83_FR_12807 83 FR 12750 - Notice of Application; Rockies Express Pipeline LLC

83 FR 12750 - Notice of Application; Rockies Express Pipeline LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 57 (March 23, 2018)

Page Range12750-12751
FR Document2018-05976

Federal Register, Volume 83 Issue 57 (Friday, March 23, 2018)
[Federal Register Volume 83, Number 57 (Friday, March 23, 2018)]
[Notices]
[Pages 12750-12751]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-05976]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-103-000]


Notice of Application; Rockies Express Pipeline LLC

    On March 5, 2018, Rockies Express Pipeline LLC (Rockies Express), 
370 Van Gordon Street, Lakewood, Colorado 80228, filed an application 
pursuant to section 7(c) of the Natural Gas Act (NGA) and Part 157 of 
the Federal Energy Regulatory Commission's (Commission) regulations 
requesting a certificate of public convenience and necessity 
authorizing the construction and operation of certain booster 
compression units and ancillary facilities located at the Cheyenne Hub, 
in Weld County, Colorado to enable Rockies Express to provide a new hub 
service allowing for firm receipts and deliveries between Rockies 
Express and other interconnected pipelines at the Cheyenne Hub, all as 
more fully set forth in the application, which is open to the public 
for inspection. The filing may also be viewed on the web at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
[email protected] or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding Rockies Express' application should be 
directed to David Haag, Vice President and Chief Compliance Officer, 
Cheyenne Connector, LLC, 370 Van Gordon Street, Lakewood, Colorado 
80228-1519, or phone (303) 763-3258 or by email 
[email protected].
    Specifically, Rockies Express states that the proposed facilities 
will enable Rockies Express to receive up to 600,000 dekatherms per day 
(Dth/d) of natural gas from Cheyenne Connector, LLC which filed an 
application under CP18-102-000 for authorization to construct, own and 
operate a new natural gas pipeline system capable of transporting up to 
600,000 Dth/d.
    Pursuant to Section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made in the proceeding with the Commission 
and must mail a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be

[[Page 12751]]

required to serve copies of filed documents on all other parties. 
However, the non-party commentors will not receive copies of all 
documents filed by other parties or issued by the Commission (except 
for the mailing of environmental documents issued by the Commission) 
and will not have the right to seek court review of the Commission's 
final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: 5 p.m. Eastern Time on April 9, 2018.

    Dated: March 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-05976 Filed 3-22-18; 8:45 am]
 BILLING CODE 6717-01-P



                                             12750                           Federal Register / Vol. 83, No. 57 / Friday, March 23, 2018 / Notices

                                             attaching them as a file with your                      DEPARTMENT OF ENERGY                                  Commission staff’s issuance of the EA
                                             submission. New eFiling users must                                                                            for this proposal. The filing of the EA
                                             first create an account by clicking on                  Federal Energy Regulatory                             in the Commission’s public record for
                                             eRegister. You will be asked to select                  Commission                                            this proceeding or the issuance of a
                                             the type of filing you are making. A                    [Docket No. CP18–103–000]                             Notice of Schedule for Environmental
                                             comment on a particular project is                                                                            Review will serve to notify federal and
                                             considered a Comment on a Filing; or                    Notice of Application; Rockies Express                state agencies of the timing for the
                                                (3) You can file a paper copy of your                Pipeline LLC                                          completion of all necessary reviews, and
                                             comments by mailing them to the                                                                               the subsequent need to complete all
                                             following address: Kimberly D. Bose,                       On March 5, 2018, Rockies Express                  federal authorizations within 90 days of
                                             Secretary, Federal Energy Regulatory                    Pipeline LLC (Rockies Express), 370 Van               the date of issuance of the Commission
                                             Commission, 888 First Street NE, Room                   Gordon Street, Lakewood, Colorado                     staff’s EA.
                                             1A, Washington, DC 20426.                               80228, filed an application pursuant to                  There are two ways to become
                                                Any person seeking to become a party                 section 7(c) of the Natural Gas Act                   involved in the Commission’s review of
                                             to the proceeding must file a motion to                 (NGA) and Part 157 of the Federal                     this project. First, any person wishing to
                                             intervene pursuant to Rule 214 of the                   Energy Regulatory Commission’s                        obtain legal status by becoming a party
                                             Commission’s Rules of Practice and                      (Commission) regulations requesting a                 to the proceedings for this project
                                             Procedures (18 CFR 385.214).3 Only                      certificate of public convenience and                 should, on or before the comment date
                                             intervenors have the right to seek                      necessity authorizing the construction                stated below file with the Federal
                                             rehearing of the Commission’s decision.                 and operation of certain booster                      Energy Regulatory Commission, 888
                                             The Commission grants affected                          compression units and ancillary                       First Street NE, Washington, DC 20426,
                                             landowners and others with                              facilities located at the Cheyenne Hub,               a motion to intervene in accordance
                                             environmental concerns intervenor                       in Weld County, Colorado to enable                    with the requirements of the
                                             status upon showing good cause by                       Rockies Express to provide a new hub                  Commission’s Rules of Practice and
                                             stating that they have a clear and direct               service allowing for firm receipts and                Procedure (18 CFR 385.214 or 385.211)
                                             interest in this proceeding which no                    deliveries between Rockies Express and                and the Regulations under the NGA (18
                                             other party can adequately represent.                   other interconnected pipelines at the                 CFR 157.10). A person obtaining party
                                             Simply filing environmental comments                    Cheyenne Hub, all as more fully set                   status will be placed on the service list
                                             will not give you intervenor status, but                forth in the application, which is open               maintained by the Secretary of the
                                             you do not need intervenor status to                    to the public for inspection. The filing              Commission and will receive copies of
                                             have your comments considered.                          may also be viewed on the web at http://              all documents filed by the applicant and
                                                Additional information about the                     www.ferc.gov using the ‘‘eLibrary’’ link.             by all other parties. A party must submit
                                             Project is available from the                           Enter the docket number excluding the                 7 copies of filings made in the
                                             Commission’s Office of External Affairs,                last three digits in the docket number                proceeding with the Commission and
                                             at (866) 208–FERC, or on the FERC                       field to access the document. For                     must mail a copy to the applicant and
                                             website (www.ferc.gov) using the                        assistance, contact FERC at                           to every other party. Only parties to the
                                             eLibrary link. Click on the eLibrary link,              FERCOnlineSupport@ferc.gov or call                    proceeding can ask for court review of
                                             click on General Search, and enter the                  toll-free, (866) 208–3676 or TTY, (202)               Commission orders in the proceeding.
                                             docket number excluding the last three                  502–8659.                                                However, a person does not have to
                                             digits in the Docket Number field (i.e.,                   Any questions regarding Rockies                    intervene in order to have comments
                                             CP17–490). Be sure you have selected                    Express’ application should be directed               considered. The second way to
                                             an appropriate date range. For                          to David Haag, Vice President and Chief               participate is by filing with the
                                             assistance, please contact FERC Online                  Compliance Officer, Cheyenne                          Secretary of the Commission, as soon as
                                             Support at FercOnlineSupport@ferc.gov                   Connector, LLC, 370 Van Gordon Street,                possible, an original and two copies of
                                             or toll free at (866) 208–3676, or for                  Lakewood, Colorado 80228–1519, or                     comments in support of or in opposition
                                             TTY, contact (202) 502–8659. The                        phone (303) 763–3258 or by email                      to this project. The Commission will
                                             eLibrary link also provides access to the               david.haag@tallgrassenergylp.com.                     consider these comments in
                                                                                                        Specifically, Rockies Express states               determining the appropriate action to be
                                             texts of formal documents issued by the
                                                                                                     that the proposed facilities will enable              taken, but the filing of a comment alone
                                             Commission, such as orders, notices,
                                                                                                     Rockies Express to receive up to 600,000              will not serve to make the filer a party
                                             and rulemakings.
                                                In addition, the Commission offers a                 dekatherms per day (Dth/d) of natural                 to the proceeding. The Commission’s
                                             free service called eSubscription which                 gas from Cheyenne Connector, LLC                      rules require that persons filing
                                             allows you to keep track of all formal                  which filed an application under CP18–                comments in opposition to the project
                                             issuances and submittals in specific                    102–000 for authorization to construct,               provide copies of their protests only to
                                             dockets. This can reduce the amount of                  own and operate a new natural gas                     the party or parties directly involved in
                                             time you spend researching proceedings                  pipeline system capable of transporting               the protest.
                                                                                                     up to 600,000 Dth/d.                                     Persons who wish to comment only
                                             by automatically providing you with
                                                                                                        Pursuant to Section 157.9 of the                   on the environmental review of this
                                             notification of these filings, document
                                                                                                     Commission’s rules, 18 CFR 157.9,                     project should submit an original and
                                             summaries, and direct links to the
                                                                                                     within 90 days of this Notice the                     two copies of their comments to the
                                             documents. Go to http://www.ferc.gov/
                                                                                                     Commission staff will either: Complete                Secretary of the Commission.
                                             docs-filing/esubscription.asp.
                                                                                                     its environmental assessment (EA) and                 Environmental commentors will be
amozie on DSK30RV082PROD with NOTICES




                                             Nathaniel J. Davis, Sr.,                                place it into the Commission’s public                 placed on the Commission’s
                                             Deputy Secretary.                                       record (eLibrary) for this proceeding, or             environmental mailing list, will receive
                                             [FR Doc. 2018–05967 Filed 3–22–18; 8:45 am]             issue a Notice of Schedule for                        copies of the environmental documents,
                                             BILLING CODE 6717–01–P                                  Environmental Review. If a Notice of                  and will be notified of meetings
                                                                                                     Schedule for Environmental Review is                  associated with the Commission’s
                                                3 See the previous discussion on the methods for     issued, it will indicate, among other                 environmental review process.
                                             filing comments.                                        milestones, the anticipated date for the              Environmental commentors will not be


                                        VerDate Sep<11>2014   21:54 Mar 22, 2018   Jkt 244001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\23MRN1.SGM   23MRN1


                                                                                 Federal Register / Vol. 83, No. 57 / Friday, March 23, 2018 / Notices                                                 12751

                                             required to serve copies of filed                           2. The Commission requires sellers                      5. Pursuant to these requirements, the
                                             documents on all other parties.                          with market-based rate authorization to                 Commission has revoked the market-
                                             However, the non-party commentors                        file Electric Quarterly Reports                         based rate tariffs of market-based rate
                                             will not receive copies of all documents                 summarizing contractual and                             sellers that failed to submit their
                                             filed by other parties or issued by the                  transaction information related to their                Electric Quarterly Reports.5
                                             Commission (except for the mailing of                    market-based power sales as a condition                    6. Sellers must file Electric Quarterly
                                             environmental documents issued by the                    for retaining that authorization.2                      Reports consistent with the procedures
                                             Commission) and will not have the right                  Commission staff’s review of the                        set forth in Order Nos. 2001, 768,6 and
                                             to seek court review of the                              Electric Quarterly Reports indicates that               770.7 The exact filing dates for Electric
                                             Commission’s final order.                                the following four public utilities with                Quarterly Reports are prescribed in 18
                                                The Commission strongly encourages                    market-based rate authorization have                    CFR 35.10b (2017). As noted above,
                                             electronic filings of comments, protests                 failed to file their Electric Quarterly                 Commission staff’s review of the
                                             and interventions in lieu of paper using                 Reports: Fibrominn LLC, BluCo Energy                    Electric Quarterly Reports for the period
                                             the eFiling link at http://www.ferc.gov.                 LLC, Alternate Power Source Inc., and                   up to the third quarter of 2017 identified
                                             Persons unable to file electronically                    Atlantic Coast Energy Corporation. This                 four public utilities with market-based
                                             should submit an original and 5 copies                   order notifies these public utilities that              rate authorization that failed to file
                                             of the protest or intervention to the                    their market-based rate authorizations                  Electric Quarterly Reports. Commission
                                             Federal Energy Regulatory Commission,                    will be revoked unless they comply                      staff contacted or attempted to contact
                                             888 First Street NE, Washington, DC                      with the Commission’s requirements                      these entities to remind them of their
                                             20426.                                                   within 15 days of the date of issuance                  regulatory obligations. Despite these
                                                Comment Date: 5 p.m. Eastern Time                     of this order.                                          reminders, the public utilities listed in
                                             on April 9, 2018.                                           3. In Order No. 2001, the Commission                 the caption of this order have not met
                                               Dated: March 19, 2018.                                 stated that:                                            these obligations. Accordingly, this
                                             Kimberly D. Bose,                                        [i]f a public utility fails to file a[n] Electric       order notifies these public utilities that
                                             Secretary.                                               Quarterly Report (without an appropriate                their market-based rate authorizations
                                                                                                      request for extension), or fails to report an           will be revoked unless they comply
                                             [FR Doc. 2018–05976 Filed 3–22–18; 8:45 am]              agreement in a report, that public utility may          with the Commission’s requirements
                                             BILLING CODE 6717–01–P                                   forfeit its market-based rate authority and             within 15 days of the issuance of this
                                                                                                      may be required to file a new application for           order.
                                                                                                      market-based rate authority if it wishes to
                                                                                                                                                                 7. In the event that any of the above-
                                             DEPARTMENT OF ENERGY                                     resume making sales at market-based rates.3
                                                                                                                                                              captioned market-based rate sellers has
                                                                                                        4. The Commission further stated that:                already filed its Electric Quarterly
                                             Federal Energy Regulatory
                                             Commission                                               [o]nce this rule becomes effective, the                 Reports in compliance with the
                                                                                                      requirement to comply with this rule will               Commission’s requirements, its
                                             Order on Intent To Revoke Market-                        supersede the conditions in public utilities’           inclusion herein is inadvertent. Such
                                             Based Rate Authority                                     market-based rate authorizations, and failure           market-based rate seller is directed,
                                                                                                      to comply with the requirements of this rule
                                                                                                                                                              within 15 days of the date of issuance
                                             Before Commissioners: Kevin J. McIntyre,                 will subject public utilities to the same
                                                                                                      consequences they would face for not                    of this order, to make a filing with the
                                               Chairman; Cheryl A. LaFleur, Neil
                                               Chatterjee, Robert F. Powelson, and                    satisfying the conditions in their rate                 Commission identifying itself and
                                               Richard Glick.                                         authorizations, including possible revocation           providing details about its prior filings
                                                                                                      of their authority to make wholesale power              that establish that it complied with the
                                                                                    Docket Nos.       sales at market-based rates.4                           Commission’s Electric Quarterly Report
                                                                                                                                                              filing requirements.
                                             Electric Quarterly Reports           ER02–2001–020       2001–F, 106 FERC ¶ 61,060 (2004), order revising           8. If any of the above-captioned
                                             Fibrominn LLC ...................    ER12–1161–002       filing requirements, Order No. 2001–G, 120 FERC ¶       market-based rate sellers does not wish
                                             BluCo Energy LLC .............       ER12–1279–000       61,270, order on reh’g and clarification, Order No.
                                                                                                      2001–H, 121 FERC ¶ 61,289 (2007), order revising        to continue having market-based rate
                                             Alternate Power Source Inc           ER11–4550–000
                                                                                                      filing requirements, Order No. 2001–I, FERC Stats.      authority, it may file a notice of
                                             Atlantic Coast Energy Cor-           ER13–734–000        & Regs. ¶ 31,282 (2008). See also Filing
                                               poration.                                                                                                      cancellation with the Commission
                                                                                                      Requirements for Electric Utility Service
                                                                                                      Agreements, 155 FERC ¶ 61,280, order on reh’g and       pursuant to section 205 of the FPA to
                                                1. Section 205 of the Federal Power                   clarification, 157 FERC ¶ 61,180 (2016) (clarifying     cancel its market-based rate tariff.
                                             Act (FPA), 16 U.S.C. 824d (2012), and                    Electric Quarterly Reports reporting requirements          The Commission orders:
                                             18 CFR part 35 (2017), require, among
                                                                                                      and updating Data Dictionary).                             (A) Within 15 days of the date of
                                                                                                         2 See Refinements to Policies and Procedures for
                                             other things, that all rates, terms, and                                                                         issuance of this order, each public
                                                                                                      Market-Based Rates for Wholesale Sales of Electric
                                             conditions for jurisdictional services be                Energy, Capacity and Ancillary Services by Public       utility listed in the caption of this order
                                             filed with the Commission. In Order No.                  Utilities, Order No. 816, FERC Stats. & Regs. ¶         shall file with the Commission all
                                             2001, the Commission revised its public
                                                                                                      31,374 (2015), order on reh’g, Order No. 816–A, 155     delinquent Electric Quarterly Reports. If
                                                                                                      FERC ¶ 61,188 (2016); Market-Based Rates for            a public utility subject to this order fails
                                             utility filing requirements and                          Wholesale Sales of Electric Energy, Capacity and
                                             established a requirement for public                     Ancillary Services by Public Utilities, Order No.
                                                                                                                                                                5 See, e.g., Electric Quarterly Reports, 82 FR
                                             utilities, including power marketers, to                 697, FERC Stats. & Regs. ¶ 31,252, at P 3, clarified,
                                                                                                      121 FERC ¶ 61,260 (2007), order on reh’g, Order No.     60,976 (Dec. 26, 2017); Electric Quarterly Reports,
                                             file Electric Quarterly Reports.1                        697–A, FERC Stats. & Regs. ¶ 31,268, clarified, 124     80 FR 58,243 (Sep. 28, 2015); Electric Quarterly
                                                                                                      FERC ¶ 61,055, order on reh’g, Order No. 697–B,         Reports, 79 FR 65,651 (Nov. 5, 2014).
                                               1 Revised Public Utility Filing Requirements,          FERC Stats. & Regs. ¶ 31,285 (2008), order on reh’g,      6 Electricity Market Transparency Provisions of
amozie on DSK30RV082PROD with NOTICES




                                             Order No. 2001, FERC Stats. & Regs. ¶ 31,127, reh’g      Order No. 697–C, FERC Stats. & Regs. ¶ 31,291           Section 220 of the Federal Power Act, Order No.
                                             denied, Order No. 2001–A, 100 FERC ¶ 61,074,             (2009), order on reh’g, Order No. 697–D, FERC           768, FERC Stats. & Regs. ¶ 31,336 (2012), order on
                                             reh’g denied, Order No. 2001–B, 100 FERC ¶ 61,342,       Stats. & Regs. ¶ 31,305 (2010), aff’d sub nom. Mont.    reh’g, Order No. 768–A, 143 FERC ¶ 61,054 (2013),
                                             order directing filing, Order No. 2001–C, 101 FERC       Consumer Counsel v. FERC, 659 F.3d 910 (9th Cir.        order on reh’g, Order No. 768–B, 150 FERC ¶ 61,075
                                             ¶ 61,314 (2002), order directing filing, Order No.       2011), cert. denied, 133 S. Ct. 26 (2012).              (2015).
                                                                                                         3 Order No. 2001, FERC Stats. & Regs. ¶ 31,127
                                             2001–D, 102 FERC ¶ 61,334, order refining filing                                                                   7 Revisions to Electric Quarterly Report Filing

                                             requirements, Order No. 2001–E, 105 FERC ¶               at P 222.                                               Process, Order No. 770, FERC Stats. & Regs. ¶
                                             61,352 (2003), order on clarification, Order No.            4 Id. P 223.                                         31,338 (2012).



                                        VerDate Sep<11>2014    21:54 Mar 22, 2018   Jkt 244001   PO 00000   Frm 00038   Fmt 4703   Sfmt 4703   E:\FR\FM\23MRN1.SGM    23MRN1



Document Created: 2018-11-01 08:53:58
Document Modified: 2018-11-01 08:53:58
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5 p.m. Eastern Time on April 9, 2018.
FR Citation83 FR 12750 