DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 75 (April 18, 2018)

Page Range17168-17170
FR Document2018-08073

Federal Register, Volume 83 Issue 75 (Wednesday, April 18, 2018)
[Federal Register Volume 83, Number 75 (Wednesday, April 18, 2018)]
[Notices]
[Pages 17168-17170]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-08073]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2669-085]


Notice of Application Tendered for Filing With the Commission and 
Establishing Procedural Schedule for Licensing and Deadline for 
Submission of Final Amendments; Bear Swamp Power Company, LLC

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.

[[Page 17169]]

    b. Project No.: 2669-085.
    c. Date Filed: March 30, 2018.
    d. Applicant: Bear Swamp Power Company, LLC (Bear Swamp).
    e. Name of Project: Bear Swamp Project.
    f. Location: The existing project is located on the Deerfield River 
in Berkshire and Franklin Counties, Massachusetts. The project does not 
affect federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Steven P. Murphy, Director of Licensing, 
Brookfield Renewable Energy Group, 33 West 1st Street South, Fulton, NY 
13069; Telephone (315) 593-3118.
    i. FERC Contact: John Baummer, (202) 502-6837 or 
john.baummer@ferc.gov.
    j. This application is not ready for environmental analysis at this 
time.
    k. Project Description: The existing Bear Swamp Project consists of 
a pumped storage development, the Bear Swamp Pumped Storage 
Development, and a conventional hydropower development, the Fife Brook 
Development, with a combined authorized capacity of 676 megawatts (MW). 
The project generates an average of 483,863 megawatt-hours (MWh) 
annually, and uses an average of 618,293 MWh annually to operate the 
pumped storage development.

Bear Swamp Pumped Storage Development

    The existing Bear Swamp Pumped Storage Development consists of the 
following existing facilities: (1) A 118-acre upper reservoir with a 
gross storage capacity of 8,300 acre-feet at the normal full water 
surface elevation of approximately 1,600 feet National Geodetic 
Vertical Datum of 1929 (NGVD), which is contained by existing 
topography and 4 dikes: (a) An approximately 1,300-foot-long, 155-foot-
high curved, earth and rock-fill dike (North Dike); (b) an 
approximately 350-foot-long, 23-foot-high earth and rock-fill dike 
extending from the eastside of the North Dike (North Dike Extension); 
(c) an approximately 2,880-foot-long, 140-foot-high earth and rock-fill 
dike (South Dike); and (d) an approximately 750-foot-long, 50-foot-high 
earth and rock-fill dike (East Dike); (2) a 420-foot long emergency 
spillway to the east of the North Dike Extension; (3) an 88-foot-long, 
1.5- to 4-foot-wide, 4-foot-high submerged weir with three 5-foot-wide, 
3-foot-high concrete stoplog gates; (4) a 40-foot-diameter concrete 
inlet/outlet structure located at the bottom of the upper reservoir to 
the west of the North Dike; (5) an approximately 1,430.5-foot-long 
tunnel system that includes: (a) A 75-foot-long concrete-lined section 
that tapers from 40 feet to 25 feet in diameter; (b) an approximately 
965-foot-long, 25-foot-diameter concrete-lined section; (c) a 15-foot-
long concrete-lined section that bifurcates from a single 25-foot-
diameter section to two 20-foot-diameter penstock sections; (d) two 25-
foot-long concrete-lined penstock sections that taper from 20 feet to 
17.5 feet in diameter; (e) two 322-foot-long, 17.5-foot-diameter 
concrete-lined penstock sections; (f) two 20-foot-long concrete-lined 
penstock sections that taper from 17.5 feet to 11 feet in diameter; and 
(g) two 8.5-foot-long, 11-foot-diameter, steel-lined penstock sections; 
(6) a 227-foot-long, 79-foot-wide, 182-foot-high underground powerhouse 
containing two reversible Francis pump turbine-generator units with a 
total authorized capacity of 666 MW; (7) two 504-foot-long, 22-foot-
wide, 29.5-foot-high concrete-lined draft tube tunnels; (8) a lower 
reservoir inlet/outlet structure with four 15-foot-wide, 20-foot-high 
bays, each equipped with 16-foot-wide, 20.6-foot-high steel slide 
gates; (9) four 15-foot-wide, 26.7-foot-tall steel trashracks with 6-
inch bar spacing; (10) two 13.8-kilovolt (kV) motor-generator lead 
electrical lines, one approximately 890 feet long (east lead) and one 
approximately 900 feet long (west lead); (11) a 600-foot-long, 15-foot-
wide, 23-foot-high access tunnel for the generator lead lines; (12) two 
13.8/230-kV step-up transformers; (13) two 230-kV above-ground 
transmission lines, one approximately 4,075 feet long (south line) and 
one approximately 3,960 feet long (north line), which terminate at a 
non-project switchyard owned by National Grid; (14) a 700-foot-long, 
25-foot-wide, 29-foot-high tunnel for the access road; and (15) 
appurtenant facilities.

Fife Brook Development

    The existing Fife Brook Development consists of: (1) An 890-foot-
long, 130-foot-high earthen rock-fill dam; (2) a 152-acre impoundment 
with a gross storage capacity of 6,900 acre-feet at a normal maximum 
water surface elevation of 870 feet NGVD, which also serves as the 
lower reservoir for the Bear Swamp Pumped Storage Development; (3) two 
36-foot-wide, 40-foot-high steel Tainter spillway gates that are 
integral with the dam; (4) a concrete intake structure that is integral 
with the dam and includes an 11.2-foot-wide, 24-foot-tall trashrack 
with 3-inch bar spacing and a 15-foot-wide, 18-foot-high headgate; (5) 
a 10-foot-diameter, 200-foot-long steel penstock; (6) an approximately 
79.25-foot-long, 44-foot-wide, 94-foot-tall concrete powerhouse 
containing a 10-MW Francis turbine-generator unit; (7) a 21-foot-long 
steel-lined draft tube; (8) an approximately 325-foot-long, 30-inch-
diameter minimum flow release pipe that is gated at its intake and 
bifurcates into an approximately 55-foot-long, 20-inch-diameter pipe 
and an approximately 55-foot-long, 24-inch-diameter pipe; (9) a 
partially buried (860-foot-long section) and partially above-ground 
(7,060-foot-long section) 13.8-kV transmission line that connects the 
turbine-generator unit to the regional grid at a non-project substation 
owned by Great River Hydro, LLC; and (10) appurtenant facilities.
    The Bear Swamp Pumped Storage Development uses a storage capacity 
of 4,600 acre-feet to generate approximately 3,028 MWh of energy over a 
generation run time of approximately 5.3 hours. The Bear Swamp Pumped 
Storage Development normally generates and pumps back some or all of 
its useable storage capacity over a 24-hour period.
    The impoundment for the Fife Brook Development is the lower 
reservoir of the Bear Swamp Pumped Storage Development. The Fife Brook 
impoundment has an allowable drawdown of 40 feet to provide a useable 
storage capacity of 4,600 acre-feet to the upper reservoir of the Bear 
Swamp Pumped Storage Development for daily peaking operations. Releases 
from Fife Brook dam generally match the inflow from the Station No. 5 
Development of Great River Hydro, LLC's Deerfield River Project (FERC 
No. 2323), which discharges directly into the Fife Brook impoundment.
    The project's current license requires Bear Swamp to release a 
continuous minimum flow of 125 cubic feet per second (cfs) from Fife 
Brook dam, and to use water from the Bear Swamp Pumped Storage 
Development to meet the required 125 cfs minimum flow as necessary. The 
existing license also requires Bear Swamp to provide 106 scheduled 
annual releases of 700 cfs for whitewater recreation downstream of the 
Fife Brook dam from April 1 through October 31.
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's website at http://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and

[[Page 17170]]

reproduction at the Rowe Town Library, located at 318 Zoar Road, Rowe, 
MA 01367; or the North Adams Public Library, located at 74 Church 
Street, North Adams, MA 01247.
    m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural Schedule: Pursuant to section 5.19(d) of the 
Commission's regulations, the Director, Office of Energy Projects will 
issue an order within 30 days of the filing date of the final license 
application to resolve study requests that were filed in comments on 
the draft license application. At this time, the application is 
expected to be processed according to the following preliminary Hydro 
Licensing Schedule. Revisions to the schedule may be made following the 
Director's determination on the study requests, or as otherwise 
appropriate.

------------------------------------------------------------------------
                  Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for       October 2018.
 Environmental Analysis.
Filing of recommendations, preliminary terms   December 2018.
 and conditions, and fishway prescriptions.
Commission issues Draft Environmental          June 2019.
 Assessment (EA).
Comments on Draft EA.........................  August 2019.
Modified terms and conditions................  October 2019.
Commission issues Final EA...................  January 2020.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: April 12, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-08073 Filed 4-17-18; 8:45 am]
 BILLING CODE 6717-01-P



                                             17168                        Federal Register / Vol. 83, No. 75 / Wednesday, April 18, 2018 / Notices

                                                Comments Due: 5 p.m. ET 5/3/18.                         Applicants: Lone Valley Solar Park I                  Docket Numbers: ER18–1355–000.
                                                Docket Numbers: ER18–1094–001.                       LLC.                                                     Applicants: Rising Tree Wind Farm III
                                                Applicants: Florida Power & Light                       Description: § 205(d) Rate Filing:                 LLC.
                                             Company.                                                Revised MBR Tariff to be effective                       Description: § 205(d) Rate Filing:
                                                Description: Tariff Amendment: FPL                   4/13/2018.                                            Revised MBR Tariff to be effective
                                             Revisions to LCEC Rate Schedule No.                        Filed Date: 4/12/18.                               4/13/2018.
                                             317 to be effective 1/1/2016.                              Accession Number: 20180412–5104.                      Filed Date: 4/12/18.
                                                                                                        Comments Due: 5 p.m. ET 5/3/18.                       Accession Number: 20180412–5152.
                                                Filed Date: 4/12/18.                                                                                          Comments Due: 5 p.m. ET 5/3/18.
                                                Accession Number: 20180412–5120.                        Docket Numbers: ER18–1349–000.
                                                Comments Due: 5 p.m. ET 5/3/18.                                                                               Docket Numbers: ER18–1356–000.
                                                                                                        Applicants: Lone Valley Solar Park II                 Applicants: Louisville Gas and
                                                Docket Numbers: ER18–1095–001.                       LLC.                                                  Electric Company, Kentucky Utilities
                                                Applicants: Florida Power & Light                       Description: § 205(d) Rate Filing:                 Company.
                                             Company.                                                Revised MBR Tariff to be effective                       Description: Notice of Cancellation of
                                                Description: Tariff Amendment: FPL                   4/13/2018.                                            Network Operating Agreement (Third
                                             Revisions to FKEC Rate Schedule No.                        Filed Date: 4/12/18.                               Revised Service Agreement 14) of
                                             322 to be effective 1/1/2016.                              Accession Number: 20180412–5114.                   Louisville Gas and Electric Company,
                                                Filed Date: 4/12/18.                                    Comments Due: 5 p.m. ET 5/3/18.                    et al.
                                                Accession Number: 20180412–5121.                        Docket Numbers: ER18–1350–000.                        Filed Date: 4/12/18.
                                                Comments Due: 5 p.m. ET 5/3/18.                         Applicants: New England Power                         Accession Number: 20180412–5166.
                                                Docket Numbers: ER18–1275–002.                       Company.                                                 Comments Due: 5 p.m. ET 5/3/18.
                                                Applicants: Mid-Atlantic Interstate                     Description: Tariff Cancellation:                     The filings are accessible in the
                                             Transmission, LLC, PJM                                  Notice of Cancellation of                             Commission’s eLibrary system by
                                             Interconnection, L.L.C.                                 Reimbursement Agreement with Granite                  clicking on the links or querying the
                                                Description: Tariff Amendment: MAIT                  Reliable Power to be effective                        docket number.
                                             submits Supplemental Filing re: OIA SA                  11/1/2017.                                               Any person desiring to intervene or
                                             No. 4929 to be effective 6/1/2018.                         Filed Date: 4/12/18.                               protest in any of the above proceedings
                                                Filed Date: 4/12/18.                                    Accession Number: 20180412–5116.                   must file in accordance with Rules 211
                                                Accession Number: 20180412–5045.                        Comments Due: 5 p.m. ET 5/3/18.                    and 214 of the Commission’s
                                                Comments Due: 5 p.m. ET 5/3/18.                         Docket Numbers: ER18–1351–000.                     Regulations (18 CFR 385.211 and
                                                Docket Numbers: ER18–1344–000.                          Applicants: Virginia Electric and                  385.214) on or before 5:00 p.m. Eastern
                                                Applicants: California Independent                   Power Company, PJM Interconnection,                   time on the specified comment date.
                                             System Operator Corporation.                            L.L.C.                                                Protests may be considered, but
                                                Description: § 205(d) Rate Filing:                      Description: § 205(d) Rate Filing:                 intervention is necessary to become a
                                             2018–04–011 Congestion Revenue                          VEPCO submits revisions to OATT,                      party to the proceeding.
                                             Rights Auction Efficiency Track 1A                      Attachment H–16A re: Depreciation                        eFiling is encouraged. More detailed
                                             Amendment to be effective 7/1/2018.                     Rate to be effective 6/15/2018.                       information relating to filing
                                                Filed Date: 4/11/18.                                    Filed Date: 4/12/18.                               requirements, interventions, protests,
                                                Accession Number: 20180411–5167.                        Accession Number: 20180412–5118.                   service, and qualifying facilities filings
                                                Comments Due: 5 p.m. ET 5/2/18.                         Comments Due: 5 p.m. ET 5/3/18.                    can be found at: http://www.ferc.gov/
                                                                                                                                                           docs-filing/efiling/filing-req.pdf. For
                                                Docket Numbers: ER18–1345–000.                          Docket Numbers: ER18–1352–000.
                                                                                                                                                           other information, call (866) 208–3676
                                                Applicants: High Prairie Wind Farm                      Applicants: Rising Tree Wind Farm
                                                                                                                                                           (toll free). For TTY, call (202) 502–8659.
                                             II, LLC.                                                LLC.
                                                Description: § 205(d) Rate Filing:                      Description: § 205(d) Rate Filing:                   Dated: April 12, 2018.
                                             Revised MBR Tariff to be effective                      Revised MBR Tariff to be effective                    Nathaniel J. Davis, Sr.,
                                             4/13/2018.                                              4/13/2018.                                            Deputy Secretary.
                                                Filed Date: 4/12/18.                                    Filed Date: 4/12/18.                               [FR Doc. 2018–08075 Filed 4–17–18; 8:45 am]
                                                Accession Number: 20180412–5046.                        Accession Number: 20180412–5119.                   BILLING CODE 6717–01–P
                                                Comments Due: 5 p.m. ET 5/3/18.                         Comments Due: 5 p.m. ET 5/3/18.
                                                Docket Numbers: ER18–1346–000.                          Docket Numbers: ER18–1353–000.
                                                Applicants: Pioneer Prairie Wind                        Applicants: Southern California                    DEPARTMENT OF ENERGY
                                             Farm I, LLC.                                            Edison Company.
                                                Description: § 205(d) Rate Filing:                                                                         Federal Energy Regulatory
                                                                                                        Description: § 205(d) Rate Filing:
                                             Revised MBR Tariff to be effective                                                                            Commission
                                                                                                     Amended IFA Between SCE and AEPCO
                                             4/13/2018.                                              and Notices of Cancellation to be                     [Project No. 2669–085]
                                                Filed Date: 4/12/18.                                 effective 4/13/2018.
                                                Accession Number: 20180412–5065.                        Filed Date: 4/12/18.                               Notice of Application Tendered for
                                                Comments Due: 5 p.m. ET 5/3/18.                         Accession Number: 20180412–5124.                   Filing With the Commission and
                                                Docket Numbers: ER18–1347–000.                          Comments Due: 5 p.m. ET 5/3/18.                    Establishing Procedural Schedule for
                                                Applicants: Rail Splitter Wind Farm,                    Docket Numbers: ER18–1354–000.                     Licensing and Deadline for
                                             LLC.                                                       Applicants: Rising Tree Wind Farm II               Submission of Final Amendments;
                                                                                                                                                           Bear Swamp Power Company, LLC
amozie on DSK30RV082PROD with NOTICES




                                                Description: § 205(d) Rate Filing:                   LLC.
                                             Revised MBR Tariff to be effective                         Description: § 205(d) Rate Filing:                   Take notice that the following
                                             4/13/2018.                                              Revised MBR Tariff to be effective                    hydroelectric application has been filed
                                                Filed Date: 4/12/18.                                 4/13/2018.                                            with the Commission and is available
                                                Accession Number: 20180412–5069.                        Filed Date: 4/12/18.                               for public inspection.
                                                Comments Due: 5 p.m. ET 5/3/18.                         Accession Number: 20180412–5136.                     a. Type of Application: New Major
                                                Docket Numbers: ER18–1348–000.                          Comments Due: 5 p.m. ET 5/3/18.                    License.


                                        VerDate Sep<11>2014   17:31 Apr 17, 2018   Jkt 244001   PO 00000   Frm 00031   Fmt 4703   Sfmt 4703   E:\FR\FM\18APN1.SGM   18APN1


                                                                          Federal Register / Vol. 83, No. 75 / Wednesday, April 18, 2018 / Notices                                          17169

                                               b. Project No.: 2669–085.                             75-foot-long concrete-lined section that              containing a 10–MW Francis turbine-
                                               c. Date Filed: March 30, 2018.                        tapers from 40 feet to 25 feet in                     generator unit; (7) a 21-foot-long steel-
                                               d. Applicant: Bear Swamp Power                        diameter; (b) an approximately 965-foot-              lined draft tube; (8) an approximately
                                             Company, LLC (Bear Swamp).                              long, 25-foot-diameter concrete-lined                 325-foot-long, 30-inch-diameter
                                               e. Name of Project: Bear Swamp                        section; (c) a 15-foot-long concrete-lined            minimum flow release pipe that is gated
                                             Project.                                                section that bifurcates from a single 25-             at its intake and bifurcates into an
                                               f. Location: The existing project is                  foot-diameter section to two 20-foot-                 approximately 55-foot-long, 20-inch-
                                             located on the Deerfield River in                       diameter penstock sections; (d) two 25-               diameter pipe and an approximately 55-
                                             Berkshire and Franklin Counties,                        foot-long concrete-lined penstock                     foot-long, 24-inch-diameter pipe; (9) a
                                             Massachusetts. The project does not                     sections that taper from 20 feet to 17.5              partially buried (860-foot-long section)
                                             affect federal lands.                                   feet in diameter; (e) two 322-foot-long,              and partially above-ground (7,060-foot-
                                                g. Filed Pursuant to: Federal Power                  17.5-foot-diameter concrete-lined                     long section) 13.8-kV transmission line
                                             Act, 16 U.S.C. 791(a)–825(r).                           penstock sections; (f) two 20-foot-long               that connects the turbine-generator unit
                                                h. Applicant Contact: Steven P.                      concrete-lined penstock sections that                 to the regional grid at a non-project
                                             Murphy, Director of Licensing,                          taper from 17.5 feet to 11 feet in                    substation owned by Great River Hydro,
                                             Brookfield Renewable Energy Group, 33                   diameter; and (g) two 8.5-foot-long, 11-              LLC; and (10) appurtenant facilities.
                                             West 1st Street South, Fulton, NY                       foot-diameter, steel-lined penstock                      The Bear Swamp Pumped Storage
                                             13069; Telephone (315) 593–3118.                        sections; (6) a 227-foot-long, 79-foot-               Development uses a storage capacity of
                                                i. FERC Contact: John Baummer, (202)                 wide, 182-foot-high underground                       4,600 acre-feet to generate
                                             502–6837 or john.baummer@ferc.gov.                      powerhouse containing two reversible                  approximately 3,028 MWh of energy
                                                j. This application is not ready for                 Francis pump turbine-generator units                  over a generation run time of
                                             environmental analysis at this time.                    with a total authorized capacity of 666               approximately 5.3 hours. The Bear
                                                k. Project Description: The existing                 MW; (7) two 504-foot-long, 22-foot-                   Swamp Pumped Storage Development
                                             Bear Swamp Project consists of a                        wide, 29.5-foot-high concrete-lined draft             normally generates and pumps back
                                             pumped storage development, the Bear                    tube tunnels; (8) a lower reservoir inlet/            some or all of its useable storage
                                             Swamp Pumped Storage Development,                       outlet structure with four 15-foot-wide,              capacity over a 24-hour period.
                                             and a conventional hydropower                           20-foot-high bays, each equipped with                    The impoundment for the Fife Brook
                                             development, the Fife Brook                             16-foot-wide, 20.6-foot-high steel slide              Development is the lower reservoir of
                                             Development, with a combined                            gates; (9) four 15-foot-wide, 26.7-foot-              the Bear Swamp Pumped Storage
                                             authorized capacity of 676 megawatts                    tall steel trashracks with 6-inch bar                 Development. The Fife Brook
                                             (MW). The project generates an average                  spacing; (10) two 13.8-kilovolt (kV)                  impoundment has an allowable
                                             of 483,863 megawatt-hours (MWh)                         motor-generator lead electrical lines,                drawdown of 40 feet to provide a
                                             annually, and uses an average of                        one approximately 890 feet long (east                 useable storage capacity of 4,600 acre-
                                             618,293 MWh annually to operate the                     lead) and one approximately 900 feet                  feet to the upper reservoir of the Bear
                                             pumped storage development.                             long (west lead); (11) a 600-foot-long,               Swamp Pumped Storage Development
                                             Bear Swamp Pumped Storage                               15-foot-wide, 23-foot-high access tunnel              for daily peaking operations. Releases
                                             Development                                             for the generator lead lines; (12) two                from Fife Brook dam generally match
                                                                                                     13.8/230-kV step-up transformers; (13)                the inflow from the Station No. 5
                                                The existing Bear Swamp Pumped                       two 230-kV above-ground transmission                  Development of Great River Hydro,
                                             Storage Development consists of the                     lines, one approximately 4,075 feet long              LLC’s Deerfield River Project (FERC No.
                                             following existing facilities: (1) A 118-               (south line) and one approximately                    2323), which discharges directly into
                                             acre upper reservoir with a gross storage               3,960 feet long (north line), which                   the Fife Brook impoundment.
                                             capacity of 8,300 acre-feet at the normal               terminate at a non-project switchyard                    The project’s current license requires
                                             full water surface elevation of                         owned by National Grid; (14) a 700-foot-              Bear Swamp to release a continuous
                                             approximately 1,600 feet National                       long, 25-foot-wide, 29-foot-high tunnel               minimum flow of 125 cubic feet per
                                             Geodetic Vertical Datum of 1929                         for the access road; and (15)                         second (cfs) from Fife Brook dam, and
                                             (NGVD), which is contained by existing                  appurtenant facilities.                               to use water from the Bear Swamp
                                             topography and 4 dikes: (a) An                                                                                Pumped Storage Development to meet
                                             approximately 1,300-foot-long, 155-foot-                Fife Brook Development                                the required 125 cfs minimum flow as
                                             high curved, earth and rock-fill dike                      The existing Fife Brook Development                necessary. The existing license also
                                             (North Dike); (b) an approximately 350-                 consists of: (1) An 890-foot-long, 130-               requires Bear Swamp to provide 106
                                             foot-long, 23-foot-high earth and rock-                 foot-high earthen rock-fill dam; (2) a                scheduled annual releases of 700 cfs for
                                             fill dike extending from the eastside of                152-acre impoundment with a gross                     whitewater recreation downstream of
                                             the North Dike (North Dike Extension);                  storage capacity of 6,900 acre-feet at a              the Fife Brook dam from April 1 through
                                             (c) an approximately 2,880-foot-long,                   normal maximum water surface                          October 31.
                                             140-foot-high earth and rock-fill dike                  elevation of 870 feet NGVD, which also                   l. Locations of the Application: A
                                             (South Dike); and (d) an approximately                  serves as the lower reservoir for the Bear            copy of the application is available for
                                             750-foot-long, 50-foot-high earth and                   Swamp Pumped Storage Development;                     review at the Commission in the Public
                                             rock-fill dike (East Dike); (2) a 420-foot              (3) two 36-foot-wide, 40-foot-high steel              Reference Room or may be viewed on
                                             long emergency spillway to the east of                  Tainter spillway gates that are integral              the Commission’s website at http://
                                             the North Dike Extension; (3) an 88-foot-               with the dam; (4) a concrete intake                   www.ferc.gov using the ‘‘eLibrary’’ link.
                                             long, 1.5- to 4-foot-wide, 4-foot-high                  structure that is integral with the dam               Enter the docket number excluding the
amozie on DSK30RV082PROD with NOTICES




                                             submerged weir with three 5-foot-wide,                  and includes an 11.2-foot-wide, 24-foot-              last three digits in the docket number
                                             3-foot-high concrete stoplog gates; (4) a               tall trashrack with 3-inch bar spacing                field to access the document. For
                                             40-foot-diameter concrete inlet/outlet                  and a 15-foot-wide, 18-foot-high                      assistance, please contact FERC Online
                                             structure located at the bottom of the                  headgate; (5) a 10-foot-diameter, 200-                Support at FERCOnlineSupport@
                                             upper reservoir to the west of the North                foot-long steel penstock; (6) an                      ferc.gov, (866) 208–3676 (toll free), or
                                             Dike; (5) an approximately 1,430.5-foot-                approximately 79.25-foot-long, 44-foot-               (202) 502–8659 (TTY). A copy is also
                                             long tunnel system that includes: (a) A                 wide, 94-foot-tall concrete powerhouse                available for inspection and


                                        VerDate Sep<11>2014   17:31 Apr 17, 2018   Jkt 244001   PO 00000   Frm 00032   Fmt 4703   Sfmt 4703   E:\FR\FM\18APN1.SGM   18APN1


                                             17170                                 Federal Register / Vol. 83, No. 75 / Wednesday, April 18, 2018 / Notices

                                             reproduction at the Rowe Town Library,                                  related to this or other pending projects.                              requests that were filed in comments on
                                             located at 318 Zoar Road, Rowe, MA                                      For assistance, contact FERC Online                                     the draft license application. At this
                                             01367; or the North Adams Public                                        Support.                                                                time, the application is expected to be
                                             Library, located at 74 Church Street,                                      n. Procedural Schedule: Pursuant to                                  processed according to the following
                                             North Adams, MA 01247.                                                  section 5.19(d) of the Commission’s                                     preliminary Hydro Licensing Schedule.
                                               m. You may also register online at                                    regulations, the Director, Office of                                    Revisions to the schedule may be made
                                             http://www.ferc.gov/docs-filing/                                        Energy Projects will issue an order                                     following the Director’s determination
                                             esubscription.asp to be notified via                                    within 30 days of the filing date of the                                on the study requests, or as otherwise
                                             email of new filings and issuances                                      final license application to resolve study                              appropriate.

                                                                                                                                  Milestone                                                                                                Target date

                                             Notice of Acceptance/Notice of Ready for Environmental Analysis ................................................................................................                            October 2018.
                                             Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ..............................................................                                       December 2018.
                                             Commission issues Draft Environmental Assessment (EA) ............................................................................................................                          June 2019.
                                             Comments on Draft EA ....................................................................................................................................................................   August 2019.
                                             Modified terms and conditions ..........................................................................................................................................................    October 2019.
                                             Commission issues Final EA ............................................................................................................................................................     January 2020.



                                               o. Final amendments to the                                            significantly affecting the quality of the                              copies of the EA are available for
                                             application must be filed with the                                      human environment.                                                      distribution and public inspection at:
                                             Commission no later than 30 days from                                      Natural proposes to abandon:                                         Federal Energy Regulatory Commission,
                                             the issuance date of the notice of ready                                   • In place 19 injection/withdrawal                                   Public Reference Room, 888 First Street
                                             for environmental analysis.                                             wells by permanently plugging and                                       NE, Room 2A, Washington, DC 20426,
                                               Dated: April 12, 2018.                                                capping;                                                                (202) 502–8371.
                                             Nathaniel J. Davis, Sr.,
                                                                                                                        • in place 16.15 miles of 4- to 16-                                     Any person wishing to comment on
                                                                                                                     inch-diameter associated pipeline                                       the EA may do so. Your comments
                                             Deputy Secretary.
                                                                                                                     laterals in the storage field by capping;                               should focus on the potential
                                             [FR Doc. 2018–08073 Filed 4–17–18; 8:45 am]
                                                                                                                        • in place 13 non-jurisdictional                                     environmental effects, reasonable
                                             BILLING CODE 6717–01–P
                                                                                                                     observation wells by plugging;                                          alternatives, and measures to avoid or
                                                                                                                        • in place one non-jurisdictional salt                               lessen environmental impacts. The more
                                                                                                                     water disposal well by plugging;                                        specific your comments, the more useful
                                             DEPARTMENT OF ENERGY
                                                                                                                        • in place approximately 15.3 Bcf of                                 they will be. To ensure that the
                                             Federal Energy Regulatory                                               non-recoverable cushion gas;                                            Commission has the opportunity to
                                             Commission                                                                 • by removal the 330-horsepower                                      consider your comments prior to
                                                                                                                     Compressor Station 202 including its                                    making its decision on this project, it is
                                             [Docket No. CP18–12–000]                                                building, compressor unit, concrete                                     important that we receive your
                                                                                                                     piers, and concrete foundation; and                                     comments in Washington, DC on or
                                             Notice of Availability of the                                              • by removal all aboveground and
                                             Environmental Assessment for the                                                                                                                before May 14, 2018.
                                                                                                                     belowground storage field auxiliary                                        For your convenience, there are three
                                             Proposed Natural Gas Pipeline
                                                                                                                     surface facilities, including, but not                                  methods you can use to file your
                                             Company of America, LLC Herscher
                                                                                                                     limited to: Well head piping, slug                                      comments to the Commission. In all
                                             Northwest Storage Field Abandonment
                                                                                                                     catchers, water gathering system, and                                   instances, please reference the project
                                             Project
                                                                                                                     methanol distribution systems                                           docket number (CP18–12–000) with
                                                The staff of the Federal Energy                                      associated with the abandoned wells;                                    your submission. The Commission
                                             Regulatory Commission (FERC or                                          seven tap valves; a pigging facility; and                               encourages electronic filing of
                                             Commission) has prepared an                                             two corrosion monitors along with their                                 comments and has expert staff available
                                             environmental assessment (EA) for the                                   associated rectifiers and ground beds.                                  to assist you at (202) 502–8258 or
                                             Herscher Northwest Storage Field                                           Natural also proposes to convert the                                 FercOnlineSupport@ferc.gov.
                                             Abandonment Project, proposed by                                        P. Cook No. 1 injection/withdrawal well                                    (1) You can file your comments
                                             Natural Gas Pipeline Company of                                         to an observational well for its nearby                                 electronically using the eComment
                                             America LLC (Natural) in the above-                                     Herscher Mount Simon Storage Field;                                     feature on the Commission’s website
                                             referenced docket. Natural requests                                     and retain the P. Cook No. G–1 well as                                  (www.ferc.gov) under the link to
                                             authorization to abandon the Herscher                                   an observation well for its nearby                                      Documents and Filings. This is an easy
                                             Northwest Storage Field facilities with                                 Herscher Galesville Storage Field.                                      method for submitting brief, text-only
                                             its certificated maximum inventory of                                      The FERC staff mailed copies of the                                  comments on a project;
                                             18.5 billion cubic feet (Bcf) located in                                EA to federal, state, and local                                            (2) You can also file your comments
                                             Kankakee County, Illinois.                                              government representatives and                                          electronically using the eFiling feature
                                                The EA assesses the potential                                        agencies; elected officials;                                            on the Commission’s website
                                             environmental effects of the                                            environmental and public interest                                       (www.ferc.gov) under the link to
                                             abandonment of the Herscher Northwest                                   groups; Native American tribes;                                         Documents and Filings. With eFiling,
amozie on DSK30RV082PROD with NOTICES




                                             Storage Field Abandonment Project in                                    potentially affected landowners and                                     you can provide comments in a variety
                                             accordance with the requirements of the                                 other interested individuals and groups;                                of formats by attaching them as a file
                                             National Environmental Policy Act                                       and newspapers and libraries in the                                     with your submission. New eFiling
                                             (NEPA). The FERC staff concludes that                                   project area. In addition, the EA is                                    users must first create an account by
                                             approval of the proposed project, with                                  available for public viewing on the                                     clicking on eRegister. You must select
                                             appropriate mitigating measures, would                                  FERC’s website (www.ferc.gov) using the                                 the type of filing you are making. If you
                                             not constitute a major federal action                                   eLibrary link. A limited number of                                      are filing a comment on a particular


                                        VerDate Sep<11>2014        17:31 Apr 17, 2018       Jkt 244001      PO 00000       Frm 00033       Fmt 4703      Sfmt 4703      E:\FR\FM\18APN1.SGM            18APN1



Document Created: 2018-04-18 02:59:29
Document Modified: 2018-04-18 02:59:29
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 17168 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR