83_FR_23549 83 FR 23451 - Commission Information Collection Activities (FERC-537); Comment Request; Extension

83 FR 23451 - Commission Information Collection Activities (FERC-537); Comment Request; Extension

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 83, Issue 98 (May 21, 2018)

Page Range23451-23452
FR Document2018-10753

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-537 (Gas Pipeline Certificates: Construction, Acquisition, and Abandonment).

Federal Register, Volume 83 Issue 98 (Monday, May 21, 2018)
[Federal Register Volume 83, Number 98 (Monday, May 21, 2018)]
[Notices]
[Pages 23451-23452]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-10753]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC18-13-000]


Commission Information Collection Activities (FERC-537); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on the currently approved 
information collection, FERC-537 (Gas Pipeline Certificates: 
Construction, Acquisition, and Abandonment).

DATES: Comments on the collection of information are due July 20, 2018.

ADDRESSES: You may submit comments (identified by Docket No. IC18-13-
000) by either of the following methods:
     eFiling at Commission's website: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE, 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
DataClearance@FERC.gov, telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-537 (Gas Pipeline Certificates: Construction, 
Acquisition, and Abandonment.
    OMB Control No.: 1902-0060.
    Type of Request: Three-year extension of the FERC-537 information 
collection requirements with no changes to the current reporting 
requirements.
    Abstract: The FERC-537 information collection requires natural gas 
companies to file the necessary information with FERC in order for the 
Commission to determine if the requested certificate should be 
authorized. Certain self-implementing construction and abandonment 
programs do not require the filing of applications. However, those 
types of programs do require the filing of annual reports, so many less 
significant actions can be reported in a single filing/response and 
less detail would be required.
    The data required to be submitted in a normal certificate filing 
consists of identification of the company and responsible officials, 
factors considered in the location of the facilities and the impact on 
the area for environmental considerations. Also to be submitted are the 
following, as applicable to the specific request:
     Flow diagrams showing the design capacity for engineering 
design verification and safety determination;
     Cost of proposed facilities, plans for financing, and 
estimated revenues and expenses related to the proposed facility for 
accounting and financial evaluation.
     Existing and proposed storage capacity and pressures and 
reservoir engineering studies for requests to increase storage 
capacity;
     An affidavit showing the consent of existing customers for 
abandonment of service requests.
    Additionally, requests for an increase of pipeline capacity must 
include a statement that demonstrates compliance with the Commission's 
Certificate Policy Statement by making a showing that the cost of the 
expansion will not be subsidized by existing customers and that there 
will not be adverse economic impacts to existing customers, competing 
pipelines or their customers, nor to landowners and to surrounding 
communities.
    Type of Respondents: Natural gas companies.
    Estimate of Annual Burden: \1\ The Commission estimates the annual 
public reporting burden for the information collection as:
---------------------------------------------------------------------------

    \1\ ``Burden'' is defined as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.

                                                                        FERC-537
                                         [Gas pipeline certificates: Construction, acquisition, and abandonment]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                       Annual  number
                                          Number of     of  responses   Total  number      Average burden and      Total annual  burden      Cost per
                                         respondents         per        of  responses    cost per  response \2\  hours and  total annual    respondent
                                                         respondent                                                        cost
                                                  (1)             (2)  (1) * (2) = (3)  (4)....................  (3) * (4) = (5)........   (5) / (1) \3\
--------------------------------------------------------------------------------------------------------------------------------------------------------
18 CFR 157.5-.11 (Interstate                       52            1.19               62  500 hrs.; $39,500......  31,000; $2,449,000.....         $47,096
 Certificate and Abandonment
 Applications).
18 CFR 157.53 (Pipeline Purging/                    1               1                1  50 hrs.; $3,950........  50 hrs.; $3,950........           3,950
 Testing Exemptions).
18 CFR 157.201-.209; 157.211; 157.214-             21            1.86               39  200 hrs; $15,800.......  7,800 hrs.; $616,200...          29,343
 .218 (Blanket Certificates Prior to
 Notice Filings).
18 CFR 157.201-.209; 157.211; 157.214-            129        \4\ 1.05              135  50 hrs.; $3,950........  6,750 hrs.; $533,250...           4,134
 .218 (Blanket Certificates--Annual
 Reports).

[[Page 23452]]

 
18 CFR 284.11 (NGPA Section 311                    83        \5\ 1.01               84  50 hrs.; $3,950........  4,200 hrs.; $331,800...           3,998
 Construction--Annual Reports).
18 CFR 284.8.........................             178               0                0  N/A....................  N/A....................             N/A
18 CFR 284.13(e) and 284.126(a)                     2               1                2  30 hrs.; $2,370........  60 hrs.; $4,740........           2,370
 (Interstate and Intrastate Bypass
 Notice).
18 CFR 284.221 (Blanket Certificates)               5         \7\ 1.4                7  100 hrs.; $7,900.......  700 hrs.; $55,300......          11,060
 \6\.
18 CFR 224 (Hinshaw Blanket                         2               1                2  75 hrs.; $5,925........  150 hrs.; $11,850......           5,925
 Certificates).
18 CFR 157.5-.11; 157.13-.20 (Non-                  3               1                3  75 hrs.; $5,925........  225 hrs.; $17,775......           5,925
 facility Certificate or Abandonment
 Applications).
                                      ------------------------------------------------------------------------------------------------------------------
    Total............................  ..............  ..............          \8\ 335  .......................  50,935 hrs.; $4,023,865  ..............
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Kwhether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.\\
---------------------------------------------------------------------------

    \2\ The estimates for cost per response are derived using the 
following formula: Average Burden Hours per Response * $79.00/hour = 
Average cost/response. The figure is the 2018 FERC average hourly 
cost (for wages and benefits) of $79.00 (and an average annual 
salary of $164,820/year). Commission staff is using the FERC average 
salary because we consider any reporting requirements completed in 
response to the FERC-537 to be compensated at rates similar to the 
work of FERC employees.
    \3\ Each of the figures in this column are rounded to the 
nearest dollar.
    \4\ This figure was derived from 135 responses / 129 respondents 
= 1.046 or ~1.05 responses/respondent.
    \5\ This figure was derived from 84 responses / 83 respondents = 
1.012 or ~1.01 responses/respondent.
    \6\ One-time filings, new tariff and rate design proposal, or 
request for exemptions.
    \7\ This figure was derived from 7 responses / 5 respondents = 
1.4 responses/respondent.
    \8\ The 335 responses are derived from 214 individual 
respondents.

     Dated: May 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-10753 Filed 5-18-18; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 83, No. 98 / Monday, May 21, 2018 / Notices                                                           23451

                                                  Dated: May 11, 2018.                                         Instructions: All submissions must be                   response and less detail would be
                                                Kimberly D. Bose,                                           formatted and filed in accordance with                     required.
                                                Secretary.                                                  submission guidelines at: http://                             The data required to be submitted in
                                                [FR Doc. 2018–10756 Filed 5–18–18; 8:45 am]                 www.ferc.gov/help/submission-                              a normal certificate filing consists of
                                                BILLING CODE 6717–01–P                                      guide.asp. For user assistance contact                     identification of the company and
                                                                                                            FERC Online Support by email at                            responsible officials, factors considered
                                                                                                            ferconlinesupport@ferc.gov, or by phone                    in the location of the facilities and the
                                                DEPARTMENT OF ENERGY                                        at: (866) 208–3676 (toll-free), or (202)                   impact on the area for environmental
                                                                                                            502–8659 for TTY.                                          considerations. Also to be submitted are
                                                Federal Energy Regulatory                                      Docket: Users interested in receiving                   the following, as applicable to the
                                                Commission                                                  automatic notification of activity in this                 specific request:
                                                [Docket No. IC18–13–000]                                    docket or in viewing/downloading                              • Flow diagrams showing the design
                                                                                                            comments and issuances in this docket                      capacity for engineering design
                                                Commission Information Collection                           may do so at http://www.ferc.gov/docs-                     verification and safety determination;
                                                Activities (FERC–537); Comment                              filing/docs-filing.asp.                                       • Cost of proposed facilities, plans for
                                                Request; Extension                                                                                                     financing, and estimated revenues and
                                                                                                            FOR FURTHER INFORMATION CONTACT:
                                                AGENCY: Federal Energy Regulatory                           Ellen Brown may be reached by email                        expenses related to the proposed facility
                                                Commission.                                                 at DataClearance@FERC.gov, telephone                       for accounting and financial evaluation.
                                                ACTION: Notice of information collection                    at (202) 502–8663, and fax at (202) 273–                      • Existing and proposed storage
                                                and request for comments.                                   0873.                                                      capacity and pressures and reservoir
                                                                                                                                                                       engineering studies for requests to
                                                                                                            SUPPLEMENTARY INFORMATION:                                 increase storage capacity;
                                                SUMMARY:   In compliance with the
                                                requirements of the Paperwork                                 Title: FERC–537 (Gas Pipeline                               • An affidavit showing the consent of
                                                Reduction Act of 1995, the Federal                          Certificates: Construction, Acquisition,                   existing customers for abandonment of
                                                Energy Regulatory Commission                                and Abandonment.                                           service requests.
                                                (Commission or FERC) is soliciting                            OMB Control No.: 1902–0060.                                 Additionally, requests for an increase
                                                public comment on the currently                               Type of Request: Three-year extension                    of pipeline capacity must include a
                                                approved information collection, FERC–                      of the FERC–537 information collection                     statement that demonstrates compliance
                                                537 (Gas Pipeline Certificates:                             requirements with no changes to the                        with the Commission’s Certificate
                                                Construction, Acquisition, and                              current reporting requirements.                            Policy Statement by making a showing
                                                Abandonment).                                                 Abstract: The FERC–537 information                       that the cost of the expansion will not
                                                DATES: Comments on the collection of                        collection requires natural gas                            be subsidized by existing customers and
                                                information are due July 20, 2018.                          companies to file the necessary                            that there will not be adverse economic
                                                ADDRESSES: You may submit comments                          information with FERC in order for the                     impacts to existing customers,
                                                (identified by Docket No. IC18–13–000)                      Commission to determine if the                             competing pipelines or their customers,
                                                by either of the following methods:                         requested certificate should be                            nor to landowners and to surrounding
                                                   • eFiling at Commission’s website:                       authorized. Certain self-implementing                      communities.
                                                http://www.ferc.gov/docs-filing/                            construction and abandonment                                  Type of Respondents: Natural gas
                                                efiling.asp.                                                programs do not require the filing of                      companies.
                                                   • Mail/Hand Delivery/Courier:                            applications. However, those types of                         Estimate of Annual Burden: 1 The
                                                Federal Energy Regulatory Commission,                       programs do require the filing of annual                   Commission estimates the annual public
                                                Secretary of the Commission, 888 First                      reports, so many less significant actions                  reporting burden for the information
                                                Street NE, Washington, DC 20426.                            can be reported in a single filing/                        collection as:

                                                                                                                                FERC–537
                                                                                              [Gas pipeline certificates: Construction, acquisition, and abandonment]

                                                                                                                       Annual                                   Average burden         Total annual
                                                                                                                     number of                Total
                                                                                                 Number of                                                           and               burden hours          Cost per
                                                                                                                     responses             number of
                                                                                                respondents                                                        cost per                 and             respondent
                                                                                                                        per                responses              response 2         total annual cost
                                                                                                                    respondent

                                                                                                      (1)                (2)              (1) * (2) = (3)              (4)             (3) * (4) = (5)       (5) ÷ (1) 3

                                                18 CFR 157.5–.11 (Interstate Cer-                            52                 1.19                   62       500 hrs.;            31,000;                      $47,096
                                                  tificate and Abandonment Appli-                                                                                 $39,500.             $2,449,000.
                                                  cations).
                                                18 CFR 157.53 (Pipeline Purging/                              1                    1                        1   50 hrs.; $3,950 ..   50 hrs.; $3,950 ..             3,950
                                                  Testing Exemptions).
                                                18 CFR 157.201–.209; 157.211;                                21                 1.86                   39       200 hrs; $15,800     7,800 hrs.;                   29,343
                                                  157.214–.218 (Blanket Certifi-                                                                                                       $616,200.
sradovich on DSK3GMQ082PROD with NOTICES




                                                  cates Prior to Notice Filings).
                                                18 CFR 157.201–.209; 157.211;                               129                4 1.05                 135       50 hrs.; $3,950 ..   6,750 hrs.;                    4,134
                                                  157.214–.218 (Blanket Certifi-                                                                                                       $533,250.
                                                  cates—Annual Reports).

                                                   1 ‘‘Burden’’ is defined as the total time, effort, or    information to or for a Federal agency. For further        collection burden, reference 5 Code of Federal
                                                financial resources expended by persons to                  explanation of what is included in the information         Regulations 1320.3.
                                                generate, maintain, retain, or disclose or provide



                                           VerDate Sep<11>2014     18:20 May 18, 2018    Jkt 244001    PO 00000   Frm 00038    Fmt 4703   Sfmt 4703   E:\FR\FM\21MYN1.SGM       21MYN1


                                                23452                                    Federal Register / Vol. 83, No. 98 / Monday, May 21, 2018 / Notices

                                                                                                                                     FERC–537—Continued
                                                                                                      [Gas pipeline certificates: Construction, acquisition, and abandonment]

                                                                                                                                      Annual                                       Average burden                  Total annual
                                                                                                                                    number of                   Total
                                                                                                        Number of                                                                       and                        burden hours                Cost per
                                                                                                                                    responses                number of
                                                                                                       respondents                                                                    cost per                          and                   respondent
                                                                                                                                       per                   responses               response 2                  total annual cost
                                                                                                                                   respondent

                                                                                                               (1)                        (2)               (1) * (2) = (3)                  (4)                   (3) * (4) = (5)              (5) ÷ (1) 3

                                                18 CFR 284.11 (NGPA Section                                               83                    5 1.01                    84      50 hrs.; $3,950 ..             4,200 hrs.;                               3,998
                                                  311 Construction—Annual Re-                                                                                                                                      $331,800.
                                                  ports).
                                                18 CFR 284.8 .................................                          178                           0                       0   N/A ....................       N/A ....................                   N/A
                                                18 CFR 284.13(e) and 284.126(a)                                           2                           1                       2   30 hrs.; $2,370 ..             60 hrs.; $4,740 ..                       2,370
                                                  (Interstate and Intrastate Bypass
                                                  Notice).
                                                18 CFR 284.221 (Blanket Certifi-                                           5                     7 1.4                        7   100 hrs.; $7,900               700 hrs.;                               11,060
                                                  cates) 6.                                                                                                                                                        $55,300.
                                                18 CFR 224 (Hinshaw Blanket                                                 2                         1                       2   75 hrs.; $5,925 ..             150 hrs.;                                 5,925
                                                  Certificates).                                                                                                                                                   $11,850.
                                                18 CFR 157.5–.11; 157.13–.20                                               3                           1                      3   75 hrs.; $5,925 ..             225 hrs.;                                5,925
                                                  (Non-facility Certificate or Aban-                                                                                                                               $17,775.
                                                  donment Applications).

                                                     Total ........................................   ........................   ........................               8 335     ............................   50,935 hrs.;               ........................
                                                                                                                                                                                                                   $4,023,865.



                                                  Comments: Comments are invited on:                                      Dated: May 14, 2018.                                                  g. Filed Pursuant to: Federal Power
                                                (1) Kwhether the collection of                                          Kimberly D. Bose,                                                     Act, 16 U.S.C. 791a–825r.
                                                information is necessary for the proper                                 Secretary.                                                              h. Applicant Contact: Barry Stemm,
                                                performance of the functions of the                                     [FR Doc. 2018–10753 Filed 5–18–18; 8:45 am]                           Engineering Manager, Sappi North
                                                Commission, including whether the                                       BILLING CODE 6717–01–P
                                                                                                                                                                                              America, P.O. Box 5000, Westbrook, ME
                                                information will have practical utility;                                                                                                      04098, (207) 856–4584, and Briana K.
                                                (2) the accuracy of the agency’s estimate                                                                                                     O’Regan, Esq., Assistant General
                                                of the burden and cost of the collection                                DEPARTMENT OF ENERGY                                                  Counsel, Sappi North America, 179 John
                                                                                                                                                                                              Roberts Road, South Portland, ME
                                                of information, including the validity of
                                                                                                                        Federal Energy Regulatory                                             04106, (207) 854–7070.
                                                the methodology and assumptions used;                                                                                                           i. FERC Contact: Dr. Jennifer Ambler,
                                                                                                                        Commission
                                                (3) ways to enhance the quality, utility                                                                                                      (202) 502–8586, or jennifer.ambler@
                                                and clarity of the information collection;                              [Project Nos. 2897–048, 2932–047, 2941–                               ferc.gov.
                                                and (4) ways to minimize the burden of                                  043, 2931–042, 2942–051]                                                j. Deadline for filing motions to
                                                the collection of information on those                                                                                                        intervene and protests, comments, terms
                                                                                                                        Notice of Applications Accepted for
                                                who are to respond, including the use                                                                                                         and conditions, recommendations, and
                                                                                                                        Filing, Soliciting Motions To Intervene
                                                of automated collection techniques or                                                                                                         prescriptions: 30 Days from the issuance
                                                                                                                        and Protests, Ready for Environmental
                                                other forms of information technology.                                  Analysis, and Soliciting Comments,                                    date of this notice.
                                                                                                                                                                                                The Commission strongly encourages
                                                                                                                        Terms and Conditions,
                                                  2 The estimates for cost per response are derived                                                                                           electronic filing. Please file motions to
                                                                                                                        Recommendations, and Prescriptions;
                                                using the following formula: Average Burden Hours                                                                                             intervene and protests, comments, terms
                                                                                                                        S.D. Warren Company
                                                per Response * $79.00/hour = Average cost/                                                                                                    and conditions, recommendations, and
                                                response. The figure is the 2018 FERC average                              Take notice that the following                                     prescriptions using the Commission’s
                                                hourly cost (for wages and benefits) of $79.00 (and                                                                                           eFiling system at http://www.ferc.gov/
                                                                                                                        hydroelectric applications have been
                                                an average annual salary of $164,820/year).
                                                Commission staff is using the FERC average salary
                                                                                                                        filed with the Commission and are                                     docs-filing/efiling.asp. Commenters can
                                                because we consider any reporting requirements                          available for public inspection:                                      submit brief comments up to 6,000
                                                completed in response to the FERC–537 to be                                a. Type of Applications: Surrender of                              characters, without prior registration,
                                                compensated at rates similar to the work of FERC                        License; Amendment of Licenses.                                       using the eComment system at http://
                                                employees.                                                                 b. Project Nos.: 2897–048 (Surrender);                             www.ferc.gov/docs-filing/
                                                  3 Each of the figures in this column are rounded
                                                                                                                        2932–047, 2941–043, 2931–042, 2942–                                   ecomment.asp. You must include your
                                                to the nearest dollar.                                                  051 (Amendments).                                                     name and contact information at the end
                                                  4 This figure was derived from 135 responses ÷
                                                                                                                           c. Date Filed: March 23, 2018.                                     of your comments. For assistance,
                                                129 respondents = 1.046 or ∼1.05 responses/                                d. Applicant: S.D. Warren Company.                                 please contact FERC Online Support at
                                                respondent.
                                                                                                                           e. Name of Projects: Saccarappa                                    FERCOnlineSupport@ferc.gov, (866)
sradovich on DSK3GMQ082PROD with NOTICES




                                                  5 This figure was derived from 84 responses ÷ 83

                                                respondents = 1.012 or ∼1.01 responses/respondent.
                                                                                                                        Hydroelectric Project (Surrender);                                    208–3676 (toll free), or (202) 502–8659
                                                  6 One-time filings, new tariff and rate design                        Mallison Falls, Little Falls, Gambo, and                              (TTY). In lieu of electronic filing, please
                                                proposal, or request for exemptions.                                    Dundee Hydroelectric Projects                                         send a paper copy to: Secretary, Federal
                                                  7 This figure was derived from 7 responses ÷ 5                        (Amendments).                                                         Energy Regulatory Commission, 888
                                                respondents = 1.4 responses/respondent.                                    f. Location: On the Presumpscot River                              First Street NE, Washington, DC 20426.
                                                  8 The 335 responses are derived from 214                              in Westbrook, Cumberland County,                                      The first page of any filing should
                                                individual respondents.                                                 Maine.                                                                include docket numbers P–2897–048,


                                           VerDate Sep<11>2014       18:20 May 18, 2018        Jkt 244001       PO 00000         Frm 00039      Fmt 4703    Sfmt 4703    E:\FR\FM\21MYN1.SGM               21MYN1



Document Created: 2018-11-02 11:07:22
Document Modified: 2018-11-02 11:07:22
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collection and request for comments.
DatesComments on the collection of information are due July 20, 2018.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.
FR Citation83 FR 23451 