83_FR_11246 83 FR 11196 - Commision Information Collection Activities (FERC-725Y), Comment Request; Extension

83 FR 11196 - Commision Information Collection Activities (FERC-725Y), Comment Request; Extension

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 50 (March 14, 2018)

Page Range11196-11197
FR Document2018-05102

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is submitting its information collection FERC-725Y, Mandatory Reliability Standards (Personnel Performance, Training, and Qualifications), to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission previously published a Notice in the Federal Register on 12/26/2017 requesting public comments. The Commission received no comments on the FERC-725Y information collection and is making this notation in its submittal to OMB.

Federal Register, Volume 83 Issue 50 (Wednesday, March 14, 2018)
[Federal Register Volume 83, Number 50 (Wednesday, March 14, 2018)]
[Notices]
[Pages 11196-11197]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-05102]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC18-2-000]


Commision Information Collection Activities (FERC-725Y), Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission, Department of Energy.

ACTION: Notice of extension of information collection and request for 
comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is submitting its information collection FERC-725Y, Mandatory 
Reliability Standards (Personnel Performance, Training, and 
Qualifications), to the Office of Management and Budget (OMB) for 
review of the information collection requirements.
    Any interested person may file comments directly with OMB and 
should address a copy of those comments to the Commission as explained 
below. The Commission previously published a Notice in the Federal 
Register on 12/26/2017 requesting public comments. The Commission 
received no comments on the FERC-725Y information collection and is 
making this notation in its submittal to OMB.

DATES: Comments on the collection of information are due by April 13, 
2018.

ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 
1902-0279, should be sent via email to the Office of Information and 
Regulatory Affairs: [email protected]. Attention: Federal Energy 
Regulatory Commission Desk Officer. The Desk Officer may also be 
reached via telephone at 202-395-0710.
    A copy of the comments should also be sent to the Commission, in 
Docket No. IC18-2-000, by either of the following methods:
     eFiling at Commission's website: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], by telephone at (202) 502-8663, and by fax at 
(202) 273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-725Y, Mandatory Reliability Standard (Personnel 
Performance, Training, and Qualifications).
    OMB Control No.: 1902-0279.
    Type of Request: Three-year extension of the FERC-725Y information 
collection requirements with no changes to the reporting requirements.
    Abstract: The FERC-725Y information collection is intended to help 
ensure the safe and reliable operation of the interconnected grid 
through the retention of suitably trained and qualified personnel in 
positions that can impact the reliable operation of the Bulk-Power 
System. The Commission uses the FERC-725Y to implement the 
Congressional mandate of the Energy Policy Act of 2005 to develop 
mandatory and enforceable Reliability Standards to better ensure the 
reliability of the nation's Bulk-Power System. FERC-725Y will ensure 
that personnel performing or supporting real-time operations on the 
Bulk Electric System (BES) are trained using a systematic approach. The 
Reliability Standard requires entities to maintain records subject to 
review by the Commission and NERC to ensure compliance with the 
Reliability Standard.
    The Reliability Standard requires entities to maintain records 
subject to review by the Commission and NERC to ensure compliance with 
the Reliability Standard. This Reliability Standard contains of five 
Requirements:
     R1 requires reliability coordinators, balancing 
authorities, and transmission operators to develop and implement a 
training program for system operators.
     R2 requires transmission owners to develop and implement a 
training program for system operators.
     R3 requires reliability coordinators, balancing 
authorities, transmission operators and transmission owners to verify 
the capabilities of their identified personnel.
     R4 requires reliability coordinators, balancing 
authorities, transmission operators and transmission owners to provide 
those personnel with emergency operations training using simulation 
technology.
     R6 requires applicable generator operators to develop and 
implement training for certain of their dispatch personnel at a 
centrally located dispatch center.
    Type of Respondents: Transmission owners and generator owners.
    Estimate of Annual Burden: \1\ Our estimate below regarding the 
number of respondents is based on the NERC compliance registry as of 
September 29, 2017. According to the NERC compliance registry, NERC has 
registered 176 transmission operators, 331 transmission owners and 890 
generator operators.
---------------------------------------------------------------------------

    \1\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, reference 5 Code of Federal Regulations 1320.3.
---------------------------------------------------------------------------

    The Commission estimates the additional annual reporting burden and 
cost as follows:

[[Page 11197]]



                                                           FERC-725Y in Docket No. IC18-2-000
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                          Annual number
                                  Number and type of      of responses    Total number    Avg. burden & cost per  Total annual burden hours    Cost per
                                   respondents \2\       per respondent   of responses         response \3\          & total annual cost      respondent
                              (1)......................             (2)     (1) * (2) =  (4)....................  (3) * (4) = (5)..........    (5) / (1)
                                                                                    (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Annual Evaluation and Update  TO (331), GOP (890)......               1       \4\ 1,064  6 hrs.; $408.72 hr.....  6,384 hrs.; $434,878.....       $68.12
 of Training Program and
 Task List.
Retention of Records........  TO (331), GOP (890)......               1       \4\ 1,064  10 hrs.; $408.90 hr....  10,640 hrs.; $435,070....        40.89
Verification and Retention    TO (331).................               1             331  10 hrs.; $408.90 hr....  3,310 hrs.; $135,346.....        40.89
 of Evidence of capabilities
 of personnel [R3, M3,
 C1.2], and Creation and
 Retention of Records on
 Simulation Training.
                             ---------------------------------------------------------------------------------------------------------------------------
    Total...................  .........................  ..............  ..............  .......................  20,334 hrs.; $1,005,294..  ...........
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.
---------------------------------------------------------------------------

    \2\ TO = Transmission Owner; GOP = Generator Operator.
    \3\ The estimates for cost per response are loaded hourly wage 
figure (includes benefits) is based on the average of three 
occupational categories for 2016 found on the Bureau of Labor 
Statistics website (http://www.bls.gov/oes/current/naics2_22.htm): 
Electrical Engineer (Occupation Code: 17-2071): $68.12; Office and 
Administrative Support (Occupation Code: 43-0000): $40.89.
    \4\ Some transmission owners are also generator operators. To 
eliminate double counting some entities, this figure reflects the 
number of unique entities (1064) within the group of TOs and GOPs. 
That approach is used throughout the table.

    Dated: March 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-05102 Filed 3-13-18; 8:45 am]
 BILLING CODE 6717-01-P



                                               11196                       Federal Register / Vol. 83, No. 50 / Wednesday, March 14, 2018 / Notices

                                               must file in accordance with Rules 211                  DATES:   Comments on the collection of                develop mandatory and enforceable
                                               and 214 of the Commission’s                             information are due by April 13, 2018.                Reliability Standards to better ensure
                                               Regulations (18 CFR 385.211 and                         ADDRESSES: Comments filed with OMB,                   the reliability of the nation’s Bulk-
                                               385.214) on or before 5:00 p.m. Eastern                 identified by the OMB Control No.                     Power System. FERC–725Y will ensure
                                               time on the specified comment date.                     1902–0279, should be sent via email to                that personnel performing or supporting
                                               Protests may be considered, but                         the Office of Information and Regulatory              real-time operations on the Bulk Electric
                                               intervention is necessary to become a                   Affairs: oira_submission@omb.gov.                     System (BES) are trained using a
                                               party to the proceeding.                                Attention: Federal Energy Regulatory                  systematic approach. The Reliability
                                                  eFiling is encouraged. More detailed                 Commission Desk Officer. The Desk                     Standard requires entities to maintain
                                               information relating to filing                          Officer may also be reached via                       records subject to review by the
                                               requirements, interventions, protests,                  telephone at 202–395–0710.                            Commission and NERC to ensure
                                               service, and qualifying facilities filings                 A copy of the comments should also                 compliance with the Reliability
                                               can be found at: http://www.ferc.gov/                   be sent to the Commission, in Docket                  Standard.
                                               docs-filing/efiling/filing-req.pdf. For                 No. IC18–2–000, by either of the                         The Reliability Standard requires
                                               other information, call (866) 208–3676                  following methods:                                    entities to maintain records subject to
                                               (toll free). For TTY, call (202) 502–8659.                 • eFiling at Commission’s website:                 review by the Commission and NERC to
                                                 Dated: March 8, 2018.                                 http://www.ferc.gov/docs-filing/                      ensure compliance with the Reliability
                                               Nathaniel J. Davis, Sr.,                                efiling.asp.                                          Standard. This Reliability Standard
                                               Deputy Secretary.
                                                                                                          • Mail/Hand Delivery/Courier:                      contains of five Requirements:
                                                                                                       Federal Energy Regulatory Commission,                    • R1 requires reliability coordinators,
                                               [FR Doc. 2018–05094 Filed 3–13–18; 8:45 am]
                                                                                                       Secretary of the Commission, 888 First                balancing authorities, and transmission
                                               BILLING CODE 6717–01–P
                                                                                                       Street NE, Washington, DC 20426.                      operators to develop and implement a
                                                                                                          Instructions: All submissions must be              training program for system operators.
                                               DEPARTMENT OF ENERGY
                                                                                                       formatted and filed in accordance with                   • R2 requires transmission owners to
                                                                                                       submission guidelines at: http://                     develop and implement a training
                                               Federal Energy Regulatory                               www.ferc.gov/help/submission-                         program for system operators.
                                               Commission                                              guide.asp. For user assistance contact                   • R3 requires reliability coordinators,
                                                                                                       FERC Online Support by email at                       balancing authorities, transmission
                                               [Docket No. IC18–2–000]                                 ferconlinesupport@ferc.gov, or by phone               operators and transmission owners to
                                                                                                       at: (866) 208–3676 (toll-free), or (202)              verify the capabilities of their identified
                                               Commision Information Collection                        502–8659 for TTY.                                     personnel.
                                               Activities (FERC–725Y), Comment                            Docket: Users interested in receiving                 • R4 requires reliability coordinators,
                                               Request; Extension                                      automatic notification of activity in this            balancing authorities, transmission
                                               AGENCY: Federal Energy Regulatory                       docket or in viewing/downloading                      operators and transmission owners to
                                               Commission, Department of Energy.                       comments and issuances in this docket                 provide those personnel with
                                                                                                       may do so at http://www.ferc.gov/docs-                emergency operations training using
                                               ACTION: Notice of extension of
                                                                                                       filing/docs-filing.asp.                               simulation technology.
                                               information collection and request for
                                               comments.                                               FOR FURTHER INFORMATION CONTACT:                         • R6 requires applicable generator
                                                                                                       Ellen Brown may be reached by email                   operators to develop and implement
                                               SUMMARY:   In compliance with the                       at DataClearance@FERC.gov, by                         training for certain of their dispatch
                                               requirements of the Paperwork                           telephone at (202) 502–8663, and by fax               personnel at a centrally located dispatch
                                               Reduction Act of 1995, the Federal                      at (202) 273–0873.                                    center.
                                               Energy Regulatory Commission                            SUPPLEMENTARY INFORMATION:                               Type of Respondents: Transmission
                                               (Commission or FERC) is submitting its                     Title: FERC–725Y, Mandatory                        owners and generator owners.
                                               information collection FERC–725Y,                       Reliability Standard (Personnel                          Estimate of Annual Burden: 1 Our
                                               Mandatory Reliability Standards                         Performance, Training, and                            estimate below regarding the number of
                                               (Personnel Performance, Training, and                   Qualifications).                                      respondents is based on the NERC
                                               Qualifications), to the Office of                          OMB Control No.: 1902–0279.                        compliance registry as of September 29,
                                               Management and Budget (OMB) for                            Type of Request: Three-year extension              2017. According to the NERC
                                               review of the information collection                    of the FERC–725Y information                          compliance registry, NERC has
                                               requirements.                                           collection requirements with no changes               registered 176 transmission operators,
                                                 Any interested person may file                        to the reporting requirements.                        331 transmission owners and 890
                                               comments directly with OMB and                             Abstract: The FERC–725Y                            generator operators.
                                               should address a copy of those                          information collection is intended to                    The Commission estimates the
                                               comments to the Commission as                           help ensure the safe and reliable                     additional annual reporting burden and
                                               explained below. The Commission                         operation of the interconnected grid                  cost as follows:
                                               previously published a Notice in the                    through the retention of suitably trained
                                               Federal Register on 12/26/2017                          and qualified personnel in positions                     1 Burden is defined as the total time, effort, or

                                               requesting public comments. The                         that can impact the reliable operation of             financial resources expended by persons to
                                               Commission received no comments on                      the Bulk-Power System. The                            generate, maintain, retain, or disclose or provide
                                                                                                                                                             information to or for a Federal agency. For further
                                               the FERC–725Y information collection                    Commission uses the FERC–725Y to
daltland on DSKBBV9HB2PROD with NOTICES




                                                                                                                                                             explanation of what is included in the information
                                               and is making this notation in its                      implement the Congressional mandate                   collection burden, reference 5 Code of Federal
                                               submittal to OMB.                                       of the Energy Policy Act of 2005 to                   Regulations 1320.3.




                                          VerDate Sep<11>2014   18:17 Mar 13, 2018   Jkt 244001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\14MRN1.SGM   14MRN1


                                                                                        Federal Register / Vol. 83, No. 50 / Wednesday, March 14, 2018 / Notices                                                                                                                 11197

                                                                                                                              FERC–725Y IN DOCKET NO. IC18–2–000
                                                                                                                                                        Annual                                                                                     Total annual burden
                                                                                                             Number and type of                        number of                Total number                Avg. burden & cost                        hours & total           Cost per
                                                                                                               respondents 2                        responses per               of responses                  per response 3                           annual cost           respondent
                                                                                                                                                      respondent

                                                                                                                           (1)                               (2)                (1) * (2) = (3)                          (4)                          (3) * (4) = (5)           (5) ÷ (1)

                                               Annual Evaluation and Update of                             TO (331), GOP (890) ...                                        1                4 1,064        6 hrs.; $408.72 hr ......              6,384 hrs.; $434,878 ....           $68.12
                                                 Training Program and Task List.
                                               Retention of Records ...........................            TO (331), GOP (890) ...                                        1                4 1,064        10 hrs.; $408.90 hr ....               10,640 hrs.; $435,070 ..              40.89
                                               Verification and Retention of Evidence                      TO (331) ......................                                1                      331      10 hrs.; $408.90 hr ....               3,310 hrs.; $135,346 ....             40.89
                                                 of capabilities of personnel [R3, M3,
                                                 C1.2], and Creation and Retention
                                                 of Records on Simulation Training.

                                                    Total ..............................................   ......................................   ........................   ........................   ....................................   20,334 hrs.; $1,005,294     ....................



                                                 Comments: Comments are invited on:                                               DEPARTMENT OF ENERGY                                                                    that are not currently licensees of the
                                               (1) Whether the collection of                                                                                                                                              project.
                                               information is necessary for the proper                                            Federal Energy Regulatory                                                                  The 900-kilowatt (kW) Yellowstone
                                               performance of the functions of the                                                Commission                                                                              Hydroelectric Project is located on the
                                               Commission, including whether the                                                                                                                                          Yellowstone River, in Duchesne County,
                                               information will have practical utility;                                           [Project No. 1773–000]                                                                  Utah. The diversion dam, and portions
                                               (2) the accuracy of the agency’s estimate                                                                                                                                  of the penstock, are located within the
                                                                                                                                  Yellowstone Hydroelectric Project;                                                      Ashley National Forest. The existing
                                               of the burden and cost of the collection                                           Notice of Existing Licensee’s Notice of
                                               of information, including the validity of                                                                                                                                  minor license for the project expires on
                                                                                                                                  Intent To Not File a Subsequent                                                         October 15, 2022.
                                               the methodology and assumptions used;                                              License Application, and Soliciting
                                               (3) ways to enhance the quality, utility                                                                                                                                      The principal project works consist
                                                                                                                                  Pre-Application Documents and                                                           of: (1) A 15-foot-high, 313-foot-long rock
                                               and clarity of the information collection;                                         Notices of Intent To File a License                                                     filled, timber-crib dam that impounds a
                                               and (4) ways to minimize the burden of                                             Application                                                                             small reservoir covering approximately
                                               the collection of information on those
                                                                                                                                     At least five years before the                                                       3.8 acres; (2) a concrete intake structure
                                               who are to respond, including the use
                                                                                                                                  expiration of a license for a minor water                                               with a gate valve; (3) a 14,126-foot-long,
                                               of automated collection techniques or                                                                                                                                      44-inch-diameter and 42-inch-diameter
                                               other forms of information technology.                                             power project not subject to sections 14
                                                                                                                                  and 15 of the Federal Power Act (i.e., a                                                steel penstock; (4) a powerhouse with
                                                 Dated: March 6, 2018.                                                            project having an installed capacity of                                                 three turbine-generators rated at 300 kW
                                               Kimberly D. Bose,                                                                  1.5 megawatts or less), the licensee must                                               each; (5) a substation; (6) a 14.27-mile-
                                               Secretary.                                                                         file with the Commission a letter that                                                  long, 7.2-kilovolt overhead transmission
                                                                                                                                  contains an unequivocal statement of                                                    line and underlain telephone line; and
                                               [FR Doc. 2018–05102 Filed 3–13–18; 8:45 am]
                                                                                                                                  the licensee’s intent to file or not to file                                            (7) and appurtenant facilities.
                                               BILLING CODE 6717–01–P
                                                                                                                                  an application for a subsequent license.1                                                  Any party interested in filing a license
                                                                                                                                     If such a licensee informs the                                                       application (i.e., potential applicant) for
                                                                                                                                  Commission that it does not intend to                                                   the Yellowstone Hydroelectric Project
                                                                                                                                  file an application for a subsequent                                                    No. 1773 must file a Notice of Intent
                                                                                                                                  license, nonpower license, or exemption                                                 (NOI) 3 and pre-application document
                                                                                                                                  for the project, the licensee may not file                                              (PAD).4 Additionally, while the
                                                                                                                                  an application for a subsequent license,                                                integrated licensing process (ILP) is the
                                                                                                                                  nonpower license, or exemption for the                                                  default process for preparing an
                                                                                                                                  project, either individually or in                                                      application for a subsequent license, a
                                                                                                                                  conjunction with an entity or entities                                                  potential applicant may request to use
                                                                                                                                  that are not currently licensees of the                                                 alternative licensing procedures when it
                                                                                                                                  project.2                                                                               files its NOI.5
                                                                                                                                     On September 26, 2017, Moon Lake                                                        The deadline for potential applicants,
                                                                                                                                  Electric Association, the existing                                                      other than the existing licensee, to file
                                                                                                                                  licensee for the Yellowstone                                                            NOIs, PADs, and requests to use an
                                                 2 TO = Transmission Owner; GOP = Generator                                       Hydroelectric Project No. 1773, filed                                                   alternative licensing process is 120 days
                                               Operator.                                                                          notice of its intent to not file an                                                     from the issuance date of this notice.
                                                 3 The estimates for cost per response are loaded
                                                                                                                                  application for a subsequent license.                                                      Applications for a subsequent license
                                               hourly wage figure (includes benefits) is based on                                 Therefore, pursuant to section                                                          from potential applicants, other than the
                                               the average of three occupational categories for                                   16.24(b)(1) of the Commission’s                                                         existing licensee, must be filed with the
                                               2016 found on the Bureau of Labor Statistics                                                                                                                               Commission at least 24 months prior to
                                                                                                                                  regulations, Moon Lake may not file an
                                               website (http://www.bls.gov/oes/current/naics2_                                                                                                                            the expiration of the existing license.6
                                                                                                                                  application for a subsequent license for
daltland on DSKBBV9HB2PROD with NOTICES




                                               22.htm): Electrical Engineer (Occupation Code: 17–
                                               2071): $68.12; Office and Administrative Support                                   the project, either individually or in                                                  Because the existing license expires on
                                               (Occupation Code: 43–0000): $40.89.                                                conjunction with an entity or entities                                                  October 15, 2022, applications for
                                                 4 Some transmission owners are also generator
                                                                                                                                                                                                                             3 18 CFR 5.5 (2017).
                                               operators. To eliminate double counting some                                         1 18 CFR 16.19(b) (2017) (citing 18 CFR 16.6(b)).

                                               entities, this figure reflects the number of unique                                                                                                                           4 18 CFR 5.6 (2017).
                                                                                                                                  Section 16.19(b) applies to licenses not subject to
                                               entities (1064) within the group of TOs and GOPs.                                  Parts 14 and 15 of the Federal Power Act.                                                  5 18 CFR 5.3(b) (2017).

                                               That approach is used throughout the table.                                          2 18 CFR 16.24(b)(1) (2017).                                                             6 18 CFR 16.20 (2017).




                                          VerDate Sep<11>2014          19:50 Mar 13, 2018            Jkt 244001         PO 00000          Frm 00030          Fmt 4703          Sfmt 4703         E:\FR\FM\14MRN1.SGM                    14MRN1



Document Created: 2018-03-14 01:06:29
Document Modified: 2018-03-14 01:06:29
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of extension of information collection and request for comments.
DatesComments on the collection of information are due by April 13, 2018.
ContactEllen Brown may be reached by email at [email protected], by telephone at (202) 502-8663, and by fax at (202) 273-0873.
FR Citation83 FR 11196 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR