83_FR_16425 83 FR 16352 - Columbia Gas Transmission, LLC; Notice of Application

83 FR 16352 - Columbia Gas Transmission, LLC; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 73 (April 16, 2018)

Page Range16352-16353
FR Document2018-07779

Federal Register, Volume 83 Issue 73 (Monday, April 16, 2018)
[Federal Register Volume 83, Number 73 (Monday, April 16, 2018)]
[Notices]
[Pages 16352-16353]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-07779]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP18-137-000 PF17-6-000]


Columbia Gas Transmission, LLC; Notice of Application

    Take notice that on March 26, 2018, Columbia Gas Transmission, LLC 
(Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002-2700, 
filed in Docket No. CP18-137-000, an application pursuant to sections 
7(b) and 7(c) of the Natural Gas Act (NGA) for its proposed Buckeye 
XPress Project. Specifically, Columbia proposes to: (i) Construct 
approximately 66.2 miles of 36-inch-diameter pipeline and 
appurtenances; and (ii) abandon approximately 60.8 miles of 20- and 24-
inch-diameter pipeline and appurtenances, all located in Vinton, 
Jackson, Gallia, and Lawrence Counties, Ohio and Wayne County, West 
Virginia. The project would provide 275,000 dekatherms per day of firm 
transportation service. Columbia estimates the cost of the Buckeye 
XPress Project to be $709,200,216, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection. The filing is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's website web 
at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions concerning this application may be directed to Robert 
Jackson, Manager, Certificates & Regulatory Administration, Columbia 
Gas Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas 
77002-2700, by telephone at (832) 320-5487 or by email at 
robert_jackson@transcanada.com.
    On August 1, 2017, Commission staff granted Columbia's request to 
utilize the Pre-Filing Process and assigned Docket No. PF17-6-000 to 
staff activities involved in the Buckeye XPress Project. Now, as of the 
March 26, 2018 application, the Pre-Filing Process for this project has 
ended. From this time forward, this proceeding will be conducted in 
CP18-137-000, as noted in the caption of the Notice.
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will issue a Notice 
of Schedule for Environmental Review. If a Notice of Schedule for 
Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the environmental assessment (EA) for this proposal. The issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit seven copies of filings made in the proceeding with the 
Commission and must mail a copy to the applicant and to every other 
party. Only parties to the proceeding can ask for court review of 
Commission orders in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project

[[Page 16353]]

provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and seven copies of the protest or intervention to 
the Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on April 30, 2018.

    Dated: April 9, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-07779 Filed 4-13-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                16352                              Federal Register / Vol. 83, No. 73 / Monday, April 16, 2018 / Notices

                                                structure; (3) a 112-foot-long, 88-foot-                    q. Final amendments to the                          Pre-Filing Process and assigned Docket
                                                wide, 46-foot-high powerhouse                             application must be filed with the                    No. PF17–6–000 to staff activities
                                                containing two 5.04-megawatt (MW)                         Commission no later than 30 days from                 involved in the Buckeye XPress Project.
                                                turbine-generator units, with a total                     the issuance date of the notice of ready              Now, as of the March 26, 2018
                                                capacity of 10.08 MW; (4) a 3,000-foot-                   for environmental analysis.                           application, the Pre-Filing Process for
                                                long, 100-foot-wide tailrace; (5) two                       Dated: April 9, 2018.                               this project has ended. From this time
                                                4.16-kilovolt, 120-foot-long                                                                                    forward, this proceeding will be
                                                                                                          Kimberly D. Bose,
                                                underground generator leads; (6) a 60-                                                                          conducted in CP18–137–000, as noted
                                                                                                          Secretary.
                                                foot-long by 48-foot-wide electrical                                                                            in the caption of the Notice.
                                                                                                          [FR Doc. 2018–07780 Filed 4–13–18; 8:45 am]              Pursuant to section 157.9 of the
                                                switchyard; and (7) appurtenant
                                                facilities.                                               BILLING CODE 6717–01–P                                Commission’s rules (18 CFR 157.9),
                                                   The Granby Project is operated in a                                                                          within 90 days of this Notice, the
                                                modified run-of-river mode. The Granby                                                                          Commission staff will issue a Notice of
                                                                                                          DEPARTMENT OF ENERGY                                  Schedule for Environmental Review. If
                                                Project and the Fulton Development at
                                                Erie’s Oswego River Hydroelectric                                                                               a Notice of Schedule for Environmental
                                                                                                          Federal Energy Regulatory                             Review is issued, it will indicate, among
                                                Project (FERC Project No. 2474) are                       Commission
                                                located at opposite ends of the same                                                                            other milestones, the anticipated date
                                                dam and share a single bypassed reach                     [Docket Nos. CP18–137–000 PF17–6–000]                 for the Commission staff’s issuance of
                                                and reservoir. The flow and                                                                                     the environmental assessment (EA) for
                                                impoundment elevation requirements in                     Columbia Gas Transmission, LLC;                       this proposal. The issuance of a Notice
                                                the Oswego Project license,1 which were                   Notice of Application                                 of Schedule for Environmental Review
                                                based on a 2004 Offer of Settlement,                                                                            will serve to notify federal and state
                                                                                                             Take notice that on March 26, 2018,
                                                affect the Granby Project. The average                                                                          agencies of the timing for the
                                                                                                          Columbia Gas Transmission, LLC
                                                annual generation at the Granby Project                                                                         completion of all necessary reviews, and
                                                                                                          (Columbia), 700 Louisiana Street, Suite
                                                is estimated to be 44,181 megawatt-                                                                             the subsequent need to complete all
                                                                                                          700, Houston, Texas 77002–2700, filed
                                                hours.                                                                                                          federal authorizations within 90 days of
                                                                                                          in Docket No. CP18–137–000, an
                                                   o. A copy of the application is                                                                              the date of issuance of the Commission
                                                                                                          application pursuant to sections 7(b)
                                                available for review at the Commission                                                                          staff’s EA.
                                                                                                          and 7(c) of the Natural Gas Act (NGA)                    There are two ways to become
                                                in the Public Reference Room or may be                    for its proposed Buckeye XPress Project.
                                                viewed on the Commission’s website at                                                                           involved in the Commission’s review of
                                                                                                          Specifically, Columbia proposes to: (i)               this project. First, any person wishing to
                                                http://www.ferc.gov using the                             Construct approximately 66.2 miles of                 obtain legal status by becoming a party
                                                ‘‘eLibrary’’ link. Enter the docket                       36-inch-diameter pipeline and                         to the proceedings for this project
                                                number excluding the last three digits in                 appurtenances; and (ii) abandon                       should, on or before the comment date
                                                the docket number field to access the                     approximately 60.8 miles of 20- and 24-               stated below file with the Federal
                                                document. For assistance, contact FERC                    inch-diameter pipeline and                            Energy Regulatory Commission, 888
                                                Online Support. A copy is also available                  appurtenances, all located in Vinton,                 First Street NE, Washington, DC 20426,
                                                for inspection and reproduction at the                    Jackson, Gallia, and Lawrence Counties,               a motion to intervene in accordance
                                                address in item h above.                                  Ohio and Wayne County, West Virginia.                 with the requirements of the
                                                   You may also register online at http://                The project would provide 275,000                     Commission’s Rules of Practice and
                                                www.ferc.gov/docs-filing/                                 dekatherms per day of firm                            Procedure (18 CFR 385.214 or 385.211)
                                                esubscription.asp to be notified via                      transportation service. Columbia                      and the Regulations under the NGA (18
                                                email of new filings and issuances                        estimates the cost of the Buckeye XPress              CFR 157.10). A person obtaining party
                                                related to this or other pending projects.                Project to be $709,200,216, all as more               status will be placed on the service list
                                                For assistance, contact FERC Online                       fully set forth in the application which              maintained by the Secretary of the
                                                Support.                                                  is on file with the Commission and open               Commission and will receive copies of
                                                   p. Procedural schedule and final                       to public inspection. The filing is                   all documents filed by the applicant and
                                                amendments: The application will be                       available for review at the Commission                by all other parties. A party must submit
                                                processed according to the following                      in the Public Reference Room or may be                seven copies of filings made in the
                                                preliminary schedule. Revisions to the                    viewed on the Commission’s website                    proceeding with the Commission and
                                                schedule will be made as appropriate.                     web at http://www.ferc.gov using the                  must mail a copy to the applicant and
                                                Issue Deficiency Letter (if necessary)—                   ‘‘eLibrary’’ link. Enter the docket                   to every other party. Only parties to the
                                                   June 2018                                              number excluding the last three digits in             proceeding can ask for court review of
                                                Request Additional Information—June                       the docket number field to access the                 Commission orders in the proceeding.
                                                   2018                                                   document. For assistance, contact FERC                   However, a person does not have to
                                                Issue Acceptance Letter—September                         at FERCOnlineSupport@ferc.gov or call                 intervene in order to have comments
                                                   2018                                                   toll-free, (886) 208–3676 or TYY, (202)               considered. The second way to
                                                Issue Scoping Document 1—September                        502–8659.                                             participate is by filing with the
                                                   2018                                                      Any questions concerning this                      Secretary of the Commission, as soon as
                                                Comments on Scoping Document 1                            application may be directed to Robert                 possible, an original and two copies of
                                                   due—October 2018                                       Jackson, Manager, Certificates &                      comments in support of or in opposition
                                                Issue Scoping Document 2 (if                              Regulatory Administration, Columbia                   to this project. The Commission will
srobinson on DSK3G9T082PROD with NOTICES




                                                   necessary)—December 2018                               Gas Transmission, LLC, 700 Louisiana                  consider these comments in
                                                Issue Notice of Ready for Environmental                   Street, Suite 700, Houston, Texas                     determining the appropriate action to be
                                                   Analysis—January 2019                                  77002–2700, by telephone at (832) 320–                taken, but the filing of a comment alone
                                                Commission issues EA—June 2019                            5487 or by email at robert_jackson@                   will not serve to make the filer a party
                                                Comments on EA—July 2019                                  transcanada.com.                                      to the proceeding. The Commission’s
                                                                                                             On August 1, 2017, Commission staff                rules require that persons filing
                                                  1 109   FERC ¶ 62, 141 (2004).                          granted Columbia’s request to utilize the             comments in opposition to the project


                                           VerDate Sep<11>2014     19:42 Apr 13, 2018   Jkt 244001   PO 00000   Frm 00068   Fmt 4703   Sfmt 4703   E:\FR\FM\16APN1.SGM   16APN1


                                                                               Federal Register / Vol. 83, No. 73 / Monday, April 16, 2018 / Notices                                                  16353

                                                provide copies of their protests only to                staff will hold a technical conference on                For more information about this
                                                the party or parties directly involved in               Tuesday, April 10, 2018 and                           technical conference, please contact
                                                the protest.                                            Wednesday, April 11, 2018, to discuss                 David Kathan at (202) 502–6404,
                                                   Persons who wish to comment only                     the participation of distributed energy               david.kathan@ferc.gov, or Louise Nutter
                                                on the environmental review of this                     resource (DER) aggregations in Regional               at (202) 502–8175, louise.nutter@
                                                project should submit an original and                   Transmission Organization (RTO) and                   ferc.gov. For information related to
                                                two copies of their comments to the                     Independent System Operator (ISO)                     logistics, please contact Sarah McKinley
                                                Secretary of the Commission.                            markets and to more broadly discuss the               at (202) 502–8368, sarah.mckinley@
                                                Environmental commentors will be                        potential effects of DERs on the bulk                 ferc.gov.
                                                placed on the Commission’s                              power system. On April 10, 2018, the                    Dated: April 9, 2018.
                                                environmental mailing list, will receive                conference will commence at 10:15 a.m.                Kimberly D. Bose,
                                                copies of the environmental documents,                  and end at 4:45 p.m. On April 11, 2018,
                                                                                                                                                              Secretary.
                                                and will be notified of meetings                        the conference will commence at 9:00
                                                                                                                                                              [FR Doc. 2018–07781 Filed 4–13–18; 8:45 am]
                                                associated with the Commission’s                        a.m. and end at 5:00 p.m. The
                                                environmental review process.                           conference will be held at the Federal                BILLING CODE 6717–01–P

                                                Environmental commentors will not be                    Energy Regulatory Commission, 888
                                                required to serve copies of filed                       First Street NE, Washington, DC 20426.
                                                                                                                                                              DEPARTMENT OF ENERGY
                                                documents on all other parties.                         Commissioners will lead the second
                                                However, the non-party commentors                       panel of the technical conference.                    Federal Energy Regulatory
                                                will not receive copies of all documents                Commission staff will lead the other six              Commission
                                                filed by other parties or issued by the                 panels, and Commissioners may attend.
                                                Commission (except for the mailing of                      The updated agenda for this technical
                                                                                                        conference is attached. All changes to                [Docket No. CP18–149–000]
                                                environmental documents issued by the
                                                Commission) and will not have the right                 the agenda since the Commission’s                     Columbia Gas Transmission, LLC;
                                                to seek court review of the                             March 29, 2018 Supplemental Notice of                 Notice of Request Under Blanket
                                                Commission’s final order.                               Technical Conference appear in italics.               Authorization
                                                   The Commission strongly encourages                      All interested persons may attend the
                                                electronic filings of comments, protests                conference, and registration is not                      Take notice that on March 29, 2018,
                                                and interventions in lieu of paper using                required. However, in-person attendees                Columbia Gas Transmission, LLC
                                                the ‘‘eFiling’’ link at http://                         are encouraged to register on-line by                 (Columbia), 700 Louisiana Street, Suite
                                                www.ferc.gov. Persons unable to file                    April 3, 2018 at: https://www.ferc.gov/               700, Houston, Texas 77002–2700, filed
                                                electronically should submit an original                whats-new/registration/04-10-18-                      in Docket No. CP18–149–000 a prior
                                                and seven copies of the protest or                      form.asp. In-person attendees should                  notice request pursuant to sections
                                                intervention to the Federal Energy                      allow time to pass through building                   157.205 and 157.213(b) of the
                                                Regulatory Commission, 888 First Street                 security procedures before the start time             Commission’s regulations under the
                                                NE, Washington, DC 20426.                               of the technical conference.                          Natural Gas Act (NGA), requesting
                                                   Comment Date: 5:00 p.m. Eastern                         The Commission will transcribe and                 authorization to construct and operate
                                                Time on April 30, 2018.                                 webcast this conference. Transcripts                  one new horizontal storage well,
                                                  Dated: April 9, 2018.                                 will be available immediately for a fee               designated Well 12606, and one new
                                                                                                        from Ace Reporting (202–347–3700). A                  vertical observation well, designated
                                                Kimberly D. Bose,
                                                                                                        link to the webcast of this event will be             Well 12607, and related pipelines and
                                                Secretary.
                                                                                                        available in the Commission Calendar of               appurtenances at Columbia’s Pavonia
                                                [FR Doc. 2018–07779 Filed 4–13–18; 8:45 am]             Events at www.ferc.gov. The Capitol                   Storage Field, located in Ashland and
                                                BILLING CODE 6717–01–P                                  Connection provides technical support                 Richland Counties, Ohio. Columbia
                                                                                                        for the webcasts and offers the option of             estimates the cost of the proposed
                                                                                                        listening to the conference via phone-                project to be approximately $5,000,000,
                                                DEPARTMENT OF ENERGY                                    bridge for a fee. For additional                      all as more fully set forth in the
                                                Federal Energy Regulatory                               information, visit                                    application which is on file with the
                                                Commission                                              www.CapitolConnection.org or call (703)               Commission and open to public
                                                                                                        993–3100.                                             inspection. The filing may also be
                                                [Docket No. RM18–9–000; Docket No.                         While this conference is not for the               viewed on the web at http://
                                                AD18–10–000]                                            purpose of discussing specific cases, it              www.ferc.gov using the ‘‘eLibrary’’ link.
                                                                                                        may address matters at issue in the                   Enter the docket number excluding the
                                                Participation of Distributed Energy                     following Commission proceedings that                 last three digits in the docket number
                                                Resource Aggregations in Markets                        are pending:                                          field to access the document. For
                                                Operated by Regional Transmission                       • Advanced Energy Economy, Docket                     assistance, please contact FERC Online
                                                Organizations and Independent                              No. EL17–75–001                                    Support at FERCOnlineSupport@
                                                System Operators; Distributed Energy                    • Southern California Edison Company,                 ferc.gov or toll free at (866) 208–3676, or
                                                Resources-Technical Considerations                         Docket No. ER18–1248–000                           TTY, contact (202) 502–8659.
                                                for the Bulk Power System; Further
                                                Supplemental Notice of Technical                           Commission conferences are                            Any questions concerning this
                                                                                                        accessible under section 508 of the                   application may be directed to Linda
srobinson on DSK3G9T082PROD with NOTICES




                                                Conference
                                                                                                        Rehabilitation Act of 1973. For                       Farquhar, Manager, Project
                                                  As announced in a Notice of                           accessibility accommodations please                   Determinations & Regulatory
                                                Technical Conference issued on                          send an email to accessibility@ferc.gov               Administration, Columbia Gas
                                                February 15, 2018 and a Supplemental                    or call toll free 1–866–208–3372 (voice)              Transmission, LLC, 700 Louisiana
                                                Notice of Technical Conference issued                   or 202–208–8659 (TTY), or send a fax to               Street, Suite 700, Houston, Texas
                                                on March 29, 2018, Federal Energy                       202–208–2106 with the required                        77002–2700, by telephone at (832) 320–
                                                Regulatory Commission (Commission)                      accommodations.                                       5685, by fax at (832) 320–6685, or by


                                           VerDate Sep<11>2014   19:42 Apr 13, 2018   Jkt 244001   PO 00000   Frm 00069   Fmt 4703   Sfmt 4703   E:\FR\FM\16APN1.SGM   16APN1



Document Created: 2018-04-14 02:19:21
Document Modified: 2018-04-14 02:19:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on April 30, 2018.
FR Citation83 FR 16352 