83_FR_1262 83 FR 1255 - Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for Environmental Review of the Northeast Supply Enhancement Project

83 FR 1255 - Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule for Environmental Review of the Northeast Supply Enhancement Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 7 (January 10, 2018)

Page Range1255-1256
FR Document2018-00271

Federal Register, Volume 83 Issue 7 (Wednesday, January 10, 2018)
[Federal Register Volume 83, Number 7 (Wednesday, January 10, 2018)]
[Notices]
[Pages 1255-1256]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-00271]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-101-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of Schedule 
for Environmental Review of the Northeast Supply Enhancement Project

    On March 27, 2017, Transcontinental Gas Pipe Line Company, LLC 
(Transco) filed an application in Docket No. CP17-101-000 requesting a 
Certificate of Public Convenience and Necessity pursuant to Section 
7(c) of the Natural Gas Act to construct, operate, and maintain certain 
natural gas pipeline facilities. The proposed project is known as the 
Northeast Supply Enhancement Project (NESE Project or Project) and 
would provide 400,000 dekatherms per day of firm transportation service 
to the New York City area.
    On April 6, 2017, the Federal Energy Regulatory Commission (FERC or 
Commission) issued its Notice of Application for the Project. Among 
other things, that notice alerted other agencies issuing federal 
authorizations of the requirement to complete all necessary reviews and 
to reach a final decision on the request for a federal authorization 
within 90 days of the date of issuance of the Commission staff's final 
Environmental Impact Statement (EIS) for the NESE Project. This instant 
notice identifies the FERC staff's planned schedule for completion of 
the final EIS for the Project, which is based on an issuance of the 
draft EIS in March 2018.

Schedule for Environmental Review

Issuance of Notice of Availability of the final EIS--September 17, 2018
90-day Federal Authorization Decision Deadline--December 16, 2018

    This schedule is predicated on Transco demonstrating a feasible and 
timely method for addressing general conformity, such that the final 
General Conformity Determination can be issued with the final EIS. If a 
schedule change becomes necessary for the final EIS, an

[[Page 1256]]

additional notice will be provided so that the relevant agencies are 
kept informed of the Project's progress.

Project Description

    The NESE Project consists of 10.2 miles of 42-inch-diameter 
pipeline loop \1\ in Lancaster County, Pennsylvania (the Quarryville 
Loop); 3.4 miles of 26-inch-diameter pipeline loop in Middlesex County, 
New Jersey (the Madison Loop); 23.5 miles of 26-inch-diameter pipeline 
loop in Middlesex and Monmouth Counties, New Jersey, and Queens and 
Richmond Counties, New York (the Raritan Bay Loop \2\); modification of 
existing Compressor Station 200 in Chester County, Pennsylvania; 
construction of new Compressor Station 206 in Somerset County, New 
Jersey; and appurtenant facilities.
---------------------------------------------------------------------------

    \1\ A loop is a segment of pipe that is installed adjacent to an 
existing pipeline and connected to it at both ends. A loop generally 
allows more gas to move through the system.
    \2\ Except for 0.2 mile of pipe in onshore Middlesex County, New 
Jersey, the Raritan Bay Loop would occur in offshore New Jersey 
waters (6.0 miles) and offshore New York waters (17.3 miles).
---------------------------------------------------------------------------

Background

    On August 24, 2016, the Commission issued a Notice of Intent to 
Prepare an Environmental Impact Statement for the Planned Northeast 
Supply Enhancement Project, Request for Comments on Environmental 
Issues, and Notice of Public Scoping Sessions (NOI). The NOI was issued 
during the pre-filing review of the Project in Docket No. PF16-5 and 
was sent to federal, state, and local government agencies; elected 
officials; affected landowners; environmental and public interest 
groups; Native American tribes and regional organizations; commentors 
and other interested parties; and local libraries and newspapers. The 
majority of environmental issues raised during scoping were related to 
proposed Compressor Station 206, including air quality and noise 
impacts; impacts on nearby residences, schools, and churches; 
socioeconomic impacts, including environmental justice; safety; and 
impacts related to activities at the nearby existing Trap Rock Quarry. 
Other major issues raised during scoping related to the Project include 
purpose and need; surface water and groundwater impacts; impacts on 
wildlife and aquatic resources; traffic; and alternatives.
    The U.S. Environmental Protection Agency, the U.S. Army Corps of 
Engineers, and the City of New York are cooperating agencies in the 
preparation of the EIS.

Additional Information

    In order to receive notification of the issuance of the EIS and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC website (www.ferc.gov). Using the eLibrary link, select General 
Search from the eLibrary menu, enter the selected date range and Docket 
Number excluding the last three digits (i.e., CP17-101), and follow the 
instructions. For assistance with access to eLibrary, the helpline can 
be reached at (866) 208-3676, TTY (202) 502-8659, or at 
FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also 
provides access to the texts of formal documents issued by the 
Commission, such as orders, notices, and rule makings.

    Dated: January 3, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-00271 Filed 1-9-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 83, No. 7 / Wednesday, January 10, 2018 / Notices                                                   1255

                                               proposes to abandon and convert                         CFR 157.10). A person obtaining party                  FERCOnlineSupport@ferc.gov, or call
                                               1,629,000 Dekatherms (Dth) of CMC                       status will be placed on the service list              (866) 208–3676 (toll free). For TTY, call
                                               Service to 762,373 Dth of No-Notice                     maintained by the Secretary of the                     (202) 502–8659.
                                               Service. Tallgrass states that the                      Commission and will receive copies of                    Comment Date: January 24, 2018.
                                               requested authorization is required in                  all documents filed by the applicant and                 Dated: January 3, 2018.
                                               order to properly align Tallgrass’                      by all other parties. A party must submit              Kimberly D. Bose,
                                               certificated storage levels with the                    7 copies of filings made with the
                                                                                                                                                              Secretary.
                                               demand for firm storage services                        Commission and must mail a copy to
                                               expressed by Tallgrass’ shippers.                       the applicant and to every other party in              [FR Doc. 2018–00272 Filed 1–9–18; 8:45 am]
                                               Further, Tallgrass also state that the                  the proceeding. Only parties to the                    BILLING CODE 6717–01–P

                                               quality of service being provided to its                proceeding can ask for court review of
                                               customers will not be affected, all as                  Commission orders in the proceeding.
                                               more fully set forth in the application,                   However, a person does not have to                  DEPARTMENT OF ENERGY
                                               which is on file with the Commission                    intervene in order to have comments
                                                                                                                                                              Federal Energy Regulatory
                                               and open to public inspection. The                      considered. The second way to
                                                                                                                                                              Commission
                                               filing may also be viewed on the web at                 participate is by filing with the
                                               http://www.ferc.gov using the                           Secretary of the Commission, as soon as                [Docket No. CP17–101–000]
                                               ‘‘eLibrary’’ link. Enter the docket                     possible, an original and two copies of
                                               number excluding the last three digits in               comments in support of or in opposition                Transcontinental Gas Pipe Line
                                               the docket number field to access the                   to this project. The Commission will                   Company, LLC; Notice of Schedule for
                                               document. For assistance, contact FERC                  consider these comments in                             Environmental Review of the Northeast
                                               at FERCOnlineSupport@ferc.gov or call                   determining the appropriate action to be               Supply Enhancement Project
                                               toll-free, (866) 208–3676 or TTY, (202)                 taken, but the filing of a comment alone                  On March 27, 2017, Transcontinental
                                               502–8659.                                               will not serve to make the filer a party               Gas Pipe Line Company, LLC (Transco)
                                                  Any questions regarding this                         to the proceeding. The Commission’s
                                                                                                                                                              filed an application in Docket No.
                                               application should be directed to Skip                  rules require that persons filing
                                                                                                                                                              CP17–101–000 requesting a Certificate
                                               George, Manager Regulatory, Tallgrass                   comments in opposition to the project
                                                                                                                                                              of Public Convenience and Necessity
                                               Interstate Gas Transmission, LLC, 370                   provide copies of their protests only to
                                                                                                                                                              pursuant to Section 7(c) of the Natural
                                               Van Gordon Street, Lakewood, Colorado                   the party or parties directly involved in
                                                                                                                                                              Gas Act to construct, operate, and
                                               80228 or phone (303) 763–3251.                          the protest.
                                                  Pursuant to section 157.9 of the                        Persons who wish to comment only                    maintain certain natural gas pipeline
                                               Commission’s rules, 18 CFR 157.9,                       on the environmental review of this                    facilities. The proposed project is
                                               within 90 days of this Notice the                       project should submit an original and                  known as the Northeast Supply
                                               Commission staff will either: Complete                  two copies of their comments to the                    Enhancement Project (NESE Project or
                                               its environmental assessment (EA) and                   Secretary of the Commission.                           Project) and would provide 400,000
                                               place it into the Commission’s public                   Environmental commentors will be                       dekatherms per day of firm
                                               record (eLibrary) for this proceeding; or               placed on the Commission’s                             transportation service to the New York
                                               issue a Notice of Schedule for                          environmental mailing list, will receive               City area.
                                               Environmental Review. If a Notice of                    copies of the environmental documents,                    On April 6, 2017, the Federal Energy
                                               Schedule for Environmental Review is                    and will be notified of meetings                       Regulatory Commission (FERC or
                                               issued, it will indicate, among other                   associated with the Commission’s                       Commission) issued its Notice of
                                               milestones, the anticipated date for the                environmental review process.                          Application for the Project. Among
                                               Commission staff’s issuance of the final                Environmental commentors will not be                   other things, that notice alerted other
                                               environmental impact statement (FEIS)                   required to serve copies of filed                      agencies issuing federal authorizations
                                               or EA for this proposal. The filing of the              documents on all other parties.                        of the requirement to complete all
                                               EA in the Commission’s public record                    However, the non-party commentors                      necessary reviews and to reach a final
                                               for this proceeding or the issuance of a                will not receive copies of all documents               decision on the request for a federal
                                               Notice of Schedule for Environmental                    filed by other parties or issued by the                authorization within 90 days of the date
                                               Review will serve to notify federal and                 Commission (except for the mailing of                  of issuance of the Commission staff’s
                                               state agencies of the timing for the                    environmental documents issued by the                  final Environmental Impact Statement
                                               completion of all necessary reviews, and                Commission) and will not have the right                (EIS) for the NESE Project. This instant
                                               the subsequent need to complete all                     to seek court review of the                            notice identifies the FERC staff’s
                                               federal authorizations within 90 days of                Commission’s final order.                              planned schedule for completion of the
                                               the date of issuance of the Commission                     The Commission strongly encourages                  final EIS for the Project, which is based
                                               staff’s FEIS or EA.                                     electronic filings of comments, protests               on an issuance of the draft EIS in March
                                                  There are two ways to become                         and interventions in lieu of paper using               2018.
                                               involved in the Commission’s review of                  the eFiling link at http://www.ferc.gov.               Schedule for Environmental Review
                                               this project. First, any person wishing to              Persons unable to file electronically
                                               obtain legal status by becoming a party                 should submit an original and 5 copies                 Issuance of Notice of Availability of the
                                               to the proceedings for this project                     of the protest or intervention to the                     final EIS—September 17, 2018
                                               should, on or before the comment date                   Federal Energy Regulatory Commission,                  90-day Federal Authorization Decision
                                               stated below, file with the Federal                     888 First Street NE, Washington, DC                       Deadline—December 16, 2018
daltland on DSKBBV9HB2PROD with NOTICES




                                               Energy Regulatory Commission, 888                       20426.                                                    This schedule is predicated on
                                               First Street NE, Washington, DC 20426,                     There is an ‘‘eSubscription’’ link on               Transco demonstrating a feasible and
                                               a motion to intervene in accordance                     the website that enables subscribers to                timely method for addressing general
                                               with the requirements of the                            receive email notification when a                      conformity, such that the final General
                                               Commission’s Rules of Practice and                      document is added to a subscribed                      Conformity Determination can be issued
                                               Procedure (18 CFR 385.214 or 385.211)                   docket(s). For assistance with any FERC                with the final EIS. If a schedule change
                                               and the Regulations under the NGA (18                   Online service, please email                           becomes necessary for the final EIS, an


                                          VerDate Sep<11>2014   18:23 Jan 09, 2018   Jkt 244001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\10JAN1.SGM   10JAN1


                                               1256                        Federal Register / Vol. 83, No. 7 / Wednesday, January 10, 2018 / Notices

                                               additional notice will be provided so                   Additional Information                                 Schoharie County, New York. The
                                               that the relevant agencies are kept                        In order to receive notification of the             project does not affect federal lands.
                                               informed of the Project’s progress.                                                                               g. Filed Pursuant to: Federal Power
                                                                                                       issuance of the EIS and to keep track of
                                                                                                                                                              Act 16 U.S.C. 791(a)–825(r).
                                               Project Description                                     all formal issuances and submittals in                    h. Applicant Contact: Mr. Robert
                                                 The NESE Project consists of 10.2                     specific dockets, the Commission offers                Daly, Licensing Manager, New York
                                               miles of 42-inch-diameter pipeline                      a free service called eSubscription. This              Power Authority 123 Main Street, White
                                               loop 1 in Lancaster County,                             can reduce the amount of time you                      Plains, New York 10601. Telephone:
                                               Pennsylvania (the Quarryville Loop); 3.4                spend researching proceedings by                       (914) 681–6564, Email: Rob.Daly@
                                               miles of 26-inch-diameter pipeline loop                 automatically providing you with                       nypa.gov.
                                               in Middlesex County, New Jersey (the                    notification of these filings, document                   i. FERC Contact: Andy Bernick at
                                               Madison Loop); 23.5 miles of 26-inch-                   summaries, and direct links to the                     (202) 502–8660, and email
                                               diameter pipeline loop in Middlesex                     documents. Go to www.ferc.gov/docs-                    andrew.bernick@ferc.gov.
                                               and Monmouth Counties, New Jersey,                      filing/esubscription.asp.                                 j. Deadline for filing comments,
                                               and Queens and Richmond Counties,                          Additional information about the                    recommendations, preliminary terms
                                               New York (the Raritan Bay Loop 2);                      Project is available from the                          and conditions, and preliminary
                                               modification of existing Compressor                     Commission’s Office of External Affairs                fishway prescriptions: 60 days from the
                                               Station 200 in Chester County,                          at (866) 208–FERC or on the FERC                       issuance date of this notice; reply
                                               Pennsylvania; construction of new                       website (www.ferc.gov). Using the                      comments are due 105 days from the
                                               Compressor Station 206 in Somerset                      eLibrary link, select General Search                   issuance date of this notice.
                                               County, New Jersey; and appurtenant                     from the eLibrary menu, enter the                         The Commission strongly encourages
                                               facilities.                                             selected date range and Docket Number                  electronic filing. Please file comments,
                                                                                                       excluding the last three digits (i.e.,                 recommendations, preliminary terms
                                               Background                                              CP17–101), and follow the instructions.                and conditions, and preliminary
                                                  On August 24, 2016, the Commission                   For assistance with access to eLibrary,                fishway prescriptions using the
                                               issued a Notice of Intent to Prepare an                 the helpline can be reached at (866)                   Commission’s eFiling system at http://
                                               Environmental Impact Statement for the                  208–3676, TTY (202) 502–8659, or at                    www.ferc.gov/docs-filing/efiling.asp.
                                               Planned Northeast Supply                                FERCOnlineSupport@ferc.gov. The                        Commenters can submit brief comments
                                               Enhancement Project, Request for                        eLibrary link on the FERC website also                 up to 6,000 characters, without prior
                                               Comments on Environmental Issues,                       provides access to the texts of formal                 registration, using the eComment system
                                               and Notice of Public Scoping Sessions                   documents issued by the Commission,                    at http://www.ferc.gov/docs-filing/
                                               (NOI). The NOI was issued during the                    such as orders, notices, and rule                      ecomment.asp. You must include your
                                               pre-filing review of the Project in Docket              makings.                                               name and contact information at the end
                                               No. PF16–5 and was sent to federal,                       Dated: January 3, 2018.                              of your comments. For assistance,
                                               state, and local government agencies;                                                                          please contact FERC Online Support at
                                                                                                       Kimberly D. Bose,
                                               elected officials; affected landowners;                                                                        FERCOnlineSupport@ferc.gov, (866)
                                               environmental and public interest                       Secretary.
                                                                                                                                                              208–3676 (toll free), or (202) 502–8659
                                               groups; Native American tribes and                      [FR Doc. 2018–00271 Filed 1–9–18; 8:45 am]
                                                                                                                                                              (TTY). In lieu of electronic filing, please
                                               regional organizations; commentors and                  BILLING CODE 6717–01–P
                                                                                                                                                              send a paper copy to: Secretary, Federal
                                               other interested parties; and local                                                                            Energy Regulatory Commission, 888
                                               libraries and newspapers. The majority                                                                         First Street NE, Washington, DC 20426.
                                               of environmental issues raised during                   DEPARTMENT OF ENERGY
                                                                                                                                                              The first page of any filing should
                                               scoping were related to proposed                                                                               include docket number P–2685–029.
                                                                                                       Federal Energy Regulatory
                                               Compressor Station 206, including air                                                                             The Commission’s Rules of Practice
                                                                                                       Commission
                                               quality and noise impacts; impacts on                                                                          require all intervenors filing documents
                                               nearby residences, schools, and                                                                                with the Commission to serve a copy of
                                               churches; socioeconomic impacts,                        [Project No. 2685–029]
                                                                                                                                                              that document on each person on the
                                               including environmental justice; safety;                New York Power Authority; Notice of                    official service list for the project.
                                               and impacts related to activities at the                Application Ready for Environmental                    Further, if an intervenor files comments
                                               nearby existing Trap Rock Quarry. Other                 Analysis, and Soliciting Comments,                     or documents with the Commission
                                               major issues raised during scoping                      Recommendations, Preliminary Terms                     relating to the merits of an issue that
                                               related to the Project include purpose                  and Conditions, and Preliminary                        may affect the responsibilities of a
                                               and need; surface water and                                                                                    particular resource agency, they must
                                                                                                       Fishway Prescriptions
                                               groundwater impacts; impacts on                                                                                also serve a copy of the document on
                                               wildlife and aquatic resources; traffic;                  Take notice that the following                       that resource agency.
                                               and alternatives.                                       hydroelectric application has been filed                  k. This application has been accepted
                                                  The U.S. Environmental Protection                    with the Commission and is available                   for filing and is now ready for
                                               Agency, the U.S. Army Corps of                          for public inspection.                                 environmental analysis.
                                               Engineers, and the City of New York are                   a. Type of Application: New Major                       l. The existing Blenheim-Gilboa
                                               cooperating agencies in the preparation                 License.                                               Project consists of the following: (1) A
                                               of the EIS.                                               b. Project No.: 2685–029.                            2.25-mile-long, 30-foot-wide earth and
                                                                                                         c. Date filed: April 27, 2017.                       rock fill embankment dike with a
daltland on DSKBBV9HB2PROD with NOTICES




                                                  1 A loop is a segment of pipe that is installed

                                               adjacent to an existing pipeline and connected to
                                                                                                         d. Applicant: New York Power                         maximum height of 110 feet,
                                               it at both ends. A loop generally allows more gas       Authority (NYPA).                                      constructed at Brown Mountain and
                                               to move through the system.                               e. Name of Project: Blenheim-Gilboa                  forming the 399-acre Upper Reservoir
                                                  2 Except for 0.2 mile of pipe in onshore
                                                                                                       Pumped Storage Project.                                (operating at the maximum and extreme
                                               Middlesex County, New Jersey, the Raritan Bay             f. Location: The existing project is                 minimum elevations of 2,003 feet and
                                               Loop would occur in offshore New Jersey waters
                                               (6.0 miles) and offshore New York waters (17.3          located on Schoharie Creek, in the                     1,955 feet National Geodetic Vertical
                                               miles).                                                 Towns of Blenheim and Gilboa in                        Datum of 1929 [NGVD 29], respectively)


                                          VerDate Sep<11>2014   18:23 Jan 09, 2018   Jkt 244001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\10JAN1.SGM   10JAN1



Document Created: 2018-10-26 09:34:26
Document Modified: 2018-10-26 09:34:26
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106: