83_FR_1031 83 FR 1025 - Endangered and Threatened Species; Recovery Plans

83 FR 1025 - Endangered and Threatened Species; Recovery Plans

DEPARTMENT OF COMMERCE
National Oceanic and Atmospheric Administration

Federal Register Volume 83, Issue 6 (January 9, 2018)

Page Range1025-1027
FR Document2018-00208

This notice announces the availability of the Southern Distinct Population Segment of Green Sturgeon (Acipenser medirostris) Draft Recovery Plan (Plan) for public review. NMFS is soliciting review and comment from the public and all interested parties on the Plan, and will consider all substantive comments received during the review period before submitting the Plan for final approval.

Federal Register, Volume 83 Issue 6 (Tuesday, January 9, 2018)
[Federal Register Volume 83, Number 6 (Tuesday, January 9, 2018)]
[Notices]
[Pages 1025-1027]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-00208]


-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

RIN 0648-XF897


Endangered and Threatened Species; Recovery Plans

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

[[Page 1026]]


ACTION: Notice of availability; request for comments.

-----------------------------------------------------------------------

SUMMARY: This notice announces the availability of the Southern 
Distinct Population Segment of Green Sturgeon (Acipenser medirostris) 
Draft Recovery Plan (Plan) for public review. NMFS is soliciting review 
and comment from the public and all interested parties on the Plan, and 
will consider all substantive comments received during the review 
period before submitting the Plan for final approval.

DATES: Comments and information on the draft Plan must be received by 
close of business on March 12, 2018.

ADDRESSES: You may submit comments on this document by either of the 
following methods:
     Electronic Submission: Submit all electronic public 
comments to [email protected].
     Mail: Submit written comments to the National Marine 
Fisheries Service, Attn: GS Recovery Plan Team, 650 Capitol Mall, Suite 
5-100, Sacramento, CA 95814.
    Instructions: You must submit comments by one of the above methods 
to ensure that we receive, document, and consider them. Comments sent 
by any other method, to any other address or individual, or received 
after the end of the comment period, may not be considered. All 
comments received are a part of the public record and will generally be 
posted for public viewing without change. All personal identifying 
information (e.g., name, address, etc.), confidential business 
information, or otherwise sensitive information submitted voluntarily 
by the sender will be publicly accessible.
    The draft recovery plan is available online at: http://www.westcoast.fisheries.noaa.gov/protected_species/green_sturgeon/green_sturgeon_pg.html.

FOR FURTHER INFORMATION CONTACT: Joe Heublein, NMFS Green Sturgeon 
Recovery Coordinator, at (916) 930-3719, or [email protected].

SUPPLEMENTARY INFORMATION: 

Background

    On April 7, 2006, we, NMFS, listed the southern distinct population 
segment (sDPS) of green sturgeon as a threatened species under the 
Endangered Species Act (ESA) (71 FR 17757). This determination was 
based on: (1) The fact that the spawning adult population occurred in 
only one river system (i.e., Sacramento River); (2) evidence of lost 
spawning habitat in the Sacramento and Feather rivers; (3) threats to 
habitat quality and quantity in the Sacramento River and Delta System; 
and (4) fish salvage data exhibiting a negative trend in juvenile sDPS 
green sturgeon abundance. The final critical habitat rule for sDPS 
green sturgeon was published in the Federal Register on October 9, 2009 
(74 FR 52300). In 2010, we appointed a recovery team to assist the NMFS 
West Coast Region with the development of research and recovery actions 
for the recovery plan. A recovery outline was completed in 2010. In 
2012, we announced initiation of a 5-year review (77 FR 64959; October 
24, 2012) for sDPS green sturgeon. Based on the 5-year review, sDPS 
green sturgeon remains listed as threatened under the ESA. The 5-year 
review (NMFS 2014a) was completed November 20, 2014, and is available 
at: http://www.fisheries.noaa.gov/pr/species/fish/green-sturgeon.html

Draft Recovery Plan

    Recovery plans describe actions beneficial to the conservation and 
recovery of species listed under the ESA of 1973, as amended (16 U.S.C. 
1531 et seq.). Section 4(f)(1) of the ESA requires that recovery plans 
incorporate, to the maximum extent practicable: (1) Objective, 
measurable criteria which, when met, would result in a determination 
that the species is no longer threatened or endangered; (2) site-
specific management actions necessary to achieve the Plan's goals; and 
(3) estimates of the time required and costs to implement recovery 
actions. The ESA requires the development of recovery plans for each 
listed species unless such a plan would not promote its recovery.
    The Plan for sDPS green sturgeon was developed by NMFS in 
cooperation with a recovery team made up of experts from the California 
Department of Fish and Wildlife, California Department of Water 
Resources, Oregon Department of Fish and Wildlife, NMFS Northwest and 
Southwest Fisheries Science Center, R2 Resource Consultants, U.S. 
Bureau of Reclamation, U.S. Fish and Wildlife Service, and U.S. 
Geological Survey.
    NMFS's goal is to restore the threatened sDPS green sturgeon to the 
point where it is a self-sustaining species that no longer needs the 
protections of the ESA. The Plan provides background on the natural 
history of green sturgeon, population status, and threats to their 
viability, based on a formal threats assessment. The Plan lays out a 
recovery strategy to address the threats based on the best available 
science, identifies site-specific actions with time lines and costs, 
and includes recovery goals and criteria.
    In order to recover sDPS green sturgeon, recovery actions within 
the Plan aim to restore passage and habitat, reduce mortality and 
poaching, address threats in the areas of contaminants, predation, and 
sediment loading, and forecast sDPS habitat and distribution changes 
with climate change. Most of the recovery efforts focus on the 
Sacramento River Basin and San Francisco Bay Delta Estuary 
environments, as threats in spawning and rearing habitats were 
considered the greatest impediments to recovery. To better inform the 
recovery process, the Plan further characterizes research priorities in 
these areas as well as in the areas of competition for habitat, altered 
prey base, non-native species, oil and chemical spills, and disease.
    The Plan is not regulatory, but presents guidance for use by 
agencies and interested parties to assist in the recovery of sDPS green 
sturgeon. The Plan identifies substantive actions needed to achieve 
recovery by assessing the species' population abundance, distribution, 
and diversity and addressing the threats to the species. When 
determining recovery actions, the Plan prioritized actions that address 
the most important threats, improve understanding of whether a 
particular threat is limiting recovery, and improve our understanding 
of, and ability to manage, that threat. The actions in the Plan include 
research, management, monitoring, and outreach efforts, because a 
comprehensive approach to green sturgeon recovery is likely to have 
greater success than focusing on any one type of action.
    We expect the Plan to inform section 7 consultations with Federal 
agencies under the ESA and to support other ESA decisions, such as 
considering permits under section 10. We have already begun 
implementation of several actions and research priorities as described 
in the plan, such as partnering with the California Department of Fish 
and Wildlife to reduce poaching and stranding of green sturgeon and 
improve knowledge of the impacts of fisheries bycatch. After public 
comment and the adoption of the Final Recovery Plan, we will continue 
to implement actions in the plan for which we have authority, encourage 
other Federal and state agencies to implement recovery actions for 
which they have responsibility and authority, and work cooperatively 
with them on the implementation of those actions.
    The total time and cost to recovery are difficult to predict. The 
Plan outlines 19 recovery actions, as well as 17 research, eight 
monitoring, and two education and outreach priorities. An estimated

[[Page 1027]]

cost is provided for an initial 20-year period. Projections of when 
certain actions could occur are provided based on five year increments. 
Assuming all recovery actions are implemented, the cost of the first 20 
years of recovery is approximately $236 million. Given a generation 
time for sDPS green sturgeon of approximately 22 years, a substantial 
increase in adult abundance in response to habitat-based recovery 
actions may not be observed for 66-88 years. Additional funds will thus 
likely be needed to monitor adult abundance after the first 20 years, 
with a total added projected cost of $25-40 million.
    Many of the most costly recovery actions (e.g., barrier removal, 
increased enforcement, addressing entrainment at diversions) have 
multi-species benefits and may be covered under recovery efforts for 
other species. For example, the recovery plan for ESA-listed Central 
Valley salmonids (NMFS 2014b) includes recovery actions designed to 
improve watershed-wide processes that will likely benefit sDPS green 
sturgeon by restoring natural ecosystem functions. Specific actions to 
improve delta habitat, remove barriers, and reduce entrainment could 
aid in the recovery of sDPS green sturgeon and reduce the recovery plan 
cost by $17 million.
    We are unable to quantify the economic benefits of sDPS green 
sturgeon recovery actions, but full recovery or delisting will provide 
multiple benefits to the ecosystem and economy. Delisting of the sDPS 
will enhance fishing opportunities by lifting fisheries restrictions 
aimed at reducing direct or incidental sDPS mortality. The ESA 
regulatory burden will also be eased for fisheries, water resource, 
industrial, and commercial activities. Accomplishing the habitat 
restoration measures will also result in more functional ecosystems 
that support other economic activities and contribute to delisting of 
other species.

References Cited

    The complete citations for the references used in this document can 
be obtained by contacting NMFS (see ADDRESSES and FOR FURTHER 
INFORMATION CONTACT) or online at: http://www.westcoast.fisheries.noaa.gov/protected_species/green_sturgeon/green_sturgeon_pg.html.

    Authority: 16 U.S.C. 1531 et seq.

    Dated: January 4, 2018.
Angela Somma,
Chief, Endangered Species Conservation Division, Office of Protected 
Resources, National Marine Fisheries Service.
[FR Doc. 2018-00208 Filed 1-8-18; 8:45 am]
 BILLING CODE 3510-22-P



                                                                                  Federal Register / Vol. 83, No. 6 / Tuesday, January 9, 2018 / Notices                                                      1025

                                                and (3) a list of issues to be discussed.                 DEPARTMENT OF COMMERCE                                 must state the reasons for the request.
                                                Issues raised in the hearing will be                                                                             Commerce will grant the request unless
                                                limited to issues raised in the briefs. If                International Trade Administration                     it finds compelling reasons to deny the
                                                a request for a hearing is made, parties                  [A–533–877, A–570–064]                                 request.
                                                will be notified of the time and date for                                                                           On December 18, 2017, the petitioners
                                                the hearing to be held at the U.S.                        Stainless Steel Flanges From India and                 submitted a timely request that
                                                Department of Commerce, 1401                              the People’s Republic of China:                        Commerce postpone the preliminary
                                                Constitution Avenue NW, Washington,                       Postponement of Preliminary                            determinations in these LTFV
                                                DC 20230.13                                               Determinations in the Less-Than-Fair-                  investigations.3 The petitioners stated
                                                   Commerce intends to issue the final                    Value Investigations                                   that they request postponement ‘‘in
                                                results of this administrative review,                                                                           order to ensure that {Commerce} has
                                                including the results of its analysis                     AGENCY:  Enforcement and Compliance,
                                                                                                          International Trade Administration,                    sufficient time to review all
                                                raised in any written briefs, not later                                                                          questionnaire responses and request
                                                than 120 days after the publication of                    Department of Commerce.
                                                                                                                                                                 clarification and/or additional
                                                these preliminary results in the Federal                  DATE: Applicable January 9, 2018.
                                                                                                                                                                 information as necessary, so that the
                                                Register, unless otherwise extended.14                    FOR FURTHER INFORMATION CONTACT:                       preliminary determinations will reflect
                                                                                                          Courtney Canales at (202) 482–4997                     the most accurate results possible.’’ 4
                                                Notification to Importers
                                                                                                          (India) and Ian Hamilton at (202) 482–
                                                  This notice also serves as a                                                                                      For the reasons stated above and
                                                                                                          4798 (the People’s Republic of China
                                                preliminary reminder to importers of                                                                             because there are no compelling reasons
                                                                                                          (China)), AD/CVD Operations,
                                                their responsibility under 19 CFR                                                                                to deny the request, Commerce, in
                                                                                                          Enforcement and Compliance,
                                                351.402(f) to file a certificate regarding                                                                       accordance with section 733(c)(1)(A) of
                                                                                                          International Trade Administration,
                                                the reimbursement of antidumping                                                                                 the Act, is postponing the deadline for
                                                                                                          U.S. Department of Commerce, 1401
                                                duties prior to liquidation of the                                                                               the preliminary determinations by 50
                                                                                                          Constitution Avenue NW, Washington,
                                                relevant entries during this review                       DC 20230.                                              days (i.e., 190 days after the date on
                                                period. Failure to comply with this                                                                              which these investigations were
                                                                                                          SUPPLEMENTARY INFORMATION:
                                                requirement could result in Commerce’s                                                                           initiated). As a result, Commerce will
                                                presumption that reimbursement of                         Background                                             issue its preliminary determinations no
                                                antidumping duties occurred and the                         On September 5, 2017, the                            later than March 14, 2018. In
                                                subsequent assessment of double                           Department of Commerce (Commerce)                      accordance with section 735(a)(1) of the
                                                antidumping duties.                                       initiated less-than-fair-value (LTFV)                  Act and 19 CFR 351.210(b)(1), the
                                                  We are issuing and publishing these                     investigations of imports of stainless                 deadline for the final determinations of
                                                results in accordance with sections                       steel flanges from India and China.1                   these investigations will continue to be
                                                751(a)(1) and 777(i)(1) of the Act.                       Currently, the preliminary                             75 days after the date of publication of
                                                                                                          determinations are due no later than                   the preliminary determinations, unless
                                                  Dated: January 2, 2018.
                                                                                                          January 23, 2018.                                      postponed at a later date.
                                                Christian Marsh,
                                                                                                                                                                    This notice is issued and published
                                                Deputy Assistant Secretary for Enforcement                Postponement of Preliminary                            pursuant to section 733(c)(2) of the Act
                                                and Compliance.                                           Determinations                                         and 19 CFR 351.205(f)(1).
                                                Appendix                                                     Section 733(b)(1)(A) of the Tariff Act                Dated: January 3, 2018.
                                                List of Topics Discussed in the Preliminary
                                                                                                          of 1930, as amended (the Act), requires
                                                                                                                                                                 Christian Marsh,
                                                Decision Memorandum                                       Commerce to issue the preliminary
                                                                                                                                                                 Deputy Assistant Secretary for Enforcement
                                                                                                          determination in a LTFV investigation
                                                I. Summary                                                                                                       and Compliance.
                                                II. Background                                            within 140 days after the date on which
                                                                                                                                                                 [FR Doc. 2018–00189 Filed 1–8–18; 8:45 am]
                                                III. Scope of the Order                                   Commerce initiated the investigation.
                                                                                                                                                                 BILLING CODE 3510–DS–P
                                                IV. Discussion of the Methodology                         However, section 733(c)(1)(A)(b)(1) of
                                                   A. Normal Value Comparisons                            the Act permits Commerce to postpone
                                                   1. Determination of Comparison Method                  the preliminary determination until no
                                                   2. Results of the Differential Pricing                                                                        DEPARTMENT OF COMMERCE
                                                                                                          later than 190 days after the date on
                                                      Analysis                                            which Commerce initiated the
                                                   B. Product Comparisons                                                                                        National Oceanic and Atmospheric
                                                   C. Export Price and Constructed Export
                                                                                                          investigation if: (A) The petitioners 2                Administration
                                                      Price                                               submit a timely request for a
                                                   D. Normal Value                                        postponement; or (B) Commerce
                                                                                                                                                                 RIN 0648–XF897
                                                   1. Particular Market Situation                         concludes that the parties concerned are
                                                   2. Home Market Viability and Selection of              cooperating, that the investigation is                 Endangered and Threatened Species;
                                                      Comparison Market                                   extraordinarily complicated, and that
                                                   3. Affiliated Party Transactions and Arm’s-                                                                   Recovery Plans
                                                                                                          additional time is necessary to make a
                                                      Length Test
                                                   4. Level of Trade
                                                                                                          preliminary determination. Under 19                    AGENCY:  National Marine Fisheries
                                                   5. Cost of Production Analysis                         CFR 351.205(e), the petitioners must                   Service (NMFS), National Oceanic and
                                                   6. Calculation of NV Based on Comparison               submit a request for postponement 25                   Atmospheric Administration (NOAA),
                                                      Market Prices                                       days or more before the scheduled date                 Commerce.
sradovich on DSK3GMQ082PROD with NOTICES




                                                   7. Calculation of NV Based on CV                       of the preliminary determination and
                                                   E. Currency Conversion                                                                                          3 See the Petitioners’ Letter, ‘‘Stainless Steel
                                                V. Recommendation                                           1 SeeStainless Steel Flanges from India and the      Flanges from India: the Petitioners’ Request to
                                                [FR Doc. 2018–00183 Filed 1–8–18; 8:45 am]                People’s Republic of China: Initiation of Less-Than-   Extend the Preliminary Determination,’’ dated
                                                                                                          Fair-Value Investigations, 82 FR 42649 (September      December 18, 2017; Petitioners’ Letter, ‘‘Stainless
                                                BILLING CODE 3510–DS–P
                                                                                                          11, 2017).                                             Steel Flanges from the People’s Republic of China:
                                                                                                            2 The petitioners are the Coalition of American      the Petitioners’ Request to Extend the Preliminary
                                                  13 Id.                                                                                                         Determination,’’ dated December 18, 2017.
                                                                                                          Flange Producers and its individual members, Core
                                                  14 See   Section 751(a)(3)(A) of the Act.               Pipe Products, Inc. and Maass Flange Corporation.        4 Id.




                                           VerDate Sep<11>2014     15:58 Jan 08, 2018   Jkt 244001   PO 00000   Frm 00013   Fmt 4703   Sfmt 4703   E:\FR\FM\09JAN1.SGM   09JAN1


                                                1026                           Federal Register / Vol. 83, No. 6 / Tuesday, January 9, 2018 / Notices

                                                ACTION:Notice of availability; request                  the Sacramento River and Delta System;                    In order to recover sDPS green
                                                for comments.                                           and (4) fish salvage data exhibiting a                 sturgeon, recovery actions within the
                                                                                                        negative trend in juvenile sDPS green                  Plan aim to restore passage and habitat,
                                                SUMMARY:    This notice announces the                   sturgeon abundance. The final critical                 reduce mortality and poaching, address
                                                availability of the Southern Distinct                   habitat rule for sDPS green sturgeon was               threats in the areas of contaminants,
                                                Population Segment of Green Sturgeon                    published in the Federal Register on                   predation, and sediment loading, and
                                                (Acipenser medirostris) Draft Recovery                  October 9, 2009 (74 FR 52300). In 2010,                forecast sDPS habitat and distribution
                                                Plan (Plan) for public review. NMFS is                  we appointed a recovery team to assist                 changes with climate change. Most of
                                                soliciting review and comment from the                  the NMFS West Coast Region with the                    the recovery efforts focus on the
                                                public and all interested parties on the                development of research and recovery                   Sacramento River Basin and San
                                                Plan, and will consider all substantive                 actions for the recovery plan. A recovery              Francisco Bay Delta Estuary
                                                comments received during the review                     outline was completed in 2010. In 2012,                environments, as threats in spawning
                                                period before submitting the Plan for                   we announced initiation of a 5-year                    and rearing habitats were considered the
                                                final approval.                                         review (77 FR 64959; October 24, 2012)                 greatest impediments to recovery. To
                                                DATES: Comments and information on                      for sDPS green sturgeon. Based on the                  better inform the recovery process, the
                                                the draft Plan must be received by close                5-year review, sDPS green sturgeon                     Plan further characterizes research
                                                of business on March 12, 2018.                          remains listed as threatened under the                 priorities in these areas as well as in the
                                                ADDRESSES: You may submit comments                      ESA. The 5-year review (NMFS 2014a)                    areas of competition for habitat, altered
                                                on this document by either of the                       was completed November 20, 2014, and                   prey base, non-native species, oil and
                                                following methods:                                      is available at: http://                               chemical spills, and disease.
                                                   • Electronic Submission: Submit all                  www.fisheries.noaa.gov/pr/species/fish/                   The Plan is not regulatory, but
                                                electronic public comments to                           green-sturgeon.html                                    presents guidance for use by agencies
                                                GreenSturgeon.Comments@noaa.gov.                                                                               and interested parties to assist in the
                                                                                                        Draft Recovery Plan                                    recovery of sDPS green sturgeon. The
                                                   • Mail: Submit written comments to
                                                the National Marine Fisheries Service,                     Recovery plans describe actions                     Plan identifies substantive actions
                                                Attn: GS Recovery Plan Team, 650                        beneficial to the conservation and                     needed to achieve recovery by assessing
                                                Capitol Mall, Suite 5–100, Sacramento,                  recovery of species listed under the ESA               the species’ population abundance,
                                                CA 95814.                                               of 1973, as amended (16 U.S.C. 1531 et                 distribution, and diversity and
                                                   Instructions: You must submit                        seq.). Section 4(f)(1) of the ESA requires             addressing the threats to the species.
                                                comments by one of the above methods                    that recovery plans incorporate, to the                When determining recovery actions, the
                                                to ensure that we receive, document,                    maximum extent practicable: (1)                        Plan prioritized actions that address the
                                                and consider them. Comments sent by                     Objective, measurable criteria which,                  most important threats, improve
                                                any other method, to any other address                  when met, would result in a                            understanding of whether a particular
                                                or individual, or received after the end                determination that the species is no                   threat is limiting recovery, and improve
                                                of the comment period, may not be                       longer threatened or endangered; (2)                   our understanding of, and ability to
                                                considered. All comments received are                   site-specific management actions                       manage, that threat. The actions in the
                                                a part of the public record and will                    necessary to achieve the Plan’s goals;                 Plan include research, management,
                                                generally be posted for public viewing                  and (3) estimates of the time required                 monitoring, and outreach efforts,
                                                without change. All personal identifying                                                                       because a comprehensive approach to
                                                                                                        and costs to implement recovery
                                                information (e.g., name, address, etc.),                                                                       green sturgeon recovery is likely to have
                                                                                                        actions. The ESA requires the
                                                                                                                                                               greater success than focusing on any one
                                                confidential business information, or                   development of recovery plans for each
                                                                                                                                                               type of action.
                                                otherwise sensitive information                         listed species unless such a plan would                   We expect the Plan to inform section
                                                submitted voluntarily by the sender will                not promote its recovery.                              7 consultations with Federal agencies
                                                be publicly accessible.                                    The Plan for sDPS green sturgeon was                under the ESA and to support other ESA
                                                   The draft recovery plan is available                 developed by NMFS in cooperation                       decisions, such as considering permits
                                                online at: http://                                      with a recovery team made up of experts                under section 10. We have already
                                                www.westcoast.fisheries.noaa.gov/                       from the California Department of Fish                 begun implementation of several actions
                                                protected_species/green_sturgeon/                       and Wildlife, California Department of                 and research priorities as described in
                                                green_sturgeon_pg.html.                                 Water Resources, Oregon Department of                  the plan, such as partnering with the
                                                FOR FURTHER INFORMATION CONTACT: Joe                    Fish and Wildlife, NMFS Northwest and                  California Department of Fish and
                                                Heublein, NMFS Green Sturgeon                           Southwest Fisheries Science Center, R2                 Wildlife to reduce poaching and
                                                Recovery Coordinator, at (916) 930–                     Resource Consultants, U.S. Bureau of                   stranding of green sturgeon and improve
                                                3719, or joe.heublein@noaa.gov.                         Reclamation, U.S. Fish and Wildlife                    knowledge of the impacts of fisheries
                                                SUPPLEMENTARY INFORMATION:                              Service, and U.S. Geological Survey.                   bycatch. After public comment and the
                                                                                                           NMFS’s goal is to restore the                       adoption of the Final Recovery Plan, we
                                                Background                                              threatened sDPS green sturgeon to the                  will continue to implement actions in
                                                  On April 7, 2006, we, NMFS, listed                    point where it is a self-sustaining                    the plan for which we have authority,
                                                the southern distinct population                        species that no longer needs the                       encourage other Federal and state
                                                segment (sDPS) of green sturgeon as a                   protections of the ESA. The Plan                       agencies to implement recovery actions
                                                threatened species under the                            provides background on the natural                     for which they have responsibility and
                                                Endangered Species Act (ESA) (71 FR                     history of green sturgeon, population
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                               authority, and work cooperatively with
                                                17757). This determination was based                    status, and threats to their viability,                them on the implementation of those
                                                on: (1) The fact that the spawning adult                based on a formal threats assessment.                  actions.
                                                population occurred in only one river                   The Plan lays out a recovery strategy to                  The total time and cost to recovery are
                                                system (i.e., Sacramento River); (2)                    address the threats based on the best                  difficult to predict. The Plan outlines 19
                                                evidence of lost spawning habitat in the                available science, identifies site-specific            recovery actions, as well as 17 research,
                                                Sacramento and Feather rivers; (3)                      actions with time lines and costs, and                 eight monitoring, and two education
                                                threats to habitat quality and quantity in              includes recovery goals and criteria.                  and outreach priorities. An estimated


                                           VerDate Sep<11>2014   15:58 Jan 08, 2018   Jkt 244001   PO 00000   Frm 00014   Fmt 4703   Sfmt 4703   E:\FR\FM\09JAN1.SGM   09JAN1


                                                                               Federal Register / Vol. 83, No. 6 / Tuesday, January 9, 2018 / Notices                                                      1027

                                                cost is provided for an initial 20-year                   Dated: January 4, 2018.                              hazards; expanded monitoring
                                                period. Projections of when certain                     Angela Somma,                                          programs; installed a sentinel site for
                                                actions could occur are provided based                  Chief, Endangered Species Conservation                 monitoring marsh ecosystem response
                                                on five year increments. Assuming all                   Division, Office of Protected Resources,               to sea level rise; upgraded exhibits;
                                                recovery actions are implemented, the                   National Marine Fisheries Service.                     conducted training workshops;
                                                cost of the first 20 years of recovery is               [FR Doc. 2018–00208 Filed 1–8–18; 8:45 am]             implemented K–12 education programs;
                                                approximately $236 million. Given a                     BILLING CODE 3510–22–P                                 purchased a marsh; installed a trail; and
                                                generation time for sDPS green sturgeon                                                                        promoted reclamation of ghost crab
                                                of approximately 22 years, a substantial                                                                       pots.
                                                                                                        DEPARTMENT OF COMMERCE                                    The total number of acres within the
                                                increase in adult abundance in response
                                                                                                                                                               boundary is 116,116 acres, which is a
                                                to habitat-based recovery actions may                   National Oceanic and Atmospheric                       modification of the original 114,665
                                                not be observed for 66–88 years.                        Administration                                         acres identified in the previous
                                                Additional funds will thus likely be                                                                           management plan. The revised acreage
                                                needed to monitor adult abundance                       National Estuarine Research Reserve                    is a result of updated mapping
                                                after the first 20 years, with a total                  System                                                 techniques rather than a boundary
                                                added projected cost of $25–40 million.                                                                        expansion resulting from inclusion of
                                                                                                        AGENCY:  Office for Coastal Management,
                                                   Many of the most costly recovery                     National Ocean Service, National                       new habitats. The revised management
                                                actions (e.g., barrier removal, increased               Oceanic and Atmospheric                                plan will serve as the guiding document
                                                enforcement, addressing entrainment at                  Administration, U.S. Department of                     for the Jacques Cousteau Reserve for the
                                                diversions) have multi-species benefits                 Commerce.                                              next five years.
                                                and may be covered under recovery                                                                                 NOAA’s Office Coastal Management
                                                                                                        ACTION: Notice of public comment
                                                                                                                                                               will be conducting an environmental
                                                efforts for other species. For example,                 period for the Jacques Cousteau                        analysis in accordance with the
                                                the recovery plan for ESA-listed Central                National Estuarine Research Reserve                    National Environmental Policy Act on
                                                Valley salmonids (NMFS 2014b)                           Management Plan revision.                              the proposed approval of the Reserve’s
                                                includes recovery actions designed to                                                                          revised management plan. The public is
                                                improve watershed-wide processes that                   FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                               invited to provide comment or
                                                will likely benefit sDPS green sturgeon                 Nina Garfield at (240) 533–0817 or Kim
                                                                                                                                                               information about any potential
                                                by restoring natural ecosystem                          Texeira at (240) 533–0781 of NOAA’s                    environmental impacts of the proposed
                                                functions. Specific actions to improve                  Office for Coastal Management, 1305                    action, and these comments will be used
                                                delta habitat, remove barriers, and                     East-West Highway, N/ORM5, 10th                        to inform the decision making process.
                                                reduce entrainment could aid in the                     floor, Silver Spring, MD 20910.                           View the Jacques Cousteau Reserve
                                                recovery of sDPS green sturgeon and                     SUPPLEMENTARY INFORMATON: Notice is                    Management Plan revision at (https://
                                                reduce the recovery plan cost by $17                    hereby given that the Office for Coastal               jcnerr.org/JCNERR_MNGMTPLAN_
                                                million.                                                Management, National Ocean Service,                    2018to2023.pdf) and provide comments
                                                                                                        National Oceanic and Atmospheric                       to the Reserve’s Assistant Manager, Lisa
                                                   We are unable to quantify the                        Administration, U.S. Department of                     Auermuller (auermull@
                                                economic benefits of sDPS green                         Commerce is announcing a thirty-day                    marine.rutgers.edu).
                                                sturgeon recovery actions, but full                     public comment period for the Jacques
                                                recovery or delisting will provide                      Cousteau National Estuarine Research                   Keelin Kuipers,
                                                multiple benefits to the ecosystem and                  Reserve Management Plan revision.                      Acting Deputy Director, Office for Coastal
                                                economy. Delisting of the sDPS will                     Pursuant to 15 CFR 921.33(c), the                      Management National Ocean Service,
                                                enhance fishing opportunities by lifting                                                                       National Oceanic and Atmospheric
                                                                                                        revised plan will bring the reserve into
                                                                                                                                                               Administration.
                                                fisheries restrictions aimed at reducing                compliance. The Jacques Cousteau
                                                                                                                                                               [FR Doc. 2018–00182 Filed 1–8–18; 8:45 am]
                                                direct or incidental sDPS mortality. The                Reserve revised plan will replace the
                                                                                                                                                               BILLING CODE 3510–08–P
                                                ESA regulatory burden will also be                      plan approved in 2009.
                                                eased for fisheries, water resource,                       The revised management plan
                                                industrial, and commercial activities.                  outlines the administrative structure;
                                                Accomplishing the habitat restoration                   the research/monitoring, stewardship,                  CONSUMER PRODUCT SAFETY
                                                                                                        education, and training programs and                   COMMISSION
                                                measures will also result in more
                                                functional ecosystems that support                      priorities of the reserve; plans for a
                                                                                                                                                               Sunshine Act Meeting Notice
                                                other economic activities and contribute                proposed future boundary expansion
                                                to delisting of other species.                          through inclusion of past and future                   TIME AND DATE: Monday, January 8,
                                                                                                        land acquisition; and facility                         2018; 1:00 p.m.*
                                                References Cited                                        development priorities to support                      PLACE: Hearing Room 420, Bethesda
                                                                                                        reserve operations.                                    Towers, 4330 East West Highway,
                                                  The complete citations for the                           The Jacques Cousteau Reserve takes
                                                references used in this document can be                                                                        Bethesda, MD 20814.
                                                                                                        an integrated approach to management,
                                                obtained by contacting NMFS (see                                                                               STATUS: Commission Meeting—Closed
                                                                                                        linking research and education, coastal
                                                ADDRESSES and FOR FURTHER                                                                                      to the Public.
                                                                                                        training, and stewardship functions.
                                                INFORMATION CONTACT) or online at:                      The Rutgers University has outlined                    MATTER TO BE CONSIDERED: Compliance
sradovich on DSK3GMQ082PROD with NOTICES




                                                http://                                                 how it will administer the reserve and                 Matter: The Commission staff will brief
                                                www.westcoast.fisheries.noaa.gov/                       its core programs by providing detailed                the Commission on the status of a
                                                protected_species/green_sturgeon/                       actions that will enable it to accomplish              compliance matter.
                                                green_sturgeon_pg.html.                                 specific goals and objectives. Since the
                                                                                                                                                                 * The Commission unanimously determined by
                                                   Authority: 16 U.S.C. 1531 et seq.                    last management plan, the reserve has:                 recorded vote that Agency business requires calling
                                                                                                        Provided technical expertise to coastal                the meeting without seven calendar days advance
                                                                                                        communities to reduce risks to natural                 public notice.



                                           VerDate Sep<11>2014   15:58 Jan 08, 2018   Jkt 244001   PO 00000   Frm 00015   Fmt 4703   Sfmt 4703   E:\FR\FM\09JAN1.SGM   09JAN1



Document Created: 2018-01-09 02:18:45
Document Modified: 2018-01-09 02:18:45
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability; request for comments.
DatesComments and information on the draft Plan must be received by close of business on March 12, 2018.
ContactJoe Heublein, NMFS Green Sturgeon Recovery Coordinator, at (916) 930-3719, or [email protected]
FR Citation83 FR 1025 
RIN Number0648-XF89

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR