82_FR_8945 82 FR 8925 - Iron Horse Battery Storage, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization

82 FR 8925 - Iron Horse Battery Storage, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 20 (February 1, 2017)

Page Range8925-8925
FR Document2017-02086

Federal Register, Volume 82 Issue 20 (Wednesday, February 1, 2017)
[Federal Register Volume 82, Number 20 (Wednesday, February 1, 2017)]
[Notices]
[Page 8925]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-02086]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER17-848-000]


Iron Horse Battery Storage, LLC; Supplemental Notice That Initial 
Market-Based Rate Filing Includes Request for Blanket Section 204 
Authorization

    This is a supplemental notice in the above-referenced proceeding of 
Iron Horse Battery Storage, LLC's application for market-based rate 
authority, with an accompanying rate tariff, noting that such 
application includes a request for blanket authorization, under 18 CFR 
part 34, of future issuances of securities and assumptions of 
liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is February 15, 2017.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the Web site that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
[email protected]. or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: January 26, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-02086 Filed 1-31-17; 8:45 am]
BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 82, No. 20 / Wednesday, February 1, 2017 / Notices                                                  8925

                                                   4. If a ticking is to be substituted on                Please provide examples of how the                  of the Commission’s Rules of Practice
                                                a qualified mattress prototype, how are                 subordinate prototype provisions are                  and Procedure (18 CFR 385.211 and
                                                candidate tickings for a substitution                   implemented in production.                            385.214). Anyone filing a motion to
                                                selected? Other than ticking                              10. For purposes of the Open Flame                  intervene or protest must serve a copy
                                                classification, what factors or features                Standard, each factory location is                    of that document on the Applicant.
                                                are important when selecting a ticking                  considered a manufacturer. Prototype                     Notice is hereby given that the
                                                material? Please explain the benefits                   pooling is a cooperative arrangement—                 deadline for filing protests with regard
                                                and/or concerns related to structure                    whereby one or more manufacturers                     to the applicant’s request for blanket
                                                (e.g., knit, woven, nonwoven), fiber                    build mattress sets based on a qualified              authorization, under 18 CFR part 34, of
                                                content, or other factors that may affect               prototype produced by another                         future issuances of securities and
                                                the decision. Is effect on compliance                   manufacturer or prototype developer. A                assumptions of liability, is February 15,
                                                with the Open Flame Standard a                          manufacturer who relies on another                    2017.
                                                consideration in the selection process?                 manufacturer’s or prototype developer’s                  The Commission encourages
                                                   5. How do different ticking design                   qualified prototype must perform a                    electronic submission of protests and
                                                features, when used in combination                      confirmation test on the mattress set it              interventions in lieu of paper, using the
                                                with flat areas or non-designed sections,               manufactures. See 16 CFR 1633.5.                      FERC Online links at http://
                                                impact the placement of cigarettes                        What are some examples of how a                     www.ferc.gov. To facilitate electronic
                                                during the test (e.g., color patterns,                  prototype pooling arrangement may be                  service, persons with Internet access
                                                weave pattern features, heat-bonded                     accomplished? How frequently are                      who will eFile a document and/or be
                                                sections, quilted sections, 3–D designs,                confirmation tests performed, as                      listed as a contact for an intervenor
                                                etc.)?                                                  described in 16 CFR 1633.2(r)?                        must create and validate an
                                                                                                          11. What types of quality assurance                 eRegistration account using the
                                                B. The Open Flame Standard                              programs are in use? What controls,                   eRegistration link. Select the eFiling
                                                   Under the Open Flame Standard, a                     inspection procedures, and production                 link to log on and submit the
                                                prototype is tested and serves as a                     testing schemes are most effective?                   intervention or protests.
                                                model for production. The Open Flame                    When mattresses are produced by a                        Persons unable to file electronically
                                                Standard distinguishes between a                        secondary firm under contract for a                   should submit an original and 5 copies
                                                qualified prototype, confirmed                          primary firm (e.g., under private label)              of the intervention or protest to the
                                                prototype, and subordinate prototype.                   or are imported, what quality assurance               Federal Energy Regulatory Commission,
                                                CPSC staff is interested in learning                    controls are in place to ensure that the              888 First Street NE., Washington, DC
                                                about stakeholder experiences related to                mattresses that are produced are the                  20426.
                                                prototyping to meet the requirements of                 same as those used in the qualified and/                 The filings in the above-referenced
                                                the Open Flame Standard so that staff                   or confirmed prototype on which they                  proceeding are accessible in the
                                                can provide appropriate guidance on                     are based?                                            Commission’s eLibrary system by
                                                these topics.                                             Dated: January 26, 2017.                            clicking on the appropriate link in the
                                                   6. What are the materials, components                Todd A. Stevenson,                                    above list. They are also available for
                                                and, methods of assembly used to                        Secretary, Consumer Product Safety
                                                                                                                                                              electronic review in the Commission’s
                                                comply with the performance                             Commission.                                           Public Reference Room in Washington,
                                                requirements of the Open Flame                          [FR Doc. 2017–02058 Filed 1–31–17; 8:45 am]
                                                                                                                                                              DC. There is an eSubscription link on
                                                Standard?                                                                                                     the Web site that enables subscribers to
                                                                                                        BILLING CODE 6355–01–P
                                                   7. Does the fiber content, barrier type,                                                                   receive email notification when a
                                                material construction, and method of                                                                          document is added to a subscribed
                                                assembly impact the performance of a                                                                          docket(s). For assistance with any FERC
                                                                                                        DEPARTMENT OF ENERGY                                  Online service, please email
                                                mattress tested using the procedure in
                                                16 CFR 1633.7?                                          Federal Energy Regulatory                             FERCOnlineSupport@ferc.gov. or call
                                                   8. What conditions might influence a                 Commission                                            (866) 208–3676 (toll free). For TTY, call
                                                decision to include specific                                                                                  (202) 502–8659.
                                                technologies to comply with the Open                    [Docket No. ER17–848–000]
                                                                                                                                                                Dated: January 26, 2017.
                                                Flame Standard (e.g., inherently flame                                                                        Nathaniel J. Davis, Sr.,
                                                                                                        Iron Horse Battery Storage, LLC;
                                                resistant material, topically applied                                                                         Deputy Secretary.
                                                                                                        Supplemental Notice That Initial
                                                flame retardant chemical treatment, FR
                                                                                                        Market-Based Rate Filing Includes                     [FR Doc. 2017–02086 Filed 1–31–17; 8:45 am]
                                                thread, etc.)?
                                                                                                        Request for Blanket Section 204                       BILLING CODE 6717–01–P
                                                   9. A subordinate prototype is a                      Authorization
                                                mattress set that is based on a qualified
                                                or confirmed prototype and is the same                    This is a supplemental notice in the                DEPARTMENT OF ENERGY
                                                as the qualified or confirmed prototype,                above-referenced proceeding of Iron
                                                except with respect to length and/or                    Horse Battery Storage, LLC’s application              Federal Energy Regulatory
                                                width, not depth; ticking material,                     for market-based rate authority, with an              Commission
                                                unless the ticking of the qualified                     accompanying rate tariff, noting that
                                                prototype has characteristics designed                                                                        [Docket No. CP17–29–000]
                                                                                                        such application includes a request for
                                                to improve test performance; and/or any                 blanket authorization, under 18 CFR
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                              North Baja Pipeline, LLC; Notice of
                                                component, material, design or method                   part 34, of future issuances of securities            Application
                                                of assembly, so long as the manufacturer                and assumptions of liability.
                                                can demonstrate on an objectively                         Any person desiring to intervene or to                Take notice that on January 6, 2017,
                                                reasonable basis that such differences                  protest should file with the Federal                  North Baja Pipeline, LLC (NBP) 700
                                                will not cause the mattress set to exceed               Energy Regulatory Commission, 888                     Louisiana Street, Suite 700, Houston,
                                                the test criteria of the Open Flame                     First Street NE., Washington, DC 20426,               Texas 77002, filed in Docket No. CP17–
                                                Standard. See 16 CFR 1633.4(b).                         in accordance with Rules 211 and 214                  29–000, an application pursuant to


                                           VerDate Sep<11>2014   16:23 Jan 31, 2017   Jkt 241001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\01FEN1.SGM   01FEN1



Document Created: 2017-02-01 00:06:16
Document Modified: 2017-02-01 00:06:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 8925 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR