83_FR_22143 83 FR 22051 - Commission Information Collection Activities; (FERC-725E); Comment Request; Revision

83 FR 22051 - Commission Information Collection Activities; (FERC-725E); Comment Request; Revision

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 92 (May 11, 2018)

Page Range22051-22053
FR Document2018-10006

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on revisions to the information collection, FERC-725E (Mandatory Reliability Standards for the Western Electric Coordinating Council), in Docket Nos. RD18-1-000, RD18-2-000, RD18-3-000, and RD18-5-000 and will be submitting FERC-725E to the Office of Management and Budget (OMB) for review of the information collection requirements.

Federal Register, Volume 83 Issue 92 (Friday, May 11, 2018)
[Federal Register Volume 83, Number 92 (Friday, May 11, 2018)]
[Notices]
[Pages 22051-22053]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-10006]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. RD18-1-000, RD18-2-000, RD18-3-000 and RD18-5-000]


Commission Information Collection Activities; (FERC-725E); 
Comment Request; Revision

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice of revised information collection and request for 
comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on revisions to the information 
collection, FERC-725E (Mandatory Reliability Standards for the Western 
Electric Coordinating Council), in Docket Nos. RD18-1-000, RD18-2-000, 
RD18-3-000, and RD18-5-000 and will be submitting FERC-725E to the 
Office of Management and Budget (OMB) for review of the information 
collection requirements.

DATES: Comments on the collection of information are due July 10, 2018.

ADDRESSES: You may submit comments identified by Docket Nos. RD18-1-
000, RD18-2-000, RD18-3-000, and RD18-5-000 by either of the following 
methods:
     eFiling at Commission's Website: http://www.ferc.gov/docs-filing/efiling.asp
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance, contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-725E, Mandatory Reliability Standards for the Western 
Electric Coordinating Council.
    OMB Control No.: 1902-0246.
    Type of Request: Revision to FERC-725E information collection 
requirements, as discussed in Docket Nos. RD18-1-000 and RD18-3-000.
    Abstract: The North American Electric Reliability Corporation 
(NERC) and Western Electricity Coordinating Council (WECC) filed four 
joint petitions to modify/retire WECC regional Reliability Standards.
    On March 8 2018, NERC and WECC filed a joint petition in Docket No. 
RD18-2-000 \1\ requesting Commission approval of:
---------------------------------------------------------------------------

    \1\ The joint petition and exhibits are posted in the 
Commission's eLibrary system in Docket No. RD18-2-000 (BAL-004-WECC-
3 Petition).
---------------------------------------------------------------------------

     Regional Reliability Standard BAL-004-WECC-3 (Automatic 
Time Error Correction), and
     the retirement of existing regional Reliability Standard 
BAL-004-WECC-2.
    The petition states: ``Regional Reliability Standard BAL-004-WECC-3

[[Page 22052]]

seeks to maintain Interconnection frequency and to ensure that Time 
Error Corrections and Primary Inadvertent Interchange (``PII'') payback 
are effectively conducted in a manner that does not adversely affect 
the reliability of the [Western] Interconnection.'' \2\ The proposed 
modifications to the standard focus on the entities using a common 
tool. All other proposed changes are for clarification. The Commission 
is not changing the reporting requirements, nor is it modifying the 
burden, cost or respondents with this collection, and sees this as a 
non-material or non-substantive change to a currently approved 
collection.
---------------------------------------------------------------------------

    \2\ BAL-004-WECC-3 Petition, page 1.
---------------------------------------------------------------------------

    On March 16, 2018, NERC and WECC filed a joint petition in Docket 
No. RD18-5-000 \3\ requesting Commission approval of:
---------------------------------------------------------------------------

    \3\ The joint petition and exhibits are posted in the 
Commission's eLibrary system in Docket No. RD18-5-000 (FAC-501-WECC-
2 Petition).
---------------------------------------------------------------------------

     Regional Reliability Standard FAC-501-WECC-2 (Transmission 
Maintenance), and
     the retirement of existing regional Reliability Standard 
FAC-501-WECC-1.
    The petition states: ``The purpose of FAC-501-WECC-2 is to ensure 
the Transmission Owner of a transmission path identified in the table 
titled ``Major WECC Transfer Paths in the Bulk Electric System'' 
(``WECC Transfer Path Table'' or ``Table''), including associated 
facilities, has a Transmission Maintenance and Inspection Plan 
(``TMIP'') and performs and documents maintenance and inspection 
activities in accordance with the TMIP.'' The modifications to the 
existing standard are for clarification of the transmission owner's 
obligations and to directly incorporate the list of applicable 
transmission paths. This list is currently posted on the WECC website 
and has not changed. The Commission is not changing reporting 
requirements nor is it modifying the burden, cost or respondents with 
this collection, and sees this as a non-material or non-substantive 
change to a currently approved collection.
    The Commission's request to OMB will reflect the following:
     Elimination of the burden associated with regional 
Reliability Standard VAR-002-WECC-2 (Automatic Voltage Regulators), 
which is proposed for retirement (addressed in Docket No. RD18-1 and 
discussed below); \4\
---------------------------------------------------------------------------

    \4\ The joint petition and exhibits are posted in the 
Commission's eLibrary system in Docket No. RD18-1-000 (VAR-002-WECC-
2 Petition).
---------------------------------------------------------------------------

     elimination of the burden associated with regional 
Reliability Standard PRC-004-WECC-2 (Protection System and Remedial 
Action Scheme Misoperation), which is proposed for retirement 
(addressed in Docket No. RD18-3 and discussed below) \5\
---------------------------------------------------------------------------

    \5\ The joint petition and exhibits are posted in the 
Commission's eLibrary system in Docket No. RD18-3-000 (WECC PRC-004-
WECC-2 Retirement Petition).
---------------------------------------------------------------------------

     non-material or non-substantive changes (discussed above) 
in Docket Nos. RD18-2 and RD18-5.
    On March 7, 2018, NERC and WECC filed a joint petition in Docket 
No. RD18-1-000 requesting Commission approval to retire the WECC 
regional Reliability Standard VAR-002-WECC-2 (Automatic Voltage 
Regulators). According to the petition, the purpose of the proposed 
retirement is based on WECC's experience with regional Reliability 
Standard VAR-002-WECC-2 which has shown that the reliability-related 
issues addressed in the regional standard are adequately addressed by 
the continent-wide voltage and reactive (``VAR'') Reliability Standards 
\6\ and that retention of the regional standard would not provide 
additional benefits for reliability.
---------------------------------------------------------------------------

    \6\ The burdens related to continent-wide Reliability Standards 
VAR-001-4.2 (Voltage and Reactive Control) and VAR-002-4.1 
(Generator Operation for Maintenance Network Voltage Schedules) are 
included in FERC-725A (Mandatory Reliability Standards for the Bulk-
Power System, OMB Control No. 1902-0244).
---------------------------------------------------------------------------

    On March 9, 2018, NERC and WECC filed a joint petition in Docket 
No. RD18-3-000 requesting Commission approval to retire the WECC 
regional Reliability Standard PRC-004-WECC-2 (Protection System and 
Remedial Action Scheme Misoperation). The purpose of the proposed 
retirement is based on NERC and WECC's belief that since the initial 
development of this regional standard, other continent-wide Reliability 
Standards \7\ have been developed that have made the requirements of 
this regional Reliability Standard redundant and no longer necessary 
for reliability in the Western Interconnection.
---------------------------------------------------------------------------

    \7\ The burdens related to continent-wide Reliability Standards 
mentioned in the petition: FAC-003-4 (Transmission Vegetation 
Management) are included in FERC-725M (Mandatory Reliability 
Standards for the Bulk-Power System, OMB Control No. 1902-0263); 
PRC-001-1.1(ii) (System Protection Coordination) are included in 
FERC-725A (Mandatory Reliability Standards for the Bulk-Power 
System, OMB Control No. 1902-0244); PRC-004-5(i) (Protection System 
Misoperation Identification and Correction), PRC-005-6 (Protection 
System, Automatic Reclosing, and Sudden Pressure Relaying 
Maintenance), PRC-012-2 (Remedial Action Schemes) are included in 
FERC-725G (Mandatory Reliability Standards for the Bulk-Power 
System: PRC Standards, OMB Control No. 1902-0252); PRC-016-1 
(Remedial Action Scheme Misoperations), PRC-017-1 (Remedial Action 
Scheme Maintenance and Testing), TOP-001-3 (Transmission Operations) 
and TOP-003-3 (Operational Reliability Data) are included in FERC-
725A (Mandatory Reliability Standards for the Bulk-Power System, OMB 
Control No. 1902-0244).
---------------------------------------------------------------------------

    Type of Respondents: Transmission owners, transmission operators, 
generator operators, and generator owners.
    Estimate of Annual Burden: \8\ Details follow on the changes in 
Docket Nos. RD18-1-000 and RD18-3-000 which will be submitted to OMB 
for approval in a consolidated package under FERC-725E.
---------------------------------------------------------------------------

    \8\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, refer to 5 Code of Federal Regulations 1320.3.
---------------------------------------------------------------------------

    Estimate of Changes to Burden Due to Docket No. RD18-1: The 
Commission estimates the reduction in the annual public reporting 
burden for the FERC-725E (due to the retirement of regional Reliability 
Standard VAR-002-WECC-2) as follows: 9 10
---------------------------------------------------------------------------

    \9\ The reductions in burden and cost shown in the table are the 
same figures as those in the current OMB-approved inventory for the 
reporting and recordkeeping requirements that are now being retired.
    \10\ The hourly cost (for salary plus benefits) uses the figures 
from the Bureau of Labor Statistics for three positions involved in 
the reporting and recordkeeping requirements. These figures include 
salary (http://bls.gov/oes/current/naics2_22.htm) and benefits 
(http://www.bls.gov/news.release/ecec.nr0.htm) and are: Manager: 
$89.07/hour, Engineer: $64.91/hour, and File Clerk: $31.19/hour.
    The hourly cost for the reporting requirements ($76.99) is an 
average of the cost of a manager and engineer. The hourly cost for 
recordkeeping requirements uses the cost of a file clerk.aaaa

[[Page 22053]]



            FERC-725E, Mandatory Reliability Standards for the Western Electric Coordinating Council, Reductions Due to Docket No. RD18-1-000
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                    Annual
                                                  number of                                               Total annual burden
              Entity                 Number of    responses    Annual number  Average burden  hours and    hours and  total     Cost per respondent ($)
                                    respondents      per       of responses     cost per response ($)       annual cost ($)
                                                  respondent
                                            (1)          (2)     (1) * (2) =  (4)......................  (3) * (4) = (5).....  (5) / (1) = (6)
                                                                         (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                  Retirement of Regional Reliability Standard VAR-002-WECC-2 and Associated Reductions
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                            Reporting Requirements (Annually)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Generator Operators...............          228            1             228  10 hr.; $769.90..........  2,280 hr.; $175,537   $770 (reduction).
                                                                                                          (reduction).
Transmission Operators applicable            86            4             344  10 hr.; $769.90..........  3,440 hr.; $264,846   $3,080 (reduction).
 to standard VAR-002.                                                                                     (reduction).
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                          Recordkeeping Requirements (Annually)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Generator Operators...............          228            1             228  1 hr.; $31.19............  228 hr.; $7,111       $31 (reduction).
                                                                                                          (reduction).
Transmission Operators applicable            86            1              86  4 hr.; $124.76...........  344 hr.; $10,729      $125 (reduction).
 to standard VAR-002.                                                                                     (reduction).
                                   ---------------------------------------------------------------------------------------------------------------------
    Total Reduction...............  ...........  ...........             886  .........................  6,292 hr.; $458,223   .........................
                                                                                                          (reduction).
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Estimate of Changes to Burden Due to Docket No. RD18-3: The 
Commission estimates the reduction in the annual public reporting 
burden for the FERC-725E (due to the retirement of regional Reliability 
Standard PRC-004-WECC-2) as follows: 11 12
---------------------------------------------------------------------------

    \11\ The reductions in burden and cost shown in the table are 
the same figures as those in the current OMB-approved inventory for 
the reporting and recordkeeping requirements, now being retired.
    \12\ The hourly cost (for salary plus benefits) uses the figures 
from the Bureau of Labor Statistics for three positions involved in 
the reporting and recordkeeping requirements. These figures include 
salary (http://bls.gov/oes/current/naics2_22.htm) and benefits 
(http://www.bls.gov/news.release/ecec.nr0.htm) and are: Manager: 
$89.07/hour, Engineer: $64.91/hour, and File Clerk: $31.19/hour.
    The hourly cost for the reporting requirements ($76.99) is an 
average of the cost of a manager and engineer. The hourly cost for 
recordkeeping requirements uses the cost of a file clerk.

            FERC-725E, Mandatory Reliability Standards for the Western Electric Coordinating Council, Reductions Due to Docket No. RD18-3-000
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                    Annual
                                                  number of                                               Total annualburden
              Entity                 Number of    responses    Annual number  Average burden  hours and     hours and total     Cost per respondent ($)
                                    respondents      per       of responses     cost per response ($)       annual cost ($)
                                                  respondent
                                            (1)          (2)     (1) * (2) =  (4)......................  (3) * (4) = (5).....  (5) / (1) = (6)
                                                                         (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                  Retirement of Regional Reliability Standard PRC-004-WECC-2 and Associated Reductions
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                            Reporting Requirements (Annually)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Transmission Owners that operate              5            2              10  40 hr.; $3,079.60........  400 hr.; $30,796      $6,159 (reduction).
 qualified transfer paths.                                                                                (reduction).
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                          Recordkeeping Requirements (Annually)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Transmission Owners that operate              5            1               5  6 hr.; $187.14...........  30 hr.; $936          $187 (reduction).
 qualified transfer paths.                                                                                (reduction).
                                   ---------------------------------------------------------------------------------------------------------------------
    Total Reduction...............  ...........  ...........              15  .........................  430 hr.; $31,732      .........................
                                                                                                          (reduction).
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Total Reduction in Burden for FERC-725E, for Submittal to OMB. The 
total reduction in burden due to the proposed retirements of regional 
Reliability Standards VAR-002-WECC-2 and PRC-004-WECC-2 is detailed 
below:
     Total Reduction of Annual Responses: 901.
     Total Reduction of Burden Hours: 6,722.
     Total Reduction of Burden Cost: $489,955.
    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: May 4, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-10006 Filed 5-10-18; 8:45 am]
BILLING CODE 6717-01-P



                                                                                 Federal Register / Vol. 83, No. 92 / Friday, May 11, 2018 / Notices                                                     22051

                                                and 214 of the Commission’s                             not serve to make protestants parties to              000, RD18–3–000, and RD18–5–000 and
                                                Regulations (18 CFR 385.211 and                         the proceeding. Any person wishing to                 will be submitting FERC–725E to the
                                                385.214) on or before 5:00 p.m. Eastern                 become a party must file a notice of                  Office of Management and Budget
                                                time on the specified comment date.                     intervention or motion to intervene, as               (OMB) for review of the information
                                                Protests may be considered, but                         appropriate. The Respondents’ answer                  collection requirements.
                                                intervention is necessary to become a                   and all interventions, or protests must               DATES: Comments on the collection of
                                                party to the proceeding.                                be filed on or before the comment date.               information are due July 10, 2018.
                                                   eFiling is encouraged. More detailed                 The Respondents’ answer, motions to                   ADDRESSES: You may submit comments
                                                information relating to filing                          intervene, and protests must be served                identified by Docket Nos. RD18–1–000,
                                                requirements, interventions, protests,                  on the Complainant.                                   RD18–2–000, RD18–3–000, and RD18–
                                                service, and qualifying facilities filings                 The Commission encourages                          5–000 by either of the following
                                                can be found at: http://www.ferc.gov/                   electronic submission of protests and                 methods:
                                                docs-filing/efiling/filing-req.pdf. For                 interventions in lieu of paper using the                 • eFiling at Commission’s Website:
                                                other information, call (866) 208–3676                  ‘‘eFiling’’ link at http://www.ferc.gov.              http://www.ferc.gov/docs-filing/
                                                (toll free). For TTY, call (202) 502–8659.              Persons unable to file electronically                 efiling.asp
                                                                                                        should submit an original and 5 copies                   • Mail/Hand Delivery/Courier:
                                                  Dated: May 4, 2018.
                                                                                                        of the protest or intervention to the                 Federal Energy Regulatory Commission,
                                                Nathaniel J. Davis, Sr.,                                Federal Energy Regulatory Commission,
                                                Deputy Secretary.
                                                                                                                                                              Secretary of the Commission, 888 First
                                                                                                        888 First Street NE, Washington, DC                   Street NE, Washington, DC 20426.
                                                [FR Doc. 2018–10001 Filed 5–10–18; 8:45 am]             20426.                                                   Instructions: All submissions must be
                                                BILLING CODE 6717–01–P                                     This filing is accessible on-line at               formatted and filed in accordance with
                                                                                                        http://www.ferc.gov, using the                        submission guidelines at: http://
                                                                                                        ‘‘eLibrary’’ link and is available for                www.ferc.gov/help/submission-
                                                DEPARTMENT OF ENERGY                                    review in the Commission’s Public                     guide.asp. For user assistance, contact
                                                                                                        Reference Room in Washington, DC.                     FERC Online Support by email at
                                                Federal Energy Regulatory                               There is an ‘‘eSubscription’’ link on the
                                                Commission                                                                                                    ferconlinesupport@ferc.gov, or by phone
                                                                                                        website that enables subscribers to                   at: (866) 208–3676 (toll-free), or (202)
                                                [Docket No. EL18–143–000]                               receive email notification when a                     502–8659 for TTY.
                                                                                                        document is added to a subscribed                        Docket: Users interested in receiving
                                                Notice of Complaint: Public Service                     docket(s). For assistance with any FERC               automatic notification of activity in this
                                                Electric and Gas Company v.                             Online service, please email                          docket or in viewing/downloading
                                                Consolidated Edison Company of New                      FERCOnlineSupport@ferc.gov, or call                   comments and issuances in this docket
                                                York, Inc.                                              (866) 208–3676 (toll free). For TTY, call             may do so at http://www.ferc.gov/docs-
                                                                                                        (202) 502–8659.                                       filing/docs-filing.asp.
                                                   Take notice that on May 3, 2018,                        Comment Date: 5:00 p.m. Eastern
                                                pursuant to sections 206, 306, and 309                                                                        FOR FURTHER INFORMATION CONTACT:
                                                                                                        Time on May 23, 2018.
                                                of the Federal Power Act, 16 U.S.C.                                                                           Ellen Brown may be reached by email
                                                824e, 825e, and 825h and Rule 206 of                      Dated: May 4, 2018.                                 at DataClearance@FERC.gov, telephone
                                                the Federal Energy Regulatory                           Nathaniel J. Davis, Sr.,                              at (202) 502–8663, and fax at (202) 273–
                                                Commission’s (Commission) Rules of                      Deputy Secretary.                                     0873.
                                                Practice and Procedure, 18 CFR 385.206,                 [FR Doc. 2018–10005 Filed 5–10–18; 8:45 am]           SUPPLEMENTARY INFORMATION:
                                                Public Service Electric and Gas                         BILLING CODE 6717–01–P                                   Title: FERC–725E, Mandatory
                                                Company (Complainant) filed a formal                                                                          Reliability Standards for the Western
                                                complaint against Consolidated Edison                                                                         Electric Coordinating Council.
                                                Company of New York, Inc.                               DEPARTMENT OF ENERGY                                     OMB Control No.: 1902–0246.
                                                (Respondent) alleging that Respondent                                                                            Type of Request: Revision to FERC–
                                                is preventing the removal of dielectric                 Federal Energy Regulatory                             725E information collection
                                                fluid that recently leaked from electric                Commission                                            requirements, as discussed in Docket
                                                transmission facilities known as the B                  [Docket Nos. RD18–1–000, RD18–2–000,                  Nos. RD18–1–000 and RD18–3–000.
                                                and C lines that Complainant and                        RD18–3–000 and RD18–5–000]                               Abstract: The North American
                                                Respondent co-own. Complainant                                                                                Electric Reliability Corporation (NERC)
                                                asserts that good utility practice requires             Commission Information Collection                     and Western Electricity Coordinating
                                                the removal of the dielectric fluid and                 Activities; (FERC–725E); Comment                      Council (WECC) filed four joint
                                                retirement of the B and C lines as                      Request; Revision                                     petitions to modify/retire WECC
                                                currently constructed, as more fully                                                                          regional Reliability Standards.
                                                                                                        AGENCY:  Federal Energy Regulatory                       On March 8 2018, NERC and WECC
                                                explained in the complaint.                             Commission.
                                                   Complainant certifies that copies of                                                                       filed a joint petition in Docket No.
                                                                                                        ACTION: Notice of revised information                 RD18–2–000 1 requesting Commission
                                                the complaint were served on contacts                   collection and request for comments.
                                                for the Respondent, the New York                                                                              approval of:
                                                Public Service Commission, and the                      SUMMARY:  In compliance with the                         • Regional Reliability Standard BAL–
                                                New Jersey Board of Public Utilities.                   requirements of the Paperwork                         004–WECC–3 (Automatic Time Error
                                                   Any person desiring to intervene or to               Reduction Act of 1995, the Federal                    Correction), and
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                                 • the retirement of existing regional
                                                protest this filing must file in                        Energy Regulatory Commission
                                                                                                                                                              Reliability Standard BAL–004–WECC–2.
                                                accordance with Rules 211 and 214 of                    (Commission or FERC) is soliciting                       The petition states: ‘‘Regional
                                                the Commission’s Rules of Practice and                  public comment on revisions to the                    Reliability Standard BAL–004–WECC–3
                                                Procedure (18 CFR 385.211 and                           information collection, FERC–725E
                                                385.214). Protests will be considered by                (Mandatory Reliability Standards for the                1 The joint petition and exhibits are posted in the
                                                the Commission in determining the                       Western Electric Coordinating Council),               Commission’s eLibrary system in Docket No. RD18–
                                                appropriate action to be taken, but will                in Docket Nos. RD18–1–000, RD18–2–                    2–000 (BAL–004–WECC–3 Petition).



                                           VerDate Sep<11>2014   19:21 May 10, 2018   Jkt 244001   PO 00000   Frm 00055   Fmt 4703   Sfmt 4703   E:\FR\FM\11MYN1.SGM   11MYN1


                                                22052                            Federal Register / Vol. 83, No. 92 / Friday, May 11, 2018 / Notices

                                                seeks to maintain Interconnection                       (Automatic Voltage Regulators), which                   developed that have made the
                                                frequency and to ensure that Time Error                 is proposed for retirement (addressed in                requirements of this regional Reliability
                                                Corrections and Primary Inadvertent                     Docket No. RD18–1 and discussed                         Standard redundant and no longer
                                                Interchange (‘‘PII’’) payback are                       below); 4                                               necessary for reliability in the Western
                                                effectively conducted in a manner that                     • elimination of the burden                          Interconnection.
                                                does not adversely affect the reliability               associated with regional Reliability                      Type of Respondents: Transmission
                                                of the [Western] Interconnection.’’ 2 The               Standard PRC–004–WECC–2 (Protection                     owners, transmission operators,
                                                proposed modifications to the standard                  System and Remedial Action Scheme                       generator operators, and generator
                                                focus on the entities using a common                    Misoperation), which is proposed for                    owners.
                                                tool. All other proposed changes are for                retirement (addressed in Docket No.
                                                clarification. The Commission is not                                                                              Estimate of Annual Burden: 8 Details
                                                                                                        RD18–3 and discussed below) 5
                                                changing the reporting requirements,                       • non-material or non-substantive                    follow on the changes in Docket Nos.
                                                nor is it modifying the burden, cost or                 changes (discussed above) in Docket                     RD18–1–000 and RD18–3–000 which
                                                respondents with this collection, and                   Nos. RD18–2 and RD18–5.                                 will be submitted to OMB for approval
                                                sees this as a non-material or non-                        On March 7, 2018, NERC and WECC                      in a consolidated package under FERC–
                                                substantive change to a currently                       filed a joint petition in Docket No.                    725E.
                                                approved collection.                                    RD18–1–000 requesting Commission                          Estimate of Changes to Burden Due to
                                                   On March 16, 2018, NERC and WECC                     approval to retire the WECC regional                    Docket No. RD18–1: The Commission
                                                filed a joint petition in Docket No.                    Reliability Standard VAR–002–WECC–2                     estimates the reduction in the annual
                                                RD18–5–000 3 requesting Commission                      (Automatic Voltage Regulators).                         public reporting burden for the FERC–
                                                approval of:                                            According to the petition, the purpose                  725E (due to the retirement of regional
                                                   • Regional Reliability Standard FAC–                 of the proposed retirement is based on                  Reliability Standard VAR–002–WECC–
                                                501–WECC–2 (Transmission                                WECC’s experience with regional                         2) as follows: 9 10
                                                Maintenance), and                                       Reliability Standard VAR–002–WECC–2
                                                   • the retirement of existing regional                which has shown that the reliability-                   Standards for the Bulk-Power System, OMB Control
                                                Reliability Standard FAC–501–WECC–1.                    related issues addressed in the regional                No. 1902–0263); PRC–001–1.1(ii) (System
                                                   The petition states: ‘‘The purpose of                standard are adequately addressed by
                                                                                                                                                                Protection Coordination) are included in FERC–
                                                FAC–501–WECC–2 is to ensure the                                                                                 725A (Mandatory Reliability Standards for the
                                                                                                        the continent-wide voltage and reactive                 Bulk-Power System, OMB Control No. 1902–0244);
                                                Transmission Owner of a transmission                    (‘‘VAR’’) Reliability Standards 6 and that              PRC–004–5(i) (Protection System Misoperation
                                                path identified in the table titled ‘‘Major             retention of the regional standard would                Identification and Correction), PRC–005–6
                                                WECC Transfer Paths in the Bulk                         not provide additional benefits for
                                                                                                                                                                (Protection System, Automatic Reclosing, and
                                                Electric System’’ (‘‘WECC Transfer Path                                                                         Sudden Pressure Relaying Maintenance), PRC–012–
                                                                                                        reliability.                                            2 (Remedial Action Schemes) are included in
                                                Table’’ or ‘‘Table’’), including associated                On March 9, 2018, NERC and WECC                      FERC–725G (Mandatory Reliability Standards for
                                                facilities, has a Transmission                          filed a joint petition in Docket No.                    the Bulk-Power System: PRC Standards, OMB
                                                Maintenance and Inspection Plan                         RD18–3–000 requesting Commission                        Control No. 1902–0252); PRC–016–1 (Remedial
                                                (‘‘TMIP’’) and performs and documents                                                                           Action Scheme Misoperations), PRC–017–1
                                                                                                        approval to retire the WECC regional                    (Remedial Action Scheme Maintenance and
                                                maintenance and inspection activities in                Reliability Standard PRC–004–WECC–2                     Testing), TOP–001–3 (Transmission Operations)
                                                accordance with the TMIP.’’ The                                                                                 and TOP–003–3 (Operational Reliability Data) are
                                                                                                        (Protection System and Remedial Action
                                                modifications to the existing standard                                                                          included in FERC–725A (Mandatory Reliability
                                                                                                        Scheme Misoperation). The purpose of
                                                are for clarification of the transmission                                                                       Standards for the Bulk-Power System, OMB Control
                                                                                                        the proposed retirement is based on                     No. 1902–0244).
                                                owner’s obligations and to directly
                                                                                                        NERC and WECC’s belief that since the                      8 Burden is defined as the total time, effort, or
                                                incorporate the list of applicable
                                                                                                        initial development of this regional                    financial resources expended by persons to
                                                transmission paths. This list is currently                                                                      generate, maintain, retain, or disclose or provide
                                                                                                        standard, other continent-wide
                                                posted on the WECC website and has                                                                              information to or for a Federal agency. For further
                                                                                                        Reliability Standards 7 have been                       explanation of what is included in the information
                                                not changed. The Commission is not
                                                                                                                                                                collection burden, refer to 5 Code of Federal
                                                changing reporting requirements nor is                    4 The joint petition and exhibits are posted in the   Regulations 1320.3.
                                                it modifying the burden, cost or                        Commission’s eLibrary system in Docket No. RD18–           9 The reductions in burden and cost shown in the
                                                respondents with this collection, and                   1–000 (VAR–002–WECC–2 Petition).                        table are the same figures as those in the current
                                                sees this as a non-material or non-                       5 The joint petition and exhibits are posted in the   OMB-approved inventory for the reporting and
                                                substantive change to a currently                       Commission’s eLibrary system in Docket No. RD18–        recordkeeping requirements that are now being
                                                                                                        3–000 (WECC PRC–004–WECC–2 Retirement                   retired.
                                                approved collection.                                    Petition).                                                 10 The hourly cost (for salary plus benefits) uses
                                                   The Commission’s request to OMB                        6 The burdens related to continent-wide               the figures from the Bureau of Labor Statistics for
                                                will reflect the following:                             Reliability Standards VAR–001–4.2 (Voltage and          three positions involved in the reporting and
                                                   • Elimination of the burden                          Reactive Control) and VAR–002–4.1 (Generator            recordkeeping requirements. These figures include
                                                associated with regional Reliability                    Operation for Maintenance Network Voltage               salary (http://bls.gov/oes/current/naics2_22.htm)
                                                                                                        Schedules) are included in FERC–725A (Mandatory         and benefits (http://www.bls.gov/news.release/
                                                Standard VAR–002–WECC–2                                 Reliability Standards for the Bulk-Power System,        ecec.nr0.htm) and are: Manager: $89.07/hour,
                                                                                                        OMB Control No. 1902–0244).                             Engineer: $64.91/hour, and File Clerk: $31.19/hour.
                                                  2 BAL–004–WECC–3      Petition, page 1.                 7 The burdens related to continent-wide                  The hourly cost for the reporting requirements
                                                  3 Thejoint petition and exhibits are posted in the    Reliability Standards mentioned in the petition:        ($76.99) is an average of the cost of a manager and
                                                Commission’s eLibrary system in Docket No. RD18–        FAC–003–4 (Transmission Vegetation Management)          engineer. The hourly cost for recordkeeping
                                                5–000 (FAC–501–WECC–2 Petition).                        are included in FERC–725M (Mandatory Reliability        requirements uses the cost of a file clerk.
sradovich on DSK3GMQ082PROD with NOTICES




                                           VerDate Sep<11>2014   19:21 May 10, 2018   Jkt 244001   PO 00000   Frm 00056   Fmt 4703   Sfmt 4703   E:\FR\FM\11MYN1.SGM     11MYN1


                                                                                            Federal Register / Vol. 83, No. 92 / Friday, May 11, 2018 / Notices                                                                                                          22053

                                                 FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL, REDUCTIONS
                                                                                    DUE TO DOCKET NO. RD18–1–000
                                                                                                                                           Annual                                       Average burden
                                                                                                                                         number of                   Annual                                             Total annual burden hours and                Cost per
                                                                                                              Number of                                                                hours and cost per
                                                                       Entity                                                            responses                 number of                                                   total annual cost                    respondent
                                                                                                             respondents                                                                   response
                                                                                                                                            per                    responses                                                           ($)                              ($)
                                                                                                                                                                                              ($)
                                                                                                                                        respondent

                                                                                                                     (1)                       (2)               (1) * (2) = (3)                    (4)                           (3) * (4) = (5)                 (5) ÷ (1) = (6)

                                                                                            Retirement of Regional Reliability Standard VAR–002–WECC–2 and Associated Reductions

                                                                                                                                                 Reporting Requirements (Annually)

                                                Generator Operators .................................                      228                             1                 228      10 hr.; $769.90 .....             2,280 hr.; $175,537 (reduction)         $770 (reduction).
                                                Transmission Operators applicable to                                        86                             4                 344      10 hr.; $769.90 .....             3,440 hr.; $264,846 (reduction)         $3,080 (reduction).
                                                  standard VAR–002.

                                                                                                                                             Recordkeeping Requirements (Annually)

                                                Generator Operators .................................                      228                             1                 228      1 hr.; $31.19 .........           228 hr.; $7,111 (reduction) ......      $31 (reduction).
                                                Transmission Operators applicable to                                        86                             1                  86      4 hr.; $124.76 .......            344 hr.; $10,729 (reduction) ....       $125 (reduction).
                                                  standard VAR–002.

                                                     Total Reduction ..................................      ....................      ....................                  886      ...............................   6,292 hr.; $458,223 (reduction)



                                                  Estimate of Changes to Burden Due to                                           public reporting burden for the FERC–                                                  Reliability Standard PRC–004–WECC–2)
                                                Docket No. RD18–3: The Commission                                                725E (due to the retirement of regional                                                as follows: 11 12
                                                estimates the reduction in the annual
                                                 FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL, REDUCTIONS
                                                                                    DUE TO DOCKET NO. RD18–3–000
                                                                                                                                       Annual                                       Average burden
                                                                                                                                     number of                    Annual                                                    Total annualburden                       Cost per
                                                                                                           Number of                                                               hours and cost per
                                                                     Entity                                                          responses                  number of                                                hours and total annual cost                respondent
                                                                                                          respondents                                                                  response
                                                                                                                                        per                     responses                                                            ($)                                ($)
                                                                                                                                                                                          ($)
                                                                                                                                    respondent

                                                                                                                 (1)                       (2)                 (1) * (2) = (3)                  (4)                              (3) * (4) = (5)                  (5) ÷ (1) = (6)

                                                                                            Retirement of Regional Reliability Standard PRC–004–WECC–2 and Associated Reductions

                                                                                                                                                 Reporting Requirements (Annually)

                                                Transmission Owners that                 operate                           5                         2                      10     40 hr.; $3,079.60 ..              400 hr.; $30,796 (reduction) ........      $6,159 (reduction).
                                                  qualified transfer paths.

                                                                                                                                             Recordkeeping Requirements (Annually)

                                                Transmission Owners that                 operate                           5                         1                       5     6 hr.; $187.14 .......            30 hr.; $936 (reduction) ...............   $187 (reduction).
                                                  qualified transfer paths.

                                                     Total Reduction ..............................       ....................      ....................                    15     ...............................   430 hr.; $31,732 (reduction).



                                                  Total Reduction in Burden for FERC–                                              Comments: Comments are invited on:                                                   the collection of information on those
                                                725E, for Submittal to OMB. The total                                            (1) Whether the collection of                                                          who are to respond, including the use
                                                reduction in burden due to the proposed                                          information is necessary for the proper                                                of automated collection techniques or
                                                retirements of regional Reliability                                              performance of the functions of the                                                    other forms of information technology.
                                                Standards VAR–002–WECC–2 and PRC–                                                Commission, including whether the                                                        Dated: May 4, 2018.
                                                004–WECC–2 is detailed below:                                                    information will have practical utility;
                                                                                                                                                                                                                        Nathaniel J. Davis, Sr.,
                                                  • Total Reduction of Annual                                                    (2) the accuracy of the agency’s estimate
                                                                                                                                 of the burden and cost of the collection                                               Deputy Secretary.
                                                Responses: 901.                                                                                                                                                         [FR Doc. 2018–10006 Filed 5–10–18; 8:45 am]
                                                                                                                                 of information, including the validity of
                                                  • Total Reduction of Burden Hours:                                             the methodology and assumptions used;                                                  BILLING CODE 6717–01–P
                                                6,722.                                                                           (3) ways to enhance the quality, utility
                                                  • Total Reduction of Burden Cost:                                              and clarity of the information collection;
sradovich on DSK3GMQ082PROD with NOTICES




                                                $489,955.                                                                        and (4) ways to minimize the burden of

                                                  11 The reductions in burden and cost shown in                                  three positions involved in the reporting and                                            The hourly cost for the reporting requirements
                                                the table are the same figures as those in the current                           recordkeeping requirements. These figures include                                      ($76.99) is an average of the cost of a manager and
                                                OMB-approved inventory for the reporting and                                     salary (http://bls.gov/oes/current/naics2_22.htm)                                      engineer. The hourly cost for recordkeeping
                                                recordkeeping requirements, now being retired.                                   and benefits (http://www.bls.gov/news.release/                                         requirements uses the cost of a file clerk.
                                                  12 The hourly cost (for salary plus benefits) uses                             ecec.nr0.htm) and are: Manager: $89.07/hour,
                                                the figures from the Bureau of Labor Statistics for                              Engineer: $64.91/hour, and File Clerk: $31.19/hour.



                                           VerDate Sep<11>2014        20:23 May 10, 2018         Jkt 244001            PO 00000            Frm 00057            Fmt 4703     Sfmt 4703         E:\FR\FM\11MYN1.SGM                11MYN1



Document Created: 2018-11-02 09:50:16
Document Modified: 2018-11-02 09:50:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of revised information collection and request for comments.
DatesComments on the collection of information are due July 10, 2018.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.
FR Citation83 FR 22051 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR