DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 95 (May 16, 2018)

Page Range22661-22663
FR Document2018-10443

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comments on revisions to the information collection, FERC-725G (Reliability Standards for the Bulk Power System: PRC Reliability Standards) in Docket No. RD18-4-000 and will be submitting FERC-725G to the Office of Management and Budget (OMB) for review of the information collection requirements.

Federal Register, Volume 83 Issue 95 (Wednesday, May 16, 2018)
[Federal Register Volume 83, Number 95 (Wednesday, May 16, 2018)]
[Notices]
[Pages 22661-22663]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-10443]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RD18-4-000]


Commission Information Collection Activities (FERC-725G); Comment 
Request; Revision

AGENCY: Federal Energy Regulatory Commission, Department of Energy.

ACTION: Notice of revised information collection and request for 
comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comments on revisions to the information 
collection, FERC-725G (Reliability Standards for the Bulk Power System: 
PRC Reliability Standards) in Docket No. RD18-4-000 and will be 
submitting FERC-725G to the Office of Management and Budget (OMB) for 
review of the information collection requirements.

DATES: Comments on the collection of information are due July 16, 2018.

ADDRESSES: You may submit comments identified by Docket No. RD18-4-000 
by either of the following methods:
     eFiling at Commission's Website: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance, contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-725G, Reliability Standards for the Bulk Power System: 
PRC Reliability Standards.
    OMB Control No.: 1902-0252.
    Type of Request: Revision of FERC-725G information collection 
requirements.

[[Page 22662]]

    Abstract: The information collected by the FERC-725G is required to 
implement the statutory provisions of section 215 of the Federal Power 
Act (FPA) (16 U.S.C. 824o). Section 215 of the FPA buttresses the 
Commission's efforts to strengthen the reliability of the interstate 
grid.
    On March 16, 2018, the North American Electric Reliability 
Corporation (NERC, the Commission-approved ERO) submitted for 
Commission approval proposed Reliability Standard PRC-025-2, Generator 
Relay Loadability. The PRC-025-2 Reliability Standard addresses setting 
load-responsive protective relays associated with generation facilities 
at a level to prevent unnecessary tripping of generators during a 
system disturbance for conditions that do not pose a risk of damage to 
the associated equipment. Proposed Reliability Standard PRC-025-2 
improves upon currently-effective Reliability Standard PRC-025-1 by 
addressing certain relay setting application issues and by clarifying 
certain terminology and references. NERC requested that the Commission 
approve the proposed Reliability Standard and find that the proposed 
standard is just, reasonable, not unduly discriminatory or 
preferential, and in the public interest. NERC also requested that the 
Commission approve: (i) The associated Implementation Plan; (ii) the 
associated Violation Risk Factors (VRFs) and Violation Severity Levels 
(VSLs), which remain unchanged from PRC-025-1; and (iii) the retirement 
of currently-effective Reliability Standard PRC-025-1.
    NERC proposed that PRC-025-2 shall become effective on the first 
day of the first calendar quarter after the effective date of the 
applicable governmental authority's order approving the standard. 
NERC's Implementation Plan proposed phased-in compliance dates after 
the effective date of Reliability Standard PRC-025-2.\1\
---------------------------------------------------------------------------

    \1\ See NERC's Implementation Plan at https://www.nerc.com/pa/Stand/Project%20201604%20Modifications%20to%20PRC0251%20DL/Project_2016_04_Implementation_Plan_Clean_01092018.pdf.
---------------------------------------------------------------------------

    On May 2, 2018, the Commission approved Reliability Standard PRC-
025-2 and the retirement of PRC-025-1.
    Type of Respondents: Generator Owner (GO), Transmission Owner (TO), 
and Distribution Provider (DP).
    Estimate of Annual Burden \2\: Details follow on the changes in 
Docket No. RD18-4-000 to FERC-725G.
---------------------------------------------------------------------------

    \2\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, refer to 5 Code of Federal Regulations 1320.3.
    \3\ According to the NERC compliance registry as of March 9, 
2018, NERC has registered 415 distribution providers (DP), 985 
generator owners (GO) and 336 transmission owners (TO). However, 
under NERC's compliance registration program, entities may be 
registered for multiple functions, so these numbers incorporate some 
double counting. The number of unique entities responding will be 
approximately 994 entities registered as a transmission owner, a 
distribution provider, or a generator owner that is also a 
transmission owner and/or a distribution owner. This estimate 
assumes all of the unique entities apply load-responsive protective 
relays.
    \4\ The hourly cost (for salary plus benefits) uses the figures 
from the Bureau of Labor Statistics, May 2017, for two positions 
involved in the reporting and recordkeeping requirements. These 
figures include salary (https://www.bls.gov/oes/current/naics2_22.htm) benefits http://www.bls.gov/news.release/ecec.nr0.htm) and are: Engineer: $64.91/hour, and File Clerk: 
$31.16/hour. Hourly cost for the engineer are used for the one-time 
costs, and hourly cost for the file clerk are used for the ongoing 
record retention.
    \5\ GO = Generator Owner, DP = Distribution Provider, TO = 
Transmission Owner, each of which applies load-responsive protective 
relays at the terminals of the Elements listed in the proposed 
standard at section 3.2 (Facilities).
    \6\ The estimated hourly costs (salary plus benefits) are based 
on Bureau of Labor Statistics (BLS) information May 2014, (at http://bls.gov/oes/current/naics3_221000.htm#17-0000) for an electrical 
engineer ($59.62/hour for review and documentation), and for a file 
clerk ($28.95/hour for record retention). Those figures (and the 
number of respondents) were used when the standard was approved and 
added to the OMB inventory. Hourly cost for the engineer are used 
for the one-time costs, and hourly cost for the file clerk are used 
for the ongoing record retention.

                                      FERC-725G, Mandatory Reliability Standard PRC-025-2, in Docket No. RD18-4-000
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                Average  burden      Total annual
                                       Number of       Annual  number of   Annual  number of  hours and cost per   burden hours and        Cost per
             Entity                  respondents 3       responses per         responses        response 4  ($)    total annual cost    respondent  ($)
                                                          respondent                                                      ($)
                                  (1)...............                 (2)     (1) * (2) = (3)  (4)...............  (3) * (4) = (5)...     (5) / (1) = (6)
--------------------------------------------------------------------------------------------------------------------------------------------------------
(One-time) Review &               994 GO/TO/DP......                   1                 994  20 hrs.; $1,298.20  19,880 hours;                $1,298.20
 documentation of relay settings                                                                                   $1,290,410.80.
 to ensure compliance.
(On-going) Record Retention (of   994 GO/TO/DP......                   1                 994  2 hrs.; $62.32....  1,988 hours;                    $62.32
 compliance records for R1 and                                                                                     $61,946.08.
 M1, for 3 years or until
 mitigation complete).
--------------------------------------------------------------------------------------------------------------------------------------------------------


                                FERC-725G, Mandatory Reliability Standard PRC-025-1, Retirement in Docket No. RD18-4-000
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                     Total annual
                                       Number of       Annual  number of   Annual  number of    Average  burden    burden hours and        Cost per
             Entity                   respondents        responses per         responses       hours and cost 5    total annual cost   respondent 6  ($)
                                                          respondent                                  ($)                 ($)
                                  (1)...............                 (2)     (1) * (2) = (3)  (4)...............  (3) * (4) = (5)...  (5) / (1) = (6)
--------------------------------------------------------------------------------------------------------------------------------------------------------
(One-time) Review &               1,019 GO/DP/TO....                   1               1,019  20 hrs.; $1,192.40  20,380 hours;       $1,192.40
 documentation of relay settings                                                               (reduction).        $1,215,055.60       (reduction).
 to ensure compliance,                                                                                             (reduction).
 (reduction).
(On-going) Record Retention (of   1,019 GO/DP/TO....                   1               1,019  2 hrs.; $57.90      2,038 hours;        $57.90
 compliance records for R1 and                                                                 (reduction).        $59,000.10          (reduction).
 M1, for 3 years or until                                                                                          (reduction).
 mitigation complete)
 (reduction).
--------------------------------------------------------------------------------------------------------------------------------------------------------


[[Page 22663]]

    Net Effect to Burden for FERC-725G: Due to the retirement of PRC-
025-1 and implementation of PRC-025-2, the number of respondents is 
reduced by 25, and the number of annual burden hours is reduced by 550 
hours. (The net changes are due to a change in the number of affected 
entities on the NERC Registry.) The burden per respondent for PRC-025-2 
remains 22 hours (total for both one-time and ongoing burden, similar 
to the now-retired PRC-025-1).
    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: May 9, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-10443 Filed 5-15-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 83, No. 95 / Wednesday, May 16, 2018 / Notices                                                22661

                                                reliance on Order No. 2000 for                           of non-native load sales and how the                      DEPARTMENT OF ENERGY
                                                approving the JDA’s disparate treatment                  JDA would treat such a sale between the
                                                and responding to Orangeburg’s                           utilities.                                                Federal Energy Regulatory
                                                overlapping Federal Power Act,                                                                                     Commission
                                                                                                           (b) Do the North Carolina
                                                preemption, and Commerce Clause                          Commission’s regulatory conditions 20                     [Docket No. RD18–4–000]
                                                arguments was untenable for a number
                                                                                                         impermissibly interfere with this
                                                of reasons.16 The court concluded that                                                                             Commission Information Collection
                                                                                                         Commission’s jurisdiction over
                                                because the Commission [has not]                                                                                   Activities (FERC–725G); Comment
                                                offer[ed] a valid reason for the disparity,              wholesale ratemaking, in violation of
                                                                                                                                                                   Request; Revision
                                                the court could not affirm [the                          the Federal Power Act 21 or the
                                                Commission’s] approval of the JDA                        Commerce Clause of the United States                      AGENCY:  Federal Energy Regulatory
                                                provisions that establish disparate                      Constitution? 22                                          Commission, Department of Energy.
                                                treatment of native-load and non-native-                   8. We require Duke Energy Carolinas                     ACTION: Notice of revised information
                                                load wholesale customers, and                            and CP&L to submit—and others may                         collection and request for comments.
                                                incorporates [the North Carolina                         submit—initial briefs on or before 45                     SUMMARY:    In compliance with the
                                                Commission’s] potentially unlawful                       days from the date of this order. Reply                   requirements of the Paperwork
                                                regulatory regime.17 Accordingly, the                    briefs must be submitted on or before 30                  Reduction Act of 1995, the Federal
                                                court vacated in part the JDA Orders                     days following the due date of the initial                Energy Regulatory Commission
                                                and remanded the matter to the                           briefs. Any person who is not currently                   (Commission or FERC) is soliciting
                                                Commission for further explanation                       a party to the proceeding and who                         public comments on revisions to the
                                                regarding its approval of the JDA.18                     wishes to submit a brief must file a                      information collection, FERC–725G
                                                II. Discussion                                           notice of intervention or motion to                       (Reliability Standards for the Bulk
                                                                                                         intervene, as appropriate.                                Power System: PRC Reliability
                                                   6. We establish a briefing schedule to                                                                          Standards) in Docket No. RD18–4–000
                                                allow the parties and other interested                   The Commission Orders                                     and will be submitting FERC–725G to
                                                persons to address the two issues noted                                                                            the Office of Management and Budget
                                                below that the D.C. Circuit raised in its                  (A) Duke Energy Carolinas and CP&L
                                                                                                                                                                   (OMB) for review of the information
                                                decision. Further briefing on these                      are required to submit, and other parties
                                                                                                                                                                   collection requirements.
                                                issues will help develop a better record                 are hereby permitted to submit initial
                                                                                                                                                                   DATES: Comments on the collection of
                                                for the Commission to respond to the                     briefs on or before forty-five (45) days of
                                                                                                                                                                   information are due July 16, 2018.
                                                court’s directive to reconsider these                    the date of this order, as discussed in
                                                issues.                                                                                                            ADDRESSES: You may submit comments
                                                                                                         the body of this order.
                                                   7. We request briefing on the                                                                                   identified by Docket No. RD18–4–000
                                                                                                           (B) Parties are hereby permitted to file                by either of the following methods:
                                                following issues, in particular:
                                                   (a) Is the JDA’s disparate treatment of
                                                                                                         reply briefs on or before thirty (30) days                   • eFiling at Commission’s Website:
                                                                                                         of the date of filing of initial briefs.                  http://www.ferc.gov/docs-filing/
                                                native and non-native load wholesale
                                                customers unduly discriminatory or                         (C) All interested persons who wish to                  efiling.asp.
                                                                                                         submit briefs but that are not currently                     • Mail/Hand Delivery/Courier:
                                                preferential? In answering this question,
                                                                                                         parties to Docket Nos. ER12–1338–003                      Federal Energy Regulatory Commission,
                                                please address the following:
                                                   (i) Explain why the JDA treats native                 or ER12–1347–004 may submit notices                       Secretary of the Commission, 888 First
                                                and non-native load wholesale                            of intervention or motions to intervene,                  Street NE, Washington, DC 20426.
                                                                                                                                                                      Instructions: All submissions must be
                                                customers disparately and whether the                    as appropriate, within 21 days of the                     formatted and filed in accordance with
                                                differences between these customers                      date of this order. The briefing schedule                 submission guidelines at: http://
                                                justify the disparate treatment.                         described in Ordering Paragraphs (A)                      www.ferc.gov/help/submission-
                                                   (ii) Specify in detail the contractual                and (B) will apply to such persons.                       guide.asp. For user assistance, contact
                                                provisions in current or future
                                                                                                           (D) The Secretary is hereby directed to                 FERC Online Support by email at
                                                wholesale contracts that would qualify
                                                                                                         publish this order in the Federal                         ferconlinesupport@ferc.gov, or by phone
                                                a wholesale customer for native load
                                                                                                         Register.                                                 at: (866) 208–3676 (toll-free), or (202)
                                                treatment under the JDA,19 as well as
                                                                                                                                                                   502–8659 for TTY.
                                                any contractual provisions that would                      By the Commission.
                                                                                                                                                                      Docket: Users interested in receiving
                                                disqualify a wholesale customer for                        Issued: May 10, 2018.                                   automatic notification of activity in this
                                                native load treatment under the JDA.                     Nathaniel J. Davis, Sr.,                                  docket or in viewing/downloading
                                                   (iii) Explain why wholesale sales                                                                               comments and issuances in this docket
                                                                                                         Deputy Secretary.
                                                between Duke Energy Carolinas and                                                                                  may do so at http://www.ferc.gov/docs-
                                                                                                         [FR Doc. 2018–10402 Filed 5–15–18; 8:45 am]
                                                CP&L are excluded from the definition                                                                              filing/docs-filing.asp.
                                                                                                         BILLING CODE 6717–01–P
                                                  16 Id. at 1085–1087.
                                                                                                                                                                   FOR FURTHER INFORMATION CONTACT:
                                                  17 Id. at 1087.                                                                                                  Ellen Brown may be reached by email
                                                  18 Id.                                                                                                           at DataClearance@FERC.gov, telephone
                                                  19 The JDA provides that Native Load Customers                                                                   at (202) 502–8663, and fax at (202) 273–
                                                include wholesale customers that have native load
                                                                                                           20 Here, we are referring to the regulatory
                                                                                                                                                                   0873.
                                                served by Duke Energy Carolinas or CP&L, for
sradovich on DSK3GMQ082PROD with NOTICES




                                                which Duke Energy Carolinas or CP&L has an
                                                                                                                                                                   SUPPLEMENTARY INFORMATION:
                                                                                                         conditions that were in section 3.2 (c)(ii)–(iv) of the
                                                obligation pursuant to current or future wholesale       JDA, which the JDA Order required be removed.
                                                                                                                                                                      Title: FERC–725G, Reliability
                                                contracts, for the length of such contracts, to engage     21 16 U.S.C. 824e(a) (2012); see, e.g., Nantahala       Standards for the Bulk Power System:
                                                in planning and to sell and deliver electric capacity                                                              PRC Reliability Standards.
                                                                                                         Power and Light Company v. Thornburg, 476 U.S.
                                                and energy in a manner comparable to the                                                                              OMB Control No.: 1902–0252.
                                                [utilities’] service to its Retail Native Load           953 (1986); Mississippi Power & Light Company v.
                                                Customers. Duke Energy Carolinas, FERC Electric          Mississippi ex rel. Moore, 487 US 354 (1988).                Type of Request: Revision of FERC–
                                                Tariff, Rate Schedule No. 341 at Article I,                22 U.S. Const. art. 1, 8, cl. 3; see, e.g., New         725G information collection
                                                Definitions.                                             England Power Company, 455 U.S. 331 (1982).               requirements.


                                           VerDate Sep<11>2014   17:34 May 15, 2018   Jkt 244001   PO 00000   Frm 00051    Fmt 4703    Sfmt 4703   E:\FR\FM\16MYN1.SGM    16MYN1


                                                22662                            Federal Register / Vol. 83, No. 95 / Wednesday, May 16, 2018 / Notices

                                                   Abstract: The information collected                          damage to the associated equipment.                                  NERC proposed that PRC–025–2 shall
                                                by the FERC–725G is required to                                 Proposed Reliability Standard PRC–                                become effective on the first day of the
                                                implement the statutory provisions of                           025–2 improves upon currently-                                    first calendar quarter after the effective
                                                section 215 of the Federal Power Act                            effective Reliability Standard PRC–025–                           date of the applicable governmental
                                                (FPA) (16 U.S.C. 824o). Section 215 of                          1 by addressing certain relay setting                             authority’s order approving the
                                                the FPA buttresses the Commission’s                             application issues and by clarifying                              standard. NERC’s Implementation Plan
                                                efforts to strengthen the reliability of the                    certain terminology and references.                               proposed phased-in compliance dates
                                                interstate grid.                                                NERC requested that the Commission                                after the effective date of Reliability
                                                   On March 16, 2018, the North                                 approve the proposed Reliability                                  Standard PRC–025–2.1
                                                American Electric Reliability                                   Standard and find that the proposed
                                                Corporation (NERC, the Commission-                              standard is just, reasonable, not unduly                             On May 2, 2018, the Commission
                                                approved ERO) submitted for                                     discriminatory or preferential, and in                            approved Reliability Standard PRC–
                                                Commission approval proposed                                    the public interest. NERC also requested                          025–2 and the retirement of PRC–025–
                                                Reliability Standard PRC–025–2,                                 that the Commission approve: (i) The                              1.
                                                Generator Relay Loadability. The PRC–                           associated Implementation Plan; (ii) the                             Type of Respondents: Generator
                                                025–2 Reliability Standard addresses                            associated Violation Risk Factors (VRFs)                          Owner (GO), Transmission Owner (TO),
                                                setting load-responsive protective relays                       and Violation Severity Levels (VSLs),                             and Distribution Provider (DP).
                                                associated with generation facilities at a                      which remain unchanged from PRC–
                                                level to prevent unnecessary tripping of                        025–1; and (iii) the retirement of                                   Estimate of Annual Burden 2: Details
                                                generators during a system disturbance                          currently-effective Reliability Standard                          follow on the changes in Docket No.
                                                for conditions that do not pose a risk of                       PRC–025–1.                                                        RD18–4–000 to FERC–725G.

                                                                     FERC–725G, MANDATORY RELIABILITY STANDARD PRC–025–2, IN DOCKET NO. RD18–4–000
                                                                                                                                                                               Average
                                                                                                                          Annual                                                                    Total annual
                                                                                                                                                         Annual             burden hours                                     Cost per
                                                                                                  Number of              number of                                                                burden hours and
                                                                 Entity                                                                                number of               and cost                                     respondent
                                                                                                respondents 3         responses per                                                               total annual cost
                                                                                                                                                       responses            per response 4                                      ($)
                                                                                                                        respondent                                                ($)                     ($)

                                                                                                     (1)                       (2)                 (1) * (2) = (3)               (4)                 (3) * (4) = (5)       (5) ÷ (1) = (6)

                                                (One-time) Review & documentation           994 GO/TO/DP ...                               1                       994   20 hrs.; $1,298.20       19,880 hours;                   $1,298.20
                                                  of relay settings to ensure compli-                                                                                                               $1,290,410.80.
                                                  ance.
                                                (On-going) Record Retention (of             994 GO/TO/DP ...                               1                       994   2 hrs.; $62.32 ......    1,988 hours;                           $62.32
                                                  compliance records for R1 and                                                                                                                     $61,946.08.
                                                  M1, for 3 years or until mitigation
                                                  complete).


                                                         FERC–725G, MANDATORY RELIABILITY STANDARD PRC–025–1, RETIREMENT IN DOCKET NO. RD18–4–000
                                                                                                               Annual                                        Average
                                                                                                                                        Annual                                Total annual burden hours                  Cost per
                                                                                   Number of                  number of                                    burden hours
                                                            Entity                                                                    number of                                 and total annual cost                  respondent 6
                                                                                  respondents              responses per                                    and cost 5
                                                                                                                                      responses                                           ($)                              ($)
                                                                                                             respondent                                         ($)

                                                                                          (1)                   (2)                  (1) * (2) = (3)               (4)                 (3) * (4) = (5)                 (5) ÷ (1) = (6)

                                                (One-time) Review & docu-         1,019 GO/                                1                     1,019     20 hrs.;          20,380 hours;                $1,192.40 (reduction).
                                                  mentation of relay set-           DP/TO.                                                                   $1,192.40         $1,215,055.60 (reduction).
                                                  tings to ensure compli-                                                                                    (reduction).
                                                  ance, (reduction).
                                                (On-going) Record Reten-          1,019 GO/                                1                     1,019     2 hrs.; $57.90    2,038 hours; $59,000.10            $57.90 (reduction).
                                                  tion (of compliance               DP/TO.                                                                   (reduction).      (reduction).
                                                  records for R1 and M1,
                                                  for 3 years or until mitiga-
                                                  tion complete) (reduction).


                                                   1 See NERC’s Implementation Plan at https://                 these numbers incorporate some double counting.                     5 GO = Generator Owner, DP = Distribution

                                                www.nerc.com/pa/Stand/Project%20201604                          The number of unique entities responding will be                  Provider, TO = Transmission Owner, each of which
                                                %20Modifications%20to%20PRC0251%20DL/                           approximately 994 entities registered as a                        applies load-responsive protective relays at the
                                                Project_2016_04_Implementation_Plan_Clean_                      transmission owner, a distribution provider, or a                 terminals of the Elements listed in the proposed
                                                01092018.pdf.                                                   generator owner that is also a transmission owner
                                                                                                                                                                                  standard at section 3.2 (Facilities).
                                                   2 Burden is defined as the total time, effort, or            and/or a distribution owner. This estimate assumes
                                                                                                                                                                                    6 The estimated hourly costs (salary plus benefits)
                                                                                                                all of the unique entities apply load-responsive
                                                financial resources expended by persons to                                                                                        are based on Bureau of Labor Statistics (BLS)
                                                                                                                protective relays.
                                                generate, maintain, retain, or disclose or provide                 4 The hourly cost (for salary plus benefits) uses              information May 2014, (at http://bls.gov/oes/
                                                information to or for a Federal agency. For further
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                the figures from the Bureau of Labor Statistics, May              current/naics3_221000.htm#17-0000) for an
                                                explanation of what is included in the information
                                                                                                                2017, for two positions involved in the reporting                 electrical engineer ($59.62/hour for review and
                                                collection burden, refer to 5 Code of Federal
                                                                                                                and recordkeeping requirements. These figures                     documentation), and for a file clerk ($28.95/hour for
                                                Regulations 1320.3.                                             include salary (https://www.bls.gov/oes/current/
                                                   3 According to the NERC compliance registry as                                                                                 record retention). Those figures (and the number of
                                                                                                                naics2_22.htm) benefits http://www.bls.gov/
                                                of March 9, 2018, NERC has registered 415                                                                                         respondents) were used when the standard was
                                                                                                                news.release/ecec.nr0.htm) and are: Engineer:
                                                distribution providers (DP), 985 generator owners               $64.91/hour, and File Clerk: $31.16/hour. Hourly                  approved and added to the OMB inventory. Hourly
                                                (GO) and 336 transmission owners (TO). However,                 cost for the engineer are used for the one-time costs,            cost for the engineer are used for the one-time costs,
                                                under NERC’s compliance registration program,                   and hourly cost for the file clerk are used for the               and hourly cost for the file clerk are used for the
                                                entities may be registered for multiple functions, so           ongoing record retention.                                         ongoing record retention.



                                           VerDate Sep<11>2014       17:34 May 15, 2018    Jkt 244001      PO 00000   Frm 00052       Fmt 4703    Sfmt 4703     E:\FR\FM\16MYN1.SGM           16MYN1


                                                                             Federal Register / Vol. 83, No. 95 / Wednesday, May 16, 2018 / Notices                                                   22663

                                                  Net Effect to Burden for FERC–725G:                   distribution assets from CPG into UGIU                proceeding can ask for court review of
                                                Due to the retirement of PRC–025–1 and                  pursuant to a corporate merger, all as                Commission orders in the proceeding.
                                                implementation of PRC–025–2, the                        more fully set forth in the application                  However, a person does not have to
                                                number of respondents is reduced by                     which is on file with the Commission                  intervene in order to have comments
                                                25, and the number of annual burden                     and open to public inspection. The                    considered. The second way to
                                                hours is reduced by 550 hours. (The net                 filing may also be viewed on the web at
                                                                                                                                                              participate is by filing with the
                                                changes are due to a change in the                      http://www.ferc.gov using the eLibrary
                                                                                                                                                              Secretary of the Commission, as soon as
                                                number of affected entities on the NERC                 link. Enter the docket number excluding
                                                Registry.) The burden per respondent                    the last three digits in the docket                   possible, an original and two copies of
                                                for PRC–025–2 remains 22 hours (total                   number field to access the document.                  comments in support of or in opposition
                                                for both one-time and ongoing burden,                   For assistance, contact FERC at                       to this project. The Commission will
                                                similar to the now-retired PRC–025–1).                  FERCOnlineSupport@ferc.gov or call                    consider these comments in
                                                  Comments: Comments are invited on:                    toll-free, (866) 208–3676 or TYY, (202)               determining the appropriate action to be
                                                (1) Whether the collection of                           502–8659.                                             taken, but the filing of a comment alone
                                                information is necessary for the proper                    Any questions regarding this                       will not serve to make the filer a party
                                                performance of the functions of the                     application should be directed to Frank               to the proceeding. The Commission’s
                                                Commission, including whether the                       Merkle, Senior Counsel, UGI                           rules require that persons filing
                                                information will have practical utility;                Corporation, Box 858, Valley Forge,                   comments in opposition to the project
                                                (2) the accuracy of the agency’s estimate               Pennsylvania 19482; or by email at                    provide copies of their protests only to
                                                of the burden and cost of the collection                marklef@ugicorp.com.                                  the party or parties directly involved in
                                                of information, including the validity of                  Pursuant to section 157.9 of the                   the protest.
                                                the methodology and assumptions used;                   Commission’s rules (18 CFR 157.9),                       Persons who wish to comment only
                                                (3) ways to enhance the quality, utility                within 90 days of this Notice, the                    on the environmental review of this
                                                and clarity of the information collection;              Commission staff will either: Complete                project should submit an original and
                                                and (4) ways to minimize the burden of                  its environmental assessment (EA) and                 two copies of their comments to the
                                                the collection of information on those                  place it into the Commission’s public                 Secretary of the Commission.
                                                who are to respond, including the use                   record (eLibrary) for this proceeding; or             Environmental commentors will be
                                                of automated collection techniques or                   issue a Notice of Schedule for
                                                other forms of information technology.                                                                        placed on the Commission’s
                                                                                                        Environmental Review. If a Notice of
                                                                                                                                                              environmental mailing list, will receive
                                                  Dated: May 9, 2018.                                   Schedule for Environmental Review is
                                                                                                                                                              copies of the environmental documents,
                                                Kimberly D. Bose,                                       issued, it will indicate, among other
                                                                                                        milestones, the anticipated date for the              and will be notified of meetings
                                                Secretary.                                                                                                    associated with the Commission’s
                                                                                                        Commission staff’s issuance of the EA
                                                [FR Doc. 2018–10443 Filed 5–15–18; 8:45 am]                                                                   environmental review process.
                                                                                                        for this proposal. The filing of the EA
                                                BILLING CODE 6717–01–P
                                                                                                        in the Commission’s public record for                 Environmental commentors will not be
                                                                                                        this proceeding or the issuance of a                  required to serve copies of filed
                                                                                                        Notice of Schedule for Environmental                  documents on all other parties.
                                                DEPARTMENT OF ENERGY                                                                                          However, the non-party commentors
                                                                                                        Review will serve to notify federal and
                                                Federal Energy Regulatory                               state agencies of the timing for the                  will not receive copies of all documents
                                                Commission                                              completion of all necessary reviews, and              filed by other parties or issued by the
                                                                                                        the subsequent need to complete all                   Commission (except for the mailing of
                                                [Docket No. CP18–477–000]                               federal authorizations within 90 days of              environmental documents issued by the
                                                                                                        the date of issuance of the Commission                Commission) and will not have the right
                                                Notice of Application: UGI Central
                                                                                                        staff’s EA.                                           to seek court review of the
                                                Penn Gas, Inc. and UGI Utilities, Inc.
                                                                                                           There are two ways to become                       Commission’s final order.
                                                   Take notice that on May 2, 2018, UGI                 involved in the Commission’s review of                   The Commission strongly encourages
                                                Central Penn Gas, Inc. (CPG), and UGI                   this project. First, any person wishing to            electronic filings of comments, protests
                                                Utilities, Inc. (UGIU) (collectively,                   obtain legal status by becoming a party               and interventions in lieu of paper using
                                                Applicants), both wholly-owned direct                   to the proceedings for this project
                                                                                                                                                              the eFiling link at http://www.ferc.gov.
                                                subsidiaries of UGI Corporation and                     should, on or before the comment date
                                                                                                                                                              Persons unable to file electronically
                                                both currently located at 2525 N. 12th                  stated below, file with the Federal
                                                Street, Reading, Pennsylvania 19605,                    Energy Regulatory Commission, 888                     should submit an original and five
                                                filed in Docket No. CP18–477–000 an                     First Street NE, Washington, DC 20426,                copies of the protest or intervention to
                                                application pursuant to sections 7(b)                   a motion to intervene in accordance                   the Federal Energy Regulatory
                                                and 7(f) of the Natural Gas Act (NGA),                  with the requirements of the                          Commission, 888 First Street NE,
                                                and Part 157 of the Commission’s                        Commission’s Rules of Practice and                    Washington, DC 20426.
                                                regulations. Specifically, the Applicants               Procedure (18 CFR 385.214 or 385.211)                    Comment Date: 5:00 p.m. Eastern time
                                                request: (i) Authority to abandon certain               and the Regulations under the NGA (18                 on May 31, 2018.
                                                limited jurisdiction certificates for                   CFR 157.10). A person obtaining party
                                                                                                                                                                Dated: May 10, 2018.
                                                transportation services held by CPG                     status will be placed on the service list
                                                pertaining to its Maryland local gas                    maintained by the Secretary of the                    Nathaniel J. Davis, Sr.,
sradovich on DSK3GMQ082PROD with NOTICES




                                                distribution system located in Maryland                 Commission and will receive copies of                 Deputy Secretary.
                                                and Pennsylvania; and (ii) for transfer of              all documents filed by the applicant and              [FR Doc. 2018–10400 Filed 5–15–18; 8:45 am]
                                                CPG’s service area determination to                     by all other parties. A party must submit             BILLING CODE 6717–01–P
                                                UGIU. The Applicants state that the                     five copies of filings made with the
                                                requested authorizations are required to                Commission and must mail a copy to
                                                implement aspects of the pending                        the applicant and to every other party in
                                                transfer of the local natural gas                       the proceeding. Only parties to the


                                           VerDate Sep<11>2014   17:34 May 15, 2018   Jkt 244001   PO 00000   Frm 00053   Fmt 4703   Sfmt 9990   E:\FR\FM\16MYN1.SGM   16MYN1



Document Created: 2018-11-02 09:14:09
Document Modified: 2018-11-02 09:14:09
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of revised information collection and request for comments.
DatesComments on the collection of information are due July 16, 2018.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.
FR Citation83 FR 22661 