The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG-1330, ``Guidance for Developing Principal Design Criteria for Non-Light Water Reactors.'' This DG is a proposed new regulatory guide (RG) to provide designers, applicants, and licensees of non-light water cooled nuclear reactors (non-LWR) guidance for developing principal design criteria (PDC) for a proposed facility. The PDC establish the necessary design, fabrication, construction, testing, and performance requirements for structures, systems, and components important to safety; that is, structures, systems, and components that provide reasonable assurance that the facility can be operated without undue risk to the health and safety of the public.

Federal Register, Volume 82 Issue 22 (Friday, February 3, 2017)
[Federal Register Volume 82, Number 22 (Friday, February 3, 2017)]
[Notices]
[Pages 9246-9247]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-02298]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2017-0016]


Guidance for Developing Principal Design Criteria for Non-Light 
Water Reactors

AGENCY: Nuclear Regulatory Commission.

ACTION: Draft regulatory guide; request for comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for 
public comment draft regulatory guide (DG), DG-1330, ``Guidance for 
Developing Principal Design Criteria for Non-Light Water Reactors.'' 
This DG is a proposed new regulatory guide (RG) to provide designers, 
applicants, and licensees of non-light water cooled nuclear reactors 
(non-LWR) guidance for developing principal design criteria (PDC) for a 
proposed facility. The PDC establish the necessary design, fabrication, 
construction, testing, and performance requirements for structures, 
systems, and components important to safety; that is, structures, 
systems, and components that provide reasonable assurance that the 
facility can be operated without undue risk to the health and safety of 
the public.

DATES: Submit comments by April 4, 2017. Comments received after this 
date will be considered if it is practical to do so, but the NRC is 
able to ensure consideration only for comments received on or before 
this date. Although a time limit is given, comments and suggestions in 
connection with items for inclusion in guides currently being developed 
or improvements in all published guides are encouraged at any time.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0016. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individuals listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     Mail comments to: Cindy Bladey, Office of Administration, 
Mail Stop: OWFN-12-H08, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Jan Mazza, Office of New Reactors, 
telephone: 301-415-0498, email: [email protected], or Mark Orr, Office 
of Nuclear Regulatory Research, telephone: 301-415-6003, email:

[[Page 9247]]

[email protected]. Both are staff of the U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2017-0016 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0016.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected].
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2017-0016 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Additional Information

    The NRC is issuing for public comment a DG in the NRC's 
``Regulatory Guide'' series. This series was developed to describe and 
make available to the public information regarding methods that are 
acceptable to the NRC staff for implementing specific parts of the 
NRC's regulations, techniques that the staff uses in evaluating 
specific issues or postulated events, and data that the staff needs in 
its review of applications for permits and licenses.
    The DG, entitled ``Guidance for Developing Principal Design 
Criteria for Non-Light Water Reactors,'' is a proposed new RG. The 
proposed new RG is temporarily identified by its task number, DG-1330. 
The proposed new RG describes the NRC's proposed guidance on how the 
general design criteria (GDC) in Appendix A, ``General Design Criteria 
for Nuclear Power Plants,'' of title 10 of the Code of Federal 
Regulations, part 50, ``Domestic Licensing of Production and 
Utilization Facilities'' (10 CFR part 50) apply to non-LWR designs. 
This guidance may be used by non-LWR reactor designers, applicants, and 
licensees to develop PDC for non-LWR designs, as required by 10 CFR 
part 50 for an application for a construction permit, and 10 CFR part 
52 for an application for a design certification, combined license, 
standard design approval, or manufacturing license. The DG also 
describes the NRC's proposed guidance for modifying and supplementing 
the GDC to develop PDC that address two specific non-LWR design 
concepts: sodium-cooled fast reactors (SFRs), and modular high 
temperature gas-cooled reactors (mHTGRs).
    The advanced reactor design criteria (ARDC) are intended to be 
technology-neutral and, therefore, could apply to any type of non-LWR 
design. In July 2013, the NRC and U.S. Department of Energy (DOE) 
established a joint initiative to review and address the existing GDC, 
which may not directly apply to non-LWR power plant designs. During the 
review it was determined that the safety objective for some of the 
current GDC were not applicable to SFR and mHTGR technologies, so 
entirely new design criteria were developed to address their unique 
design features.

III. Backfitting and Issue Finality

    The purpose of DG-1330 is to provide regulatory guidance to assist 
future applicants in developing PDC for non-LWR designs. The NRC 
approves the PDC, which form part of the licensing basis for the 
facility. The DG, if finalized, would not constitute regulatory 
requirements. For this reason, issuance of DG-1330, if finalized, would 
not constitute backfitting under 10 CFR 50.109 (the ``Backfit Rule''). 
Future applicants may choose to follow the guidance or utilize another 
approach in developing principle design criteria for their facilities. 
Applicants and potential applicants are not, with certain exceptions, 
protected by either the Backfit Rule or any issue finality provisions 
under 10 CFR part 52. Neither the Backfit Rule nor the issue finality 
provisions under 10 CFR part 52--with certain exclusions discussed 
below--were intended to apply to every NRC action which substantially 
changes the expectations of current and future applicants. Therefore, 
the positions in any regulatory guide, if imposed on applicants under 
10 CFR 50.34(a)(3), 52.47(a)(3), 52.79(a)(4), 52.137(a)(3), or 
52.157(a), would not represent backfitting or a violation of issue 
finality (except as discussed below).
    The exceptions to the general principle are applicable whenever a 
combined license applicant references a 10 CFR part 52 license (i.e., 
an early site permit or a manufacturing license) and/or 10 CFR part 52 
regulatory approval (i.e., a design certification rule or design 
approval). There are no current non-LWR applicants or holders of 
licenses or design certifications for non-LWR designs. Therefore, 
issuance of DG-1330 in final form would not constitute a violation of 
issue finality.

    Dated at Rockville, Maryland, this 31st day of January, 2017.

    For the Nuclear Regulatory Commission.
Edward O'Donnell,
Acting Chief, Regulatory Guidance and Generic Issues Branch, Division 
of Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2017-02298 Filed 2-2-17; 8:45 am]
BILLING CODE 7590-01-P



                                                    9246                                       Federal Register / Vol. 82, No. 22 / Friday, February 3, 2017 / Notices

                                                    viewed as involving either safeguards,                                       73.5, the exemption is authorized by                                         operator or a certified fuel handler, at a
                                                    materials control, or managerial matters.                                    law and will not endanger life or                                            nuclear power plant reactor facility for
                                                       Therefore, pursuant to § 51.22(b) and                                     property or the common defense and                                           which the certifications required under
                                                    (c)(25), no environmental impact                                             security, and is otherwise in the public                                     10 CFR 50.82(a)(1) have been submitted.
                                                    statement or environmental assessment                                        interest. Therefore, the Commission                                            The exemption is effective upon
                                                    need be prepared in connection with the                                      hereby grants the licensee’s request for                                     receipt.
                                                    approval of this exemption request.                                          an exemption from the requirements of
                                                                                                                                                                                                              V. Availability of Documents
                                                                                                                                 10 CFR 73.55(p)(1)(i) and (ii), to
                                                    IV. Conclusions                                                              authorize that the suspension of security                                      The documents identified in the
                                                      Accordingly, the Commission has                                            measures must be approved as a                                               following table are available to
                                                    determined that, pursuant to 10 CFR                                          minimum by either a licensed senior                                          interested persons.

                                                                                                                                                                                                                                                ADAMS accession
                                                                                                                                    Title                                                                                           Date             No.

                                                    Exelon letter to NRC, ‘‘Permanent Cessation of Operations at Oyster Creek Nuclear Generating Station.’’ ..                                                                      1/07/2011      ML110070507
                                                    Exelon letter to NRC, Clinton Power Station, Unit 1, ‘‘Certification of Permanent Cessation of Power Oper-
                                                      ations.’’ ...........................................................................................................................................................         6/20/2016      ML16172A137
                                                    Exelon letter to NRC, Quad Cities Nuclear Power Station, Units 1 and 2, ‘‘Certification of Permanent Ces-
                                                      sation of Power Operations.’’ .........................................................................................................................                       6/20/2016      ML16172A151
                                                    NRC letter to Exelon, Oyster Creek Nuclear Generating Station; ‘‘Clinton Power Station, Unit No. 1; and
                                                      Quad Cities Nuclear Power Station, Units 1 and 2—Approval of Certified Fuel Handler Training and Re-
                                                      training Program.’’ ..........................................................................................................................................                9/06/2016      ML16222A787
                                                    Exelon letter to NRC, Clinton Power Station, Unit No. 1, Quad Cities Nuclear Power Station, Units 1 and 2,
                                                      and Oyster Creek Nuclear Generating Station, ‘‘Request for Exemption from Specific Provisions in 10
                                                      CFR 7355(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or
                                                      During Severe Weather.’’ ...............................................................................................................................                      8/16/2016      ML16229A133
                                                    Exelon letter to NRC, Oyster Creek Nuclear Generating Station, ‘‘License Amendment Request—Proposed
                                                      Changes to Technical Specifications Section 6.0 Administrative Controls for Permanently Defueled Con-
                                                      dition’’ .............................................................................................................................................................        5/17/2016      ML16138A129
                                                    Exelon letter to NRC, Clinton Power Station, Unit No. 1, ‘‘License Amendment Request—Proposed
                                                      Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Con-
                                                      dition’’ .............................................................................................................................................................        7/28/2016      ML16210A300
                                                    Exelon letter to NRC, Quad Cities Nuclear Power Station, Units 1 and 2, ‘‘License Amendment Request—
                                                      Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently
                                                      Defueled Condition .........................................................................................................................................                 10/20/2016      ML16294A203
                                                    Exelon Letter to NRC, Quad Cities Nuclear Power Station, Units 1 and 2, ‘‘Withdrawal of Certification of
                                                      Permanent Cessation of Power Operations.’’ ................................................................................................                                  12/14/2016      ML16349A311
                                                    Exelon Letter to NRC, Clinton Power Station, Unit No. 1, ‘‘Withdrawal of Certification of Permanent Ces-
                                                      sation of Power Operations.’’ .........................................................................................................................                      12/14/2016      ML16349A314



                                                      Dated at Rockville, Maryland, this 23rd day                                Water Reactors.’’ This DG is a proposed                                      ADDRESSES:   You may submit comments
                                                    of January 2017.                                                             new regulatory guide (RG) to provide                                         by any of the following methods:
                                                      For the Nuclear Regulatory Commission.                                     designers, applicants, and licensees of                                         • Federal Rulemaking Web site: Go to
                                                    Anne T. Boland,                                                              non-light water cooled nuclear reactors                                      http://www.regulations.gov and search
                                                    Director, Division of Operating Reactor                                      (non-LWR) guidance for developing                                            for Docket ID NRC–2017–0016. Address
                                                    Licensing, Office of Nuclear Reactor                                         principal design criteria (PDC) for a                                        questions about NRC dockets to Carol
                                                    Regulation.                                                                  proposed facility. The PDC establish the                                     Gallagher; telephone: 301–415–3463;
                                                    [FR Doc. 2017–02336 Filed 2–2–17; 8:45 am]                                   necessary design, fabrication,                                               email: Carol.Gallagher@nrc.gov. For
                                                    BILLING CODE 7590–01–P                                                       construction, testing, and performance                                       technical questions, contact the
                                                                                                                                 requirements for structures, systems,                                        individuals listed in the FOR FURTHER
                                                                                                                                 and components important to safety;                                          INFORMATION CONTACT section of this
                                                    NUCLEAR REGULATORY                                                           that is, structures, systems, and                                            document.
                                                    COMMISSION                                                                   components that provide reasonable                                              • Mail comments to: Cindy Bladey,
                                                                                                                                 assurance that the facility can be                                           Office of Administration, Mail Stop:
                                                    [NRC–2017–0016]                                                                                                                                           OWFN–12–H08, U.S. Nuclear
                                                                                                                                 operated without undue risk to the
                                                                                                                                 health and safety of the public.                                             Regulatory Commission, Washington,
                                                    Guidance for Developing Principal
                                                                                                                                                                                                              DC 20555–0001.
                                                    Design Criteria for Non-Light Water                                          DATES:  Submit comments by April 4,                                             For additional direction on obtaining
                                                    Reactors                                                                     2017. Comments received after this date                                      information and submitting comments,
                                                    AGENCY: Nuclear Regulatory                                                   will be considered if it is practical to do                                  see ‘‘Obtaining Information and
                                                    Commission.                                                                  so, but the NRC is able to ensure                                            Submitting Comments’’ in the
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                                                 consideration only for comments                                              SUPPLEMENTARY INFORMATION section of
                                                    ACTION: Draft regulatory guide; request
                                                    for comment.                                                                 received on or before this date.                                             this document.
                                                                                                                                 Although a time limit is given,                                              FOR FURTHER INFORMATION CONTACT: Jan
                                                    SUMMARY:  The U.S. Nuclear Regulatory                                        comments and suggestions in                                                  Mazza, Office of New Reactors,
                                                    Commission (NRC) is issuing for public                                       connection with items for inclusion in                                       telephone: 301–415–0498, email:
                                                    comment draft regulatory guide (DG),                                         guides currently being developed or                                          Jan.Mazza@nrc.gov, or Mark Orr, Office
                                                    DG–1330, ‘‘Guidance for Developing                                           improvements in all published guides                                         of Nuclear Regulatory Research,
                                                    Principal Design Criteria for Non-Light                                      are encouraged at any time.                                                  telephone: 301–415–6003, email:


                                               VerDate Sep<11>2014          17:26 Feb 02, 2017         Jkt 241001       PO 00000        Frm 00056        Fmt 4703       Sfmt 4703       E:\FR\FM\03FEN1.SGM               03FEN1


                                                                                   Federal Register / Vol. 82, No. 22 / Friday, February 3, 2017 / Notices                                                 9247

                                                    Mark.Orr@nrc.gov. Both are staff of the                 Guide’’ series. This series was                       50.109 (the ‘‘Backfit Rule’’). Future
                                                    U.S. Nuclear Regulatory Commission,                     developed to describe and make                        applicants may choose to follow the
                                                    Washington, DC 20555–0001.                              available to the public information                   guidance or utilize another approach in
                                                    SUPPLEMENTARY INFORMATION:                              regarding methods that are acceptable to              developing principle design criteria for
                                                                                                            the NRC staff for implementing specific               their facilities. Applicants and potential
                                                    I. Obtaining Information and                            parts of the NRC’s regulations,                       applicants are not, with certain
                                                    Submitting Comments                                     techniques that the staff uses in                     exceptions, protected by either the
                                                    A. Obtaining Information                                evaluating specific issues or postulated              Backfit Rule or any issue finality
                                                                                                            events, and data that the staff needs in              provisions under 10 CFR part 52.
                                                       Please refer to Docket ID NRC–2017–                  its review of applications for permits                Neither the Backfit Rule nor the issue
                                                    0016 when contacting the NRC about                      and licenses.                                         finality provisions under 10 CFR part
                                                    the availability of information for this                   The DG, entitled ‘‘Guidance for                    52—with certain exclusions discussed
                                                    action. You may obtain publicly-                        Developing Principal Design Criteria for              below—were intended to apply to every
                                                    available information related to this                   Non-Light Water Reactors,’’ is a                      NRC action which substantially changes
                                                    action by any of the following methods:                 proposed new RG. The proposed new                     the expectations of current and future
                                                       • Federal Rulemaking Web site: Go to                 RG is temporarily identified by its task              applicants. Therefore, the positions in
                                                    http://www.regulations.gov and search                   number, DG–1330. The proposed new                     any regulatory guide, if imposed on
                                                    for Docket ID NRC–2017–0016.                            RG describes the NRC’s proposed                       applicants under 10 CFR 50.34(a)(3),
                                                       • NRC’s Agencywide Documents                         guidance on how the general design                    52.47(a)(3), 52.79(a)(4), 52.137(a)(3), or
                                                    Access and Management System                            criteria (GDC) in Appendix A, ‘‘General               52.157(a), would not represent
                                                    (ADAMS): You may obtain publicly-                       Design Criteria for Nuclear Power                     backfitting or a violation of issue finality
                                                    available documents online in the                       Plants,’’ of title 10 of the Code of                  (except as discussed below).
                                                    ADAMS Public Documents collection at                    Federal Regulations, part 50, ‘‘Domestic                 The exceptions to the general
                                                    http://www.nrc.gov/reading-rm/                          Licensing of Production and Utilization               principle are applicable whenever a
                                                    adams.html. To begin the search, select                 Facilities’’ (10 CFR part 50) apply to                combined license applicant references a
                                                    ‘‘ADAMS Public Documents’’ and then                     non-LWR designs. This guidance may                    10 CFR part 52 license (i.e., an early site
                                                    select ‘‘Begin Web-based ADAMS                          be used by non-LWR reactor designers,                 permit or a manufacturing license) and/
                                                    Search.’’ For problems with ADAMS,                      applicants, and licensees to develop                  or 10 CFR part 52 regulatory approval
                                                    please contact the NRC’s Public                         PDC for non-LWR designs, as required                  (i.e., a design certification rule or design
                                                    Document Room (PDR) reference staff at                  by 10 CFR part 50 for an application for              approval). There are no current non-
                                                    1–800–397–4209, 301–415–4737, or by                     a construction permit, and 10 CFR part                LWR applicants or holders of licenses or
                                                    email to pdr.resource@nrc.gov.                          52 for an application for a design                    design certifications for non-LWR
                                                       • NRC’s PDR: You may examine and                     certification, combined license,                      designs. Therefore, issuance of DG–1330
                                                    purchase copies of public documents at                  standard design approval, or                          in final form would not constitute a
                                                    the NRC’s PDR, Room O1–F21, One                         manufacturing license. The DG also                    violation of issue finality.
                                                    White Flint North, 11555 Rockville                      describes the NRC’s proposed guidance
                                                    Pike, Rockville, Maryland 20852.                        for modifying and supplementing the                     Dated at Rockville, Maryland, this 31st day
                                                                                                                                                                  of January, 2017.
                                                    B. Submitting Comments                                  GDC to develop PDC that address two
                                                                                                            specific non-LWR design concepts:                       For the Nuclear Regulatory Commission.
                                                      Please include Docket ID NRC–2017–                    sodium-cooled fast reactors (SFRs), and               Edward O’Donnell,
                                                    0016 in your comment submission.                        modular high temperature gas-cooled                   Acting Chief, Regulatory Guidance and
                                                      The NRC cautions you not to include                   reactors (mHTGRs).                                    Generic Issues Branch, Division of
                                                    identifying or contact information that                    The advanced reactor design criteria               Engineering, Office of Nuclear Regulatory
                                                    you do not want to be publicly                          (ARDC) are intended to be technology-                 Research.
                                                    disclosed in your comment submission.                   neutral and, therefore, could apply to                [FR Doc. 2017–02298 Filed 2–2–17; 8:45 am]
                                                    The NRC will post all comment                           any type of non-LWR design. In July                   BILLING CODE 7590–01–P
                                                    submissions at http://                                  2013, the NRC and U.S. Department of
                                                    www.regulations.gov as well as enter the                Energy (DOE) established a joint
                                                    comment submissions into ADAMS.                         initiative to review and address the                  POSTAL REGULATORY COMMISSION
                                                    The NRC does not routinely edit                         existing GDC, which may not directly
                                                                                                                                                                  [Docket Nos. MC2017–82 and CP2017–111]
                                                    comment submissions to remove                           apply to non-LWR power plant designs.
                                                    identifying or contact information.                     During the review it was determined                   New Postal Products
                                                      If you are requesting or aggregating                  that the safety objective for some of the
                                                    comments from other persons for                         current GDC were not applicable to SFR                AGENCY:   Postal Regulatory Commission.
                                                    submission to the NRC, then you should                  and mHTGR technologies, so entirely                   ACTION:   Notice.
                                                    inform those persons not to include                     new design criteria were developed to
                                                    identifying or contact information that                                                                       SUMMARY:   The Commission is noticing
                                                                                                            address their unique design features.
                                                    they do not want to be publicly                                                                               recent Postal Service filings for the
                                                    disclosed in their comment submission.                  III. Backfitting and Issue Finality                   Commission’s consideration concerning
                                                    Your request should state that the NRC                     The purpose of DG–1330 is to provide               negotiated service agreements. This
                                                                                                            regulatory guidance to assist future                  notice informs the public of the filing,
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    does not routinely edit comment
                                                    submissions to remove such information                  applicants in developing PDC for non-                 invites public comment, and takes other
                                                    before making the comment                               LWR designs. The NRC approves the                     administrative steps.
                                                    submissions available to the public or                  PDC, which form part of the licensing                 DATES: Comments are due: February 7,
                                                    entering the comment into ADAMS.                        basis for the facility. The DG, if                    2017.
                                                                                                            finalized, would not constitute                       ADDRESSES: Submit comments
                                                    II. Additional Information                              regulatory requirements. For this reason,             electronically via the Commission’s
                                                      The NRC is issuing for public                         issuance of DG–1330, if finalized, would              Filing Online system at http://
                                                    comment a DG in the NRC’s ‘‘Regulatory                  not constitute backfitting under 10 CFR               www.prc.gov. Those who cannot submit


                                               VerDate Sep<11>2014   17:26 Feb 02, 2017   Jkt 241001   PO 00000   Frm 00057   Fmt 4703   Sfmt 4703   E:\FR\FM\03FEN1.SGM   03FEN1



Document Created: 2018-02-01 14:34:40
Document Modified: 2018-02-01 14:34:40
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionDraft regulatory guide; request for comment.
DatesSubmit comments by April 4, 2017. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date. Although a time limit is given, comments and suggestions in connection with items for inclusion in guides currently being developed or improvements in all published guides are encouraged at any time.
ContactJan Mazza, Office of New Reactors, telephone: 301-415-0498, email: [email protected], or Mark Orr, Office of Nuclear Regulatory Research, telephone: 301-415-6003, email: [email protected] Both are staff of the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.