DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 80 (April 25, 2018)

Page Range18019-18020
FR Document2018-08670

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is submitting its information collection FERC-725X (Mandatory Reliability Standards: Voltage and Reactive (VAR) Standards) to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission previously issued a Notice in the Federal Register requesting public comments. The Commission received no comments on the FERC-725X and is making this notation in its submittal to OMB.

Federal Register, Volume 83 Issue 80 (Wednesday, April 25, 2018)
[Federal Register Volume 83, Number 80 (Wednesday, April 25, 2018)]
[Notices]
[Pages 18019-18020]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-08670]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC18-9-000]


Commission Information Collection Activities (FERC-725x); Comment 
Request

AGENCY: Federal Energy Regulatory Commission, Department of Energy.

ACTION: Comment request.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is submitting its information collection FERC-725X (Mandatory 
Reliability Standards: Voltage and Reactive (VAR) Standards) to the 
Office of Management and Budget (OMB) for review of the information 
collection requirements. Any interested person may file comments 
directly with OMB and should address a copy of those comments to the 
Commission as explained below. The Commission previously issued a 
Notice in the Federal Register requesting public comments. The 
Commission received no comments on the FERC-725X and is making this 
notation in its submittal to OMB.

DATES: Comments on the collection of information are due by May 25, 
2018.

ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 
1902-0278, should be sent via email to the Office of Information and 
Regulatory Affairs: [email protected]. Attention: Federal Energy 
Regulatory Commission Desk Officer. The Desk Officer may also be 
reached via telephone at 202-395-8528.
    A copy of the comments should also be sent to the Commission, in 
Docket No. IC18-9-000, by either of the following methods:
     eFiling at Commission's website: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], by telephone at (202) 502-8663, and by fax at 
(202) 273-0873.

SUPPLEMENTARY INFORMATION:
    Title: FERC-725X, Mandatory Reliability Standards: Voltage and 
Reactive (VAR) Standards.
    OMB Control No.: 1902-0278.
    Type of Request: Three-year extension of the FERC-725X information 
collection requirements with no changes to the reporting requirements.
    Abstract: Pursuant to Section 215 of the Federal Power Act (FPA), 
NERC established the Voltage and Reactive (VAR) group of Reliability 
Standards, which consists of two continent-wide Reliability Standards, 
VAR-001-4 and VAR-002-3.\1\ These two standards were designed to 
maintain voltage stability on the Bulk-Power System, protect 
transmission, generation, distribution, and customer equipment, and 
support the reliable operation of the Bulk-Power System. Voltage 
stability is the ability of a power system to maintain acceptable 
voltage levels throughout the system under normal operating conditions 
and following a disturbance. Failure to maintain acceptable voltage 
levels (i.e., voltage levels become too high or too low) may cause 
violations of System Operating Limits (SOLs) and Interconnection 
Reliability Operating Limits (IROLs), resulting in damage to Bulk-Power 
System equipment, and thereby threaten the reliable operation of the 
Bulk-Power System.
---------------------------------------------------------------------------

    \1\ FERC approved these standards in the Order in Docket No. 
RD14-11-000 (issued on 8/1/2014).
---------------------------------------------------------------------------

Reliability Standard VAR-001-4 \2\
---------------------------------------------------------------------------

    \2\ Applies to generation operators only.
---------------------------------------------------------------------------

    Reliability Standard VAR-001-4 contains the following requirements:
     Specify a system-wide voltage schedule (which is either a 
range or a target value with an associated tolerance band) as part of 
its plan to operate within SOLs and IROLs, and to provide the voltage 
schedule to its Reliability Coordinator and adjacent Transmission 
Operators upon request (Requirement R1);

[[Page 18020]]

     Schedule sufficient reactive resources to regulate voltage 
levels (Requirement R2);
     Operate or direct the operation of devices to regulate 
transmission voltage and reactive flows (Requirement R3);
     Develop a set of criteria to exempt generators from 
certain requirements under Reliability Standard VAR-002-3 related to 
voltage or Reactive Power schedules, automatic voltage regulations, and 
notification (Requirement R4);
     Specify a voltage or Reactive Power schedule (which is 
either a range or a target value with an associated tolerance band) for 
generators at either the high or low voltage side of the generator 
step-up transformer, provide the schedule to the associated Generator 
Operator, direct the Generator Operator to comply with that schedule in 
automatic voltage control mode, provide the Generator Operator the 
notification requirements for deviating from the schedule, and, if 
requested, provide the Generator Operator the criteria used to develop 
the schedule (Requirement R5); and
     Communicate step-up transformer tap changes, the time 
frame for completion, and the justification for these changes to 
Generator Owners (Requirement R6).

Reliability Standard VAR-002-3 \3\
---------------------------------------------------------------------------

    \3\ Applies to transmission operators only.
---------------------------------------------------------------------------

    Reliability Standard VAR-002-3 contains the following requirements:
     Operate each of its generators connected to the 
interconnected transmission system in automatic voltage control mode or 
in a different control mode as instructed by the Transmission Operator, 
unless the Generator Operator (1) is exempted pursuant to the criteria 
developed under VAR-001-4, Requirement R4, or (2) makes certain 
notifications to the Transmission Operator specifying the reasons it 
cannot so operate (Requirement R1);
     Maintain the Transmission Operator's generator voltage or 
Reactive Power schedule, unless the Generator Operator (1) is exempted 
pursuant to the criteria developed under VAR-001-4, Requirement R4, or 
(2) complies with the notification requirements for deviations as 
established by the Transmission Owner pursuant to Requirement R5 in 
VAR-001-4 (Requirement R2);
     Notify the Transmission Operator of a change in status of 
its voltage controlling device within 30 minutes, unless the status is 
restored within that time period (Requirement R3);
     Notify the Transmission Operator of a change in reactive 
capability due to factors other than those described in VAR-002-3, 
Requirement R3 within 30 minutes unless the capability has been 
restored during that time period (Requirement R4).
     Provide information on its step-up transformers and 
auxiliary transformers within 30 days of a request from the 
Transmission Operator or Transmission Planner (Requirement R5); and
     Comply with the Transmission Operator's step-up 
transformer tap change directives unless compliance would violate 
safety, an equipment rating, or applicable laws, rules or regulations 
(Requirement R6).
    Type of Respondents: Generator operators and transmission 
operators.
    Estimate of Annual Burden: \4\ The Commission estimates the annual 
public reporting burden for the information collection as:
---------------------------------------------------------------------------

    \4\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, reference 5 Code of Federal Regulations 1320.3.
    \5\ TOP = transmission operator; GOP = generator operators.
    \6\ The estimate for hourly cost is $68.12/hour. This figure is 
the average salary plus benefits for an electrical engineer 
(Occupation Code: 17-2071) from the Bureau of Labor Statistics at 
https://www.bls.gov/oes/current/naics2_22.htm.

                                    FERC-725X, Mandatory Reliability Standards: Voltage and Reactive (VAR) Standards
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                              Annual  number
                                     Number of  respondents    of  responses   Total number     Average  Burden &   Total annual  burden     Cost per
                                               \5\                  per        of responses    Cost per  response      hours  & total     respondent ($)
                                                                respondent                             \6\               annual Cost
                                    (1).....................             (2)     (1) * (2) =  (4).................  (3) * (4) = (5).....       (5) / (1)
                                                                                         (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
VAR-001-4 (Requirement R1-R6).....  181 (TOP)...............               1             181  160 hrs.; $10,899.20  28,960 hrs.;              $10,899.20
                                                                                                                     $1,972,755.
VAR-002-3 (Requirement R1)........  944 (GOP)...............               1             944  80 hrs.; 5,449.60...  75,520 hrs.;                5,449.60
                                                                                                                     $5,144,422.
VAR-002-3 (Requirement R2-R6).....  944 (GOP)...............               1             944  120 hrs.; $8,174.40.  113,280 hrs.;               8,174.40
                                                                                                                     $7,716,634.
                                                             -------------------------------------------------------------------------------------------
    Total.........................  ........................  ..............           2,069  ....................  217,760 hrs.;         ..............
                                                                                                                     $14,833,811.
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: April 19, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-08670 Filed 4-24-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                             Federal Register / Vol. 83, No. 80 / Wednesday, April 25, 2018 / Notices                                                 18019

                                                Line 880, currently owned by Spire                        Dated: April 19, 2018.                              guide.asp. For user assistance contact
                                                Missouri Inc. (Spire Missouri); 1 and (iii)             Nathaniel J. Davis, Sr.,                              FERC Online Support by email at
                                                minor modifications to Line 880 after it                Deputy Secretary.                                     ferconlinesupport@ferc.gov, or by phone
                                                is acquired. This notice set February 27,               [FR Doc. 2018–08613 Filed 4–24–18; 8:45 am]           at: (866) 208–3676 (toll-free), or (202)
                                                2017, as the deadline for motions to                    BILLING CODE 6717–01–P
                                                                                                                                                              502–8659 for TTY.
                                                intervene.                                                                                                       Docket: Users interested in receiving
                                                                                                                                                              automatic notification of activity in this
                                                   On May 1, 2017, in Docket No. CP17–
                                                                                                        DEPARTMENT OF ENERGY                                  docket or in viewing/downloading
                                                40–001, the Commission issued public
                                                                                                                                                              comments and issuances in this docket
                                                notice of Spire’s amendment to its                      Federal Energy Regulatory                             may do so at http://www.ferc.gov/docs-
                                                application to propose a route                          Commission                                            filing/docs-filing.asp.
                                                alternative. Instead of acquiring and
                                                                                                        [Docket No. IC18–9–000]                               FOR FURTHER INFORMATION CONTACT:
                                                refurbishing Spire Missouri’s Line 880,
                                                Spire’s amended application proposes                                                                          Ellen Brown may be reached by email
                                                to construct a new six-mile, 24-inch                    Commission Information Collection                     at DataClearance@FERC.gov, by
                                                diameter pipeline for the final segment                 Activities (FERC–725x); Comment                       telephone at (202) 502–8663, and by fax
                                                                                                        Request                                               at (202) 273–0873.
                                                of its proposal (referred to as the North
                                                County Extension). This notice set May                                                                        SUPPLEMENTARY INFORMATION:
                                                                                                        AGENCY:  Federal Energy Regulatory
                                                22, 2017, as the deadline for motions to                Commission, Department of Energy.                        Title: FERC–725X, Mandatory
                                                intervene.                                                                                                    Reliability Standards: Voltage and
                                                                                                        ACTION: Comment request.
                                                                                                                                                              Reactive (VAR) Standards.
                                                   Multiple motions to intervene out of                                                                          OMB Control No.: 1902–0278.
                                                time were filed between the                             SUMMARY:    In compliance with the
                                                                                                        requirements of the Paperwork                            Type of Request: Three-year extension
                                                intervention deadlines and December                                                                           of the FERC–725X information
                                                19, 2017. Here, because the deadline for                Reduction Act of 1995, the Federal
                                                                                                        Energy Regulatory Commission                          collection requirements with no changes
                                                filing a timely intervention passed                                                                           to the reporting requirements.
                                                before the Commission announced its                     (Commission or FERC) is submitting its
                                                                                                        information collection FERC–725X                         Abstract: Pursuant to Section 215 of
                                                new policy governing late interventions                                                                       the Federal Power Act (FPA), NERC
                                                in Tennessee Gas Pipeline Company,                      (Mandatory Reliability Standards:
                                                                                                        Voltage and Reactive (VAR) Standards)                 established the Voltage and Reactive
                                                L.L.C.,2 the late motions to intervene are                                                                    (VAR) group of Reliability Standards,
                                                                                                        to the Office of Management and Budget
                                                granted.3                                                                                                     which consists of two continent-wide
                                                                                                        (OMB) for review of the information
                                                  Dated: April 19, 2018.                                collection requirements. Any interested               Reliability Standards, VAR–001–4 and
                                                Kimberly D. Bose,                                       person may file comments directly with                VAR–002–3.1 These two standards were
                                                                                                        OMB and should address a copy of                      designed to maintain voltage stability on
                                                Secretary.
                                                                                                        those comments to the Commission as                   the Bulk-Power System, protect
                                                [FR Doc. 2018–08671 Filed 4–24–18; 8:45 am]
                                                                                                        explained below. The Commission                       transmission, generation, distribution,
                                                BILLING CODE 6717–01–P
                                                                                                        previously issued a Notice in the                     and customer equipment, and support
                                                                                                        Federal Register requesting public                    the reliable operation of the Bulk-Power
                                                                                                        comments. The Commission received no                  System. Voltage stability is the ability of
                                                DEPARTMENT OF ENERGY                                                                                          a power system to maintain acceptable
                                                                                                        comments on the FERC–725X and is
                                                                                                        making this notation in its submittal to              voltage levels throughout the system
                                                Federal Energy Regulatory                                                                                     under normal operating conditions and
                                                Commission                                              OMB.
                                                                                                                                                              following a disturbance. Failure to
                                                                                                        DATES: Comments on the collection of
                                                                                                                                                              maintain acceptable voltage levels (i.e.,
                                                [Docket Nos. PR17–60–001; PR17–60–002]                  information are due by May 25, 2018.
                                                                                                                                                              voltage levels become too high or too
                                                                                                        ADDRESSES: Comments filed with OMB,                   low) may cause violations of System
                                                Atmos Pipeline-Texas; Notice of                         identified by the OMB Control No.                     Operating Limits (SOLs) and
                                                Technical Conference                                    1902–0278, should be sent via email to                Interconnection Reliability Operating
                                                                                                        the Office of Information and Regulatory              Limits (IROLs), resulting in damage to
                                                   Take notice that an informal technical               Affairs: oira_submission@omb.gov.                     Bulk-Power System equipment, and
                                                conference concerning the above-                        Attention: Federal Energy Regulatory                  thereby threaten the reliable operation
                                                captioned proceedings will be convened                  Commission Desk Officer. The Desk                     of the Bulk-Power System.
                                                by phone on May 2, 2018, at 2:00 p.m.                   Officer may also be reached via
                                                (EDT). The purpose of the                               telephone at 202–395–8528.                            Reliability Standard VAR–001–4 2
                                                teleconference will be to discuss                          A copy of the comments should also                   Reliability Standard VAR–001–4
                                                comments filed in the proceeding.                       be sent to the Commission, in Docket                  contains the following requirements:
                                                   All interested parties are invited to                No. IC18–9–000, by either of the                        • Specify a system-wide voltage
                                                participate by phone. Please email                      following methods:                                    schedule (which is either a range or a
                                                Deirdra Archie at deirdra.archie@                          • eFiling at Commission’s website:                 target value with an associated tolerance
                                                ferc.gov or call (202) 502–6819 by                      http://www.ferc.gov/docs-filing/                      band) as part of its plan to operate
                                                                                                        efiling.asp.                                          within SOLs and IROLs, and to provide
                                                Tuesday, May 1, 2018, to RSVP and to
                                                                                                           • Mail/Hand Delivery/Courier:
sradovich on DSK3GMQ082PROD with NOTICES




                                                receive specific instructions on how to                                                                       the voltage schedule to its Reliability
                                                                                                        Federal Energy Regulatory Commission,                 Coordinator and adjacent Transmission
                                                participate.
                                                                                                        Secretary of the Commission, 888 First                Operators upon request (Requirement
                                                  1 Spire Missouri Inc. was formerly known as
                                                                                                        Street NE, Washington, DC 20426.                      R1);
                                                Laclede Gas Company.
                                                                                                           Instructions: All submissions must be
                                                  2 Tennessee Gas Pipeline Co., L.L.C., 162 FERC        formatted and filed in accordance with                 1 FERC approved these standards in the Order in

                                                61,167, at P 51 (2018).                                 submission guidelines at: http://                     Docket No. RD14–11–000 (issued on 8/1/2014).
                                                  3 18 CFR 385.214(d) (2017).                           www.ferc.gov/help/submission-                          2 Applies to generation operators only.




                                           VerDate Sep<11>2014   19:12 Apr 24, 2018   Jkt 244001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\25APN1.SGM   25APN1


                                                18020                                    Federal Register / Vol. 83, No. 80 / Wednesday, April 25, 2018 / Notices

                                                  • Schedule sufficient reactive                                                 completion, and the justification for                                                • Notify the Transmission Operator of
                                                resources to regulate voltage levels                                             these changes to Generator Owners                                                 a change in status of its voltage
                                                (Requirement R2);                                                                (Requirement R6).                                                                 controlling device within 30 minutes,
                                                  • Operate or direct the operation of                                           Reliability Standard VAR–002–3 3
                                                                                                                                                                                                                   unless the status is restored within that
                                                devices to regulate transmission voltage                                                                                                                           time period (Requirement R3);
                                                                                                                                    Reliability Standard VAR–002–3
                                                and reactive flows (Requirement R3);                                                                                                                                  • Notify the Transmission Operator of
                                                  • Develop a set of criteria to exempt                                          contains the following requirements:
                                                                                                                                    • Operate each of its generators                                               a change in reactive capability due to
                                                generators from certain requirements                                                                                                                               factors other than those described in
                                                                                                                                 connected to the interconnected
                                                under Reliability Standard VAR–002–3                                                                                                                               VAR–002–3, Requirement R3 within 30
                                                                                                                                 transmission system in automatic
                                                related to voltage or Reactive Power                                                                                                                               minutes unless the capability has been
                                                                                                                                 voltage control mode or in a different
                                                schedules, automatic voltage                                                                                                                                       restored during that time period
                                                                                                                                 control mode as instructed by the
                                                regulations, and notification                                                    Transmission Operator, unless the                                                 (Requirement R4).
                                                (Requirement R4);                                                                Generator Operator (1) is exempted                                                   • Provide information on its step-up
                                                  • Specify a voltage or Reactive Power                                          pursuant to the criteria developed under                                          transformers and auxiliary transformers
                                                schedule (which is either a range or a                                           VAR–001–4, Requirement R4, or (2)                                                 within 30 days of a request from the
                                                target value with an associated tolerance                                        makes certain notifications to the                                                Transmission Operator or Transmission
                                                band) for generators at either the high or                                       Transmission Operator specifying the                                              Planner (Requirement R5); and
                                                low voltage side of the generator step-                                          reasons it cannot so operate                                                         • Comply with the Transmission
                                                up transformer, provide the schedule to                                          (Requirement R1);                                                                 Operator’s step-up transformer tap
                                                the associated Generator Operator,                                                  • Maintain the Transmission                                                    change directives unless compliance
                                                direct the Generator Operator to comply                                          Operator’s generator voltage or Reactive                                          would violate safety, an equipment
                                                with that schedule in automatic voltage                                          Power schedule, unless the Generator                                              rating, or applicable laws, rules or
                                                control mode, provide the Generator                                              Operator (1) is exempted pursuant to the                                          regulations (Requirement R6).
                                                Operator the notification requirements                                           criteria developed under VAR–001–4,
                                                for deviating from the schedule, and, if                                         Requirement R4, or (2) complies with                                                 Type of Respondents: Generator
                                                requested, provide the Generator                                                 the notification requirements for                                                 operators and transmission operators.
                                                Operator the criteria used to develop the                                        deviations as established by the                                                     Estimate of Annual Burden: 4 The
                                                schedule (Requirement R5); and                                                   Transmission Owner pursuant to                                                    Commission estimates the annual public
                                                  • Communicate step-up transformer                                              Requirement R5 in VAR–001–4                                                       reporting burden for the information
                                                tap changes, the time frame for                                                  (Requirement R2);                                                                 collection as:
                                                                      FERC–725X, MANDATORY RELIABILITY STANDARDS: VOLTAGE AND REACTIVE (VAR) STANDARDS
                                                                                                                               Annual                                                     Average                                    Total annual                  Cost per
                                                                                                 Number of                    number of               Total number                        Burden &                                   burden hours                 respondent
                                                                                               respondents 5               responses per              of responses                        Cost per                                      & total                       ($)
                                                                                                                             respondent                                                  response 6                                   annual Cost

                                                                                                       (1)                          (2)               (1) * (2) = (3)                          (4)                                   (3) * (4) = (5)                 (5) ÷ (1)

                                                VAR–001–4 (Requirement                       181 (TOP) .........                                 1               181      160 hrs.; $10,899.20 .............                 28,960 hrs.; $1,972,755 ........         $10,899.20
                                                 R1–R6).
                                                VAR–002–3 (Requirement                       944 (GOP) .........                                 1               944      80 hrs.; 5,449.60 ...................              75,520 hrs.; $5,144,422 ........             5,449.60
                                                 R1).
                                                VAR–002–3 (Requirement                       944 (GOP) .........                                 1               944      120 hrs.; $8,174.40 ...............                113,280 hrs.; $7,716,634 ......              8,174.40
                                                 R2–R6).

                                                    Total ................................   ...........................   ........................            2,069      ................................................   217,760 hrs.; $14,833,811 ....     ........................



                                                  Comments: Comments are invited on:                                             of automated collection techniques or                                             DEPARTMENT OF ENERGY
                                                (1) Whether the collection of                                                    other forms of information technology.
                                                information is necessary for the proper                                                                                                                            Federal Energy Regulatory
                                                                                                                                   Dated: April 19, 2018.
                                                performance of the functions of the                                                                                                                                Commission
                                                                                                                                 Kimberly D. Bose,
                                                Commission, including whether the                                                                                                                                  [Docket No. PL18–1–000]
                                                                                                                                 Secretary.
                                                information will have practical utility;
                                                                                                                                 [FR Doc. 2018–08670 Filed 4–24–18; 8:45 am]                                       Certification of New Interstate Natural
                                                (2) the accuracy of the agency’s estimate
                                                of the burden and cost of the collection                                         BILLING CODE 6717–01–P                                                            Gas Facilities
                                                of information, including the validity of                                                                                                                          AGENCY: Federal Energy Regulatory
                                                the methodology and assumptions used;                                                                                                                              Commission, Department of Energy.
                                                (3) ways to enhance the quality, utility                                                                                                                           ACTION: Notice of Inquiry.
                                                and clarity of the information collection;
                                                and (4) ways to minimize the burden of                                                                                                                             SUMMARY:  In this Notice of Inquiry, the
                                                the collection of information on those                                                                                                                             Federal Energy Regulatory Commission
sradovich on DSK3GMQ082PROD with NOTICES




                                                who are to respond, including the use                                                                                                                              (Commission) seeks information and
                                                                                                                                                                                                                   stakeholder perspectives to help the
                                                  3 Applies  to transmission operators only.                                     explanation of what is included in the information                                  6 The estimate for hourly cost is $68.12/hour.
                                                  4 Burden  is defined as the total time, effort, or                             collection burden, reference 5 Code of Federal                                    This figure is the average salary plus benefits for an
                                                financial resources expended by persons to                                       Regulations 1320.3.                                                               electrical engineer (Occupation Code: 17–2071)
                                                generate, maintain, retain, or disclose or provide                                 5 TOP = transmission operator; GOP = generator                                  from the Bureau of Labor Statistics at https://
                                                information to or for a Federal agency. For further                              operators.                                                                        www.bls.gov/oes/current/naics2_22.htm.



                                           VerDate Sep<11>2014         19:12 Apr 24, 2018          Jkt 244001          PO 00000           Frm 00028      Fmt 4703       Sfmt 4703       E:\FR\FM\25APN1.SGM                   25APN1



Document Created: 2018-11-02 08:17:16
Document Modified: 2018-11-02 08:17:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionComment request.
DatesComments on the collection of information are due by May 25, 2018.
ContactEllen Brown may be reached by email at [email protected], by telephone at (202) 502-8663, and by fax at (202) 273-0873.
FR Citation83 FR 18019 