83_FR_21378 83 FR 21288 - Commission Information Collection Activities (FERC-917 and FERC-918); Comment Request; Extension

83 FR 21288 - Commission Information Collection Activities (FERC-917 and FERC-918); Comment Request; Extension

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 90 (May 9, 2018)

Page Range21288-21290
FR Document2018-09859

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is submitting its information collection FERC-917 (Electric Transmission Facilities) and FERC-918 (Standards for Business Practices and Communication Protocols for Public Utilities to the Office of Management and Budget (OMB)] for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission previously published a Notice in the Federal Register 2/6/2018 requesting public comments. The Commission received no comments on the FERC-917 nor the FERC-918 and is making this notation in its submittal to OMB.

Federal Register, Volume 83 Issue 90 (Wednesday, May 9, 2018)
[Federal Register Volume 83, Number 90 (Wednesday, May 9, 2018)]
[Notices]
[Pages 21288-21290]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-09859]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC18-5-000]


Commission Information Collection Activities (FERC-917 and FERC-
918); Comment Request; Extension

AGENCY: Federal Energy Regulatory Commission.

ACTION: Comment request.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is submitting its information collection FERC-917 (Electric 
Transmission Facilities) and FERC-918 (Standards for Business Practices 
and Communication Protocols for Public Utilities to the Office of 
Management and Budget (OMB)] for review of the information collection 
requirements. Any interested person may file comments directly with OMB 
and should address a copy of those comments to the Commission as 
explained below. The Commission previously published a Notice in the 
Federal Register 2/6/2018 requesting public comments. The Commission 
received no comments on the FERC-917 nor the FERC-918 and is making 
this notation in its submittal to OMB.

DATES: Comments on the collection of information are due by June 8, 
2018.

ADDRESSES: Comments filed with OMB, identified by the OMB Control No. 
1902-0233 (for both the FERC-917 and FERC-918), should be sent via 
email to the Office of Information and Regulatory Affairs: 
[email protected]. Attention: Federal Energy Regulatory 
Commission Desk Officer. The Desk Officer may also be reached via 
telephone at 202-395-8528.
    A copy of the comments should also be sent to the Commission, in 
Docket No. IC18-5-000, by either of the following methods:
     eFiling at Commission's website: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], by telephone at (202) 502-8663, and by fax at 
(202) 273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-917 (Electric Transmission Facilities) and FERC-918 
(Standards for Business Practices and Communication Protocols for 
Public Utilities.
    OMB Control No.: 1902-0233.
    Type of Request: Three-year extension of the FERC-917 and FERC-918 
information collection requirements with no changes to the reporting 
requirements.
    Abstract: On February 17, 2007, the Commission issued Order No. 890 
\1\ to address and remedy opportunities for undue discrimination under 
the pro forma Open Access Transmission Tariff (OATT) adopted in 1996 by 
Order No. 888.\2\ Through Order No. 890, the Commission:
---------------------------------------------------------------------------

    \1\ Final Rule in Docket Nos. RM05-17-000 and RM05-25-000, 
issued 2/16/2007.
    \2\ Promoting Wholesale Competition Through Open Access Non-
discriminatory Transmission Services by Public Utilities; Recovery 
of Stranded Costs by Public Utilities and Transmitting Utilities, 
Order No. 888, 61 FR 21540 (May 10, 1996), FERC Stats. & Regs. ] 
31,036 (1996), order on reh'g, Order No. 888-A, 62 FR 12274 (Mar. 
14, 1997), FERC Stats. & Regs. ] 31,048 (1997), order on reh'g, 
Order No. 888-B, 81 FERC ] 61,248 (1997), order on reh'g, Order No. 
888-C, 82 FERC ] 61,046 (1998), aff'd in relevant part sub nom. 
Transmission Access Policy Study Group v. FERC, 225 F.3d 667 (D.C. 
Cir. 2000), aff'd sub nom. New York v. FERC, 535 U.S. 1 (2002).
---------------------------------------------------------------------------

     Adopted pro forma OATT provisions necessary to keep 
imbalance charges closely related to incremental costs;
     Increased nondiscriminatory access to the grid by 
requiring public utilities, working through the North American Electric 
Reliability Corporation (NERC), to develop consistent methodologies for 
available transfer capability (ATC) calculation and to publish those 
methodologies to increase transparency;
     Required an open, transparent, and coordinated 
transmission planning process thereby increasing the ability of 
customers to access new generating resources and promote efficient 
utilization of transmission;
     Gave the right to customers to request from transmission 
providers, studies addressing congestion and/or integration of new 
resource loads in areas of the transmission system where they have 
encountered transmission problems due to congestion or where they 
believe upgrades and other investments may be necessary to reduce 
congestion and to integrate new resources;
     Required both the transmission provider's merchant 
function and network customers to include a statement with each 
application for network service or to designate a new network resource 
that attests, for each network resource identified, that the 
transmission customer owns or has committed to purchase the designated 
network resource and the designated network resource comports with the 
requirements for designated network resources. The network customer 
includes this attestation in the customer's comment section of the 
request when it confirms the request on the Open Access Same-Time 
Information System (OASIS);
     Required with regard to capacity reassignment that: (a) 
All sales or assignments of capacity be conducted through or otherwise 
posted on the transmission provider's OASIS on or before the date the 
reassigned service commences; (b) assignees of transmission capacity 
execute a service agreement prior to the date on which the reassigned 
service commences; and (c) transmission providers aggregate and 
summarize in an electric quarterly report the data contained in these 
service agreements;
     Adopted an operational penalties annual filing that 
provides information regarding the penalty revenue the transmission 
provider has received and distributed; and
     Required creditworthiness information to be included in a 
transmission provider's OATT. Attachment L must specify the qualitative 
and quantitative criteria that the transmission provider uses to

[[Page 21289]]

determine the level of secured and unsecured credit required.
    The Commission required a NERC/NAESB \3\ team to draft and review 
Order No. 890 reliability standards and business practices. The team 
was to solicit comment from each utility on developed standards and 
practices and utilities were to implement each, after Commission 
approval. Public utilities, working through NERC, were to revise 
reliability standards to require the exchange of data and coordination 
among transmission providers and, working through NAESB, were to 
develop complementary business practices.
---------------------------------------------------------------------------

    \3\ NAESB is the North American Energy Standards Board.
---------------------------------------------------------------------------

    Required OASIS postings included:

     Explanations for changes in ATC values;
     Capacity benefit margin (CBM) reevaluations and quarterly 
postings;
     OASIS metrics and accepted/denied requests;
     Planning redispatch offers and reliability redispatch 
data;
     Curtailment data;
     Planning and system impact studies;
     Metrics for system impact studies; and
     All rules.

    Incorporating the Order No. 890 standards into the Commission's 
regulations benefits wholesale electric customers by streamlining 
utility business practices, transactional processes, and OASIS 
procedures, and by adopting a formal ongoing process for reviewing and 
upgrading the Commission's OASIS standards and other electric industry 
business practices. These practices and procedures benefit from the 
implementation of generic industry standards.
    The Commission's Order No. 890 regulations can be found in 18 CFR 
35.28 (pro forma tariff requirements), and 37.6 and 37.7 (OASIS 
requirements).
    Type of Respondents: Provide information on any types of entities 
who respond to the information collection.
    Estimate of Annual Burden \4\: The estimated annual public 
reporting burdens for FERC-917 (requirements in 18 CFR 35.28) and FERC-
918 (requirements in 18 CFR 37.6 and 37.7) are reduced from the 
original estimates made three years ago. The reductions are due to the 
incorporation and completion of:
---------------------------------------------------------------------------

    \4\ The Commission defines burden as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.
---------------------------------------------------------------------------

     One-time pro forma tariff and standards changes by 
utilities in existence at that time, which would not be needed unless 
the tariff and/or standards are changed again; and
     completed development and comment solicitation of the 
required NERC/NAESB reliability standards and business practices. The 
other activities are annual ongoing requirements. The estimated annual 
figures follow:
---------------------------------------------------------------------------

    \5\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, refer to 5 Code of Federal Regulations 1320.3.

----------------------------------------------------------------------------------------------------------------
                                                                  Average number  Average burden
           FERC information collection             Annual number    of reponses    \5\ hours per   Total annual
                                                  of respondents  per respondent     response      burden hours
                                                             (1)             (2)             (3)     (1)x(2)x(3)
----------------------------------------------------------------------------------------------------------------
                                             18 CFR 35.28 (FERC-917)
----------------------------------------------------------------------------------------------------------------
Conforming tariff changes.......................               0               0               0               0
Revision of Imbalance Charges...................               0               0               0               0
ATC revisions...................................               0               0               0               0
Planning (Attachment K).........................             134               1             100          13,400
Congestion studies..............................             134               1             300          40,200
Attestation of network resource commitment......             134               1               1             134
Capacity reassignment...........................             134               1             100          13,400
Operational Penalty annual filing...............             134               1              10           1,340
Creditworthiness--include criteria in the tariff               0               0               0               0
                                                 ---------------------------------------------------------------
    FERC-917--Sub Total Part 35.................  ..............  ..............  ..............          68,474
----------------------------------------------------------------------------------------------------------------
                                          18 CFR 37.6 & 37.7 (FERC-918)
----------------------------------------------------------------------------------------------------------------
ATC-related standards:
    NERC/NAESB Team to develop..................               0               0               0               0
    Review and comment by utility...............               0               0               0               0
    Implementation by each utility..............               0               0               0               0
Mandatory data exchanges........................             134               1              80          10,720
Explanation of change of ATC values.............             134               1             100          13,400
Reevaluate CBM and post quarterly...............             134               1              20           2,680
Post OASIS metrics; requests accepted/denied....             134               1              90          12,060
Post planning redispatch offers and reliability              134               1              20           2,680
 redispatch data................................
Post curtailment data...........................             134               1              10           1,340
Post Planning and System Impact Studies.........             134               1               5             670
Posting of metrics for System Impact Studies....             134               1             100          13,400
Post all rules to OASIS.........................             134               1               5             670
    FERC-918--Recordkeeping Requirements........             134               1              40           5,360
                                                 ---------------------------------------------------------------
        FERC-918 -Sub Total of Part 37 Reporting  ..............  ..............  ..............          57,620
         Requirements...........................
                                                 ---------------------------------------------------------------

[[Page 21290]]

 
        FERC-918--Sub Total of Reporting and      ..............  ..............  ..............          62,980
         Recordkeeping Requirements.............
                                                 ---------------------------------------------------------------
        Total FERC-917 and FERC-918 (Part 35 +    ..............  ..............  ..............         131,454
         Part 37, Reporting and Recordkeeping
         Requirements)..........................
----------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: May 3, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-09859 Filed 5-8-18; 8:45 am]
 BILLING CODE 6717-01-P



                                             21288                         Federal Register / Vol. 83, No. 90 / Wednesday, May 9, 2018 / Notices

                                             time on the specified comment date.                        A copy of the comments should also                      • Increased nondiscriminatory access
                                             Protests may be considered, but                         be sent to the Commission, in Docket                    to the grid by requiring public utilities,
                                             intervention is necessary to become a                   No. IC18–5–000, by either of the                        working through the North American
                                             party to the proceeding.                                following methods:                                      Electric Reliability Corporation (NERC),
                                                eFiling is encouraged. More detailed                    • eFiling at Commission’s website:                   to develop consistent methodologies for
                                             information relating to filing                          http://www.ferc.gov/docs-filing/                        available transfer capability (ATC)
                                             requirements, interventions, protests,                  efiling.asp.                                            calculation and to publish those
                                             service, and qualifying facilities filings                 • Mail/Hand Delivery/Courier:                        methodologies to increase transparency;
                                             can be found at: http://www.ferc.gov/                   Federal Energy Regulatory Commission,                      • Required an open, transparent, and
                                             docs-filing/efiling/filing-req.pdf. For                 Secretary of the Commission, 888 First                  coordinated transmission planning
                                             other information, call (866) 208–3676                  Street NE, Washington, DC 20426.                        process thereby increasing the ability of
                                             (toll free). For TTY, call (202) 502–8659.                 Instructions: All submissions must be                customers to access new generating
                                                                                                     formatted and filed in accordance with                  resources and promote efficient
                                               Dated: May 3, 2018.
                                                                                                     submission guidelines at: http://                       utilization of transmission;
                                             Nathaniel J. Davis, Sr.,                                www.ferc.gov/help/submission-
                                             Deputy Secretary.                                                                                                  • Gave the right to customers to
                                                                                                     guide.asp. For user assistance contact                  request from transmission providers,
                                             [FR Doc. 2018–09850 Filed 5–8–18; 8:45 am]              FERC Online Support by email at                         studies addressing congestion and/or
                                             BILLING CODE 6717–01–P                                  ferconlinesupport@ferc.gov, or by phone
                                                                                                                                                             integration of new resource loads in
                                                                                                     at: (866) 208–3676 (toll-free), or (202)
                                                                                                                                                             areas of the transmission system where
                                                                                                     502–8659 for TTY.
                                             DEPARTMENT OF ENERGY                                       Docket: Users interested in receiving                they have encountered transmission
                                                                                                     automatic notification of activity in this              problems due to congestion or where
                                             Federal Energy Regulatory                               docket or in viewing/downloading                        they believe upgrades and other
                                             Commission                                              comments and issuances in this docket                   investments may be necessary to reduce
                                                                                                     may do so at http://www.ferc.gov/docs-                  congestion and to integrate new
                                             [Docket No. IC18–5–000]                                                                                         resources;
                                                                                                     filing/docs-filing.asp.
                                             Commission Information Collection                                                                                  • Required both the transmission
                                                                                                     FOR FURTHER INFORMATION CONTACT:
                                             Activities (FERC–917 and FERC–918);                                                                             provider’s merchant function and
                                                                                                     Ellen Brown may be reached by email
                                             Comment Request; Extension                                                                                      network customers to include a
                                                                                                     at DataClearance@FERC.gov, by
                                                                                                                                                             statement with each application for
                                                                                                     telephone at (202) 502–8663, and by fax
                                             AGENCY:  Federal Energy Regulatory                                                                              network service or to designate a new
                                                                                                     at (202) 273–0873.
                                             Commission.                                                                                                     network resource that attests, for each
                                                                                                     SUPPLEMENTARY INFORMATION:
                                             ACTION: Comment request.                                                                                        network resource identified, that the
                                                                                                        Title: FERC–917 (Electric
                                                                                                                                                             transmission customer owns or has
                                             SUMMARY:    In compliance with the                      Transmission Facilities) and FERC–918
                                                                                                                                                             committed to purchase the designated
                                             requirements of the Paperwork                           (Standards for Business Practices and
                                                                                                                                                             network resource and the designated
                                             Reduction Act of 1995, the Federal                      Communication Protocols for Public
                                                                                                     Utilities.                                              network resource comports with the
                                             Energy Regulatory Commission                                                                                    requirements for designated network
                                             (Commission or FERC) is submitting its                     OMB Control No.: 1902–0233.
                                                                                                        Type of Request: Three-year extension                resources. The network customer
                                             information collection FERC–917                                                                                 includes this attestation in the
                                                                                                     of the FERC–917 and FERC–918
                                             (Electric Transmission Facilities) and                                                                          customer’s comment section of the
                                                                                                     information collection requirements
                                             FERC–918 (Standards for Business                                                                                request when it confirms the request on
                                                                                                     with no changes to the reporting
                                             Practices and Communication Protocols                                                                           the Open Access Same-Time
                                                                                                     requirements.
                                             for Public Utilities to the Office of                      Abstract: On February 17, 2007, the                  Information System (OASIS);
                                             Management and Budget (OMB)] for                        Commission issued Order No. 890 1 to                       • Required with regard to capacity
                                             review of the information collection                    address and remedy opportunities for                    reassignment that: (a) All sales or
                                             requirements. Any interested person                     undue discrimination under the pro                      assignments of capacity be conducted
                                             may file comments directly with OMB                     forma Open Access Transmission Tariff                   through or otherwise posted on the
                                             and should address a copy of those                      (OATT) adopted in 1996 by Order No.                     transmission provider’s OASIS on or
                                             comments to the Commission as                           888.2 Through Order No. 890, the                        before the date the reassigned service
                                             explained below. The Commission                         Commission:                                             commences; (b) assignees of
                                             previously published a Notice in the                       • Adopted pro forma OATT                             transmission capacity execute a service
                                             Federal Register 2/6/2018 requesting                    provisions necessary to keep imbalance                  agreement prior to the date on which
                                             public comments. The Commission                         charges closely related to incremental                  the reassigned service commences; and
                                             received no comments on the FERC–917                    costs;                                                  (c) transmission providers aggregate and
                                             nor the FERC–918 and is making this                                                                             summarize in an electric quarterly
                                             notation in its submittal to OMB.                          1 Final Rule in Docket Nos. RM05–17–000 and          report the data contained in these
                                             DATES: Comments on the collection of                    RM05–25–000, issued 2/16/2007.                          service agreements;
                                                                                                                                                                • Adopted an operational penalties
                                                                                                        2 Promoting Wholesale Competition Through
                                             information are due by June 8, 2018.
                                                                                                     Open Access Non-discriminatory Transmission
                                             ADDRESSES: Comments filed with OMB,                     Services by Public Utilities; Recovery of Stranded      annual filing that provides information
                                             identified by the OMB Control No.                       Costs by Public Utilities and Transmitting Utilities,   regarding the penalty revenue the
                                             1902–0233 (for both the FERC–917 and                    Order No. 888, 61 FR 21540 (May 10, 1996), FERC         transmission provider has received and
amozie on DSK3GDR082PROD with NOTICES




                                                                                                     Stats. & Regs. ¶ 31,036 (1996), order on reh’g, Order
                                             FERC–918), should be sent via email to                  No. 888–A, 62 FR 12274 (Mar. 14, 1997), FERC
                                                                                                                                                             distributed; and
                                             the Office of Information and Regulatory                Stats. & Regs. ¶ 31,048 (1997), order on reh’g, Order      • Required creditworthiness
                                             Affairs: oira_submission@omb.gov.                       No. 888–B, 81 FERC ¶ 61,248 (1997), order on reh’g,     information to be included in a
                                             Attention: Federal Energy Regulatory                    Order No. 888–C, 82 FERC ¶ 61,046 (1998), aff’d in      transmission provider’s OATT.
                                                                                                     relevant part sub nom. Transmission Access Policy
                                             Commission Desk Officer. The Desk                       Study Group v. FERC, 225 F.3d 667 (D.C. Cir. 2000),
                                                                                                                                                             Attachment L must specify the
                                             Officer may also be reached via                         aff’d sub nom. New York v. FERC, 535 U.S. 1             qualitative and quantitative criteria that
                                             telephone at 202–395–8528.                              (2002).                                                 the transmission provider uses to


                                        VerDate Sep<11>2014   17:39 May 08, 2018   Jkt 244001   PO 00000   Frm 00032   Fmt 4703   Sfmt 4703   E:\FR\FM\09MYN1.SGM   09MYN1


                                                                                     Federal Register / Vol. 83, No. 90 / Wednesday, May 9, 2018 / Notices                                                                                            21289

                                             determine the level of secured and      • Planning redispatch offers and                                                                          and 37.6 and 37.7 (OASIS
                                             unsecured credit required.            reliability redispatch data;                                                                                requirements).
                                               The Commission required a NERC/       • Curtailment data;                                                                                          Type of Respondents: Provide
                                             NAESB 3 team to draft and review Order  • Planning and system impact                                                                              information on any types of entities who
                                             No. 890 reliability standards and     studies;                                                                                                    respond to the information collection.
                                             business practices. The team was to     • Metrics for system impact studies;                                                                         Estimate of Annual Burden 4: The
                                             solicit comment from each utility on  and                                                                                                         estimated annual public reporting
                                             developed standards and practices and   • All rules.                                                                                              burdens for FERC–917 (requirements in
                                             utilities were to implement each, after Incorporating the Order No. 890                                                                           18 CFR 35.28) and FERC–918
                                             Commission approval. Public utilities,standards into the Commission’s                                                                             (requirements in 18 CFR 37.6 and 37.7)
                                             working through NERC, were to revise  regulations benefits wholesale electric                                                                     are reduced from the original estimates
                                             reliability standards to require the  customers by streamlining utility                                                                           made three years ago. The reductions
                                             exchange of data and coordination     business practices, transactional                                                                           are due to the incorporation and
                                             among transmission providers and,     processes, and OASIS procedures, and                                                                        completion of:
                                             working through NAESB, were to        by adopting a formal ongoing process                                                                           • One-time pro forma tariff and
                                             develop complementary business        for reviewing and upgrading the                                                                             standards changes by utilities in
                                             practices.                            Commission’s OASIS standards and                                                                            existence at that time, which would not
                                               Required OASIS postings included:   other electric industry business                                                                            be needed unless the tariff and/or
                                                                                   practices. These practices and                                                                              standards are changed again; and
                                               • Explanations for changes in ATC   procedures benefit from the                                                                                    • completed development and
                                             values;                               implementation of generic industry                                                                          comment solicitation of the required
                                               • Capacity benefit margin (CBM)     standards.                                                                                                  NERC/NAESB reliability standards and
                                             reevaluations and quarterly postings;   The Commission’s Order No. 890                                                                            business practices. The other activities
                                               • OASIS metrics and accepted/denied regulations can be found in 18 CFR                                                                          are annual ongoing requirements. The
                                             requests;                             35.28 (pro forma tariff requirements),                                                                      estimated annual figures follow:

                                                                                                                                                                                               Average
                                                                                                                                                                    Annual                                               Average
                                                                                                                                                                                              number of                                          Total annual
                                                                                FERC information collection                                                       number of                                           burden 5 hours
                                                                                                                                                                                            reponses per                                         burden hours
                                                                                                                                                                 respondents                                           per response
                                                                                                                                                                                             respondent

                                                                                                                                                                         (1)                        (2)                        (3)                (1)×(2)×(3)

                                                                                                                                   18 CFR 35.28 (FERC–917)

                                             Conforming tariff changes ...............................................................................                             0                            0                        0                   0
                                             Revision of Imbalance Charges .......................................................................                                 0                            0                        0                   0
                                             ATC revisions ..................................................................................................                      0                            0                        0                   0
                                             Planning (Attachment K) ..................................................................................                          134                            1                      100              13,400
                                             Congestion studies ..........................................................................................                       134                            1                      300              40,200
                                             Attestation of network resource commitment ..................................................                                       134                            1                        1                 134
                                             Capacity reassignment ....................................................................................                          134                            1                      100              13,400
                                             Operational Penalty annual filing .....................................................................                             134                            1                       10               1,340
                                             Creditworthiness—include criteria in the tariff .................................................                                     0                            0                        0                   0

                                                   FERC–917—Sub Total Part 35 ................................................................                  ........................   ........................   ........................          68,474

                                                                                                                               18 CFR 37.6 & 37.7 (FERC–918)

                                             ATC-related standards:
                                                 NERC/NAESB Team to develop ..............................................................                                         0                            0                        0                   0
                                                 Review and comment by utility .................................................................                                   0                            0                        0                   0
                                                 Implementation by each utility ..................................................................                                 0                            0                        0                   0
                                             Mandatory data exchanges .............................................................................                              134                            1                       80              10,720
                                             Explanation of change of ATC values .............................................................                                   134                            1                      100              13,400
                                             Reevaluate CBM and post quarterly ...............................................................                                   134                            1                       20               2,680
                                             Post OASIS metrics; requests accepted/denied .............................................                                          134                            1                       90              12,060
                                             Post planning redispatch offers and reliability redispatch data .......................                                             134                            1                       20               2,680
                                             Post curtailment data .......................................................................................                       134                            1                       10               1,340
                                             Post Planning and System Impact Studies .....................................................                                       134                            1                        5                 670
                                             Posting of metrics for System Impact Studies ................................................                                       134                            1                      100              13,400
                                             Post all rules to OASIS ....................................................................................                        134                            1                        5                 670
                                                 FERC–918—Recordkeeping Requirements .............................................                                               134                            1                       40               5,360

                                                          FERC–918 -Sub Total of Part 37 Reporting Requirements .............                                   ........................   ........................   ........................          57,620
amozie on DSK3GDR082PROD with NOTICES




                                               3 NAESB is the North American Energy Standards                        further explanation of what is included in the                            information to or for a Federal agency. For further
                                             Board.                                                                  information collection burden, reference 5 Code of                        explanation of what is included in the information
                                               4 The Commission defines burden as the total                          Federal Regulations 1320.3.                                               collection burden, refer to 5 Code of Federal
                                             time, effort, or financial resources expended by                           5 Burden is defined as the total time, effort, or
                                                                                                                                                                                               Regulations 1320.3.
                                             persons to generate, maintain, retain, or disclose or                   financial resources expended by persons to
                                             provide information to or for a Federal agency. For                     generate, maintain, retain, or disclose or provide



                                        VerDate Sep<11>2014        18:53 May 08, 2018        Jkt 244001      PO 00000       Frm 00033       Fmt 4703      Sfmt 4703      E:\FR\FM\09MYN1.SGM                09MYN1


                                             21290                               Federal Register / Vol. 83, No. 90 / Wednesday, May 9, 2018 / Notices

                                                                                                                                                                                             Average
                                                                                                                                                                  Annual                                               Average
                                                                                                                                                                                            number of                                          Total annual
                                                                            FERC information collection                                                         number of                                           burden 5 hours
                                                                                                                                                                                          reponses per                                         burden hours
                                                                                                                                                               respondents                                           per response
                                                                                                                                                                                           respondent

                                                                                                                                                                       (1)                        (2)                        (3)                (1)×(2)×(3)

                                                      FERC–918—Sub Total of Reporting and Recordkeeping Require-
                                                        ments .............................................................................................   ........................   ........................   ........................          62,980

                                                      Total FERC–917 and FERC–918 (Part 35 + Part 37, Reporting
                                                        and Recordkeeping Requirements) ...............................................                       ........................   ........................   ........................        131,454



                                               Comments: Comments are invited on:                                    Accession Number: 20180503–5091.                                        requirements, interventions, protests,
                                             (1) Whether the collection of                                           Comments Due: 5 p.m. ET 5/24/18.                                        service, and qualifying facilities filings
                                             information is necessary for the proper                                 Docket Numbers: ER18–1464–002.                                          can be found at: http://www.ferc.gov/
                                             performance of the functions of the                                     Applicants: Midcontinent                                                docs-filing/efiling/filing-req.pdf. For
                                             Commission, including whether the                                    Independent System Operator, Inc.                                          other information, call (866) 208–3676
                                             information will have practical utility;                                Description: Tariff Amendment:                                          (toll free). For TTY, call (202) 502–8659.
                                             (2) the accuracy of the agency’s estimate                            2018–05–03_2nd Amendment to Sub-                                             Dated: May 3, 2018.
                                             of the burden and cost of the collection                             Regional Power Balance Constraints                                         Nathaniel J. Davis, Sr.,
                                             of information, including the validity of                            filing to be effective 6/27/2018.
                                                                                                                                                                                             Deputy Secretary.
                                             the methodology and assumptions used;                                   Filed Date: 5/3/18.
                                                                                                                     Accession Number: 20180503–5111.                                        [FR Doc. 2018–09849 Filed 5–8–18; 8:45 am]
                                             (3) ways to enhance the quality, utility
                                             and clarity of the information collection;                              Comments Due: 5 p.m. ET 5/24/18.                                        BILLING CODE 6717–01–P

                                             and (4) ways to minimize the burden of                                  Docket Numbers: ER18–1482–001.
                                             the collection of information on those                                  Applicants: Pacific Gas and Electric
                                             who are to respond, including the use                                Company.                                                                   DEPARTMENT OF ENERGY
                                             of automated collection techniques or                                   Description: Tariff Amendment: Errata
                                                                                                                                                                                             Federal Energy Regulatory
                                             other forms of information technology.                               to Q1 2018 Quarterly Filing of City and
                                                                                                                                                                                             Commission
                                               Dated: May 3, 2018.
                                                                                                                  County of San Francisco’s WDT SA to
                                                                                                                  be effective 3/31/2018.                                                    Notice of Document Labelling
                                             Nathaniel J. Davis, Sr.,
                                                                                                                     Filed Date: 5/3/18.                                                     Guidance for Documents Submitted to
                                             Deputy Secretary.                                                       Accession Number: 20180503–5053.
                                                                                                                                                                                             or Filed With the Commission or
                                             [FR Doc. 2018–09859 Filed 5–8–18; 8:45 am]                              Comments Due: 5 p.m. ET 5/24/18.
                                                                                                                                                                                             Commission Staff
                                             BILLING CODE 6717–01–P                                                  Docket Numbers: ER18–1507–000.
                                                                                                                     Applicants: PJM Interconnection,                                          Take notice that, pursuant to National
                                                                                                                  L.L.C.                                                                     Archives and Records Administration
                                             DEPARTMENT OF ENERGY                                                    Description: § 205(d) Rate Filing: First                                procedures for appropriate handling of
                                                                                                                  Revised ISA, SA No. 2013, Queue No.                                        documents (81 FR 63323 (Sept. 14,
                                             Federal Energy Regulatory                                            AC2–018 to be effective 4/11/2018.                                         2016)), the Federal Energy Regulatory
                                             Commission                                                              Filed Date: 5/2/18.                                                     Commission (Commission) will follow
                                             Combined Notice of Filings #2                                           Accession Number: 20180502–5186.                                        the Information Governance Policy and
                                                                                                                     Comments Due: 5 p.m. ET 5/23/18.                                        Guidelines for the Protection of
                                                Take notice that the Commission                                      Docket Numbers: ER18–1514–000.                                          Sensitive Information requirements as
                                             received the following electric rate                                    Applicants: Southern California                                         described in 18 CFR 388.112 and
                                             filings:                                                             Edison Company.                                                            388.113. As a result, every submission
                                                Docket Numbers: ER10–2641–031;                                       Description: § 205(d) Rate Filing: GIA                                  or filing with the Commission or
                                             ER10–1874–007; ER10–2663–032;                                        & DSA Goleta Energy Center Project SA                                      Commission staff that contains sensitive
                                             ER10–2881–032; ER10–2882–034;                                        Nos. 1004–1005 to be effective 5/4/2018.                                   material (as described below) should be
                                             ER10–2883–032; ER10–2884–032;                                           Filed Date: 5/3/18.                                                     labeled controlled unclassified
                                             ER10–2885–032; ER16–2509–003;                                           Accession Number: 20180503–5050.                                        information (CUI). The documents
                                             ER17–2400–003; ER17–2401–003;                                           Comments Due: 5 p.m. ET 5/24/18.                                        described below should be labeled as
                                             ER17–2403–003; ER17–2404–003.                                           The filings are accessible in the                                       follows:
                                                Applicants: Oleander Power Project,                               Commission’s eLibrary system by
                                                                                                                                                                                               Documents containing Critical Energy/
                                             Limited Partnership, Southern                                        clicking on the links or querying the                                      Electric Infrastructure Information (CEII), see
                                             Company—Florida LLC, Mankato                                         docket number.                                                             18 CFR 388.113, should include in a top
                                             Energy Center, LLC, Alabama Power                                       Any person desiring to intervene or                                     center header of each page of the document
                                             Company, Southern Power Company,                                     protest in any of the above proceedings                                    the following text: CUI//CEII.
                                             Mississippi Power Company, Georgia                                   must file in accordance with Rules 211                                       Documents containing information that
                                             Power Company, Gulf Power Company,                                   and 214 of the Commission’s                                                section 388.112 of the Commission’s
                                             Rutherford Farm, LLC, SP Butler Solar,                               Regulations (18 CFR 385.211 and                                            regulations, 18 CFR 388.112, recognizes as
amozie on DSK3GDR082PROD with NOTICES




                                             LLC, SP Decatur Parkway Solar, LLC, SP                               385.214) on or before 5:00 p.m. Eastern                                    privileged, and documents containing
                                                                                                                  time on the specified comment date.                                        information within the scope of protective
                                             Pawpaw Solar, LLC, SP Sandhills Solar,                                                                                                          orders and agreements in Commission
                                             LLC.                                                                 Protests may be considered, but                                            proceedings, should include in a top center
                                                Description: Notification of Change in                            intervention is necessary to become a                                      header of each page of the document the
                                             Status of Oleander Power Project,                                    party to the proceeding.                                                   following text: CUI//PRIV.
                                             Limited Partnership, et al.                                             eFiling is encouraged. More detailed                                      Documents containing multiple
                                                Filed Date: 5/3/18.                                               information relating to filing                                             information types, should reference each



                                        VerDate Sep<11>2014    18:53 May 08, 2018         Jkt 244001      PO 00000        Frm 00034       Fmt 4703      Sfmt 4703      E:\FR\FM\09MYN1.SGM                09MYN1



Document Created: 2018-05-09 03:17:27
Document Modified: 2018-05-09 03:17:27
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionComment request.
DatesComments on the collection of information are due by June 8, 2018.
ContactEllen Brown may be reached by email at [email protected], by telephone at (202) 502-8663, and by fax at (202) 273-0873.
FR Citation83 FR 21288 