83_FR_22761 83 FR 22666 - Notice of Request Under Blanket Authorization: Southern Star Central Gas Pipeline, Inc.

83 FR 22666 - Notice of Request Under Blanket Authorization: Southern Star Central Gas Pipeline, Inc.

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 95 (May 16, 2018)

Page Range22666-22667
FR Document2018-10399

Federal Register, Volume 83 Issue 95 (Wednesday, May 16, 2018)
[Federal Register Volume 83, Number 95 (Wednesday, May 16, 2018)]
[Notices]
[Pages 22666-22667]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-10399]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-384-000]


Notice of Request Under Blanket Authorization: Southern Star 
Central Gas Pipeline, Inc.

    Take notice that on April 30, 2018, Southern Star Central Gas 
Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro, Kentucky 
42301, filed in the above referenced docket, a prior notice request 
pursuant to sections 157.205, 157.208, 157.210, 157.211, and 157.216 of 
the Commission's regulations under the Natural Gas Act (NGA) and 
Southern Star's blanket certificate issued in Docket No. CP82-479-000, 
for authorization to construct, own, and operate a total of 
approximately 14.27 miles in seven non-contiguous 20- and 24-inch-
diameter pipeline segments, and subsequently to abandon the equivalent 
existing segments of Line V in Oklahoma and Logan Counties, Oklahoma 
(Line V Replacement Project). The replacement is required due to the 
age and condition of the acetylene-welded pipe and to enable in-line 
assessments of the Line V pipeline, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection.
    The filing may also be viewed on the web at http://www.ferc.gov 
using the eLibrary link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this prior notice request should be 
directed to Cindy Thompson, Manager, Regulatory, Southern Star Central 
Gas Pipeline, Inc., 4700 Highway 56, Owensboro, Kentucky 42301, by 
phone (270) 852-4655, or by email Cindy.C.Thompson@sscgp.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the NGA (18 CFR 157.205) file a protest to the request. If no protest 
is filed within

[[Page 22667]]

the time allowed therefore, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request shall be treated as 
an application for authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
website (www.ferc.gov) under the ``e-Filing'' link.

    Dated: May 10, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-10399 Filed 5-15-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                22666                               Federal Register / Vol. 83, No. 95 / Wednesday, May 16, 2018 / Notices

                                                                   FERC–725V, MANDATORY RELIABILITY STANDARDS: COM RELIABILITY STANDARDS—Continued
                                                                                                                         Annual                                                                            Total annual burden
                                                                                     Number of                          number of               Total number        Average burden and                     hours & total annual      Cost per
                                                                                    respondents                      responses per              of responses        cost per response 7                            cost             respondent
                                                                                                                       respondent

                                                                                           (1)                                (2)               (1) * (2) = (3)                   (4)                         (3) * (4) = (5)       ($) (5) ÷ (1)

                                                (On-going) Main-            201 (BA, RC & TOP)                                            1                 201    8 hrs. & $288 ............             1,608 hrs. & $57,888                      288
                                                  tain evidence of
                                                  training and as-
                                                  sessments
                                                  [COM–002–4
                                                  R2, R4, R5 and
                                                  R6].
                                                (On-going) Main-            1,880 (DP & GOP) ....                                          1               1,180   8 hrs. & $288 ............             15,040 hrs. &                             288
                                                  tain evidence of                                                                                                                                          $541,440.
                                                  training [COM–
                                                  002–4 R3 and
                                                  R6].

                                                     Total ..............   ....................................     ........................              2,762   ....................................   22,976 hrs. &           ........................
                                                                                                                                                                                                            $827,136.



                                                  Comments: Comments are invited on:                                     DEPARTMENT OF ENERGY                                                  free at (866) 208–3676, or TTY, contact
                                                (1) Whether the collection of                                                                                                                  (202) 502–8659.
                                                information is necessary for the proper                                  Federal Energy Regulatory                                                Any questions concerning this prior
                                                performance of the functions of the                                      Commission                                                            notice request should be directed to
                                                Commission, including whether the                                                                                                              Cindy Thompson, Manager, Regulatory,
                                                information will have practical utility;                                 [Docket No. CP18–384–000]                                             Southern Star Central Gas Pipeline, Inc.,
                                                (2) the accuracy of the agency’s estimate                                                                                                      4700 Highway 56, Owensboro,
                                                                                                                         Notice of Request Under Blanket                                       Kentucky 42301, by phone (270) 852–
                                                of the burden and cost of the collection
                                                                                                                         Authorization: Southern Star Central                                  4655, or by email Cindy.C.Thompson@
                                                of information, including the validity of
                                                                                                                         Gas Pipeline, Inc.                                                    sscgp.com.
                                                the methodology and assumptions used;                                                                                                             Pursuant to section 157.9 of the
                                                (3) ways to enhance the quality, utility                                    Take notice that on April 30, 2018,                                Commission’s rules, 18 CFR 157.9,
                                                and clarity of the information collection;                               Southern Star Central Gas Pipeline, Inc.                              within 90 days of this Notice the
                                                and (4) ways to minimize the burden of                                   (Southern Star), 4700 Highway 56,                                     Commission staff will either: Complete
                                                the collection of information on those                                   Owensboro, Kentucky 42301, filed in                                   its environmental assessment (EA) and
                                                who are to respond, including the use                                    the above referenced docket, a prior                                  place it into the Commission’s public
                                                of automated collection techniques or                                    notice request pursuant to sections                                   record (eLibrary) for this proceeding; or
                                                other forms of information technology.                                   157.205, 157.208, 157.210, 157.211, and                               issue a Notice of Schedule for
                                                                                                                         157.216 of the Commission’s regulations                               Environmental Review. If a Notice of
                                                  Dated: May 10, 2018.                                                   under the Natural Gas Act (NGA) and                                   Schedule for Environmental Review is
                                                Nathaniel J. Davis, Sr.,                                                 Southern Star’s blanket certificate                                   issued, it will indicate, among other
                                                Deputy Secretary.                                                        issued in Docket No. CP82–479–000, for                                milestones, the anticipated date for the
                                                [FR Doc. 2018–10401 Filed 5–15–18; 8:45 am]                              authorization to construct, own, and                                  Commission staff’s issuance of the EA
                                                BILLING CODE 6717–01–P                                                   operate a total of approximately 14.27                                for this proposal. The filing of the EA
                                                                                                                         miles in seven non-contiguous 20- and                                 in the Commission’s public record for
                                                                                                                         24-inch-diameter pipeline segments,                                   this proceeding or the issuance of a
                                                                                                                         and subsequently to abandon the                                       Notice of Schedule for Environmental
                                                                                                                         equivalent existing segments of Line V                                Review will serve to notify federal and
                                                                                                                         in Oklahoma and Logan Counties,                                       state agencies of the timing for the
                                                                                                                         Oklahoma (Line V Replacement Project).                                completion of all necessary reviews, and
                                                                                                                         The replacement is required due to the                                the subsequent need to complete all
                                                                                                                         age and condition of the acetylene-                                   federal authorizations within 90 days of
                                                                                                                         welded pipe and to enable in-line                                     the date of issuance of the Commission
                                                                                                                         assessments of the Line V pipeline, all                               staff’s EA.
                                                   7 The loaded hourly wage figure (includes                             as more fully set forth in the application                               Any person may, within 60 days after
                                                benefits) is based on the occupational categories for                    which is on file with the Commission                                  the issuance of the instant notice by the
                                                2016 found on the Bureau of Labor Statistics                             and open to public inspection.                                        Commission, file pursuant to Rule 214
                                                website (http://www.bls.gov/oes/current/naics2_                             The filing may also be viewed on the
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                                                               of the Commission’s Procedural Rules
                                                22.htm):
                                                                                                                         web at http://www.ferc.gov using the                                  (18 CFR 385.214) a motion to intervene
                                                   Electrical Engineer (Occupation Code: 17–2071):
                                                                                                                         eLibrary link. Enter the docket number                                or notice of intervention. Any person
                                                $68.12 (review and documentation).
                                                                                                                         excluding the last three digits in the                                filing to intervene or the Commission’s
                                                   Office and Administrative Support (Occupation
                                                Code: 43–0000): $40.89 ($68.12 + 40.89 = 109.01 ÷
                                                                                                                         docket number field to access the                                     staff may, pursuant to section 157.205 of
                                                3 = $36.34. This figure is rounded to $36.00 for use                     document. For assistance, please contact                              the Commission’s Regulations under the
                                                in collection FERC–725V for calculating wage                             FERC Online Support at                                                NGA (18 CFR 157.205) file a protest to
                                                figures in this renewal calculation.                                     FERCOnlineSupport@ferc.gov or toll                                    the request. If no protest is filed within


                                           VerDate Sep<11>2014     17:34 May 15, 2018         Jkt 244001           PO 00000      Frm 00056      Fmt 4703    Sfmt 4703    E:\FR\FM\16MYN1.SGM              16MYN1


                                                                             Federal Register / Vol. 83, No. 95 / Wednesday, May 16, 2018 / Notices                                                   22667

                                                the time allowed therefore, the proposed                   Description: Tariff Amendment:                        Docket Numbers: ER18–1565–000.
                                                activity shall be deemed to be                          Amended GIA Santa Ana Storage                            Applicants: PJM Interconnection,
                                                authorized effective the day after the                  Project SA No. 1006 to be effective                   L.L.C.
                                                time allowed for protest. If a protest is               3/14/2018.                                               Description: Tariff Cancellation:
                                                filed and not withdrawn within 30 days                     Filed Date: 5/10/18.                               Notice of Cancellation of Service
                                                after the time allowed for filing a                        Accession Number: 20180510–5111.                   Agreement No. 3764; Queue No. Y3–029
                                                protest, the instant request shall be                      Comments Due: 5 p.m. ET 5/31/18.                   to be effective 6/4/2014.
                                                treated as an application for                              Docket Numbers: ER18–1219–001.                        Filed Date: 5/10/18.
                                                authorization pursuant to section 7 of                     Applicants: Midcontinent                              Accession Number: 20180510–5067.
                                                the NGA.                                                Independent System Operator, Inc.                        Comments Due: 5 p.m. ET 5/31/18.
                                                   The Commission strongly encourages                      Description: Tariff Amendment:                        Docket Numbers: ER18–1566–000.
                                                electronic filings of comments, protests,               2018–05–08_SA 3105 EMI–EMI                               Applicants: Essential Power Rock
                                                and interventions via the internet in lieu              Substitute GIA (J477) to be effective                 Springs, LLC, PJM Interconnection,
                                                of paper. See 18 CFR 385.2001(a)(1)(iii)                3/15/2018.                                            L.L.C.
                                                and the instructions on the                                Filed Date: 5/8/18.                                   Description: eTariff filing per 1450:
                                                Commission’s website (www.ferc.gov)                        Accession Number: 20180508–5195.                   Essential Power submits revisions to
                                                under the ‘‘e-Filing’’ link.                               Comments Due: 5 p.m. ET 5/15/18.                   OATT Att H–23 re Tax Reform EL18–97
                                                  Dated: May 10, 2018.                                     Docket Numbers: ER18–1292–001.                     to be effective 6/1/2018.
                                                Nathaniel J. Davis, Sr.,                                   Applicants: Southern California                       Filed Date: 5/10/18.
                                                Deputy Secretary.                                       Edison Company.                                          Accession Number: 20180510–5068.
                                                [FR Doc. 2018–10399 Filed 5–15–18; 8:45 am]                Description: Tariff Amendment:                        Comments Due: 5 p.m. ET 5/31/18.
                                                BILLING CODE 6717–01–P                                  Amended LGIA Desert Quartzite, LLC—                      Docket Numbers: ER18–1567–000.
                                                                                                        Quartz 3 Solar Project—Revised ITCC to                   Applicants: South Carolina Electric &
                                                                                                        be effective 4/4/2018.                                Gas Company.
                                                DEPARTMENT OF ENERGY                                       Filed Date: 5/10/18.                                  Description: Compliance filing: Order
                                                                                                           Accession Number: 20180510–5095.                   842 Attch M and N to be effective 5/15/
                                                Federal Energy Regulatory                                  Comments Due: 5 p.m. ET 5/31/18.                   2018.
                                                Commission                                                 Docket Numbers: ER18–1297–001.                        Filed Date: 5/10/18.
                                                                                                           Applicants: Southern California                       Accession Number: 20180510–5104.
                                                Combined Notice of Filings #1
                                                                                                        Edison Company.                                          Comments Due: 5 p.m. ET 5/31/18.
                                                   Take notice that the Commission                         Description: Tariff Amendment:
                                                                                                                                                                 Docket Numbers: ER18–1568–000.
                                                received the following exempt                           Amended LGIA—Revised ITCC
                                                                                                        Palmdale Energy, LLC to be effective                     Applicants: Southwest Power Pool,
                                                wholesale generator filings:
                                                                                                        6/4/2018.                                             Inc.
                                                   Docket Numbers: EG18–84–000.                                                                                  Description: § 205(d) Rate Filing:
                                                   Applicants: Antelope Expansion 2,                       Filed Date: 5/10/18.
                                                                                                           Accession Number: 20180510–5097.                   Market Import Service Tariff Revisions
                                                LLC.                                                                                                          to be effective 7/10/2018.
                                                   Description: Self-Certification of EWG                  Comments Due: 5 p.m. ET 5/31/18.
                                                                                                                                                                 Filed Date: 5/10/18.
                                                Antelope Expansion 2, LLC.                                 Docket Numbers: ER18–1562–000.                        Accession Number: 20180510–5163.
                                                   Filed Date: 5/10/18.                                    Applicants: Southwest Power Pool,                     Comments Due: 5 p.m. ET 5/31/18.
                                                   Accession Number: 20180510–5119.                     Inc.
                                                   Comments Due: 5 p.m. ET 5/31/18.                        Description: Compliance filing: Order                 The filings are accessible in the
                                                   Take notice that the Commission                      No. 842 Compliance Filing to be                       Commission’s eLibrary system by
                                                received the following electric rate                    effective 5/15/2018.                                  clicking on the links or querying the
                                                filings:                                                   Filed Date: 5/9/18.                                docket number.
                                                                                                           Accession Number: 20180509–5216.                      Any person desiring to intervene or
                                                   Docket Numbers: ER17–157–003.                                                                              protest in any of the above proceedings
                                                   Applicants: Moapa Southern Paiute                       Comments Due: 5 p.m. ET 5/30/18.
                                                                                                                                                              must file in accordance with Rules 211
                                                Solar, LLC.                                                Docket Numbers: ER18–1563–000.
                                                                                                                                                              and 214 of the Commission’s
                                                   Description: Compliance filing:                         Applicants: NorthWestern
                                                                                                                                                              Regulations (18 CFR 385.211 and
                                                Supplement to Notice of Non-Material                    Corporation.
                                                                                                                                                              385.214) on or before 5:00 p.m. Eastern
                                                Change in Status to be effective                           Description: § 205(d) Rate Filing:
                                                                                                                                                              time on the specified comment date.
                                                5/11/2018.                                              Revisions to Attachment L—
                                                                                                                                                              Protests may be considered, but
                                                   Filed Date: 5/10/18.                                 Creditworthiness Procedures to be
                                                                                                                                                              intervention is necessary to become a
                                                   Accession Number: 20180510–5084.                     effective 7/10/2018.
                                                                                                                                                              party to the proceeding.
                                                   Comments Due: 5 p.m. ET 5/31/18.                        Filed Date: 5/10/18.
                                                                                                                                                                 eFiling is encouraged. More detailed
                                                   Docket Numbers: ER18–995–001.                           Accession Number: 20180510–5033.
                                                                                                                                                              information relating to filing
                                                   Applicants: Southwest Power Pool,                       Comments Due: 5 p.m. ET 5/31/18.
                                                                                                                                                              requirements, interventions, protests,
                                                Inc.                                                       Docket Numbers: ER18–1564–000.                     service, and qualifying facilities filings
                                                   Description: Tariff Amendment:                          Applicants: Niagara Mohawk Power                   can be found at: http://www.ferc.gov/
                                                Amended Filing—Attachment AE                            Corporation, New York Independent                     docs-filing/efiling/filing-req.pdf. For
                                                Revisions to Clarify Registration of Load               System Operator, Inc.
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                              other information, call (866) 208–3676
                                                to be effective 5/11/2018.                                 Description: Tariff Cancellation:                  (toll free). For TTY, call (202) 502–8659.
                                                   Filed Date: 5/10/18.                                 NMPC Cancellation of CRA 2264 with
                                                   Accession Number: 20180510–5116.                     Oneida Indian Nation to be effective                    Dated: May 10, 2018.
                                                   Comments Due: 5 p.m. ET 5/31/18.                     3/30/2017.                                            Nathaniel J. Davis, Sr.,
                                                   Docket Numbers: ER18–1172–001                           Filed Date: 5/10/18.                               Deputy Secretary.
                                                   Applicants: Southern California                         Accession Number: 20180510–5055.                   [FR Doc. 2018–10397 Filed 5–15–18; 8:45 am]
                                                Edison Company.                                            Comments Due: 5 p.m. ET 5/31/18.                   BILLING CODE 6717–01–P




                                           VerDate Sep<11>2014   17:34 May 15, 2018   Jkt 244001   PO 00000   Frm 00057   Fmt 4703   Sfmt 9990   E:\FR\FM\16MYN1.SGM   16MYN1



Document Created: 2018-11-02 09:13:16
Document Modified: 2018-11-02 09:13:16
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation83 FR 22666 