83_FR_14518 83 FR 14453 - Notice of Application; Transcontinental Gas Pipe Line Company, LLC

83 FR 14453 - Notice of Application; Transcontinental Gas Pipe Line Company, LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 65 (April 4, 2018)

Page Range14453-14454
FR Document2018-06797

Federal Register, Volume 83 Issue 65 (Wednesday, April 4, 2018)
[Federal Register Volume 83, Number 65 (Wednesday, April 4, 2018)]
[Notices]
[Pages 14453-14454]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-06797]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-145-000]


Notice of Application; Transcontinental Gas Pipe Line Company, 
LLC

    Take notice that on March 27, 2018, Transcontinental Gas Pipe Line 
Company, LLC (Transco), Post Office Box 1396, Houston, Texas 77251, 
filed in Docket No. CP18-145-000, an application pursuant to sections 
7(b) and 7(c) of the Natural Gas Act (NGA) requesting an order 
permitting and approving revised certificated pressures and storage 
capacity parameters at its Eminence Storage Field, located in Covington 
County, Mississippi, all as more fully set forth in the application 
which is on file with the Commission and open to public inspection. The 
filing is available for review at the Commission in the Public 
Reference Room or may be viewed on the Commission's website web at 
http://www.ferc.gov using the eLibrary link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions concerning this application may be directed to Ingrid 
Germany, Staff Regulatory Analyst, Transcontinental Gas Pipe Line Co., 
P.O. Box 1396, Houston, Texas 77251-1396 at (713) 215-4015.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit seven copies of filings made in the proceeding with the 
Commission and must mail a copy to the applicant and to every other 
party. Only parties to the proceeding can ask for court review of 
Commission orders in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will

[[Page 14454]]

consider these comments in determining the appropriate action to be 
taken, but the filing of a comment alone will not serve to make the 
filer a party to the proceeding. The Commission's rules require that 
persons filing comments in opposition to the project provide copies of 
their protests only to the party or parties directly involved in the 
protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on April 19, 2018.

    Dated: March 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-06797 Filed 4-3-18; 8:45 am]
BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 83, No. 65 / Wednesday, April 4, 2018 / Notices                                           14453

                                             has been transferred to Hossic River                    be filed on or before the comment date.               field to access the document. For
                                             Hydro, LLC. The project is located on                   The Respondent’s answer, motions to                   assistance, contact FERC at
                                             the Hoosic River in Bennington, County,                 intervene, and protests must be served                FERCOnlineSupport@ferc.gov or call
                                             Vermont. The transfer of an exemption                   on the Complainant.                                   toll-free, (886) 208–3676 or TYY, (202)
                                             does not require Commission approval.                      The Commission encourages                          502–8659.
                                               2. Hoosic River Hydro, LLC is now the                 electronic submission of protests and                    Any questions concerning this
                                             exemptee of the Pownal Hydroelectric                    interventions in lieu of paper using the              application may be directed to Ingrid
                                             Project No. 6795. All correspondence                    ‘‘eFiling’’ link at http://www.ferc.gov.              Germany, Staff Regulatory Analyst,
                                             should be forwarded to: Mr. William                     Persons unable to file electronically                 Transcontinental Gas Pipe Line Co.,
                                             Scully, Hoosic River Hydro, LLC, P.O.                   should submit an original and 5 copies                P.O. Box 1396, Houston, Texas 77251–
                                             Box 338, North Bennington, VT 05257,                    of the protest or intervention to the                 1396 at (713) 215–4015.
                                             Phone: 802–379–2469.                                    Federal Energy Regulatory Commission,                    Pursuant to section 157.9 of the
                                               Dated: March 29, 2018.                                888 First Street NE, Washington, DC                   Commission’s rules, 18 CFR 157.9,
                                                                                                     20426.                                                within 90 days of this Notice the
                                             Kimberly D. Bose,
                                                                                                        This filing is accessible on-line at               Commission staff will either: Complete
                                             Secretary.
                                                                                                     http://www.ferc.gov, using the                        its environmental assessment (EA) and
                                             [FR Doc. 2018–06799 Filed 4–3–18; 8:45 am]                                                                    place it into the Commission’s public
                                             BILLING CODE 6717–01–P
                                                                                                     ‘‘eLibrary’’ link and is available for
                                                                                                     review in the Commission’s Public                     record (eLibrary) for this proceeding; or
                                                                                                     Reference Room in Washington, DC.                     issue a Notice of Schedule for
                                                                                                     There is an ‘‘eSubscription’’ link on the             Environmental Review. If a Notice of
                                             DEPARTMENT OF ENERGY                                                                                          Schedule for Environmental Review is
                                                                                                     website that enables subscribers to
                                             Federal Energy Regulatory                               receive email notification when a                     issued, it will indicate, among other
                                             Commission                                              document is added to a subscribed                     milestones, the anticipated date for the
                                                                                                     docket(s). For assistance with any FERC               Commission staff’s issuance of the EA
                                             [Docket No. EL18–135–000]                                                                                     for this proposal. The filing of the EA
                                                                                                     Online service, please email
                                                                                                     FERCOnlineSupport@ferc.gov, or call                   in the Commission’s public record for
                                             Ohio Valley Electric Corporation v.                                                                           this proceeding or the issuance of a
                                             First Energy Solutions Corp.; Notice of                 (866) 208–3676 (toll free). For TTY, call
                                                                                                     (202) 502–8659.                                       Notice of Schedule for Environmental
                                             Complaint                                                                                                     Review will serve to notify federal and
                                                                                                        Comment Date: 5:00 p.m. Eastern
                                                Take notice that on March 26, 2018,                  Time on April 16, 2018.                               state agencies of the timing for the
                                             pursuant to section 306 of the Federal                                                                        completion of all necessary reviews, and
                                                                                                       Dated: March 28, 2018.                              the subsequent need to complete all
                                             Power Act, 16 U.S.C. 825e, and Rule 206
                                             of the Federal Energy Regulatory                        Kimberly D. Bose,                                     federal authorizations within 90 days of
                                             Commission’s (Commission) Rules of                      Secretary.                                            the date of issuance of the Commission
                                             Practice and Procedure, 18 CFR 385.206                  [FR Doc. 2018–06784 Filed 4–3–18; 8:45 am]            staff’s EA.
                                             (2018), the Ohio Valley Electric                        BILLING CODE 6717–01–P                                   There are two ways to become
                                             Corporation and its wholly-owned                                                                              involved in the Commission’s review of
                                             subsidiary, Indiana-Kentucky Electric                                                                         this project. First, any person wishing to
                                             Corporation (collectively, Complainant),                DEPARTMENT OF ENERGY                                  obtain legal status by becoming a party
                                             filed a formal complaint against                                                                              to the proceedings for this project
                                             FirstEnergy Solutions Corp.                             Federal Energy Regulatory                             should, on or before the comment date
                                             (Respondent) asserting that the                         Commission                                            stated below file with the Federal
                                             Respondent will breach the Inter-                       [Docket No. CP18–145–000]
                                                                                                                                                           Energy Regulatory Commission, 888
                                             Company Power Agreement, and also                                                                             First Street NE, Washington, DC 20426,
                                             alleges that said breach will constitute                Notice of Application; Transcontinental               a motion to intervene in accordance
                                             a violation of its obligations under that               Gas Pipe Line Company, LLC                            with the requirements of the
                                             agreement, all as more fully explained                                                                        Commission’s Rules of Practice and
                                             in the complaint.                                          Take notice that on March 27, 2018,                Procedure (18 CFR 385.214 or 385.211)
                                                Complainant certifies that copies of                 Transcontinental Gas Pipe Line                        and the Regulations under the NGA (18
                                             the complaint were served on the                        Company, LLC (Transco), Post Office                   CFR 157.10). A person obtaining party
                                             contacts for Respondent as listed on the                Box 1396, Houston, Texas 77251, filed                 status will be placed on the service list
                                             Commission’s list of Corporate Officials.               in Docket No. CP18–145–000, an                        maintained by the Secretary of the
                                                Any person desiring to intervene or to               application pursuant to sections 7(b)                 Commission and will receive copies of
                                             protest this filing must file in                        and 7(c) of the Natural Gas Act (NGA)                 all documents filed by the applicant and
                                             accordance with Rules 211 and 214 of                    requesting an order permitting and                    by all other parties. A party must submit
                                             the Commission’s Rules of Practice and                  approving revised certificated pressures              seven copies of filings made in the
                                             Procedure (18 CFR 385.211 and                           and storage capacity parameters at its                proceeding with the Commission and
                                             385.214). Protests will be considered by                Eminence Storage Field, located in                    must mail a copy to the applicant and
                                             the Commission in determining the                       Covington County, Mississippi, all as                 to every other party. Only parties to the
                                             appropriate action to be taken, but will                more fully set forth in the application               proceeding can ask for court review of
                                             not serve to make protestants parties to                which is on file with the Commission                  Commission orders in the proceeding.
                                             the proceeding. Any person wishing to                   and open to public inspection. The                       However, a person does not have to
amozie on DSK30RV082PROD with NOTICES




                                             become a party must file a notice of                    filing is available for review at the                 intervene in order to have comments
                                             intervention or motion to intervene, as                 Commission in the Public Reference                    considered. The second way to
                                             appropriate. The Respondent’s answer                    Room or may be viewed on the                          participate is by filing with the
                                             and all interventions, or protests must                 Commission’s website web at http://                   Secretary of the Commission, as soon as
                                                                                                     www.ferc.gov using the eLibrary link.                 possible, an original and two copies of
                                             Pownal Hydropower Corporation, 23 FERC 62,004           Enter the docket number excluding the                 comments in support of or in opposition
                                             (1983).                                                 last three digits in the docket number                to this project. The Commission will


                                        VerDate Sep<11>2014   18:12 Apr 03, 2018   Jkt 244001   PO 00000   Frm 00044   Fmt 4703   Sfmt 4703   E:\FR\FM\04APN1.SGM   04APN1


                                             14454                         Federal Register / Vol. 83, No. 65 / Wednesday, April 4, 2018 / Notices

                                             consider these comments in                              prior notice request pursuant to sections                Pursuant to section 157.9 of the
                                             determining the appropriate action to be                157.205, 157.208, 157.210 and 157.211                 Commission’s rules, 18 CFR 157.9,
                                             taken, but the filing of a comment alone                of the Commission’s regulations under                 within 90 days of this Notice the
                                             will not serve to make the filer a party                the Natural Gas Act (NGA), requesting                 Commission staff will either: Complete
                                             to the proceeding. The Commission’s                     authorization to construct, own, and                  its environmental assessment (EA) and
                                             rules require that persons filing                       operate: (1) Approximately 4.5 miles of               place it into the Commission’s public
                                             comments in opposition to the project                   12-inch-diameter pipeline and                         record (eLibrary) for this proceeding; or
                                             provide copies of their protests only to                appurtenances; (2) a metering and                     issue a Notice of Schedule for
                                             the party or parties directly involved in               regulating station/delivery point; (3) a              Environmental Review. If a Notice of
                                             the protest.                                            pipeline connection; and (4)                          Schedule for Environmental Review is
                                                Persons who wish to comment only                     modifications to certain existing                     issued, it will indicate, among other
                                             on the environmental review of this                     facilities and appurtenances, all located             milestones, the anticipated date for the
                                             project should submit an original and                   in Beaver and Washington Counties,
                                                                                                                                                           Commission staff’s issuance of the EA
                                             two copies of their comments to the                     Pennsylvania (Line N to Monaca
                                                                                                                                                           for this proposal. The filing of the EA
                                             Secretary of the Commission.                            Project). The Line N to Monaca Project
                                                                                                                                                           in the Commission’s public record for
                                             Environmental commentors will be                        would deliver 133,000 dekatherms per
                                                                                                     day of firm transportation service. The               this proceeding or the issuance of a
                                             placed on the Commission’s
                                             environmental mailing list, will receive                cost of the Line N to Monaca Project is               Notice of Schedule for Environmental
                                             copies of the environmental documents,                  estimated to be $20,200,000, all as more              Review will serve to notify federal and
                                             and will be notified of meetings                        fully set forth in the application which              state agencies of the timing for the
                                             associated with the Commission’s                        is on file with the Commission and open               completion of all necessary reviews, and
                                             environmental review process.                           to public inspection.                                 the subsequent need to complete all
                                             Environmental commentors will not be                       The filing may also be viewed on the               federal authorizations within 90 days of
                                             required to serve copies of filed                       web at http://www.ferc.gov using the                  the date of issuance of the Commission
                                             documents on all other parties.                         ‘‘eLibrary’’ link. Enter the docket                   staff’s EA.
                                             However, the non-party commentors                       number excluding the last three digits in                Persons who wish to comment only
                                             will not receive copies of all documents                the docket number field to access the                 on the environmental review of this
                                             filed by other parties or issued by the                 document. For assistance, please contact              project should submit an original and
                                             Commission (except for the mailing of                   FERC Online Support at                                two copies of their comments to the
                                             environmental documents issued by the                   FERCOnlineSupport@ferc.gov or toll                    Secretary of the Commission.
                                             Commission) and will not have the right                 free at (866) 208–3676, or TTY, contact               Environmental commenter’s will be
                                             to seek court review of the                             (202) 502–8659.                                       placed on the Commission’s
                                             Commission’s final order.                                  Any questions concerning this                      environmental mailing list, will receive
                                                The Commission strongly encourages                   application may be directed to Randy C.               copies of the environmental documents,
                                             electronic filings of comments, protests                Rucinski, Deputy General Counsel,                     and will be notified of meetings
                                             and interventions in lieu of paper using                National Fuel Gas Supply Corporation,
                                             the eFiling link at http://www.ferc.gov.                                                                      associated with the Commission’s
                                                                                                     6363 Main Street, Williamsville, New                  environmental review process.
                                             Persons unable to file electronically                   York 14221–5887, by telephone at (716)
                                             should submit an original and 5 copies                                                                        Environmental commenter’s will not be
                                                                                                     857–7237, by fax at (716) 857–7206, or
                                             of the protest or intervention to the                                                                         required to serve copies of filed
                                                                                                     by email at rucinskir@natfuel.com; or
                                             Federal Energy Regulatory Commission,                                                                         documents on all other parties.
                                                                                                     Janet R. Bayer, Senior Regulatory
                                             888 First Street NE, Washington, DC                                                                           However, the non-party commentary,
                                                                                                     Analyst, National Fuel Gas Supply
                                             20426.                                                  Corporation, 6363 Main Street,                        will not receive copies of all documents
                                                Comment Date: 5:00 p.m. Eastern                      Williamsville, New York 14221–5887,                   filed by other parties or issued by the
                                             Time on April 19, 2018.                                 by telephone at (716) 857–7429, by fax                Commission (except for the mailing of
                                               Dated: March 29, 2018.                                at (716) 857–7206, or by email at                     environmental documents issued by the
                                                                                                     jrbferc@natfuel.com.                                  Commission) and will not have the right
                                             Kimberly D. Bose,
                                                                                                        Any person or the Commission’s staff               to seek court review of the
                                             Secretary.
                                                                                                     may, within 60 days after issuance of                 Commission’s final order.
                                             [FR Doc. 2018–06797 Filed 4–3–18; 8:45 am]
                                             BILLING CODE 6717–01–P
                                                                                                     the instant notice by the Commission,                   The Commission strongly encourages
                                                                                                     file pursuant to Rule 214 of the                      electronic filings of comments, protests
                                                                                                     Commission’s Procedural Rules (18 CFR                 and interventions in lieu of paper using
                                             DEPARTMENT OF ENERGY                                    385.214) a motion to intervene or notice              the ‘‘eFiling’’ link at http://
                                                                                                     of intervention and pursuant to section               www.ferc.gov. Persons unable to file
                                             Federal Energy Regulatory                               157.205 of the regulations under the                  electronically should submit an original
                                             Commission                                              NGA (18 CFR 157.205), a protest to the                and 7 copies of the protest or
                                                                                                     request. If no protest is filed within the            intervention to the Federal Energy
                                             [Docket No. CP18–135–000]
                                                                                                     time allowed therefore, the proposed                  Regulatory Commission, 888 First Street
                                             National Fuel Gas Supply Company;                       activity shall be deemed to be                        NE, Washington, DC 20426.
                                             Notice of Request Under Blanket                         authorized effective the day after the
                                                                                                                                                             Dated: March 28, 2018.
amozie on DSK30RV082PROD with NOTICES




                                             Authorization                                           time allowed for filing a protest. If a
                                                                                                     protest is filed and not withdrawn                    Kimberly D. Bose,
                                                Take notice that on March 23, 2018,                  within 30 days after the allowed time                 Secretary.
                                             National Fuel Gas Supply Company                        for filing a protest, the instant request             [FR Doc. 2018–06787 Filed 4–3–18; 8:45 am]
                                             (National Fuel), 6363 Main Street,                      shall be treated as an application for                BILLING CODE 6717–01–P
                                             Williamsville, New York 14221–5887,                     authorization pursuant to section 7 of
                                             filed in Docket No. CP18–135–000 a                      the NGA.


                                        VerDate Sep<11>2014   18:12 Apr 03, 2018   Jkt 244001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\04APN1.SGM   04APN1



Document Created: 2018-11-01 09:11:44
Document Modified: 2018-11-01 09:11:44
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on April 19, 2018.
FR Citation83 FR 14453 

2025 Federal Register | Disclaimer | Privacy Policy