83_FR_12806 83 FR 12749 - Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Rivervale South to Market Project

83 FR 12749 - Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Rivervale South to Market Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 57 (March 23, 2018)

Page Range12749-12750
FR Document2018-05967

Federal Register, Volume 83 Issue 57 (Friday, March 23, 2018)
[Federal Register Volume 83, Number 57 (Friday, March 23, 2018)]
[Notices]
[Pages 12749-12750]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-05967]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-490-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of 
Availability of the Environmental Assessment for the Proposed Rivervale 
South to Market Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared this environmental assessment (EA) for the 
Rivervale South to Market Project (Project) proposed by 
Transcontinental Gas Pipe Line Company, LLC (Transco) in the above-
referenced docket. Transco requests authorization to construct and 
operate natural gas pipeline facilities in Bergen and Hudson Counties, 
New Jersey. The Project would enable Transco to transport an additional 
190 million cubic feet of natural gas per day.
    The EA assesses the potential environmental effects of the 
construction and operation of the Project in accordance with the 
National Environmental Policy Act. The FERC staff concludes that 
approval of the proposed Project, with appropriate mitigating measures, 
would not constitute a major federal action significantly affecting the 
quality of the human environment.
    The Project would involve the following activities in the specified 
counties in New Jersey:
     Construct 0.61 mile of 42-inch-diameter pipeline loop \1\ 
along Transco's Mainline A, from milepost 1825.80 to 1826.41 (Bergen 
County);
---------------------------------------------------------------------------

    \1\ A loop is a segment of pipe that is usually installed 
adjacent to an existing pipeline and connected to it at both ends. 
The loop allows more gas to be moved through the system.
---------------------------------------------------------------------------

     Uprate 10.35 miles of existing 24-inch-diameter-pipeline 
(North New Jersey Extension) from a maximum allowable operating 
pressure of 650 pounds per square inch gauge to 812 pounds per square 
inch gauge from the Paramus Meter and Regulation Station (M&R) to the 
Orange and Rockland M&R (Bergen County);
     Upgrade the existing valves, including overpressure 
protection valves, and yard piping at the Central Manhattan M&R (Hudson 
County) and Orange and Rockland M&R (Bergen County);
     Construct regulation and overpressure protection valves 
and upgrade yard piping at the Emerson M&R and Paramus M&R (Bergen 
County); and
     Construct additional facilities, such as mainline valves, 
cathodic protection, pig \2\ launchers and receivers, communication 
equipment, and related appurtenant underground and aboveground 
facilities.
---------------------------------------------------------------------------

    \2\ A pig is a tool that the pipeline company inserts into and 
pushes through the pipeline for cleaning the pipeline, conducting 
internal inspections, or other purposes.
---------------------------------------------------------------------------

    The FERC staff mailed copies of the EA to federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners and other interested individuals and 
groups; and local media in the Project area. In addition, the EA is 
available for public viewing on the FERC's website (www.ferc.gov) using 
the eLibrary link. A limited number of copies of the EA are available 
for distribution and public inspection at: Federal Energy Regulatory 
Commission, Public Conference Room, 888 First Street NE, Room 2A, 
Washington, DC 20426, (202) 502-8371.
    Any person wishing to comment on the EA may do so. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
The more specific your comments, the more useful they will be. To 
ensure that your comments are properly recorded and considered prior to 
a Commission decision on the proposal, it is important that the FERC 
receives your comments in Washington, DC on or before April 16, 2018.
    For your convenience, there are three methods you can use to submit 
your comments to the Commission. In all instances, please reference the 
Project docket number (CP17-490-000) with your submission. The 
Commission encourages electronic filing of comments and has dedicated 
eFiling expert staff available to assist you at (202) 502-8258 or 
[email protected].
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's website at www.ferc.gov 
under the link to Documents and Filings. An eComment is an easy method 
for interested persons to submit brief, text-only comments on a 
project;
    (2) You may file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. With eFiling, you can provide 
comments in a variety of formats by

[[Page 12750]]

attaching them as a file with your submission. New eFiling users must 
first create an account by clicking on eRegister. You will be asked to 
select the type of filing you are making. A comment on a particular 
project is considered a Comment on a Filing; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426.
    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (18 CFR 385.214).\3\ Only intervenors have the 
right to seek rehearing of the Commission's decision. The Commission 
grants affected landowners and others with environmental concerns 
intervenor status upon showing good cause by stating that they have a 
clear and direct interest in this proceeding which no other party can 
adequately represent. Simply filing environmental comments will not 
give you intervenor status, but you do not need intervenor status to 
have your comments considered.
---------------------------------------------------------------------------

    \3\ See the previous discussion on the methods for filing 
comments.
---------------------------------------------------------------------------

    Additional information about the Project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on General Search, and enter the docket number 
excluding the last three digits in the Docket Number field (i.e., CP17-
490). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to http://www.ferc.gov/docs-filing/esubscription.asp.

Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-05967 Filed 3-22-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 83, No. 57 / Friday, March 23, 2018 / Notices                                                    12749

                                             www.ferc.gov/whats-new/registration/                    DEPARTMENT OF ENERGY                                     • Construct additional facilities, such
                                             04-24-18-speaker-form.asp.                                                                                    as mainline valves, cathodic protection,
                                                                                                     Federal Energy Regulatory                             pig 2 launchers and receivers,
                                                The technical conference will be
                                                                                                     Commission                                            communication equipment, and related
                                             transcribed and will be part of the
                                             record in these proceedings. Transcripts                                                                      appurtenant underground and
                                                                                                     [Docket No. CP17–490–000]
                                                                                                                                                           aboveground facilities.
                                             will be available for a fee from Ace-
                                                                                                     Transcontinental Gas Pipe Line                           The FERC staff mailed copies of the
                                             Federal Reports, Inc. (202–347–3700).
                                                                                                     Company, LLC; Notice of Availability                  EA to federal, state, and local
                                             There will be a free webcast of the                                                                           government representatives and
                                             conference. The webcast will allow                      of the Environmental Assessment for
                                                                                                     the Proposed Rivervale South to                       agencies; elected officials;
                                             persons to listen to the technical                                                                            environmental and public interest
                                             conference, but not participate. Anyone                 Market Project
                                                                                                                                                           groups; Native American tribes;
                                             with internet access who wants to listen                   The staff of the Federal Energy                    potentially affected landowners and
                                             to the conference can do so by                          Regulatory Commission (FERC or                        other interested individuals and groups;
                                             navigating to the Calendar of Events at                 Commission) has prepared this                         and local media in the Project area. In
                                             www.ferc.gov and locating the technical                 environmental assessment (EA) for the                 addition, the EA is available for public
                                             conference in the Calendar. The                         Rivervale South to Market Project                     viewing on the FERC’s website
                                             technical conference listing on the                     (Project) proposed by Transcontinental                (www.ferc.gov) using the eLibrary link.
                                             calendar will contain a link to its                     Gas Pipe Line Company, LLC (Transco)                  A limited number of copies of the EA
                                             webcast.                                                in the above-referenced docket. Transco               are available for distribution and public
                                                The Capitol Connection provides                      requests authorization to construct and               inspection at: Federal Energy Regulatory
                                                                                                     operate natural gas pipeline facilities in            Commission, Public Conference Room,
                                             technical support for the webcast and
                                                                                                     Bergen and Hudson Counties, New                       888 First Street NE, Room 2A,
                                             offers the option of listening to the
                                                                                                     Jersey. The Project would enable                      Washington, DC 20426, (202) 502–8371.
                                             meeting via phone-bridge for a fee. The
                                                                                                     Transco to transport an additional 190                   Any person wishing to comment on
                                             phone bridge must be requested at least                 million cubic feet of natural gas per day.            the EA may do so. Your comments
                                             24 hours in advance of the meeting. If                     The EA assesses the potential                      should focus on the potential
                                             you have any questions, visit                           environmental effects of the                          environmental effects, reasonable
                                             www.CapitolConnection.org or call 703–                  construction and operation of the                     alternatives, and measures to avoid or
                                             993–3100. The webcast will be available                 Project in accordance with the National               lessen environmental impacts. The more
                                             on the Calendar of Events on the                        Environmental Policy Act. The FERC                    specific your comments, the more useful
                                             Commission’s website www.ferc.gov for                   staff concludes that approval of the                  they will be. To ensure that your
                                             three months after the conference.                      proposed Project, with appropriate                    comments are properly recorded and
                                                Commission conferences are                           mitigating measures, would not                        considered prior to a Commission
                                             accessible under section 508 of the                     constitute a major federal action                     decision on the proposal, it is important
                                             Rehabilitation Act of 1973. For                         significantly affecting the quality of the            that the FERC receives your comments
                                             accessibility accommodations, please                    human environment.                                    in Washington, DC on or before April
                                             send an email to accessibility@ferc.gov                    The Project would involve the                      16, 2018.
                                             or call toll free (866) 208–3372 (voice)                following activities in the specified                    For your convenience, there are three
                                             or (202) 502–8659 (TTY), or send a FAX                  counties in New Jersey:                               methods you can use to submit your
                                                                                                        • Construct 0.61 mile of 42-inch-                  comments to the Commission. In all
                                             to (202) 208–2106 with the required
                                                                                                     diameter pipeline loop 1 along Transco’s              instances, please reference the Project
                                             accommodations.
                                                                                                     Mainline A, from milepost 1825.80 to                  docket number (CP17–490–000) with
                                                For more information about this                      1826.41 (Bergen County);                              your submission. The Commission
                                             technical conference, please contact:                      • Uprate 10.35 miles of existing 24-               encourages electronic filing of
                                             Sarah McKinley (Logistical Issues),                     inch-diameter-pipeline (North New                     comments and has dedicated eFiling
                                               Office of External Affairs, 202–502–                  Jersey Extension) from a maximum                      expert staff available to assist you at
                                                                                                     allowable operating pressure of 650                   (202) 502–8258 or FercOnlineSupport@
                                               8368, sarah.mckinley@ferc.gov
                                                                                                     pounds per square inch gauge to 812                   ferc.gov.
                                             John Riehl (Technical Issues), Office of                pounds per square inch gauge from the                    (1) You may file your comments
                                               Energy Market Regulation, 202–502–                    Paramus Meter and Regulation Station                  electronically by using the eComment
                                               6026, john.riehl@ferc.gov                             (M&R) to the Orange and Rockland M&R                  feature, which is located on the
                                             Noah Monick (Legal Issues), Office of                   (Bergen County);                                      Commission’s website at www.ferc.gov
                                               General Counsel, 202–502–8299,                           • Upgrade the existing valves,                     under the link to Documents and
                                               noah.monick@ferc.gov                                  including overpressure protection                     Filings. An eComment is an easy
                                                                                                     valves, and yard piping at the Central                method for interested persons to submit
                                               Dated: March 16, 2018.                                Manhattan M&R (Hudson County) and                     brief, text-only comments on a project;
                                             Nathaniel J. Davis, Sr.,                                Orange and Rockland M&R (Bergen                          (2) You may file your comments
                                             Deputy Secretary.                                       County);                                              electronically by using the eFiling
                                             [FR Doc. 2018–05948 Filed 3–22–18; 8:45 am]                • Construct regulation and                         feature, which is located on the
                                             BILLING CODE 6717–01–P                                  overpressure protection valves and                    Commission’s website (www.ferc.gov)
                                                                                                     upgrade yard piping at the Emerson                    under the link to Documents and
amozie on DSK30RV082PROD with NOTICES




                                                                                                     M&R and Paramus M&R (Bergen                           Filings. With eFiling, you can provide
                                                                                                     County); and                                          comments in a variety of formats by
                                                                                                       1 A loop is a segment of pipe that is usually         2 A pig is a tool that the pipeline company inserts

                                                                                                     installed adjacent to an existing pipeline and        into and pushes through the pipeline for cleaning
                                                                                                     connected to it at both ends. The loop allows more    the pipeline, conducting internal inspections, or
                                                                                                     gas to be moved through the system.                   other purposes.



                                        VerDate Sep<11>2014   21:54 Mar 22, 2018   Jkt 244001   PO 00000   Frm 00036   Fmt 4703   Sfmt 4703   E:\FR\FM\23MRN1.SGM   23MRN1


                                             12750                           Federal Register / Vol. 83, No. 57 / Friday, March 23, 2018 / Notices

                                             attaching them as a file with your                      DEPARTMENT OF ENERGY                                  Commission staff’s issuance of the EA
                                             submission. New eFiling users must                                                                            for this proposal. The filing of the EA
                                             first create an account by clicking on                  Federal Energy Regulatory                             in the Commission’s public record for
                                             eRegister. You will be asked to select                  Commission                                            this proceeding or the issuance of a
                                             the type of filing you are making. A                    [Docket No. CP18–103–000]                             Notice of Schedule for Environmental
                                             comment on a particular project is                                                                            Review will serve to notify federal and
                                             considered a Comment on a Filing; or                    Notice of Application; Rockies Express                state agencies of the timing for the
                                                (3) You can file a paper copy of your                Pipeline LLC                                          completion of all necessary reviews, and
                                             comments by mailing them to the                                                                               the subsequent need to complete all
                                             following address: Kimberly D. Bose,                       On March 5, 2018, Rockies Express                  federal authorizations within 90 days of
                                             Secretary, Federal Energy Regulatory                    Pipeline LLC (Rockies Express), 370 Van               the date of issuance of the Commission
                                             Commission, 888 First Street NE, Room                   Gordon Street, Lakewood, Colorado                     staff’s EA.
                                             1A, Washington, DC 20426.                               80228, filed an application pursuant to                  There are two ways to become
                                                Any person seeking to become a party                 section 7(c) of the Natural Gas Act                   involved in the Commission’s review of
                                             to the proceeding must file a motion to                 (NGA) and Part 157 of the Federal                     this project. First, any person wishing to
                                             intervene pursuant to Rule 214 of the                   Energy Regulatory Commission’s                        obtain legal status by becoming a party
                                             Commission’s Rules of Practice and                      (Commission) regulations requesting a                 to the proceedings for this project
                                             Procedures (18 CFR 385.214).3 Only                      certificate of public convenience and                 should, on or before the comment date
                                             intervenors have the right to seek                      necessity authorizing the construction                stated below file with the Federal
                                             rehearing of the Commission’s decision.                 and operation of certain booster                      Energy Regulatory Commission, 888
                                             The Commission grants affected                          compression units and ancillary                       First Street NE, Washington, DC 20426,
                                             landowners and others with                              facilities located at the Cheyenne Hub,               a motion to intervene in accordance
                                             environmental concerns intervenor                       in Weld County, Colorado to enable                    with the requirements of the
                                             status upon showing good cause by                       Rockies Express to provide a new hub                  Commission’s Rules of Practice and
                                             stating that they have a clear and direct               service allowing for firm receipts and                Procedure (18 CFR 385.214 or 385.211)
                                             interest in this proceeding which no                    deliveries between Rockies Express and                and the Regulations under the NGA (18
                                             other party can adequately represent.                   other interconnected pipelines at the                 CFR 157.10). A person obtaining party
                                             Simply filing environmental comments                    Cheyenne Hub, all as more fully set                   status will be placed on the service list
                                             will not give you intervenor status, but                forth in the application, which is open               maintained by the Secretary of the
                                             you do not need intervenor status to                    to the public for inspection. The filing              Commission and will receive copies of
                                             have your comments considered.                          may also be viewed on the web at http://              all documents filed by the applicant and
                                                Additional information about the                     www.ferc.gov using the ‘‘eLibrary’’ link.             by all other parties. A party must submit
                                             Project is available from the                           Enter the docket number excluding the                 7 copies of filings made in the
                                             Commission’s Office of External Affairs,                last three digits in the docket number                proceeding with the Commission and
                                             at (866) 208–FERC, or on the FERC                       field to access the document. For                     must mail a copy to the applicant and
                                             website (www.ferc.gov) using the                        assistance, contact FERC at                           to every other party. Only parties to the
                                             eLibrary link. Click on the eLibrary link,              FERCOnlineSupport@ferc.gov or call                    proceeding can ask for court review of
                                             click on General Search, and enter the                  toll-free, (866) 208–3676 or TTY, (202)               Commission orders in the proceeding.
                                             docket number excluding the last three                  502–8659.                                                However, a person does not have to
                                             digits in the Docket Number field (i.e.,                   Any questions regarding Rockies                    intervene in order to have comments
                                             CP17–490). Be sure you have selected                    Express’ application should be directed               considered. The second way to
                                             an appropriate date range. For                          to David Haag, Vice President and Chief               participate is by filing with the
                                             assistance, please contact FERC Online                  Compliance Officer, Cheyenne                          Secretary of the Commission, as soon as
                                             Support at FercOnlineSupport@ferc.gov                   Connector, LLC, 370 Van Gordon Street,                possible, an original and two copies of
                                             or toll free at (866) 208–3676, or for                  Lakewood, Colorado 80228–1519, or                     comments in support of or in opposition
                                             TTY, contact (202) 502–8659. The                        phone (303) 763–3258 or by email                      to this project. The Commission will
                                             eLibrary link also provides access to the               david.haag@tallgrassenergylp.com.                     consider these comments in
                                                                                                        Specifically, Rockies Express states               determining the appropriate action to be
                                             texts of formal documents issued by the
                                                                                                     that the proposed facilities will enable              taken, but the filing of a comment alone
                                             Commission, such as orders, notices,
                                                                                                     Rockies Express to receive up to 600,000              will not serve to make the filer a party
                                             and rulemakings.
                                                In addition, the Commission offers a                 dekatherms per day (Dth/d) of natural                 to the proceeding. The Commission’s
                                             free service called eSubscription which                 gas from Cheyenne Connector, LLC                      rules require that persons filing
                                             allows you to keep track of all formal                  which filed an application under CP18–                comments in opposition to the project
                                             issuances and submittals in specific                    102–000 for authorization to construct,               provide copies of their protests only to
                                             dockets. This can reduce the amount of                  own and operate a new natural gas                     the party or parties directly involved in
                                             time you spend researching proceedings                  pipeline system capable of transporting               the protest.
                                                                                                     up to 600,000 Dth/d.                                     Persons who wish to comment only
                                             by automatically providing you with
                                                                                                        Pursuant to Section 157.9 of the                   on the environmental review of this
                                             notification of these filings, document
                                                                                                     Commission’s rules, 18 CFR 157.9,                     project should submit an original and
                                             summaries, and direct links to the
                                                                                                     within 90 days of this Notice the                     two copies of their comments to the
                                             documents. Go to http://www.ferc.gov/
                                                                                                     Commission staff will either: Complete                Secretary of the Commission.
                                             docs-filing/esubscription.asp.
                                                                                                     its environmental assessment (EA) and                 Environmental commentors will be
amozie on DSK30RV082PROD with NOTICES




                                             Nathaniel J. Davis, Sr.,                                place it into the Commission’s public                 placed on the Commission’s
                                             Deputy Secretary.                                       record (eLibrary) for this proceeding, or             environmental mailing list, will receive
                                             [FR Doc. 2018–05967 Filed 3–22–18; 8:45 am]             issue a Notice of Schedule for                        copies of the environmental documents,
                                             BILLING CODE 6717–01–P                                  Environmental Review. If a Notice of                  and will be notified of meetings
                                                                                                     Schedule for Environmental Review is                  associated with the Commission’s
                                                3 See the previous discussion on the methods for     issued, it will indicate, among other                 environmental review process.
                                             filing comments.                                        milestones, the anticipated date for the              Environmental commentors will not be


                                        VerDate Sep<11>2014   21:54 Mar 22, 2018   Jkt 244001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\23MRN1.SGM   23MRN1



Document Created: 2018-11-01 08:53:49
Document Modified: 2018-11-01 08:53:49
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 12749 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR