of its transmission lines. These easements give TVA the 
legal right to manage vegetation within its ROWs as well as adjacent to 
the ROW if vegetation is tall enough to pass within ten feet of a 
conductor or strike a structure should it fall toward the transmission 
line.
    TVA manages its transmission system according to industry-wide 
standards established by the North American Electric Reliability 
Corporation (NERC). Those standards state that the TVA transmission 
system must be able to survive single-failure events while continuing 
to serve customer loads with adequate voltage and no overloaded 
facilities while maintaining adequate transmission line clearances as 
required by the National Electric Safety Code (NESC).
    In order to meet its goal of providing the public safe and reliable 
electricity, TVA must control the vegetation that would otherwise grow 
up on its ROWs. When trees or branches get too close to high-voltage 
transmission lines, electricity can arc through the air like a 
lightning bolt, seeking the nearest path to the ground, such as a tree. 
When this occurs, the electricity can cause a fault on the transmission 
line, severely damaging or destroying nearby property and structures 
(e.g., houses), and injuring nearby people. The cost and disruption to 
people's lives when this happens can be serious even if people are not 
injured from the arc or flash over itself. In August 2003, a single 
tree contacted a transmission line in Ohio and triggered cascading 
transmission line failures and blackouts from Ontario, Canada to the 
northeastern United States. Eleven people died as a result of these 
blackouts and the economic impact was estimated at $6 billion. As a 
result of the event, mandatory reliability standards were developed and 
implemented. These standards are monitored and enforced by NERC.
    TVA uses an integrated approach to vegetation management on its 
ROWs designed to encourage low-growing plant species and discourage 
tall-growing plant species. This includes the initial clearing of trees 
and other tall-growing vegetation from ROWs. Vegetation re-clearing 
along ROWs utilizes various management techniques including mechanical 
mowing (using tractor-mounted rotary mowers), tree removal by means of 
chain saws or other mechanized equipment, and non-restricted herbicides 
registered with the U.S. Environmental Protection Agency when 
appropriate. TVA's approach to vegetation management historically has 
taken into account whether the vegetation is in the ``wire zone,'' the 
area directly under the transmission line and between the outermost 
conductors, or the ``border zone,'' the areas between the wire zone and 
the edge of the ROW, as well as whether vegetation outside the ROW is 
tall enough to pass within ten feet of a conductor or strike a 
structure should it fall toward the transmission line.
    The purpose of this EIS is to examine at a programmatic level the 
potential environmental impacts of vegetation management practices 
along the approximately 17,000 miles of TVA's transmission line within 
its seven-state power service area and alternative management 
approaches.

EIS Scope

    Scoping is a process that allows the public to comment on an 
agency's plans for an EIS. This includes identifying issues that should 
be studied and those that have little significance. The public's views 
on alternative actions that meet the stated purpose of the EIS are also 
helpful in preparing an EIS.
    TVA anticipates evaluating several alternative management 
approaches, but these could change as the NEPA EIS process progresses. 
As required by applicable regulations, one of those alternative 
approaches is the No Action Alternative, or no change to TVA's current 
management practices. TVA has evaluated growth rates, climate, 
conductor sag and sway to design a cyclical, preemptive vegetation 
management program that is currently practiced on TVA's transmission 
line system. TVA's current management practices target existing 
incompatible vegetation within the ROW as well as vegetation that will 
become incompatible in the future. Under the No Action Alternative, 
TVA's ROW management personnel have discretion to manage the risk 
associated with vegetation growth that otherwise would be cleared. This 
approach allows TVA's ROW management personnel to allow exceptions to 
having the entire width of the ROW cleared by TVA. This approach is 
subject to the availability of financial resources. Any ``danger'' tree 
adjacent to the ROW is cleared by TVA. Danger trees include any trees 
located beyond the cleared ROW, but that are tall enough to pass within 
ten feet of a conductor or strike a structure should it fall toward the 
transmission line. TVA would continue to maintain its ROWs consistent 
with this approach, or any different approach that may be mandated 
during development of the EIS.
    A second alternative approach is utilizing integrated vegetation 
management (IVM) practices with a wire zone/border zone approach, where 
TVA sets objectives, identifies compatible and incompatible vegetation. 
TVA would then consider action thresholds and evaluate, select and 
implement the most appropriate methods to achieve the established short 
and long-term objectives. This vegetation control method is based on 
considerations of environmental impact and anticipated effectiveness, 
safety, reliability, economics, site topography and other factors. This 
approach would be subject to the availability of financial resources. 
Any ``danger'' trees adjacent to the ROW would be cleared by TVA.
    A third alternative approach to be considered is a border-to-border 
(BTB) approach in which TVA would remove all vegetation except the low-
growing vegetation for the width of the easement on TVA ROWs (includes 
both the wire and border zones as well as danger trees outside the 
ROWs). This approach would be subject to the availability of financial 
resources. TVA ROWs would take on the appearance and characteristics of 
natural meadows, as well as promote inflorescence by keeping woody stem 
counts low.
    A number of natural resource impacts would be evaluated in the EIS. 
These include potential impacts on air quality, surface water, 
groundwater, aquatic ecology, vegetation, wildlife, threatened and 
endangered species, wetlands, forest resources, and natural areas and 
parks. In addition, TVA would evaluate socioeconomic impacts and 
impacts on archaeological and historic resources and aesthetics 
(visual, noise, and odors). Potential impacts from siting lines in 
floodplains occur when new lines are constructed and are usually 
addressed in the environmental reviews done for those lines. 
Accordingly, TVA does not plan to address floodplain impacts in this 
programmatic EIS unless circumstances warrant.
    These analyses will be conducted at a programmatic, transmission 
system-wide level. For new transmission lines, TVA considers the 
potential effects of the initial ROW clearing and of continuing site-
specific vegetation management. For ongoing vegetation management of 
transmission lines already on the TVA system, TVA considers potential 
site-specific impacts in its NEPA reviews of transmission sector 
analyses, including impacts on identified sensitive areas. TVA divides 
its entire transmission system into discrete ``sectors'' and conducts

[[Page 7915]]

environmental analyses within specific sectors slated for vegetation 
maintenance each year. TVA anticipates that these sector area analyses 
would continue in the future, tiering off of the programmatic EIS when 
it is completed.

Public Participation

    The public is invited to submit comments on the scope of this EIS 
no later than the date identified in the ``Dates'' section of this 
notice. After TVA prepares a draft of the EIS, TVA will release it for 
public comment. TVA anticipates holding public meetings at various 
locations throughout TVA's seven-state service area after release of 
the draft EIS. Meeting details will be posted on TVA's Web site at 
tva.gov/nepa.

    Dated: January 13, 2017.
M. Susan Smelley,
Director, Environmental Permitting & Compliance.
[FR Doc. 2017-01448 Filed 1-19-17; 8:45 am]
 BILLING CODE 8120-08-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of intent.
DatesComments on the scope of the EIS must be received on or before March 20, 2017.
ContactFor further nepa information, contact Anita Masters, 1101 Market Street BR 4A, Chattanooga, TN 37402, [email protected] For information on current row maintenance practices, see TVA's Transmission Web page (https://www.tva.gov/Energy/ Transmission-System/Right-of-Way-Maintenance).
FR Citation82 FR 7913 