83_FR_11242 83 FR 11192 - Pioneer Valley Renewables; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

83 FR 11192 - Pioneer Valley Renewables; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 50 (March 14, 2018)

Page Range11192-11192
FR Document2018-05110

Federal Register, Volume 83 Issue 50 (Wednesday, March 14, 2018)
[Federal Register Volume 83, Number 50 (Wednesday, March 14, 2018)]
[Notices]
[Page 11192]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-05110]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14868-000]


Pioneer Valley Renewables; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On February 13, 2018, Pioneer Valley Renewables, filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Scotlandville Bend Project (Scotlandville Project or project) to be 
located on the Mississippi River, in West Baton Rouge and East Baton 
Rouge Parishes, Louisiana. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of the following: (1) Four 
underwater, carbon fiber shroud and blade design turbine-generating 
units, each with a diameter of 18 meters and a cross section of 4 
meters; (2) each pair of units will be mounted on a riverbed secured 
piling, 30 meters apart; (3) flexible cables would convey power to a 
metering station; and (4) a transmission line would interconnect with 
the power grid. Each unit would have an installed capacity of 1.5 
megawatts for a total generating capacity of 6 megawatts. The proposed 
project would have an estimated average annual generation of 40,000 
megawatt-hours, which would be sold.
    Applicant Contact: Mr. Mark D. Farb, Pioneer Valley Renewables, 240 
Central Avenue, 1J, Lawrence, New York 11559; phone: (631) 552-0284.
    FERC Contact: Michael Spencer, (202) 502-6093, 
[email protected]
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14868-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the eLibrary link of 
Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14868) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: March 7, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-05110 Filed 3-13-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               11192                       Federal Register / Vol. 83, No. 50 / Wednesday, March 14, 2018 / Notices

                                               identifying information requested by the                Avenue, 1J, Lawrence, New York 11559;                 Mountain Time at the Colorado Public
                                               Department while processing the                         phone: (631) 552–0284.                                Utilities Commission, Hearing Room A,
                                               request, to distinguish between                            FERC Contact: Michael Spencer, (202)               1560 Broadway, Suite 250, Denver, CO
                                               individuals with the same name. Your                    502–6093, michael.spencer@ferc.gov                    80202. The phone number is (303) 894–
                                               request must meet the requirements of                      Deadline for filing comments, motions              2533.
                                               the Department’s Privacy Act                            to intervene, competing applications                     The discussions may address matters
                                               regulations at 34 CFR 5b.5, including                   (without notices of intent), or notices of            at issue in the following proceedings:
                                               proof of identity.                                      intent to file competing applications: 60             Docket No. ER12–1179, Southwest Power
                                                                                                       days from the issuance of this notice.                  Pool, Inc.
                                               EXEMPTIONS PROMULGATED FOR THE SYSTEM:                  Competing applications and notices of                 Docket No. ER15–1809, ATX Southwest, LLC
                                                  None.                                                intent must meet the requirements of 18               Docket No. ER15–2028, Southwest Power
                                               HISTORY:
                                                                                                       CFR 4.36.                                               Pool, Inc.
                                                                                                          The Commission strongly encourages                 Docket No. ER15–2115, Southwest Power
                                                  None.                                                electronic filing. Please file comments,                Pool, Inc.
                                               [FR Doc. 2018–05195 Filed 3–13–18; 8:45 am]             motions to intervene, notices of intent,              Docket No. ER15–2236, Midwest Power
                                                                                                                                                               Transmission Arkansas, LLC
                                               BILLING CODE 4000–01–P                                  and competing applications using the
                                                                                                                                                             Docket No. ER15–2237, Kanstar
                                                                                                       Commission’s eFiling system at http://                  Transmission, LLC
                                                                                                       www.ferc.gov/docs-filing/efiling.asp.                 Docket No. ER15–2324, Southwest Power
                                               DEPARTMENT OF ENERGY                                    Commenters can submit brief comments                    Pool, Inc.
                                                                                                       up to 6,000 characters, without prior                 Docket No. ER15–2594, South Central MCN
                                               Federal Energy Regulatory                               registration, using the eComment system                 LLC
                                               Commission                                              at http://www.ferc.gov/docs-filing/                   Docket No. EL16–91, Southwest Power Pool,
                                                                                                       ecomment.asp. You must include your                     Inc.
                                               [Project No. 14868–000]                                                                                       Docket No. EL18–19, Southwest Power Pool,
                                                                                                       name and contact information at the end
                                                                                                                                                               Inc.
                                               Pioneer Valley Renewables; Notice of                    of your comments. For assistance,                     Docket No. EL16–108, Tilton Energy v.
                                               Preliminary Permit Application                          please contact FERC Online Support at                   Midcontinent Independent System
                                               Accepted for Filing and Soliciting                      FERCOnlineSupport@ferc.gov, (866)                       Operator, Inc.
                                               Comments, Motions To Intervene, and                     208–3676 (toll free), or (202) 502–8659               Docket No. EL16–110, Southwest Power Pool,
                                               Competing Applications                                  (TTY). In lieu of electronic filing, please             Inc.
                                                                                                       send a paper copy to: Secretary, Federal              Docket No. ER16–204, Southwest Power Pool,
                                                  On February 13, 2018, Pioneer Valley                 Energy Regulatory Commission, 888                       Inc.
                                               Renewables, filed an application for a                  First Street NE, Washington, DC 20426.                Docket No. ER16–2522, Southwest Power
                                               preliminary permit, pursuant to section                                                                         Pool, Inc.
                                                                                                       The first page of any filing should                   Docket No. ER16–2523, Southwest Power
                                               4(f) of the Federal Power Act (FPA),                    include docket number P–14868–000.
                                               proposing to study the feasibility of the                                                                       Pool, Inc.
                                                                                                          More information about this project,               Docket No. EL17–11, Alabama Power Co. v.
                                               Scotlandville Bend Project                              including a copy of the application, can                Southwest Power Pool, Inc.
                                               (Scotlandville Project or project) to be                be viewed or printed on the eLibrary                  Docket No. EL17–21, Kansas Electric Co. v.
                                               located on the Mississippi River, in                    link of Commission’s website at http://                 Southwest Power Pool, Inc.
                                               West Baton Rouge and East Baton Rouge                   www.ferc.gov/docs-filing/elibrary.asp.                Docket No. EL17–69, Buffalo Dunes et al. v.
                                               Parishes, Louisiana. The sole purpose of                Enter the docket number (P–14868) in                    Southwest Power Pool, Inc.
                                               a preliminary permit, if issued, is to                  the docket number field to access the                 Docket No. EL17–86, Nebraska Public Power
                                               grant the permit holder priority to file                                                                        District v. Southwest Power Pool, Inc.
                                                                                                       document. For assistance, contact FERC                Docket No. ER17–426, Southwest Power Pool,
                                               a license application during the permit                 Online Support.
                                               term. A preliminary permit does not                                                                             Inc.
                                                                                                         Dated: March 7, 2018.                               Docket No. ER17–428, Southwest Power Pool,
                                               authorize the permit holder to perform
                                                                                                       Kimberly D. Bose,                                       Inc.
                                               any land-disturbing activities or                                                                             Docket No. ER17–469, Southwest Power Pool,
                                               otherwise enter upon lands or waters                    Secretary.
                                                                                                                                                               Inc.
                                               owned by others without the owners’                     [FR Doc. 2018–05110 Filed 3–13–18; 8:45 am]           Docket No. ER17–772, Southwest Power Pool,
                                               express permission.                                     BILLING CODE 6717–01–P                                  Inc.
                                                  The proposed project would consist of                                                                      Docket No. ER17–889, Southwest Power Pool,
                                               the following: (1) Four underwater,                                                                             Inc.
                                               carbon fiber shroud and blade design                    DEPARTMENT OF ENERGY                                  Docket No. ER17–953, South Central MCN
                                               turbine-generating units, each with a                                                                           LLC
                                               diameter of 18 meters and a cross                       Federal Energy Regulatory                             Docket No. ER17–1092, Southwest Power
                                                                                                       Commission                                              Pool, Inc.
                                               section of 4 meters; (2) each pair of units                                                                   Docket No. ER17–1575, Southwest Power
                                               will be mounted on a riverbed secured                                                                           Pool, Inc.
                                                                                                       Notice of Attendance at the Colorado
                                               piling, 30 meters apart; (3) flexible                                                                         Docket No. ER17–2229, Southwest Power
                                                                                                       Public Utilities Commission’s Fifth
                                               cables would convey power to a                                                                                  Pool, Inc.
                                                                                                       Commissioner Information Meeting
                                               metering station; and (4) a transmission                                                                      Docket No. ER18–171, Southwest Power Pool,
                                               line would interconnect with the power                     The Federal Energy Regulatory                        Inc.
                                               grid. Each unit would have an installed                 Commission (Commission) hereby gives                  Docket No. ER18–194, Southwest Power Pool,
                                               capacity of 1.5 megawatts for a total                   notice that members of its staff may                    Inc.
daltland on DSKBBV9HB2PROD with NOTICES




                                               generating capacity of 6 megawatts. The                 attend the Colorado Public Utilities                  Docket No. ER18–195, Southwest Power Pool,
                                                                                                                                                               Inc.
                                               proposed project would have an                          Commission’s Commissioner                             Docket No. ER18–374, Southwest Power Pool,
                                               estimated average annual generation of                  Information Meeting (CIM) as noted                      Inc.
                                               40,000 megawatt-hours, which would be                   below. Their attendance is part of the                Docket No. ER18–381, Southwest Power Pool,
                                               sold.                                                   Commission’s ongoing outreach efforts.                  Inc.
                                                  Applicant Contact: Mr. Mark D. Farb,                    The CIM will be held on March 20,                  Docket No. ER18–499, Southwestern Electric
                                               Pioneer Valley Renewables, 240 Central                  2018 from 9:00 a.m. until 3:00 p.m.                     Power Company



                                          VerDate Sep<11>2014   18:17 Mar 13, 2018   Jkt 244001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\14MRN1.SGM   14MRN1



Document Created: 2018-03-14 01:06:25
Document Modified: 2018-03-14 01:06:25
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 11192 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR