82_FR_9590 82 FR 9566 - Atlantic Sunrise Project; Notice of Availability of Final General Conformity Analysis

82 FR 9566 - Atlantic Sunrise Project; Notice of Availability of Final General Conformity Analysis

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 24 (February 7, 2017)

Page Range9566-9566
FR Document2017-02480

Federal Register, Volume 82 Issue 24 (Tuesday, February 7, 2017)
[Federal Register Volume 82, Number 24 (Tuesday, February 7, 2017)]
[Notices]
[Page 9566]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-02480]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP15-138-000]


Atlantic Sunrise Project; Notice of Availability of Final General 
Conformity Analysis

    In accordance with the National Environmental Policy Act of 1969, 
the Clean Air Act, and the Federal Energy Regulatory Commission's 
(Commission or FERC) regulations, Commission staff has prepared this 
final General Conformity Determination (GCD) for the Atlantic Sunrise 
Project (Project) proposed by Transcontinental Gas Pipeline Company, 
LLC (Transco).
    The FERC staff concludes that the Project would achieve conformity 
with the Pennsylvania State Implementation Plan in Lancaster County 
through the transfer of Emission Reduction Credits.
    The Project would involve the construction and operation of about 
199.4 miles of pipeline facilities and appurtenant aboveground 
facilities, including:
     185.9 miles of new natural gas pipeline in Columbia, 
Lancaster, Lebanon, Luzerne, Northumberland, Schuylkill, Susquehanna, 
and Wyoming Counties, Pennsylvania (58.7 miles of 30-inch-diameter and 
127.3 miles of 42-inch-diameter pipeline);
     11.0 miles of new pipeline looping in Clinton and Lycoming 
Counties, Pennsylvania (2.5 miles of 36-inch-diameter and 8.5 miles of 
42-inch-diameter pipeline);
     2.5 miles of 30-inch-diameter pipeline replacements in 
Prince William County, Virginia;
     two new compressor stations in Columbia and Wyoming 
Counties, Pennsylvania (Compressor Stations 610 and 605);
     additional compression and related modifications to two 
existing compressor stations in Columbia and Lycoming Counties, 
Pennsylvania (Compressor Stations 517 and 520) and one in Howard 
County, Maryland (Compressor Station 190);
     other modifications would be taking place at Compressor 
Stations 145, 150, 155, 160, 170, 185, and 190 across Maryland, North 
Carolina, and Virginia;
     two new meter stations and three new regulator stations 
would be constructed and operated in Pennsylvania. There would also be 
modifications at an existing meter station, and the construction and 
operation of additional ancillary facilities would occur in 
Pennsylvania; and
     in North Carolina and South Carolina, supplemental 
odorization, odor detection, and/or odor masking/deodorization 
equipment would be installed at 56 meter stations, regulator stations, 
and ancillary facilities.
    For additional information on the Project, the public can view the 
final environmental impact statement on our Web site at https://www.ferc.gov/industries/gas/enviro/eis/2016/12-30-16-FEIS.asp. The 
complete final General Conformity Determination, which also contains 
our responses to public comments on the draft General Conformity 
Determination, may be found on FERC's elibrary system under the above 
referenced Docket number.
    For further information, contact Eric Tomasi by telephone at 202-
502-8097 or by email at [email protected].

    Dated: January 17, 2017.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-02480 Filed 2-6-17; 8:45 am]
 BILLING CODE 6717-01-P



                                             9566                          Federal Register / Vol. 82, No. 24 / Tuesday, February 7, 2017 / Notices

                                                                                                                        Number of                                      Average burden
                                                 FERC 725R, reductions due to                 Number of                  responses                Total number         hours & cost per                 Annual burden hours & total
                                                        RD17–1–000                          respondents 2                   per                   of responses           response 3                            annual cost
                                                                                                                        respondent

                                                                                                    (1)                        (2)                (1) × (2) = (3)                 (4)                         (3) × (4) = (5)

                                             Retirement of current standard BAL–           BA 99; RC 11                                 ¥1                   ¥110   (Eng.) 2 hrs. ($129);               ¥330 hrs. (¥220 Eng.,
                                               004–0 currently in (FERC–725R).                                                                                        (R.K.) 1 hr. ($38).                ¥110 R.K.); ¥$18,370
                                                                                                                                                                                                         (¥$14,190 Eng., ¥$4,180
                                                                                                                                                                                                         R.K.)

                                                  TOTAL REDUCTION (Rounded)                ........................   ........................        ¥110 hrs.     .................................   ¥110
                                                                                                                                                                                                        ¥$18,370



                                               Total annual burden and cost will be                       Regulatory Commission’s (Commission                                facilities would occur in Pennsylvania;
                                             reduced by 110 hours and $18,370.                            or FERC) regulations, Commission staff                             and
                                               Comments: Comments are invited on:                         has prepared this final General                                      • in North Carolina and South
                                             (1) Whether the collection of                                Conformity Determination (GCD) for the                             Carolina, supplemental odorization,
                                             information are necessary for the proper                     Atlantic Sunrise Project (Project)                                 odor detection, and/or odor masking/
                                             performance of the functions of the                          proposed by Transcontinental Gas                                   deodorization equipment would be
                                             Commission, including whether the                            Pipeline Company, LLC (Transco).                                   installed at 56 meter stations, regulator
                                             information will have practical utility;                        The FERC staff concludes that the                               stations, and ancillary facilities.
                                             (2) the accuracy of the agency’s                             Project would achieve conformity with                                For additional information on the
                                             estimates of the burden and cost of the                      the Pennsylvania State Implementation                              Project, the public can view the final
                                             collection of information, including the                     Plan in Lancaster County through the                               environmental impact statement on our
                                             validity of the methodology and                              transfer of Emission Reduction Credits.                            Web site at https://www.ferc.gov/
                                             assumptions used; (3) ways to enhance                           The Project would involve the                                   industries/gas/enviro/eis/2016/12-30-
                                             the quality, utility and clarity of the                      construction and operation of about                                16-FEIS.asp. The complete final General
                                             information collection; and (4) ways to                      199.4 miles of pipeline facilities and                             Conformity Determination, which also
                                             minimize the burden of the collection of                     appurtenant aboveground facilities,                                contains our responses to public
                                             information on those who are to                              including:                                                         comments on the draft General
                                             respond, including the use of automated                         • 185.9 miles of new natural gas                                Conformity Determination, may be
                                             collection techniques or other forms of                      pipeline in Columbia, Lancaster,                                   found on FERC’s elibrary system under
                                             information technology.                                      Lebanon, Luzerne, Northumberland,                                  the above referenced Docket number.
                                               Dated: February 1, 2017.                                   Schuylkill, Susquehanna, and Wyoming                                 For further information, contact Eric
                                             Kimberly D. Bose,                                            Counties, Pennsylvania (58.7 miles of                              Tomasi by telephone at 202–502–8097
                                             Secretary.                                                   30-inch-diameter and 127.3 miles of 42-                            or by email at Eric.Tomasi@ferc.gov.
                                             [FR Doc. 2017–02448 Filed 2–6–17; 8:45 am]
                                                                                                          inch-diameter pipeline);                                             Dated: January 17, 2017.
                                                                                                             • 11.0 miles of new pipeline looping                            Kimberly D. Bose,
                                             BILLING CODE 6717–01–P
                                                                                                          in Clinton and Lycoming Counties,
                                                                                                                                                                             Secretary.
                                                                                                          Pennsylvania (2.5 miles of 36-inch-
                                                                                                                                                                             [FR Doc. 2017–02480 Filed 2–6–17; 8:45 am]
                                             DEPARTMENT OF ENERGY                                         diameter and 8.5 miles of 42-inch-
                                                                                                                                                                             BILLING CODE 6717–01–P
                                                                                                          diameter pipeline);
                                             Federal Energy Regulatory                                       • 2.5 miles of 30-inch-diameter
                                             Commission                                                   pipeline replacements in Prince William
                                                                                                                                                                             DEPARTMENT OF ENERGY
                                                                                                          County, Virginia;
                                             [Docket No. CP15–138–000]                                       • two new compressor stations in                                Federal Energy Regulatory
                                             Atlantic Sunrise Project; Notice of                          Columbia and Wyoming Counties,                                     Commission
                                             Availability of Final General                                Pennsylvania (Compressor Stations 610
                                                                                                          and 605);                                                          [Project No. 2035–099]
                                             Conformity Analysis
                                                                                                             • additional compression and related
                                               In accordance with the National                            modifications to two existing                                      City and County of Denver, Colorado;
                                             Environmental Policy Act of 1969, the                        compressor stations in Columbia and                                Notice of Application Accepted For
                                             Clean Air Act, and the Federal Energy                        Lycoming Counties, Pennsylvania                                    Filing, Ready for Environmental
                                                                                                          (Compressor Stations 517 and 520) and                              Analysis, Soliciting Comments,
                                               2 The estimated number of respondents is based
                                                                                                          one in Howard County, Maryland                                     Motions To Intervene, Protests,
                                             on the NERC compliance registry as of December               (Compressor Station 190);                                          Recommendations, Terms and
                                             12, 2016. According to the NERC compliance                                                                                      Conditions, and Fishway Prescriptions
                                             registry, there are 99 U.S. balancing authorities (BA)          • other modifications would be taking
                                             and 11 reliability coordinators (RC).                        place at Compressor Stations 145, 150,                               Take notice that the following
                                               3 The estimates for cost per response are derived          155, 160, 170, 185, and 190 across                                 hydroelectric application has been filed
                                             using the following formula: Burden Hours per                Maryland, North Carolina, and Virginia;
                                             Response * $/hour = Cost per Response. The
                                                                                                                                                                             with the Commission and is available
                                                                                                             • two new meter stations and three
Lhorne on DSK30JT082PROD with NOTICES




                                             $64.29/hour figure for an engineer and the $37.75/                                                                              for public inspection:
                                             hour figure for a record clerk (rounded to $38.00)           new regulator stations would be                                      a. Type of Application: Amendment
                                             are based on the average salary plus benefits data           constructed and operated in                                        of License.
                                             from the Bureau of Labor Statistics. (https://               Pennsylvania. There would also be                                    b. Project No.: 2035–099.
                                             www.bls.gov/oes/current/naics2_22.htm), May
                                             2015, Section 22, Utilities. In the burden table,
                                                                                                          modifications at an existing meter                                   c. Date Filed: November 25, 2016.
                                             engineering is abbreviated as ‘‘Eng.’’ and record            station, and the construction and                                    d. Applicant: City and County of
                                             keeping is abbreviated as ‘‘R.K.’’.                          operation of additional ancillary                                  Denver, Colorado acting through its


                                        VerDate Sep<11>2014   14:31 Feb 06, 2017   Jkt 241001   PO 00000        Frm 00008       Fmt 4703         Sfmt 4703   E:\FR\FM\07FEN1.SGM         07FEN1



Document Created: 2017-02-07 00:27:21
Document Modified: 2017-02-07 00:27:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 9566 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR