83_FR_1277 83 FR 1270 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

83 FR 1270 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

DEPARTMENT OF THE INTERIOR
Bureau of Reclamation

Federal Register Volume 83, Issue 7 (January 10, 2018)

Page Range1270-1272
FR Document2018-00250

Notice is hereby given of contractual actions that have been proposed to the Bureau of Reclamation (Reclamation) and are new, discontinued, or completed since the last publication of this notice. This notice is one of a variety of means used to inform the public about proposed contractual actions for capital recovery and management of project resources and facilities consistent with the Reclamation Project Act of 1939, as amended and supplemented. Additional announcements of individual contract actions may be published in the Federal Register and in newspapers of general circulation in the areas determined by Reclamation to be affected by the proposed action.

Federal Register, Volume 83 Issue 7 (Wednesday, January 10, 2018)
[Federal Register Volume 83, Number 7 (Wednesday, January 10, 2018)]
[Notices]
[Pages 1270-1272]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-00250]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Reclamation

[RR83550000, 189R5065C6, RX.59389832.1009676]


Quarterly Status Report of Water Service, Repayment, and Other 
Water-Related Contract Actions

AGENCY: Bureau of Reclamation, Interior.

ACTION: Notice of contract actions.

-----------------------------------------------------------------------

SUMMARY: Notice is hereby given of contractual actions that have been 
proposed to the Bureau of Reclamation (Reclamation) and are new, 
discontinued, or completed since the last publication of this notice. 
This notice is one of a variety of means used to inform the public 
about proposed contractual actions for capital recovery and management 
of project resources and facilities consistent with the Reclamation 
Project Act of 1939, as amended and supplemented. Additional 
announcements of individual contract actions may be published in the 
Federal Register and in newspapers of general circulation in the areas 
determined by Reclamation to be affected by the proposed action.

ADDRESSES: The identity of the approving officer and other information 
pertaining to a specific contract proposal may be obtained by calling 
or

[[Page 1271]]

writing the appropriate regional office at the address and telephone 
number given for each region in the SUPPLEMENTARY INFORMATION section 
of this notice.

FOR FURTHER INFORMATION CONTACT: Michelle Kelly, Reclamation Law 
Administration Division, Bureau of Reclamation, P.O. Box 25007, Denver, 
Colorado 80225-0007; telephone 303-445-2888.

SUPPLEMENTARY INFORMATION: Consistent with section 9(f) of the 
Reclamation Project Act of 1939, as amended and supplemented, and the 
rules and regulations published in 52 FR 11954, April 13, 1987 (43 CFR 
426.22), Reclamation will publish notice of proposed or amendatory 
contract actions for any contract for the delivery of project water for 
authorized uses in newspapers of general circulation in the affected 
area at least 60 days prior to contract execution. Announcements may be 
in the form of news releases, legal notices, official letters, 
memorandums, or other forms of written material. Meetings, workshops, 
and/or hearings may also be used, as appropriate, to provide local 
publicity. The public participation procedures do not apply to proposed 
contracts for the sale of surplus or interim irrigation water for a 
term of 1 year or less. Either of the contracting parties may invite 
the public to observe contract proceedings. All public participation 
procedures will be coordinated with those involved in complying with 
the National Environmental Policy Act. Pursuant to the ``Final Revised 
Public Participation Procedures'' for water resource-related contract 
negotiations, published in 47 FR 7763, February 22, 1982, a tabulation 
is provided of all proposed contractual actions in each of the five 
Reclamation regions. When contract negotiations are completed, and 
prior to execution, each proposed contract form must be approved by the 
Secretary of the Interior, or pursuant to delegated or redelegated 
authority, the Commissioner of Reclamation or one of the regional 
directors. In some instances, congressional review and approval of a 
report, water rate, or other terms and conditions of the contract may 
be involved.
    Public participation in and receipt of comments on contract 
proposals will be facilitated by adherence to the following procedures:
    1. Only persons authorized to act on behalf of the contracting 
entities may negotiate the terms and conditions of a specific contract 
proposal.
    2. Advance notice of meetings or hearings will be furnished to 
those parties that have made a timely written request for such notice 
to the appropriate regional or project office of Reclamation.
    3. Written correspondence regarding proposed contracts may be made 
available to the general public pursuant to the terms and procedures of 
the Freedom of Information Act, as amended.
    4. Written comments on a proposed contract or contract action must 
be submitted to the appropriate regional officials at the locations and 
within the time limits set forth in the advance public notices.
    5. All written comments received and testimony presented at any 
public hearings will be reviewed and summarized by the appropriate 
regional office for use by the contract approving authority.
    6. Copies of specific proposed contracts may be obtained from the 
appropriate regional director or his or her designated public contact 
as they become available for review and comment.
    7. In the event modifications are made in the form of a proposed 
contract, the appropriate regional director shall determine whether 
republication of the notice and/or extension of the comment period is 
necessary.
    Factors considered in making such a determination shall include, 
but are not limited to, (i) the significance of the modification, and 
(ii) the degree of public interest which has been expressed over the 
course of the negotiations. At a minimum, the regional director will 
furnish revised contracts to all parties who requested the contract in 
response to the initial public notice.

Definitions of Abbreviations Used in the Reports

ARRA American Recovery and Reinvestment Act of 2009
BCP Boulder Canyon Project
Reclamation Bureau of Reclamation
CAP Central Arizona Project
CUP Central Utah Project
CVP Central Valley Project
CRSP Colorado River Storage Project
FR Federal Register
IDD Irrigation and Drainage District
ID Irrigation District
M&I Municipal and Industrial
O&M Operation and Maintenance
OM&R Operation, Maintenance, and Replacement
P-SMBP Pick-Sloan Missouri Basin Program
PPR Present Perfected Right
RRA Reclamation Reform Act of 1982
SOD Safety of Dams
SRPA Small Reclamation Projects Act of 1956
USACE U.S. Army Corps of Engineers
WD Water District

    Pacific Northwest Region: Bureau of Reclamation, 1150 North Curtis 
Road, Suite 100, Boise, Idaho 83706-1234, telephone 208-378-5344.
    The Pacific Northwest Region has no updates for this quarter.
    Mid-Pacific Region: Bureau of Reclamation, 2800 Cottage Way, 
Sacramento, California 95825-1898, telephone 916-978-5250.
    New contract action:
    50. Del Puerto WD, CVP, California: Negotiation of a multi-year 
wheeling agreement with the State of California, Department of Water 
Resources to provide for the conveyance and delivery of CVP water 
through the State of California's water project facilities to Del 
Puerto Water District via a state water project contractor.
    Lower Colorado Region: Bureau of Reclamation, P.O. Box 61470 
(Nevada Highway and Park Street), Boulder City, Nevada 89006-1470, 
telephone 702-293-8192.
    New contract action:
    23. Imperial ID, Lower Colorado Water Supply Project, California: 
Amend the agreement between Reclamation and Imperial ID to extend the 
term for the funding of design, construction, and installation of power 
facilities for the Lower Colorado Water Supply Project.
    Completed contract actions:
    15. Imperial ID, BCP, California: Approve an assignment of 155 
cubic feet per second of capacity in the All-American Canal and all 
obligations associated therewith to the District from the City of San 
Diego. Contract executed May 24, 2017.
    16. Valencia Water Company and the City of Buckeye, CAP, Arizona: 
Execute a proposed assignment to the City of Buckeye of Valencia Water 
Company's 43 acre-foot annual CAP M&I water entitlement. This proposed 
action will increase the City of Buckeye's final 2034 entitlement to 68 
acre-feet per annum and will eliminate Valencia Water Company's 
entitlement. Contract executed April 13, 2017.
    18. San Carlos Apache Tribe and the Town of Gilbert, CAP, Arizona: 
Execute amendment No. 6 to a CAP water lease to extend the term of the 
lease in order for the San Carlos Apache Tribe to lease 29,341 acre-
feet of its CAP water to the Town of Gilbert during calendar year 2017. 
Contract executed April 25, 2017.
    20. Ak-Chin Indian Community and Del Webb Corporation, CAP, 
Arizona: Execute a CAP water lease in order for the Ak-Chin Indian 
Community to lease 1,800 acre-feet of its CAP water to the Del Webb 
Corporation during calendar year 2017. Contract executed April 23, 
2017.

[[Page 1272]]

    Upper Colorado Region: Bureau of Reclamation, 125 South State 
Street, Room 8100, Salt Lake City, Utah 84138-1102, telephone 801-524-
3864.
    New contract actions:
    45. Strawberry High Line Canal Company, Strawberry Valley Project; 
Utah: The Strawberry High Line Canal Company has requested to allow for 
the carriage of non-project water held by McMullin Orchards in the High 
Line Canal.
    46. Mancos Water Conservancy District, Mancos Project, Colorado: 
Proposed amendment to Jackson Gulch Rehabilitation Project repayment 
contract to provide continued funding within repayment terms that are 
consistent with terms of Section 9105 of Pub. L. 111-11.
    Discontinued contract actions:
    12. Salem Canal and Irrigation Company, Strawberry Valley Project, 
Utah: The United States intends to enter into an amendatory contract 
regarding possible lost generation of power revenues generated at the 
Spanish Fork Power Plant on the Strawberry Valley Project.
    15. Uintah Water Conservancy District; Flaming Gorge Unit, CRSP; 
Utah: The District has requested a long-term water service contract to 
remove up to 5,500 acre-feet of water annually from the Green River for 
irrigation purposes under the authority of Section 9(e) of the 
Reclamation Project Act of 1939. A short-term contract may be executed 
until a long-term contract can be completed.
    42. Weber Basin Water Conservancy District, Weber Basin Project, 
Utah: The District requires a Contributed Funds Act agreement for 
reimbursable costs not currently under contract.
    Discontinued contract action from 2016:
    (14) South Cache Water Users Association, Hyrum Project, Utah: The 
Association has requested a loan under Pub. L. 111-11 to pipe 
approximately 2,100 linear-feet of the Hyrum Mendon Canal.
    Completed contract actions:
    31. East Wanship Irrigation Company, Weber Basin Project, Utah: The 
Company has requested a supplemental O&M agreement to modify the 
Federal facilities below Wanship Dam to install a pipe from its current 
point of delivery to the end of the Primary Jurisdiction Zone. Contract 
executed May 24, 2017.
    34. North Fork Water Conservancy District and Ragged Mountain Water 
Users Association, Paonia Project, Colorado: An existing contract for 
2,000 acre-feet expired on December 31, 2016. The parties requested a 
5-year contract that began when the existing contract expired. The new 
contract will be for up to 2,000 acre-feet of water for irrigation and 
M&I uses. Up to 200 acre-feet will be available for M&I uses. Contract 
executed April 12, 2017.
    41. Weber Basin Water Conservancy District, Weber Basin Project, 
Utah: The District requires an amendment to its block notices for 
construction costs not currently under repayment. Contract executed 
July 31, 2017.
    Completed contract action from 2016:
    (37) Grand Valley Water Users Association and Orchard Mesa ID, 
Grand Valley Project, Colorado: A contract for repayment of 
extraordinary maintenance of the Grand Valley Power Plant funded 
pursuant to Subtitle G of Pub. L. 111-11. Contract executed September 
13, 2016.
    Great Plains Region: Bureau of Reclamation, P.O. Box 36900, Federal 
Building, 2021 4th Avenue North, Billings, Montana 59101, telephone 
406-247-7752.
    New contract actions:
    34. Bureau of Land Management, Fryingpan-Arkansas Project, 
Colorado: Consideration of excess capacity contracting to store water 
in the Fryingpan-Arkansas Project.
    35. Southeastern Colorado Water Conservancy District, Fryingpan-
Arkansas Project, Colorado: Consideration of amending Contract no. 5-
07-70-W0086 to create a reserve fund and convert or renew Contract no. 
5-07-70-W0086.
    36. Fresno Dam, Milk River Project, Montana: Consideration of 
contract(s) for repayment of SOD costs.
    Discontinued contract action:
    28. Avalanche ID; Canyon Ferry Unit, P-SMBP; Montana: Proposal to 
negotiate, execute, and administer a long-term water service contract 
to irrigate up to 11,000 acres of land with water from Canyon Ferry 
Reservoir.
    Completed contract actions:
    13. Northern Colorado Water Conservancy District, Colorado-Big 
Thompson Project, Colorado: Amend or supplement the 1938 repayment 
contract to include the transfer of OM&R for Carter Lake Dam Additional 
Outlet Works and Flatiron Power Plant Bypass facilities. Contract 
executed August 3, 2017.
    14. Van Amundson; Jamestown Reservoir, Garrison Diversion Unit, P-
SMBP; North Dakota: Intent to enter into an individual long-term 
irrigation water service contract to provide up to 285 acre-feet of 
water annually for a term of up to 40 years from Jamestown Reservoir, 
North Dakota. Contract executed April 18, 2017.
    18. Midvale ID; Riverton Unit, P-SMBP; Wyoming: Consideration of a 
contract with the District for repayment of SOD costs at Bull Lake Dam. 
Contract executed June 20, 2017.
    29. Oxbow Ranch; Canyon Ferry Unit, P-SMBP; Montana: Proposal to 
negotiate, execute, and administer a long-term water service contract 
for multiple purposes with water from Canyon Ferry Reservoir. Contract 
executed April 18, 2017.
    31. Ainsworth ID; Ainsworth Unit, P-SMBP; Montana: Consideration of 
a contract with the District for repayment of SOD costs at Merritt Dam. 
Contract executed July 25, 2017.

    Dated: October 18, 2017.
Karl Stock,
Acting Director, Policy and Administration.
[FR Doc. 2018-00250 Filed 1-9-18; 8:45 am]
 BILLING CODE 4332-90-P



                                               1270                                       Federal Register / Vol. 83, No. 7 / Wednesday, January 10, 2018 / Notices

                                                                                                                                                                                                                            Estimated
                                                                                                                                         Number of                   Responses                 Total annual                  burden                                              Annual
                                                                        Information collection                                                                                                                                                      Total hours   Hourly cost
                                                                                                                                        respondents                   per year                  responses                   hours per                                             cost
                                                                                                                                                                                                                            response

                                               SF–LLL—Lobbying (0348–0046) ....................................                                           75                             1                        75                      0.17           12.75            42          536
                                               HUD–2880 Applicant Disclosure (2510–0011) ...............                                                  75                             1                        75                      0.17           12.75            42          536
                                               HUD–2991 Certification of Consistency with Consoli-
                                                 dated Plan (2506–0112) ..............................................                                     75                            1                       75                       0.25           18.75            42          788
                                               HUD–2993 Acknowledgement of Application Receipt
                                                 (2577–0259) ................................................................                             75                             1                       75                        0.5            37.5            42        1,577
                                               Map of Proposed Site .....................................................                                 75                             1                       75                       0.25           18.75            42          788
                                               Signed MOU between PHA and WIB .............................                                               75                             1                       75                          2             150            42        6,308
                                               Match/Leverage Commitment Letters .............................                                            75                             1                       75                         14           1,050            42       44,153
                                               Rating Factor 1—Capacity ..............................................                                    75                             1                       75                         10             750            42       31,538
                                               Rating Factor 2—Need ...................................................                                   75                             1                       75                          8             600            42       25,230
                                               Rating Factor 3—Soundness of Approach .....................                                                75                             1                       75                         12             900            42       37,845
                                                   Applicant’s Detailed Program Budget ......................                                             75                             1                       75                        3.2             240            42       10,092
                                                   Form HUD–50144—Summary Jobs Plus Budget ...                                                            75                             1                       75                          2             150            42        6,308
                                                   Narrative to Program Budget ...................................                                        75                             1                       75                          4             300            42       12,615
                                               Rating Factor 4—Match/Leveraging Table .....................                                               75                             1                       75                          2             150            42        6,308
                                               Rating Factor 5—Bonus Points Documentation (HUD–
                                                 2995) ............................................................................                        75                            1                        75                        0.5           37.5            42         1,577

                                                     Sub-Total Application Submission w/Narratives ......                                                  75                            1                        75                   59.79          4,484.25            42    188,562.71

                                                                                                                                                         Post Award Submissions

                                               Code of Conduct (if not on HUD website, if recently up-
                                                 dated, if not previously submitted) ..............................                                        36                            1                       36                            1            36            42         1,514

                                                     Sub-Total—Post-Award ...........................................                                      36                            1                        36                           1            36            42      1,513.80

                                                                                                                                                              Grant Management

                                               Quarterly Performance Reports ......................................                                       36                             4                      144                           8          1,152            42       48,442
                                               Annual Performance Reports ..........................................                                      36                             4                      144                           6            864            42       36,331
                                               Workplan Submission .....................................................                                  36                             1                       36                          10            360            42       15,138
                                               Federal Financial Report (Form SF–425) .......................                                             36                             1                       36                           2             72            42        3,028
                                               Final Financial Status Report (Form SF–269–A) ...........                                                  36                             1                       36                           4            144            42        6,055

                                                     Sub-Total—Grant Management ...............................                                            36                            1                        36                         24          2,592            42    108,993.60

                                                                                                                                                             Program Monitoring

                                               Monitoring and Reporting ................................................                                   36                            1                        36                         10             10            42          421

                                                     Sub-Total—Monitoring .............................................                                    36                            1                       36                          10            360            42     15,138.00

                                                            Grand Totals .....................................................         ........................    ........................   ........................   ........................        7,472            42      314,208
                                                  Note: The estimated hourly cost, applied when the burden cost relates to a PHA, is an estimated median hourly salary of a PHA Project Manager or other profes-
                                               sional/managerial staff preparing grant applications.



                                               B. Solicitation of Public Comment                                                        HUD encourages interested parties to                                                ACTION:          Notice of contract actions.
                                                                                                                                      submit comment in response to these
                                                  This notice is soliciting comments                                                  questions.                                                                            SUMMARY:   Notice is hereby given of
                                               from members of the public and affected                                                                                                                                      contractual actions that have been
                                               parties concerning the collection of                                                     Authority: Section 3507 of the Paperwork
                                                                                                                                      Reduction Act of 1995, 44 U.S.C. Chapter 35.                                          proposed to the Bureau of Reclamation
                                               information described in Section A on                                                                                                                                        (Reclamation) and are new,
                                               the following:                                                                           Dated: December 19, 2017.                                                           discontinued, or completed since the
                                                  (1) Whether the proposed collection                                                 Colette Pollard,                                                                      last publication of this notice. This
                                               of information is necessary for the                                                    Department Reports Management Officer,                                                notice is one of a variety of means used
                                               proper performance of the functions of                                                 Office of the Chief Information Officer.                                              to inform the public about proposed
                                               the agency, including whether the                                                      [FR Doc. 2018–00216 Filed 1–9–18; 8:45 am]                                            contractual actions for capital recovery
                                               information will have practical utility;                                               BILLING CODE 4210–67–P                                                                and management of project resources
                                                  (2) The accuracy of the agency’s                                                                                                                                          and facilities consistent with the
                                               estimate of the burden of the proposed                                                                                                                                       Reclamation Project Act of 1939, as
                                               collection of information;                                                             DEPARTMENT OF THE INTERIOR                                                            amended and supplemented. Additional
                                                  (3) Ways to enhance the quality,                                                                                                                                          announcements of individual contract
                                                                                                                                      Bureau of Reclamation                                                                 actions may be published in the Federal
                                               utility, and clarity of the information to
                                               be collected; and                                                                      [RR83550000, 189R5065C6,                                                              Register and in newspapers of general
daltland on DSKBBV9HB2PROD with NOTICES




                                                  (4) Ways to minimize the burden of                                                  RX.59389832.1009676]                                                                  circulation in the areas determined by
                                               the collection of information on those                                                                                                                                       Reclamation to be affected by the
                                                                                                                                      Quarterly Status Report of Water                                                      proposed action.
                                               who are to respond: Including through
                                                                                                                                      Service, Repayment, and Other Water-
                                               the use of appropriate automated                                                                                                                                             ADDRESSES: The identity of the
                                                                                                                                      Related Contract Actions
                                               collection techniques or other forms of                                                                                                                                      approving officer and other information
                                               information technology, e.g., permitting                                               AGENCY:         Bureau of Reclamation,                                                pertaining to a specific contract
                                               electronic submission of responses.                                                    Interior.                                                                             proposal may be obtained by calling or


                                          VerDate Sep<11>2014            18:23 Jan 09, 2018            Jkt 244001        PO 00000          Frm 00038              Fmt 4703       Sfmt 4703         E:\FR\FM\10JAN1.SGM                   10JAN1


                                                                           Federal Register / Vol. 83, No. 7 / Wednesday, January 10, 2018 / Notices                                             1271

                                               writing the appropriate regional office at              request for such notice to the                            Pacific Northwest Region: Bureau of
                                               the address and telephone number given                  appropriate regional or project office of              Reclamation, 1150 North Curtis Road,
                                               for each region in the SUPPLEMENTARY                    Reclamation.                                           Suite 100, Boise, Idaho 83706–1234,
                                               INFORMATION section of this notice.                       3. Written correspondence regarding                  telephone 208–378–5344.
                                               FOR FURTHER INFORMATION CONTACT:                        proposed contracts may be made                            The Pacific Northwest Region has no
                                               Michelle Kelly, Reclamation Law                         available to the general public pursuant               updates for this quarter.
                                               Administration Division, Bureau of                      to the terms and procedures of the                        Mid-Pacific Region: Bureau of
                                               Reclamation, P.O. Box 25007, Denver,                    Freedom of Information Act, as                         Reclamation, 2800 Cottage Way,
                                               Colorado 80225–0007; telephone 303–                     amended.                                               Sacramento, California 95825–1898,
                                               445–2888.                                                 4. Written comments on a proposed                    telephone 916–978–5250.
                                                                                                       contract or contract action must be                       New contract action:
                                               SUPPLEMENTARY INFORMATION: Consistent
                                                                                                                                                                 50. Del Puerto WD, CVP, California:
                                               with section 9(f) of the Reclamation                    submitted to the appropriate regional
                                                                                                                                                              Negotiation of a multi-year wheeling
                                               Project Act of 1939, as amended and                     officials at the locations and within the
                                                                                                                                                              agreement with the State of California,
                                               supplemented, and the rules and                         time limits set forth in the advance
                                                                                                                                                              Department of Water Resources to
                                               regulations published in 52 FR 11954,                   public notices.
                                                                                                                                                              provide for the conveyance and delivery
                                               April 13, 1987 (43 CFR 426.22),                           5. All written comments received and
                                                                                                                                                              of CVP water through the State of
                                               Reclamation will publish notice of                      testimony presented at any public
                                                                                                                                                              California’s water project facilities to
                                               proposed or amendatory contract                         hearings will be reviewed and
                                                                                                                                                              Del Puerto Water District via a state
                                               actions for any contract for the delivery               summarized by the appropriate regional
                                                                                                                                                              water project contractor.
                                               of project water for authorized uses in                 office for use by the contract approving                  Lower Colorado Region: Bureau of
                                               newspapers of general circulation in the                authority.                                             Reclamation, P.O. Box 61470 (Nevada
                                               affected area at least 60 days prior to                   6. Copies of specific proposed                       Highway and Park Street), Boulder City,
                                               contract execution. Announcements                       contracts may be obtained from the                     Nevada 89006–1470, telephone 702–
                                               may be in the form of news releases,                    appropriate regional director or his or                293–8192.
                                               legal notices, official letters,                        her designated public contact as they                     New contract action:
                                               memorandums, or other forms of                          become available for review and                           23. Imperial ID, Lower Colorado
                                               written material. Meetings, workshops,                  comment.                                               Water Supply Project, California:
                                               and/or hearings may also be used, as                      7. In the event modifications are made               Amend the agreement between
                                               appropriate, to provide local publicity.                in the form of a proposed contract, the                Reclamation and Imperial ID to extend
                                               The public participation procedures do                  appropriate regional director shall                    the term for the funding of design,
                                               not apply to proposed contracts for the                 determine whether republication of the                 construction, and installation of power
                                               sale of surplus or interim irrigation                   notice and/or extension of the comment                 facilities for the Lower Colorado Water
                                               water for a term of 1 year or less. Either              period is necessary.                                   Supply Project.
                                               of the contracting parties may invite the                 Factors considered in making such a                     Completed contract actions:
                                               public to observe contract proceedings.                 determination shall include, but are not                  15. Imperial ID, BCP, California:
                                               All public participation procedures will                limited to, (i) the significance of the                Approve an assignment of 155 cubic feet
                                               be coordinated with those involved in                   modification, and (ii) the degree of                   per second of capacity in the All-
                                               complying with the National                             public interest which has been                         American Canal and all obligations
                                               Environmental Policy Act. Pursuant to                   expressed over the course of the                       associated therewith to the District from
                                               the ‘‘Final Revised Public Participation                negotiations. At a minimum, the                        the City of San Diego. Contract executed
                                               Procedures’’ for water resource-related                 regional director will furnish revised                 May 24, 2017.
                                               contract negotiations, published in 47                  contracts to all parties who requested                    16. Valencia Water Company and the
                                               FR 7763, February 22, 1982, a tabulation                the contract in response to the initial                City of Buckeye, CAP, Arizona: Execute
                                               is provided of all proposed contractual                 public notice.                                         a proposed assignment to the City of
                                               actions in each of the five Reclamation                                                                        Buckeye of Valencia Water Company’s
                                               regions. When contract negotiations are                 Definitions of Abbreviations Used in the               43 acre-foot annual CAP M&I water
                                               completed, and prior to execution, each                 Reports                                                entitlement. This proposed action will
                                               proposed contract form must be                          ARRA American Recovery and                             increase the City of Buckeye’s final 2034
                                               approved by the Secretary of the                          Reinvestment Act of 2009                             entitlement to 68 acre-feet per annum
                                               Interior, or pursuant to delegated or                   BCP Boulder Canyon Project                             and will eliminate Valencia Water
                                               redelegated authority, the Commissioner                 Reclamation Bureau of Reclamation                      Company’s entitlement. Contract
                                               of Reclamation or one of the regional                   CAP Central Arizona Project                            executed April 13, 2017.
                                                                                                       CUP Central Utah Project                                  18. San Carlos Apache Tribe and the
                                               directors. In some instances,
                                                                                                       CVP Central Valley Project
                                               congressional review and approval of a                  CRSP Colorado River Storage Project
                                                                                                                                                              Town of Gilbert, CAP, Arizona: Execute
                                               report, water rate, or other terms and                  FR Federal Register                                    amendment No. 6 to a CAP water lease
                                               conditions of the contract may be                       IDD Irrigation and Drainage District                   to extend the term of the lease in order
                                               involved.                                               ID Irrigation District                                 for the San Carlos Apache Tribe to lease
                                                  Public participation in and receipt of               M&I Municipal and Industrial                           29,341 acre-feet of its CAP water to the
                                               comments on contract proposals will be                  O&M Operation and Maintenance                          Town of Gilbert during calendar year
                                               facilitated by adherence to the following               OM&R Operation, Maintenance, and                       2017. Contract executed April 25, 2017.
                                               procedures:                                               Replacement                                             20. Ak-Chin Indian Community and
daltland on DSKBBV9HB2PROD with NOTICES




                                                  1. Only persons authorized to act on                 P-SMBP Pick-Sloan Missouri Basin Program               Del Webb Corporation, CAP, Arizona:
                                                                                                       PPR Present Perfected Right                            Execute a CAP water lease in order for
                                               behalf of the contracting entities may
                                                                                                       RRA Reclamation Reform Act of 1982
                                               negotiate the terms and conditions of a                 SOD Safety of Dams
                                                                                                                                                              the Ak-Chin Indian Community to lease
                                               specific contract proposal.                             SRPA Small Reclamation Projects Act of                 1,800 acre-feet of its CAP water to the
                                                  2. Advance notice of meetings or                       1956                                                 Del Webb Corporation during calendar
                                               hearings will be furnished to those                     USACE U.S. Army Corps of Engineers                     year 2017. Contract executed April 23,
                                               parties that have made a timely written                 WD Water District                                      2017.


                                          VerDate Sep<11>2014   18:23 Jan 09, 2018   Jkt 244001   PO 00000   Frm 00039   Fmt 4703   Sfmt 4703   E:\FR\FM\10JAN1.SGM   10JAN1


                                               1272                        Federal Register / Vol. 83, No. 7 / Wednesday, January 10, 2018 / Notices

                                                  Upper Colorado Region: Bureau of                     expired. The new contract will be for up               contract with the District for repayment
                                               Reclamation, 125 South State Street,                    to 2,000 acre-feet of water for irrigation             of SOD costs at Bull Lake Dam. Contract
                                               Room 8100, Salt Lake City, Utah 84138–                  and M&I uses. Up to 200 acre-feet will                 executed June 20, 2017.
                                               1102, telephone 801–524–3864.                           be available for M&I uses. Contract                      29. Oxbow Ranch; Canyon Ferry Unit,
                                                  New contract actions:                                executed April 12, 2017.                               P–SMBP; Montana: Proposal to
                                                  45. Strawberry High Line Canal                          41. Weber Basin Water Conservancy                   negotiate, execute, and administer a
                                               Company, Strawberry Valley Project;                     District, Weber Basin Project, Utah: The               long-term water service contract for
                                               Utah: The Strawberry High Line Canal                    District requires an amendment to its                  multiple purposes with water from
                                               Company has requested to allow for the                  block notices for construction costs not               Canyon Ferry Reservoir. Contract
                                               carriage of non-project water held by                   currently under repayment. Contract                    executed April 18, 2017.
                                               McMullin Orchards in the High Line                      executed July 31, 2017.                                  31. Ainsworth ID; Ainsworth Unit, P–
                                               Canal.                                                     Completed contract action from 2016:                SMBP; Montana: Consideration of a
                                                  46. Mancos Water Conservancy                            (37) Grand Valley Water Users                       contract with the District for repayment
                                               District, Mancos Project, Colorado:                     Association and Orchard Mesa ID,                       of SOD costs at Merritt Dam. Contract
                                               Proposed amendment to Jackson Gulch                     Grand Valley Project, Colorado: A                      executed July 25, 2017.
                                               Rehabilitation Project repayment                        contract for repayment of extraordinary                  Dated: October 18, 2017.
                                               contract to provide continued funding                   maintenance of the Grand Valley Power
                                                                                                                                                              Karl Stock,
                                               within repayment terms that are                         Plant funded pursuant to Subtitle G of
                                               consistent with terms of Section 9105 of                                                                       Acting Director, Policy and Administration.
                                                                                                       Pub. L. 111–11. Contract executed
                                               Pub. L. 111–11.                                         September 13, 2016.                                    [FR Doc. 2018–00250 Filed 1–9–18; 8:45 am]
                                                  Discontinued contract actions:                          Great Plains Region: Bureau of                      BILLING CODE 4332–90–P
                                                  12. Salem Canal and Irrigation                       Reclamation, P.O. Box 36900, Federal
                                               Company, Strawberry Valley Project,                     Building, 2021 4th Avenue North,
                                               Utah: The United States intends to enter                Billings, Montana 59101, telephone                     DEPARTMENT OF THE INTERIOR
                                               into an amendatory contract regarding                   406–247–7752.
                                               possible lost generation of power                                                                              Bureau of Reclamation
                                                                                                          New contract actions:
                                               revenues generated at the Spanish Fork                     34. Bureau of Land Management,                      [RR83550000, 189R5065C6,
                                               Power Plant on the Strawberry Valley                    Fryingpan-Arkansas Project, Colorado:                  RX.59389832.1009676.]
                                               Project.                                                Consideration of excess capacity
                                                  15. Uintah Water Conservancy                         contracting to store water in the                      Change in Discount Rate for Water
                                               District; Flaming Gorge Unit, CRSP;                     Fryingpan-Arkansas Project.                            Resources Planning
                                               Utah: The District has requested a long-                   35. Southeastern Colorado Water                     AGENCY:   Bureau of Reclamation,
                                               term water service contract to remove                   Conservancy District, Fryingpan-                       Interior.
                                               up to 5,500 acre-feet of water annually                 Arkansas Project, Colorado:
                                                                                                                                                              ACTION: Notice of change in discount
                                               from the Green River for irrigation                     Consideration of amending Contract no.
                                                                                                                                                              rate.
                                               purposes under the authority of Section                 5–07–70–W0086 to create a reserve fund
                                               9(e) of the Reclamation Project Act of                  and convert or renew Contract no. 5–                   SUMMARY:    The Bureau of Reclamation is
                                               1939. A short-term contract may be                      07–70–W0086.                                           announcing the interest rate to be used
                                               executed until a long-term contract can                    36. Fresno Dam, Milk River Project,                 by Federal agencies in the formulation
                                               be completed.                                           Montana: Consideration of contract(s)                  and evaluation of plans for water and
                                                  42. Weber Basin Water Conservancy                    for repayment of SOD costs.                            related land resources is 2.750 percent
                                               District, Weber Basin Project, Utah: The                   Discontinued contract action:                       for fiscal year 2018.
                                               District requires a Contributed Funds                      28. Avalanche ID; Canyon Ferry Unit,
                                                                                                                                                              DATES: This discount rate is to be used
                                               Act agreement for reimbursable costs                    P–SMBP; Montana: Proposal to
                                                                                                                                                              for the period October 1, 2017, through
                                               not currently under contract.                           negotiate, execute, and administer a
                                                                                                                                                              and including September 30, 2018.
                                                  Discontinued contract action from                    long-term water service contract to
                                               2016:                                                   irrigate up to 11,000 acres of land with               FOR FURTHER INFORMATION CONTACT: Mr.
                                                  (14) South Cache Water Users                         water from Canyon Ferry Reservoir.                     DeShawn Woods, Bureau of
                                               Association, Hyrum Project, Utah: The                      Completed contract actions:                         Reclamation, Reclamation Law
                                               Association has requested a loan under                     13. Northern Colorado Water                         Administration Division, P.O. Box
                                               Pub. L. 111–11 to pipe approximately                    Conservancy District, Colorado-Big                     25007, Denver, Colorado 80225;
                                               2,100 linear-feet of the Hyrum Mendon                   Thompson Project, Colorado: Amend or                   telephone 303–445–2900.
                                               Canal.                                                  supplement the 1938 repayment                          SUPPLEMENTARY INFORMATION: The Water
                                                  Completed contract actions:                          contract to include the transfer of OM&R               Resources Planning Act of 1965 and the
                                                  31. East Wanship Irrigation Company,                 for Carter Lake Dam Additional Outlet                  Water Resources Development Act of
                                               Weber Basin Project, Utah: The                          Works and Flatiron Power Plant Bypass                  1974 require an annual determination of
                                               Company has requested a supplemental                    facilities. Contract executed August 3,                a discount rate for Federal water
                                               O&M agreement to modify the Federal                     2017.                                                  resources planning. The discount rate
                                               facilities below Wanship Dam to install                    14. Van Amundson; Jamestown                         for Federal water resources planning for
                                               a pipe from its current point of delivery               Reservoir, Garrison Diversion Unit, P–                 fiscal year 2018 is 2.750 percent.
                                               to the end of the Primary Jurisdiction                  SMBP; North Dakota: Intent to enter                    Discounting is to be used to convert
                                               Zone. Contract executed May 24, 2017.                   into an individual long-term irrigation                future monetary values to present
daltland on DSKBBV9HB2PROD with NOTICES




                                                  34. North Fork Water Conservancy                     water service contract to provide up to                values.
                                               District and Ragged Mountain Water                      285 acre-feet of water annually for a                     This rate has been computed in
                                               Users Association, Paonia Project,                      term of up to 40 years from Jamestown                  accordance with Section 80(a), Public
                                               Colorado: An existing contract for 2,000                Reservoir, North Dakota. Contract                      Law 93–251 (88 Stat. 34), and 18 CFR
                                               acre-feet expired on December 31, 2016.                 executed April 18, 2017.                               704.39, which: (1) Specify that the rate
                                               The parties requested a 5-year contract                    18. Midvale ID; Riverton Unit, P–                   will be based upon the average yield
                                               that began when the existing contract                   SMBP; Wyoming: Consideration of a                      during the preceding fiscal year on


                                          VerDate Sep<11>2014   18:23 Jan 09, 2018   Jkt 244001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\10JAN1.SGM   10JAN1



Document Created: 2018-10-26 09:32:57
Document Modified: 2018-10-26 09:32:57
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of contract actions.
ContactMichelle Kelly, Reclamation Law Administration Division, Bureau of Reclamation, P.O. Box 25007, Denver, Colorado 80225-0007; telephone 303-445-2888.
FR Citation83 FR 1270 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR