83_FR_11204 83 FR 11154 - Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in Instrumentation and Control Systems

83 FR 11154 - Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in Instrumentation and Control Systems

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 83, Issue 50 (March 14, 2018)

Page Range11154-11155
FR Document2018-04958

The U.S. Nuclear Regulatory Commission (NRC) is seeking public comment on the draft Regulatory Issue Summary (RIS) 2002-22, Supplement 1, ``Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in Instrumentation and Control Systems.'' This RIS Supplement clarifies the guidance in RIS 2002-22, which remains in effect. The NRC continues to endorse Nuclear Energy Institute 01-01 (NEI-01-01) as stated in RIS 2002-22, as clarified by the RIS Supplement.

Federal Register, Volume 83 Issue 50 (Wednesday, March 14, 2018)
[Federal Register Volume 83, Number 50 (Wednesday, March 14, 2018)]
[Proposed Rules]
[Pages 11154-11155]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-04958]


========================================================================
Proposed Rules
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains notices to the public of 
the proposed issuance of rules and regulations. The purpose of these 
notices is to give interested persons an opportunity to participate in 
the rule making prior to the adoption of the final rules.

========================================================================


Federal Register / Vol. 83, No. 50 / Wednesday, March 14, 2018 / 
Proposed Rules

[[Page 11154]]



NUCLEAR REGULATORY COMMISSION

10 CFR Chapter I

[NRC-2018-0044]


Clarification on Endorsement of Nuclear Energy Institute Guidance 
in Designing Digital Upgrades in Instrumentation and Control Systems

AGENCY: Nuclear Regulatory Commission.

ACTION: Draft regulatory issue summary; request for comment and public 
meeting.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is seeking public 
comment on the draft Regulatory Issue Summary (RIS) 2002-22, Supplement 
1, ``Clarification on Endorsement of Nuclear Energy Institute Guidance 
in Designing Digital Upgrades in Instrumentation and Control Systems.'' 
This RIS Supplement clarifies the guidance in RIS 2002-22, which 
remains in effect. The NRC continues to endorse Nuclear Energy 
Institute 01-01 (NEI-01-01) as stated in RIS 2002-22, as clarified by 
the RIS Supplement.

DATES: Submit comments by March 29, 2018. Comments received after this 
date will be considered if it is practical to do so, but the Commission 
is able to ensure consideration only for comments received before this 
date.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2018-0044. Address 
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact 
the individuals listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     Mail comments to: May Ma, Office of Administration, Mail 
Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Tekia Govan, Office of Nuclear Reactor 
Regulation (NRR), telephone: 301-415-6197, email: [email protected] 
of the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2018-0044 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking Website: Go to http://www.regulations.gov and search for Docket ID NRC-2018-0044.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
draft RIS is available in ADAMS under Accession No. ML18051A084.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

B. Submitting Comments

    Please include Docket ID NRC-2018-0044 in your comment submission.
    The NRC cautions you not to include identifying or contact 
information that you do not want to be publicly disclosed in your 
comment submission. The NRC will post all comment submissions at http://www.regulations.gov as well as enter the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Background

    The RIS is intended for all holders of and applicants for power 
reactor operating licenses or construction permits under 10 CFR part 
50, ``Domestic Licensing of Production and Utilization Facilities,'' 
all holders of, and applicants for, a power reactor combined license, 
standard design approval, or manufacturing license, and all applicants 
for a standard design certification, under 10 CFR part 52, ``Licenses, 
Certifications, and Approvals for Nuclear Power Plants,'' and all 
holders of, and applicants for, a construction permit or an operating 
license for non-power production or utilization facilities under 10 CFR 
part 50, including all existing non-power reactors and proposed 
facilities for the production of medical radioisotopes, such as 
molybdenum-99, except those that have permanently ceased operations and 
have returned all of their fuel to the U.S. Department of Energy.
    In 2002, the NRC staff issued RIS 2002-22 to notify addressees that 
the NRC staff had reviewed NEI-01-01 and was endorsing the report for 
use as guidance in designing and implementing digital upgrades to 
nuclear power plant instrumentation and control systems. Following the 
NRC staff's 2002 endorsement of NEI 01-01, holders of operating 
licenses have used this guidance in support of digital design 
modifications implemented without prior NRC approval in accordance with 
10 CFR 50.59. The NRC inspections of documentation for these activities 
uncovered inconsistencies in the performance and documentation of 
engineering evaluations and associated technical bases for 
determinations on the 10 CFR 50.59(c)(2) evaluation criteria. This RIS 
Supplement clarifies

[[Page 11155]]

the RIS 2002-22 endorsement of the NEI 01-01 guidance by providing 
additional guidance for developing and documenting ``qualitative 
assessments'' that are used to provide an adequate basis for a 
licensee's determination that a digital modification will exhibit a low 
likelihood of failure to support a conclusion when applying 10 CFR 
50.59 that a license amendment is not needed.
    The NRC published a notice of opportunity for public comment on 
this RIS in the Federal Register on July 3, 2017 (82 FR 30913). 
Following that notice, the NRC staff engaged in multiple communications 
with the public and stakeholders and continued internal discussions 
about the RIS. As a result of these efforts, the NRC has substantially 
rewritten the RIS. Due to the extensive nature of these revisions, and 
in light of this additional opportunity for comment, the NRC is not 
directly responding to each comment received in the previous comment 
period. All comments and other communications associated with the 
previous version of this RIS can be found in ADAMS under Accession No. 
ML18039A804.

Proposed Action

    The NRC is requesting public comments on the draft RIS. To the 
extent that the NRC's revisions have not resolved a comment that was 
submitted in the previous comment period, the NRC asks that such 
comments be resubmitted for further consideration. Because of the 
extensive communication about this RIS, the NRC believes that 
stakeholders will be able to submit comments quickly. In addition, the 
NRC seeks to issue this RIS as expeditiously as possible to minimize 
misunderstandings about the NRC's requirements for digital I&C 
modifications under 10 CFR 50.59. Therefore, the NRC is publishing the 
draft RIS with a 15 day comment period. Requests for extension of the 
comment period may be submitted as described above in the ADDRESSEES 
section.
    The NRC is also requesting specific comments on Figure 1 in the 
attachment of the draft RIS:
     Does Figure 1 clearly explain the engineering evaluation 
process (as described in Section 4 of the RIS attachment) to determine 
sufficient dependability, which may be used in performing and 
documenting a qualitative assessment (as described in Section 3 of the 
RIS attachment)?
     How could the figure and/or explanatory text in the draft 
RIS be modified to clarify the relationship between the engineering 
evaluation and qualitative assessment approaches described in the draft 
RIS?
    The NRC plans to hold a public meeting to discuss this RIS and the 
issues associated with clarification of the applicability of the 
endorsed NEI 01-01 guidance. All comments that are to receive 
consideration in the final RIS must still be submitted electronically 
or in writing as indicated in the ADDRESSES section of this document. 
Additional details regarding the meeting will be posted at least 10 
days prior to the public meeting on the NRC's Public Meeting Schedule 
website at http://www.nrc.gov/public-involve/public-meetings/index.cfm. 
The NRC staff will make a final determination regarding issuance of the 
RIS after it considers any public comments received in response to this 
request.

    Dated at Rockville, Maryland, this day of March 7, 2018.

    For the Nuclear Regulatory Commission.
Tekia Govan,
Project Manager, ROP Support and Generic Communication Branch, Division 
of Inspection and Regional Support, Office of Nuclear Reactor 
Regulation.
[FR Doc. 2018-04958 Filed 3-13-18; 8:45 am]
 BILLING CODE 7590-01-P



                                                 11154

                                                 Proposed Rules                                                                                                Federal Register
                                                                                                                                                               Vol. 83, No. 50

                                                                                                                                                               Wednesday, March 14, 2018



                                                 This section of the FEDERAL REGISTER                      For additional direction on obtaining               comment submissions to remove
                                                 contains notices to the public of the proposed          information and submitting comments,                  identifying or contact information.
                                                 issuance of rules and regulations. The                  see ‘‘Obtaining Information and                         If you are requesting or aggregating
                                                 purpose of these notices is to give interested          Submitting Comments’’ in the                          comments from other persons for
                                                 persons an opportunity to participate in the            SUPPLEMENTARY INFORMATION section of                  submission to the NRC, then you should
                                                 rule making prior to the adoption of the final
                                                 rules.
                                                                                                         this document.                                        inform those persons not to include
                                                                                                         FOR FURTHER INFORMATION CONTACT:                      identifying or contact information that
                                                                                                         Tekia Govan, Office of Nuclear Reactor                they do not want to be publicly
                                                 NUCLEAR REGULATORY                                      Regulation (NRR), telephone: 301–415–                 disclosed in their comment submission.
                                                 COMMISSION                                              6197, email: Tekia.Govan@nrc.gov of                   Your request should state that the NRC
                                                                                                         the U.S. Nuclear Regulatory                           does not routinely edit comment
                                                 10 CFR Chapter I                                        Commission, Washington, DC 20555–                     submissions to remove such information
                                                 [NRC–2018–0044]                                         0001.                                                 before making the comment
                                                                                                                                                               submissions available to the public or
                                                                                                         SUPPLEMENTARY INFORMATION:
                                                 Clarification on Endorsement of                                                                               entering the comment into ADAMS.
                                                 Nuclear Energy Institute Guidance in                    I. Obtaining Information and                          II. Background
                                                 Designing Digital Upgrades in                           Submitting Comments
                                                 Instrumentation and Control Systems                                                                              The RIS is intended for all holders of
                                                                                                         A. Obtaining Information                              and applicants for power reactor
                                                 AGENCY:  Nuclear Regulatory                                Please refer to Docket ID NRC–2018–                operating licenses or construction
                                                 Commission.                                             0044 when contacting the NRC about                    permits under 10 CFR part 50,
                                                 ACTION: Draft regulatory issue summary;                 the availability of information for this              ‘‘Domestic Licensing of Production and
                                                 request for comment and public                          action. You may obtain publicly-                      Utilization Facilities,’’ all holders of,
                                                 meeting.                                                available information related to this                 and applicants for, a power reactor
                                                                                                         action by any of the following methods:               combined license, standard design
                                                 SUMMARY:    The U.S. Nuclear Regulatory                    • Federal Rulemaking Website: Go to                approval, or manufacturing license, and
                                                 Commission (NRC) is seeking public                      http://www.regulations.gov and search                 all applicants for a standard design
                                                 comment on the draft Regulatory Issue                   for Docket ID NRC–2018–0044.                          certification, under 10 CFR part 52,
                                                 Summary (RIS) 2002–22, Supplement 1,                       • NRC’s Agencywide Documents                       ‘‘Licenses, Certifications, and Approvals
                                                 ‘‘Clarification on Endorsement of                       Access and Management System                          for Nuclear Power Plants,’’ and all
                                                 Nuclear Energy Institute Guidance in                    (ADAMS): You may obtain publicly-                     holders of, and applicants for, a
                                                 Designing Digital Upgrades in                           available documents online in the                     construction permit or an operating
                                                 Instrumentation and Control Systems.’’                  ADAMS Public Documents collection at                  license for non-power production or
                                                 This RIS Supplement clarifies the                       http://www.nrc.gov/reading-rm/                        utilization facilities under 10 CFR part
                                                 guidance in RIS 2002–22, which                          adams.html. To begin the search, select               50, including all existing non-power
                                                 remains in effect. The NRC continues to                 ‘‘ADAMS Public Documents’’ and then                   reactors and proposed facilities for the
                                                 endorse Nuclear Energy Institute 01–01                  select ‘‘Begin Web-based ADAMS                        production of medical radioisotopes,
                                                 (NEI–01–01) as stated in RIS 2002–22,                   Search.’’ For problems with ADAMS,                    such as molybdenum-99, except those
                                                 as clarified by the RIS Supplement.                     please contact the NRC’s Public                       that have permanently ceased
                                                 DATES: Submit comments by March 29,                     Document Room (PDR) reference staff at                operations and have returned all of their
                                                 2018. Comments received after this date                 1–800–397–4209, 301–415–4737, or by                   fuel to the U.S. Department of Energy.
                                                 will be considered if it is practical to do             email to pdr.resource@nrc.gov. The draft                 In 2002, the NRC staff issued RIS
                                                 so, but the Commission is able to ensure                RIS is available in ADAMS under                       2002–22 to notify addressees that the
                                                 consideration only for comments                         Accession No. ML18051A084.                            NRC staff had reviewed NEI–01–01 and
                                                 received before this date.                                 • NRC’s PDR: You may examine and                   was endorsing the report for use as
                                                 ADDRESSES: You may submit comments                      purchase copies of public documents at                guidance in designing and
                                                 by any of the following methods:                        the NRC’s PDR, Room O1–F21, One                       implementing digital upgrades to
                                                    • Federal Rulemaking Website: Go to                  White Flint North, 11555 Rockville                    nuclear power plant instrumentation
                                                 http://www.regulations.gov and search                   Pike, Rockville, Maryland 20852.                      and control systems. Following the NRC
                                                 for Docket ID NRC–2018–0044. Address                                                                          staff’s 2002 endorsement of NEI 01–01,
                                                 questions about NRC dockets to Jennifer                 B. Submitting Comments                                holders of operating licenses have used
                                                 Borges; telephone: 301–287–9127;                          Please include Docket ID NRC–2018–                  this guidance in support of digital
                                                 email: Jennifer.Borges@nrc.gov. For                     0044 in your comment submission.                      design modifications implemented
                                                 technical questions, contact the                          The NRC cautions you not to include                 without prior NRC approval in
daltland on DSKBBV9HB2PROD with PROPOSALS




                                                 individuals listed in the FOR FURTHER                   identifying or contact information that               accordance with 10 CFR 50.59. The NRC
                                                 INFORMATION CONTACT section of this                     you do not want to be publicly                        inspections of documentation for these
                                                 document.                                               disclosed in your comment submission.                 activities uncovered inconsistencies in
                                                    • Mail comments to: May Ma, Office                   The NRC will post all comment                         the performance and documentation of
                                                 of Administration, Mail Stop: TWFN–7–                   submissions at http://                                engineering evaluations and associated
                                                 A60M, U.S. Nuclear Regulatory                           www.regulations.gov as well as enter the              technical bases for determinations on
                                                 Commission, Washington, DC 20555–                       comment submissions into ADAMS.                       the 10 CFR 50.59(c)(2) evaluation
                                                 0001.                                                   The NRC does not routinely edit                       criteria. This RIS Supplement clarifies


                                            VerDate Sep<11>2014   16:23 Mar 13, 2018   Jkt 244001   PO 00000   Frm 00001   Fmt 4702   Sfmt 4702   E:\FR\FM\14MRP1.SGM   14MRP1


                                                                       Federal Register / Vol. 83, No. 50 / Wednesday, March 14, 2018 / Proposed Rules                                         11155

                                                 the RIS 2002–22 endorsement of the NEI                  qualitative assessment approaches                     Act (CAA). EPA is also proposing to
                                                 01–01 guidance by providing additional                  described in the draft RIS?                           conditionally approve certain
                                                 guidance for developing and                                The NRC plans to hold a public                     provisions of this SIP revision, based
                                                 documenting ‘‘qualitative assessments’’                 meeting to discuss this RIS and the                   upon Pennsylvania’s commitment to
                                                 that are used to provide an adequate                    issues associated with clarification of               submit additional enforceable measures
                                                 basis for a licensee’s determination that               the applicability of the endorsed NEI                 that meet RACT. This action is being
                                                 a digital modification will exhibit a low               01–01 guidance. All comments that are                 taken under the CAA.
                                                 likelihood of failure to support a                      to receive consideration in the final RIS             DATES: Written comments must be
                                                 conclusion when applying 10 CFR 50.59                   must still be submitted electronically or             received on or before April 13, 2018.
                                                 that a license amendment is not needed.                 in writing as indicated in the ADDRESSES              ADDRESSES: Submit your comments,
                                                    The NRC published a notice of                        section of this document. Additional                  identified by Docket ID No. EPA–R03–
                                                 opportunity for public comment on this                  details regarding the meeting will be                 OAR–2017–0290 at http://
                                                 RIS in the Federal Register on July 3,                  posted at least 10 days prior to the                  www.regulations.gov, or via email to
                                                 2017 (82 FR 30913). Following that                      public meeting on the NRC’s Public                    Spielberger.susan@epa.gov. For
                                                 notice, the NRC staff engaged in                        Meeting Schedule website at http://                   comments submitted at Regulations.gov,
                                                 multiple communications with the                        www.nrc.gov/public-involve/public-                    follow the online instructions for
                                                 public and stakeholders and continued                   meetings/index.cfm. The NRC staff will                submitting comments. Once submitted,
                                                 internal discussions about the RIS. As a                make a final determination regarding                  comments cannot be edited or removed
                                                 result of these efforts, the NRC has                    issuance of the RIS after it considers any            from Regulations.gov. For either manner
                                                 substantially rewritten the RIS. Due to                 public comments received in response                  of submission, EPA may publish any
                                                 the extensive nature of these revisions,                to this request.                                      comment received to its public docket.
                                                 and in light of this additional                           Dated at Rockville, Maryland, this day of           Do not submit electronically any
                                                 opportunity for comment, the NRC is                     March 7, 2018.                                        information you consider to be
                                                 not directly responding to each                           For the Nuclear Regulatory Commission.              confidential business information (CBI)
                                                 comment received in the previous                        Tekia Govan,                                          or other information whose disclosure is
                                                 comment period. All comments and                        Project Manager, ROP Support and Generic              restricted by statute. Multimedia
                                                 other communications associated with                    Communication Branch, Division of                     submissions (audio, video, etc.) must be
                                                 the previous version of this RIS can be                 Inspection and Regional Support, Office of            accompanied by a written comment.
                                                 found in ADAMS under Accession No.                      Nuclear Reactor Regulation.                           The written comment is considered the
                                                 ML18039A804.                                            [FR Doc. 2018–04958 Filed 3–13–18; 8:45 am]           official comment and should include
                                                 Proposed Action                                         BILLING CODE 7590–01–P                                discussion of all points you wish to
                                                                                                                                                               make. EPA will generally not consider
                                                    The NRC is requesting public                                                                               comments or comment contents located
                                                 comments on the draft RIS. To the                                                                             outside of the primary submission (i.e.
                                                 extent that the NRC’s revisions have not                ENVIRONMENTAL PROTECTION
                                                                                                                                                               on the web, cloud, or other file sharing
                                                 resolved a comment that was submitted                   AGENCY
                                                                                                                                                               system). For additional submission
                                                 in the previous comment period, the                     40 CFR Part 52                                        methods, please contact the person
                                                 NRC asks that such comments be                                                                                identified in the ‘‘For Further
                                                 resubmitted for further consideration.                  [EPA–R03–OAR–2017–0290; FRL–9975–14–                  Information Contact’’ section. For the
                                                 Because of the extensive                                Region 3]                                             full EPA public comment policy,
                                                 communication about this RIS, the NRC                                                                         information about CBI or multimedia
                                                 believes that stakeholders will be able to              Approval and Promulgation of Air
                                                                                                                                                               submissions, and general guidance on
                                                 submit comments quickly. In addition,                   Quality Implementation Plans;
                                                                                                                                                               making effective comments, please visit
                                                 the NRC seeks to issue this RIS as                      Pennsylvania; Regulatory
                                                                                                                                                               http://www2.epa.gov/dockets/
                                                 expeditiously as possible to minimize                   Amendments Addressing Reasonably
                                                                                                                                                               commenting-epa-dockets.
                                                 misunderstandings about the NRC’s                       Available Control Technology
                                                                                                                                                               FOR FURTHER INFORMATION CONTACT:
                                                 requirements for digital I&C                            Requirements Under the 1997 and 2008
                                                                                                         8-Hour Ozone National Ambient Air                     Emlyn Vélez-Rosa, (215) 814–2038, or
                                                 modifications under 10 CFR 50.59.                                                                             by email at velez-rosa.emlyn@epa.gov.
                                                 Therefore, the NRC is publishing the                    Quality Standards
                                                                                                                                                               SUPPLEMENTARY INFORMATION: On May
                                                 draft RIS with a 15 day comment period.                 AGENCY:  Environmental Protection                     16, 2016, the Pennsylvania Department
                                                 Requests for extension of the comment                   Agency (EPA).                                         of Environmental Protection (PADEP)
                                                 period may be submitted as described                                                                          submitted a revision to the
                                                                                                         ACTION: Proposed rule.
                                                 above in the ADDRESSEES section.                                                                              Pennsylvania SIP consisting of
                                                    The NRC is also requesting specific                  SUMMARY:   The Environmental Protection               amendments to regulations in 25 Pa.
                                                 comments on Figure 1 in the attachment                  Agency (EPA) is proposing rulemaking                  Code Chapters 121 and 129, to meet
                                                 of the draft RIS:                                       action on a state implementation plan                 certain RACT requirements of the CAA
                                                    • Does Figure 1 clearly explain the                  (SIP) revision submitted by the                       for both the 1997 and 2008 8-hour ozone
                                                 engineering evaluation process (as                      Commonwealth of Pennsylvania                          NAAQS.
                                                 described in Section 4 of the RIS                       (Pennsylvania or the Commonwealth).
                                                 attachment) to determine sufficient                     This revision consists of regulatory                  I. Background
daltland on DSKBBV9HB2PROD with PROPOSALS




                                                 dependability, which may be used in                     amendments intended to meet certain                      The Pennsylvania May 16, 2016 SIP
                                                 performing and documenting a                            reasonably available control technology               revision submitted by PADEP includes
                                                 qualitative assessment (as described in                 (RACT) requirements under the 1997                    the Pennsylvania regulations in 25 Pa.
                                                 Section 3 of the RIS attachment)?                       and 2008 8-hour ozone national ambient                Code sections 129.96–129.100 titled
                                                    • How could the figure and/or                        air quality standards (NAAQS). EPA is                 ‘‘Additional RACT Requirements for
                                                 explanatory text in the draft RIS be                    proposing to approve most parts of the                Major Sources of NOX and VOCs’’ (the
                                                 modified to clarify the relationship                    Pennsylvania SIP revision as meeting                  RACT II Rule) and amendments to 25
                                                 between the engineering evaluation and                  RACT requirements under the Clean Air                 Pa. Code section 121.1, including


                                            VerDate Sep<11>2014   16:23 Mar 13, 2018   Jkt 244001   PO 00000   Frm 00002   Fmt 4702   Sfmt 4702   E:\FR\FM\14MRP1.SGM   14MRP1



Document Created: 2018-03-14 01:06:46
Document Modified: 2018-03-14 01:06:46
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionProposed Rules
ActionDraft regulatory issue summary; request for comment and public meeting.
DatesSubmit comments by March 29, 2018. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received before this date.
ContactTekia Govan, Office of Nuclear Reactor Regulation (NRR), telephone: 301-415-6197, email: [email protected] of the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
FR Citation83 FR 11154 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR