83_FR_17900 83 FR 17821 - San Diego County Water Authority; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions

83 FR 17821 - San Diego County Water Authority; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 79 (April 24, 2018)

Page Range17821-17822
FR Document2018-08479

Federal Register, Volume 83 Issue 79 (Tuesday, April 24, 2018)
[Federal Register Volume 83, Number 79 (Tuesday, April 24, 2018)]
[Notices]
[Pages 17821-17822]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-08479]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 5670-001]


San Diego County Water Authority; Notice of Application Accepted 
for Filing and Soliciting Comments, Motions To Intervene, Protests, 
Recommendations, and Terms and Conditions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Amendment of Conduit Exemption.
    b. Project No.: 5670-001.
    c. Date filed: April 3, 2018.
    d. Applicant: San Diego County Water Authority.
    e. Name of Project: Alvarado Hydroelectric Project.
    f. Location: The project is located within Alvarado Water Treatment 
Plant in the city of San Diego, San Diego County, California. The land 
on which all the project facilities are located is owned by the 
applicant.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Brent Fountain, Engineer, 4677 Overland 
Avenue, San Diego, California 92123, phone (858) 522-6808.
    i. FERC Contact: Christopher Chaney, (202) 502-6778 or 
[email protected].
    j. Deadline for filing responsive documents: Due to the small size 
of the proposed project, as well as the resource agency consultation 
letters filed with the application, the 60-day timeframe specified in 
18 CFR 4.34(b) for filing all comments, motions to intervene, protests, 
recommendations, terms and conditions, and prescriptions is shortened 
to 30 days from the issuance date of this notice. All reply comments 
must be filed with the Commission within 45 days from the issuance date 
of this notice.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-5670-001.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, it must also serve a 
copy of the document on that resource agency.
    k. Description of Project: The proposed amendment consists of the 
rehabilitation of the existing hydroelectric facility by: (1) Replacing 
the two existing, 1-megawatt (MW) turbine/generating units with a 
single, 1.7 MW-rated turbine/generating unit, switchgear, and generator 
protection panels; and (2) installing a flow control bypass line to 
provide flow to the water treatment plant when the project is offline.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling (202) 502-8371. This filing may also be viewed on 
the Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number, P-5670, in the docket number 
field to access the document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of 
new filings and issuances related to this or other pending projects. 
For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
and .214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
deadline date for the particular application.
    n. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title COMMENTS, PROTEST, MOTION TO 
INTERVENE, REPLY COMMENTS, RECOMMENDATIONS, TERMS AND CONDITIONS, or 
PRESCRIPTIONS; (2) set forth in the heading, the name of the applicant 
and the project number of the application to which the filing responds; 
(3) furnish the name, address, and telephone number of the person 
protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions 
to intervene, or protests must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may 
obtain copies of the application directly from the applicant. A copy of 
any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. If an intervener files comments or documents

[[Page 17822]]

with the Commission relating to the merits of an issue that may affect 
the responsibilities of a particular resource agency, they must also 
serve a copy of the document on that resource agency. A copy of all 
other filings in reference to this application must be accompanied by 
proof of service on all persons listed in the service list prepared by 
the Commission in this proceeding, in accordance with 18 CFR 4.34(b) 
and 385.2010.

    Dated: April 18, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-08479 Filed 4-23-18; 8:45 am]
BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 83, No. 79 / Tuesday, April 24, 2018 / Notices                                          17821

                                                  Persons who wish to comment only                     County, California. The land on which                 bypass line to provide flow to the water
                                               on the environmental review of this                     all the project facilities are located is             treatment plant when the project is
                                               project should submit an original and                   owned by the applicant.                               offline.
                                               two copies of their comments to the                        g. Filed Pursuant to: Federal Power                   l. Locations of the Application: A
                                               Secretary of the Commission.                            Act 16 U.S.C. 791a–825r.                              copy of the application is available for
                                               Environmental commenter’s will be                          h. Applicant Contact: Mr. Brent                    inspection and reproduction at the
                                               placed on the Commission’s                              Fountain, Engineer, 4677 Overland                     Commission’s Public Reference Room,
                                               environmental mailing list, will receive                Avenue, San Diego, California 92123,                  located at 888 First Street NE, Room 2A,
                                               copies of the environmental documents,                  phone (858) 522–6808.                                 Washington, DC 20426, or by calling
                                               and will be notified of meetings                           i. FERC Contact: Christopher Chaney,               (202) 502–8371. This filing may also be
                                               associated with the Commission’s                        (202) 502–6778 or christopher.chaney@                 viewed on the Commission’s website at
                                               environmental review process.                           ferc.gov.                                             http://www.ferc.gov/docs-filing/
                                               Environmental commenter’s will not be                      j. Deadline for filing responsive                  elibrary.asp. Enter the docket number,
                                               required to serve copies of filed                       documents: Due to the small size of the               P–5670, in the docket number field to
                                               documents on all other parties.                         proposed project, as well as the resource             access the document. You may also
                                               However, the non-party commentary,                      agency consultation letters filed with                register online at http://www.ferc.gov/
                                               will not receive copies of all documents                the application, the 60-day timeframe                 docs-filing/esubscription.asp to be
                                                                                                       specified in 18 CFR 4.34(b) for filing all            notified via email of new filings and
                                               filed by other parties or issued by the
                                                                                                       comments, motions to intervene,                       issuances related to this or other
                                               Commission (except for the mailing of
                                                                                                       protests, recommendations, terms and                  pending projects. For assistance, call 1–
                                               environmental documents issued by the
                                                                                                       conditions, and prescriptions is                      866–208–3676 or email
                                               Commission) and will not have the right
                                                                                                       shortened to 30 days from the issuance                FERCOnlineSupport@ferc.gov, for TTY,
                                               to seek court review of the
                                                                                                       date of this notice. All reply comments               call (202) 502–8659. A copy is also
                                               Commission’s final order.
                                                                                                       must be filed with the Commission                     available for inspection and
                                                  The Commission strongly encourages
                                                                                                       within 45 days from the issuance date                 reproduction at the address in item (h)
                                               electronic filings of comments, protests
                                                                                                       of this notice.                                       above.
                                               and interventions in lieu of paper using                   The Commission strongly encourages
                                               the eFiling link at http://www.ferc.gov.                                                                         m. Comments, Protests, or Motions to
                                                                                                       electronic filing. Please file comments,              Intervene: Anyone may submit
                                               Persons unable to file electronically                   motions to intervene, and protests using
                                               should submit an original and 5 copies                                                                        comments, a protest, or a motion to
                                                                                                       the Commission’s eFiling system at                    intervene in accordance with the
                                               of the protest or intervention to the                   http://www.ferc.gov/docs-filing/
                                               Federal Energy regulatory Commission,                                                                         requirements of Rules of Practice and
                                                                                                       efiling.asp. Commenters can submit                    Procedure, 18 CFR 385.210, .211, and
                                               888 First Street NE, Washington, DC                     brief comments up to 6,000 characters,                .214. In determining the appropriate
                                               20426.                                                  without prior registration, using the                 action to take, the Commission will
                                                 Dated: April 18, 2018.                                eComment system at http://www.ferc.                   consider all protests or other comments
                                               Kimberly D. Bose,                                       gov/docs-filing/ecomment.asp. You                     filed, but only those who file a motion
                                               Secretary.                                              must include your name and contact                    to intervene in accordance with the
                                               [FR Doc. 2018–08476 Filed 4–23–18; 8:45 am]             information at the end of your                        Commission’s Rules may become a
                                               BILLING CODE 6717–01–P
                                                                                                       comments. For assistance, please                      party to the proceeding. Any comments,
                                                                                                       contact FERC Online Support at                        protests, or motions to intervene must
                                                                                                       FERCOnlineSupport@ferc.gov, (866)                     be received on or before the specified
                                               DEPARTMENT OF ENERGY                                    208–3676 (toll free), or (202) 502–8659               deadline date for the particular
                                                                                                       (TTY). In lieu of electronic filing, please           application.
                                               Federal Energy Regulatory                               send a paper copy to: Secretary, Federal                 n. Filing and Service of Responsive
                                               Commission                                              Energy Regulatory Commission, 888                     Documents: Any filing must (1) bear in
                                                                                                       First Street NE, Washington, DC 20426.                all capital letters the title COMMENTS,
                                               [Project No. 5670–001]
                                                                                                       The first page of any filing should                   PROTEST, MOTION TO INTERVENE,
                                               San Diego County Water Authority;                       include docket number P–5670–001.                     REPLY COMMENTS,
                                               Notice of Application Accepted for                         The Commission’s Rules of Practice                 RECOMMENDATIONS, TERMS AND
                                               Filing and Soliciting Comments,                         and Procedure require all intervenors                 CONDITIONS, or PRESCRIPTIONS; (2)
                                               Motions To Intervene, Protests,                         filing documents with the Commission                  set forth in the heading, the name of the
                                               Recommendations, and Terms and                          to serve a copy of that document on                   applicant and the project number of the
                                               Conditions                                              each person on the official service list              application to which the filing
                                                                                                       for the project. Further, if an intervenor            responds; (3) furnish the name, address,
                                                 Take notice that the following                        files comments or documents with the                  and telephone number of the person
                                               hydroelectric application has been filed                Commission relating to the merits of an               protesting or intervening; and (4)
                                               with the Commission and is available                    issue that may affect the responsibilities            otherwise comply with the requirements
                                               for public inspection:                                  of a particular resource agency, it must              of 18 CFR 385.2001 through 385.2005.
                                                 a. Type of Application: Amendment                     also serve a copy of the document on                  All comments, motions to intervene, or
                                               of Conduit Exemption.                                   that resource agency.                                 protests must set forth their evidentiary
                                                 b. Project No.: 5670–001.                                k. Description of Project: The                     basis and otherwise comply with the
                                                 c. Date filed: April 3, 2018.                         proposed amendment consists of the                    requirements of 18 CFR 4.34(b).
daltland on DSKBBV9HB2PROD with NOTICES




                                                 d. Applicant: San Diego County Water                  rehabilitation of the existing                        Agencies may obtain copies of the
                                               Authority.                                              hydroelectric facility by: (1) Replacing              application directly from the applicant.
                                                 e. Name of Project: Alvarado                          the two existing, 1-megawatt (MW)                     A copy of any protest or motion to
                                               Hydroelectric Project.                                  turbine/generating units with a single,               intervene must be served upon each
                                                 f. Location: The project is located                   1.7 MW-rated turbine/generating unit,                 representative of the applicant specified
                                               within Alvarado Water Treatment Plant                   switchgear, and generator protection                  in the particular application. If an
                                               in the city of San Diego, San Diego                     panels; and (2) installing a flow control             intervener files comments or documents


                                          VerDate Sep<11>2014   17:03 Apr 23, 2018   Jkt 244001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\24APN1.SGM   24APN1


                                               17822                          Federal Register / Vol. 83, No. 79 / Tuesday, April 24, 2018 / Notices

                                               with the Commission relating to the                     DEPARTMENT OF ENERGY                                  Wellton-Mohawk Canal in Roll, Yuma
                                               merits of an issue that may affect the                                                                        County, Arizona.
                                               responsibilities of a particular resource               Federal Energy Regulatory                               Applicant Contact: Robert Freda, 306
                                               agency, they must also serve a copy of                  Commission                                            Bellevue St., Boston, MA 02132, Phone
                                               the document on that resource agency.                                                                         No. (617) 435–6288.
                                               A copy of all other filings in reference                [Docket No. CD18–5–000]                                 FERC Contact: Christopher Chaney,
                                               to this application must be accompanied                                                                       Phone No. (202) 502–6778, email:
                                               by proof of service on all persons listed               GenH, Inc.; Notice of Preliminary                     Christopher.Chaney@ferc.gov.
                                               in the service list prepared by the                     Determination of a Qualifying Conduit                   Qualifying Conduit Hydropower
                                               Commission in this proceeding, in                       Hydropower Facility and Soliciting                    Facility Description: The proposed
                                               accordance with 18 CFR 4.34(b) and                      Comments and Motions To Intervene                     project would consist of: (1) Up to 10
                                               385.2010.                                                                                                     15-kW Turgo turbine units with a total
                                                                                                         On April 12, 2018, GenH, Inc. filed a               installed capacity of up to 150 kW
                                                 Dated: April 18, 2018.                                notice of intent to construct a qualifying            located at an unnamed drop along the
                                               Kimberly D. Bose,                                       conduit hydropower facility, pursuant                 Wellton-Mohawk Canal; and (2)
                                               Secretary.                                              to section 30 of the Federal Power Act                appurtenant facilities. The proposed
                                               [FR Doc. 2018–08479 Filed 4–23–18; 8:45 am]             (FPA), as amended by section 4 of the                 project would have an estimated annual
                                                                                                       Hydropower Regulatory Efficiency Act                  generating capacity of up to
                                               BILLING CODE 6717–01–P
                                                                                                       of 2013 (HREA). The proposed Mohawk                   approximately 1,336,000 kilowatt-hours.
                                                                                                       Hydro Station Project would have an                     A qualifying conduit hydropower
                                                                                                       installed capacity of up to 150 kilowatts             facility is one that is determined or
                                                                                                       (kW), and would be located at an                      deemed to meet all of the criteria shown
                                                                                                       existing unnamed drop along the                       in the table below.

                                                                                 TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                               Satisfies
                                                           Statutory provision                                                              Description                                         (Y/N)

                                               FPA 30(a)(3)(A), as amended by HREA ..             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or          Y
                                                                                                    similar manmade water conveyance that is operated for the distribution of water
                                                                                                    for agricultural, municipal, or industrial consumption and not primarily for the gen-
                                                                                                    eration of electricity..
                                               FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric             Y
                                                                                                    power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                    erally owned conduit..
                                               FPA 30(a)(3)(C)(ii), as amended              by    The facility has an installed capacity that does not exceed 5 megawatts. .................      Y
                                                 HREA.
                                               FPA 30(a)(3)(C)(iii), as amended             by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-             Y
                                                 HREA.                                             censing requirements of Part I of the FPA..



                                                 Preliminary Determination: The                           Filing and Service of Responsive                   registration, using the eComment system
                                               proposed addition of the hydroelectric                  Documents: All filings must (1) bear in               at http://www.ferc.gov/docs-filing/
                                               project along the existing irrigation                   all capital letters the COMMENTS                      ecomment.asp. You must include your
                                               canal will not alter its primary purpose.               CONTESTING QUALIFICATION FOR A                        name and contact information at the end
                                               Therefore, based upon the above                         CONDUIT HYDROPOWER FACILITY or                        of your comments. For assistance,
                                               information and criteria, Commission                    MOTION TO INTERVENE, as                               please contact FERC Online Support at
                                               staff preliminarily determines that the                 applicable; (2) state in the heading the              FERCOnlineSupport@ferc.gov, (866)
                                               proposal satisfies the requirements for a               name of the applicant and the project                 208–3676 (toll free), or (202) 502–8659
                                               qualifying conduit hydropower facility,                 number of the application to which the                (TTY). In lieu of electronic filing, please
                                               which is not required to be licensed or                 filing responds; (3) state the name,                  send a paper copy to: Secretary, Federal
                                               exempted from licensing.                                address, and telephone number of the                  Energy Regulatory Commission, 888
                                                 Comments and Motions to Intervene:                    person filing; and (4) otherwise comply               First Street NE, Washington, DC 20426.
                                               Deadline for filing comments contesting                 with the requirements of sections                     A copy of all other filings in reference
                                               whether the facility meets the qualifying               385.2001 through 385.2005 of the                      to this application must be accompanied
                                               criteria is 45 days from the issuance                   Commission’s regulations.1 All                        by proof of service on all persons listed
                                               date of this notice.                                    comments contesting Commission staff’s                in the service list prepared by the
                                                                                                       preliminary determination that the                    Commission in this proceeding, in
                                                 Deadline for filing motions to                        facility meets the qualifying criteria                accordance with 18 CFR 4.34(b) and
                                               intervene is 30 days from the issuance                  must set forth their evidentiary basis.               385.2010.
                                               date of this notice.                                       The Commission strongly encourages                    Locations of Notice of Intent: Copies
                                                 Anyone may submit comments or a                       electronic filing. Please file motions to             of the notice of intent can be obtained
daltland on DSKBBV9HB2PROD with NOTICES




                                               motion to intervene in accordance with                  intervene and comments using the                      directly from the applicant or such
                                               the requirements of Rules of Practice                   Commission’s eFiling system at http://                copies can be viewed and reproduced at
                                               and Procedure, 18 CFR 385.210 and                       www.ferc.gov/docs-filing/efiling.asp.                 the Commission in its Public Reference
                                               385.214. Any motions to intervene must                  Commenters can submit brief comments                  Room, Room 2A, 888 First Street NE,
                                               be received on or before the specified                  up to 6,000 characters, without prior                 Washington, DC 20426. The filing may
                                               deadline date for the particular                                                                              also be viewed on the web at http://
                                               proceeding.                                               1 18   CFR 385.2001–2005 (2017).                    www.ferc.gov/docs-filing/elibrary.asp


                                          VerDate Sep<11>2014   17:03 Apr 23, 2018   Jkt 244001   PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:\FR\FM\24APN1.SGM   24APN1



Document Created: 2018-04-24 00:38:59
Document Modified: 2018-04-24 00:38:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 17821 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR