83_FR_17248 83 FR 17173 - Notice of Filing; Duke Energy Carolinas, LLC

83 FR 17173 - Notice of Filing; Duke Energy Carolinas, LLC

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 75 (April 18, 2018)

Page Range17173-17174
FR Document2018-08058

Federal Register, Volume 83 Issue 75 (Wednesday, April 18, 2018)
[Federal Register Volume 83, Number 75 (Wednesday, April 18, 2018)]
[Notices]
[Pages 17173-17174]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-08058]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL17-83-000]


Notice of Filing; Duke Energy Carolinas, LLC

    Take notice that on April 10, 2018, Duke Energy Carolinas, LLC 
submitted tariff filing per: Refund Report to be effective N/A, 
pursuant to the Federal Energy Regulatory Commission's (Commission) 
Order issued on February 15, 2018.\1\
---------------------------------------------------------------------------

    \1\ Piedmont Mun. Power Agency v. Duke Energy Carolinas, LLC, 
162 FERC ] 61,109 (2018).
---------------------------------------------------------------------------

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the

[[Page 17174]]

Commission in determining the appropriate action to be taken, but will 
not serve to make protestants parties to the proceeding. Any person 
wishing to become a party must file a notice of intervention or motion 
to intervene, as appropriate. Such notices, motions, or protests must 
be filed on or before the comment date. On or before the comment date, 
it is not necessary to serve motions to intervene or protests on 
persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426.
    This filing is accessible on-line at http://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the website that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on May 1, 2018.

    Dated: April 11, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-08058 Filed 4-17-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                        Federal Register / Vol. 83, No. 75 / Wednesday, April 18, 2018 / Notices                                                                                                                                    17173

                                                                                                                                                                 MOD–027–1
                                                                       [Verification of models and data for turbine/governor and load control or active power/frequency control functions]

                                                                                                                                                             Annual                                                                                             Total annual
                                                                                                                                                                                                                       Average burden                                                          Cost per
                                                                                                                        Number of                           number of                    Total number                                                           burden hours
                                                                                                                                                                                                                        and cost per                                                          respondent
                                                                                                                       respondents                       responses per                   of responses                                                             and total
                                                                                                                                                                                                                          response                                                                ($)
                                                                                                                                                           respondent                                                                                            annual cost

                                                                                                                               (1)                                (2)                    (1) * (2) = (3)                          (4)                           (3) * (4) = (5)                  (5) ÷ (1)

                                             Instructions for obtaining excitation con-                        185 (TP) ....................                                   1                          185        8 hrs.;    $598.56 7       ...      1,480 hrs.; $110,734 ....                     $598.56
                                               trol system or plant voltage/variance
                                               control function model.
                                             Documentation on generator verification                           466 (GO) ...................                                    1                          466        8 hrs.; $598.56 7 ...               3,728 hrs.; ....................                598.56
                                                                                                                                                                                                                                                         $278,929 ......................
                                             Evidence Retention ..................................             651 (GO and TP) ......                                          1                          651        1 hr.;   $32.74 8      .......      651 hrs.; $21,314 .........                       32.74

                                                  Total ..................................................     ....................................      ........................       ........................     ...............................     5,859 hrs.; $410,977 ....          ........................


                                                                                                                                                                 MOD–032–1
                                                                       [Verification of models and data for turbine/governor and load control or active power/frequency control functions]

                                                                                                                                                               Annual                                                                                            Total annual
                                                                                                                                                                                                                          Average burden                                                       Cost per
                                                                                                          Number of                                           number of                    Total number                                                          burden hours
                                                                                                                                                                                                                           and cost per                                                       respondent
                                                                                                         respondents                                       responses per                   of responses                                                            and total
                                                                                                                                                                                                                             response                                                             ($)
                                                                                                                                                             respondent                                                                                           annual cost

                                                                                                                 (1)                                                 (2)                   (1) * (2) = (3)                          (4)                          (3) * (4) = (5)                 (5) ÷ (1)

                                             Data Submittal ...........          1,197 (BA, GO, PA, RP, TO, TP, and                                                                 1                    1,197         8 hrs.; $544.96 9 ...               9,576 hrs.; $652,317                        $544.96
                                                                                   TSP).
                                             Evidence Retention ...              1,197 (BA, GO, PA, RP, TO, TP, and                                                                 1                    1,197         1 hr.; $32.74 8 .......             1,197 hrs.; $39,190 ...                         32.74
                                                                                   TSP).

                                                  Total ...................      .....................................................................     ........................       ........................     ...............................     10,773 hrs.; $691,507            ........................


                                                                                                                                                                 MOD–033–1
                                                                                                                             [Steady-state and dynamics system model validation]

                                                                                                                                                               Annual                                                                                            Total annual
                                                                                                                                                                                                                          Average burden                                                       Cost per
                                                                                                                  Number of                                   number of                    Total number                                                          burden hours
                                                                                                                                                                                                                           and cost per                                                       respondent
                                                                                                                 respondents                               responses per                   of responses                                                            and total
                                                                                                                                                                                                                             response                                                             ($)
                                                                                                                                                             respondent                                                                                           annual cost

                                                                                                                         (1)                                         (2)                   (1) * (2) = (3)                          (4)                          (3) * (4) = (5)                 (5) ÷ (1)

                                             Data Submittal ...........................          188 (RC and TOP) ....................                                              1                       188        8 hrs.; $544.96 9 ...               1,504 hrs.; $102,452                        $544.96
                                             Evidence Retention ....................             194 (PA, RC, and TOP) ............                                                 1                       194        1 hr.; $32.74 8 .......             194 hrs.; $6,352 ........                     32.74

                                                  Total ....................................      ....................................................     ........................       ........................     ...............................     1,698 hrs.; $108,804             ........................



                                               The total annual estimated burden                                                     of the burden and cost of the collection                                                       DEPARTMENT OF ENERGY
                                             and cost for the FERC–725L information                                                  of information, including the validity of
                                             collection is 30,720 hours and                                                          the methodology and assumptions used;                                                          Federal Energy Regulatory
                                             $2,071,653 respectively.                                                                (3) ways to enhance the quality, utility                                                       Commission
                                               Comments: Comments are invited on:                                                    and clarity of the information collection;                                                     [Docket No. EL17–83–000]
                                             (1) Whether the collection of                                                           and (4) ways to minimize the burden of
                                             information is necessary for the proper                                                 the collection of information on those                                                         Notice of Filing; Duke Energy
                                             performance of the functions of the                                                     who are to respond, including the use                                                          Carolinas, LLC
                                             Commission, including whether the                                                       of automated collection techniques or
                                             information will have practical utility;                                                                                                                                                  Take notice that on April 10, 2018,
                                                                                                                                     other forms of information technology.
                                             (2) the accuracy of the agency’s estimate                                                                                                                                              Duke Energy Carolinas, LLC submitted
                                                                                                                                       Dated: April 11, 2018.                                                                       tariff filing per: Refund Report to be
                                               7 This wage figure uses the average hourly wage
                                                                                                                                     Kimberly D. Bose,                                                                              effective N/A, pursuant to the Federal
                                             (plus benefits) for electrical engineers (Occupation                                    Secretary.                                                                                     Energy Regulatory Commission’s
                                             Code: 17–2071, $68.12/hour) and managers                                                [FR Doc. 2018–08057 Filed 4–17–18; 8:45 am]                                                    (Commission) Order issued on February
                                             (Occupation Code: 11–0000, $81.52/hour) obtained                                                                                                                                       15, 2018.1
                                             from the Bureau of Labor Statistics (BLS). The                                          BILLING CODE 6717–01–P
                                             average used the following calculation: [$68.12/
                                                                                                                                                                                                                                       Any person desiring to intervene or to
                                             hour + $81.52/hour] ÷ 2 = $74.82/hour.                                                                                                                                                 protest this filing must file in
amozie on DSK30RV082PROD with NOTICES




                                               8 The estimate uses the hourly average wage (plus                                                                                                                                    accordance with Rules 211 and 214 of
                                             benefits) for file clerks obtained from the Bureau of                                                                                                                                  the Commission’s Rules of Practice and
                                             Labor Statistics: $32.74/hour (BLS Occupation                                                                                                                                          Procedure (18 CFR 385.211, 385.214).
                                             Code: 43–4071).
                                               9 This uses the hourly average wage (plus                                                                                                                                            Protests will be considered by the
                                             benefits) for electrical engineers obtained from the
                                             Bureau of Labor Statistics: $68.12/hour (BLS                                                                                                                                             1 Piedmont Mun. Power Agency v. Duke Energy

                                             Occupation Code: 17–2071).                                                                                                                                                             Carolinas, LLC, 162 FERC ¶ 61,109 (2018).



                                        VerDate Sep<11>2014          17:31 Apr 17, 2018              Jkt 244001         PO 00000           Frm 00036            Fmt 4703            Sfmt 4703           E:\FR\FM\18APN1.SGM                      18APN1


                                             17174                        Federal Register / Vol. 83, No. 75 / Wednesday, April 18, 2018 / Notices

                                             Commission in determining the                           priority to file a license application                   The Commission strongly encourages
                                             appropriate action to be taken, but will                during the permit term. A preliminary                 electronic filing. Please file comments,
                                             not serve to make protestants parties to                permit does not authorize the permit                  motions to intervene, notices of intent,
                                             the proceeding. Any person wishing to                   holder to perform any land-disturbing                 and competing applications using the
                                             become a party must file a notice of                    activities or otherwise enter upon lands              Commission’s eFiling system at http://
                                             intervention or motion to intervene, as                 or waters owned by others without the                 www.ferc.gov/docs-filing/efiling.asp.
                                             appropriate. Such notices, motions, or                  owners’ express permission.                           Commenters can submit brief comments
                                             protests must be filed on or before the                    The proposed project would be a                    up to 6,000 characters, without prior
                                             comment date. On or before the                          closed-loop pumped storage                            registration, using the eComment system
                                             comment date, it is not necessary to                    hydropower facility that consists of the              at http://www.ferc.gov/docs-filing/
                                             serve motions to intervene or protests                  following: (1) A 37-acre upper reservoir              ecomment.asp. You must include your
                                             on persons other than the Applicant.                    having a total storage capacity of 1,800              name and contact information at the end
                                                The Commission encourages                            acre-feet at a normal maximum                         of your comments. For assistance,
                                             electronic submission of protests and                   operating elevation of 6,930 feet mean                please contact FERC Online Support at
                                             interventions in lieu of paper using the                sea level (msl); (2) a 55-foot-high, 550-             FERCOnlineSupport@ferc.gov, (866)
                                             ‘‘eFiling’’ link at http://www.ferc.gov.                foot-long zoned earth/rockfill or                     208–3676 (toll free), or (202) 502–8659
                                             Persons unable to file electronically                   concrete-faced upper reservoir dam; (3)               (TTY). In lieu of electronic filing, please
                                             should submit an original and 5 copies                  a 55-foot-high, 525-foot-long zoned                   send a paper copy to: Secretary, Federal
                                             of the protest or intervention to the                   earth/rockfill or concrete-faced second               Energy Regulatory Commission, 888
                                             Federal Energy Regulatory Commission,                   upper reservoir dam; (4) a 1,350-foot-                First Street NE, Washington, DC 20426.
                                             888 First Street NE, Washington, DC                     long, 15-foot-diameter low-pressure                   The first page of any filing should
                                             20426.                                                  headrace tunnel either unlined or lined               include docket number P–14870–000.
                                                This filing is accessible on-line at                 concrete-lined; (5) a 6,850-foot-long, 15-               More information about this project,
                                             http://www.ferc.gov, using the                          foot-diameter high-pressure headrace                  including a copy of the application, can
                                             ‘‘eLibrary’’ link and is available for                  tunnel lined with either concrete or                  be viewed or printed on the eLibrary
                                             review in the Commission’s Public                       steel; (6) a 220-foot-long, 60-foot-wide,             link of Commission’s website at http://
                                             Reference Room in Washington, DC.                       120-foot-high powerhouse housed in an                 www.ferc.gov/docs-filing/elibrary.asp.
                                             There is an ‘‘eSubscription’’ link on the               underground cavern and accessed via a                 Enter the docket number (P–14870) in
                                             website that enables subscribers to                     2,600-foot-long, 18-foot-diameter access              the docket number field to access the
                                             receive email notification when a                       tunnel, housing two variable-speed                    document. For assistance, contact FERC
                                             document is added to a subscribed                       reversible pump/turbine-motor/                        Online Support.
                                             docket(s). For assistance with any FERC                 generator units rated for 150 megawatts                 Dated: April 12, 2018. .
                                             Online service, please email                            each at 1,370 feet maximum gross head;                Nathaniel J. Davis, Sr.,
                                             FERCOnlineSupport@ferc.gov, or call                     (7) a 2,400-foot-long, 17.5-foot-diameter             Deputy Secretary.
                                             (866) 208–3676 (toll free). For TTY, call               tailrace tunnel lined with concrete; (8)              [FR Doc. 2018–08078 Filed 4–17–18; 8:45 am]
                                             (202) 502–8659.                                         a 37-acre lower reservoir having a total              BILLING CODE 6717–01–P
                                                Comment Date: 5:00 p.m. Eastern                      storage capacity 1,800 acre-feet at a
                                             Time on May 1, 2018.                                    normal maximum operating elevation of
                                               Dated: April 11, 2018.                                5,630 feet msl; (9) a 75-foot-high, 850-              DEPARTMENT OF ENERGY
                                             Kimberly D. Bose,                                       foot-long zoned earth/rockfill or
                                                                                                     concrete-faced lower reservoir dam; (10)              Federal Energy Regulatory
                                             Secretary.
                                                                                                     a 13-mile-long, 230-kilovolt (kV)                     Commission
                                             [FR Doc. 2018–08058 Filed 4–17–18; 8:45 am]
                                                                                                     transmission line extending from the                  [Project No. 7987–014]
                                             BILLING CODE 6717–01–P
                                                                                                     powerhouse that would follow an
                                                                                                     existing transmission corridor to the                 Notice of Transfer of Exemption;
                                                                                                     Sigurd Substation owned by Rocky                      Hydrodyne Industries, LLC, UP
                                             DEPARTMENT OF ENERGY
                                                                                                     Mountain Power, or, if possible, a direct             Property 2, LLC
                                             Federal Energy Regulatory                               connection to Rocky Mountain Power’s
                                                                                                     Sigurd-Red Butte No. 2 345-kV line                      1. By letter filed March 8, 2018,
                                             Commission                                                                                                    Charles T. Hagan, III, Manager,
                                                                                                     adjacent to the project (the point of
                                             [Project No. 14870–000]                                 interconnection); and (11) appurtenant                Hydrodyne Industries, LLC, exemptee
                                                                                                     facilities. The estimated annual                      informed the Commission that the
                                             Notice of Preliminary Permit                            generation of the Flat Canyon Project                 exemption from licensing for the High
                                             Application Accepted for Filing and                     would be 525.6 gigawatt-hours.                        Falls Hydroelectric Project No. 7987,
                                             Soliciting Comments, Motions To                                                                               originally issued September 12, 1984 1
                                                                                                        Applicant Contact: Matthew Shapiro,
                                             Intervene, and Competing                                                                                      has been transferred to UP Property 2,
                                                                                                     CEO, Gridflex Energy, LLC, 1210 W
                                             Applications; Flat Canyon Hydro, LLC                                                                          LLC. The project is located on the Deep
                                                                                                     Franklin St, Ste. 2, Boise, Idaho 83702;
                                                                                                     phone: (208) 246–9925.                                River in Moore County, North Carolina.
                                                On March 7, 2018, the Flat Canyon
                                                                                                        FERC Contact: Kyle Olcott; phone:                  The transfer of an exemption does not
                                             Hydro, LLC, filed an application for a
                                                                                                     (202) 502–8963.                                       require Commission approval.
                                             preliminary permit, pursuant to section                                                                         2. UP Property 2, LLC is now the
                                             4(f) of the Federal Power Act (FPA),                       Deadline for filing comments, motions
                                                                                                                                                           exemptee of the High Falls
amozie on DSK30RV082PROD with NOTICES




                                             proposing to study the feasibility of the               to intervene, competing applications
                                                                                                                                                           Hydroelectric Project No. 7987. All
                                             Flat Canyon Pumped Storage Project                      (without notices of intent), or notices of
                                                                                                                                                           correspondence should be forwarded to:
                                             (Flat Canyon Project or project) to be                  intent to file competing applications: 60
                                                                                                                                                           Mr. Aaron Aho, Land and Resource
                                             located in Flat Canyon, near the City of                days from the issuance of this notice.
                                             Elsinore, Sevier County, Utah. The sole                 Competing applications and notices of                   1 Order Granting Exemption From Licensing of a
                                             purpose of a preliminary permit, if                     intent must meet the requirements of 18               Small Hydroelectric Project of 5 Megawatts or Less.
                                             issued, is to grant the permit holder                   CFR 4.36.                                             Cook Industries, Inc., 28 FERC 62,352 (1984).



                                        VerDate Sep<11>2014   17:31 Apr 17, 2018   Jkt 244001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\18APN1.SGM   18APN1



Document Created: 2018-04-18 02:59:30
Document Modified: 2018-04-18 02:59:30
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on May 1, 2018.
FR Citation83 FR 17173 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR