83_FR_23558 83 FR 23460 - Notice of Availability of the Deepwater Horizon Oil Spill Louisiana Trustee Implementation Group Draft Supplemental Restoration Plan and Environmental Assessment for the Elmer's Island Access Project Modification

83 FR 23460 - Notice of Availability of the Deepwater Horizon Oil Spill Louisiana Trustee Implementation Group Draft Supplemental Restoration Plan and Environmental Assessment for the Elmer's Island Access Project Modification

ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 83, Issue 98 (May 21, 2018)

Page Range23460-23461
FR Document2018-10112

On December 20, 2017, the Environmental Protection Agency (EPA) published a Notice of Availability of the Deepwater Horizon Oil Spill Louisiana Trustee Implementation Group (Louisiana TIG) Draft Restoration Plan and Environmental Assessment #2: Provide and Enhance Recreational Opportunities (Draft RP/EA #2) and requested comments from the public. In response to the public comments received on the Elmer's Island Access project proposed in the Draft RP/EA #2, the Louisiana TIG is proposing a modification to the original Elmer's Island Access project feature. In accordance with the Oil Pollution Act of 1990 (OPA) and the National Environmental Policy Act (NEPA), the Federal and State natural resource trustee agencies for the Louisiana TIG prepared a Draft Supplemental Restoration Plan and Environmental Assessment for the Elmer's Island Access Project Modification (Draft Supplemental RP/ EA). The Draft Supplemental RP/EA evaluates the proposed change to the Elmer's Island Access project and alternatives considered by the Louisiana TIG under criteria set forth in the OPA natural resource damage assessment (NRDA) regulations, and evaluates their environmental effects in accordance with NEPA. The proposed modification to the Elmer's Island Access project is consistent with the restoration alternatives selected in the Deepwater Horizon oil spill Final Programmatic Damage Assessment and Restoration Plan/Programmatic Environmental Impact Statement (PDARP/PEIS). The purpose of this notice is to inform the public of the availability of the Draft Supplemental RP/EA and to seek public comments on the document.

Federal Register, Volume 83 Issue 98 (Monday, May 21, 2018)
[Federal Register Volume 83, Number 98 (Monday, May 21, 2018)]
[Notices]
[Pages 23460-23461]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2018-10112]



[[Page 23460]]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[FRL-9977-97-OW]


Notice of Availability of the Deepwater Horizon Oil Spill 
Louisiana Trustee Implementation Group Draft Supplemental Restoration 
Plan and Environmental Assessment for the Elmer's Island Access Project 
Modification

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of availability; request for public comments.

-----------------------------------------------------------------------

SUMMARY: On December 20, 2017, the Environmental Protection Agency 
(EPA) published a Notice of Availability of the Deepwater Horizon Oil 
Spill Louisiana Trustee Implementation Group (Louisiana TIG) Draft 
Restoration Plan and Environmental Assessment #2: Provide and Enhance 
Recreational Opportunities (Draft RP/EA #2) and requested comments from 
the public. In response to the public comments received on the Elmer's 
Island Access project proposed in the Draft RP/EA #2, the Louisiana TIG 
is proposing a modification to the original Elmer's Island Access 
project feature. In accordance with the Oil Pollution Act of 1990 (OPA) 
and the National Environmental Policy Act (NEPA), the Federal and State 
natural resource trustee agencies for the Louisiana TIG prepared a 
Draft Supplemental Restoration Plan and Environmental Assessment for 
the Elmer's Island Access Project Modification (Draft Supplemental RP/
EA). The Draft Supplemental RP/EA evaluates the proposed change to the 
Elmer's Island Access project and alternatives considered by the 
Louisiana TIG under criteria set forth in the OPA natural resource 
damage assessment (NRDA) regulations, and evaluates their environmental 
effects in accordance with NEPA. The proposed modification to the 
Elmer's Island Access project is consistent with the restoration 
alternatives selected in the Deepwater Horizon oil spill Final 
Programmatic Damage Assessment and Restoration Plan/Programmatic 
Environmental Impact Statement (PDARP/PEIS). The purpose of this notice 
is to inform the public of the availability of the Draft Supplemental 
RP/EA and to seek public comments on the document.

DATES: The Louisiana TIG will consider public comments received on or 
before June 20, 2018.
    Public Meeting: The Louisiana TIG will also take verbal comments at 
a public meeting that will be held at the Tulane River and Coastal 
Center on May 22, 2018; Open House 5:30 p.m., Meeting 6:00 p.m.; 1370 
Port of New Orleans Place, New Orleans, LA 70130.

ADDRESSES: Obtaining Documents: You may download the Draft Supplemental 
RP/EA at any of the following sites:
     http://www.gulfspillrestoration.noaa.gov.
     http://www.la-dwh.com.
    Alternatively, you may request a CD of the Draft Supplemental RP/EA 
(see FOR FURTHER INFORMATION CONTACT). You may also view the document 
at any of the public facilities listed at http://www.gulfspillrestoration.noaa.gov.
    Submitting Comments: You may submit comments on the Draft 
Supplemental RP/EA by one of the following methods:
     Via the Web: http://www.gulfspillrestoration.noaa.gov/restoration-areas/louisiana.
     Via U.S. Mail: U.S. Fish and Wildlife Service, P.O. Box 
49567, Atlanta, GA 30345.
     In Person: Verbal comments may be provided at the public 
meeting on May 22, 2018.
    Once submitted, comments cannot be edited or withdrawn. The 
Louisiana TIG may publish any comment received on the document. Do not 
submit electronically any information you consider to be Confidential 
Business Information (CBI) or other information whose disclosure is 
restricted by statute. Multimedia submissions (audio, video, etc.) must 
be accompanied by a written comment. The written comment is considered 
the official comment and should include discussion of all points you 
wish to make. The Louisiana TIG will generally not consider comments or 
comment contents located outside of the primary submission (i.e. on the 
web, cloud, or other file sharing system). Please be aware that your 
entire comment, including your personal identifying information, will 
become part of the public record. Please note that mailed comments must 
be postmarked on or before the comment deadline of 30 days following 
publication of this notice to be considered.

FOR FURTHER INFORMATION CONTACT: 
     Louisiana--Joann Hicks, 225-342-5477.
     EPA--Tim Landers, 202-566-2231.

SUPPLEMENTARY INFORMATION:

Introduction

    On April 20, 2010, the mobile offshore drilling unit Deepwater 
Horizon, which was being used to drill a well for BP Exploration and 
Production, Inc. (BP), in the Macondo prospect (Mississippi Canyon 252-
MC252), experienced a significant explosion, fire, and subsequent 
sinking in the Gulf of Mexico, resulting in an unprecedented volume of 
oil and other discharges from the rig and from the wellhead on the 
seabed. The Deepwater Horizon oil spill is the largest off shore oil 
spill in U.S. history, discharging millions of barrels of oil over a 
period of 87 days.
    The Trustees conducted the natural resource damage assessment for 
the Deepwater Horizon oil spill under the Oil Pollution Act of 1990 (33 
U.S.C. 2701 et seq.). Under OPA, Federal and State agencies act as 
trustees on behalf of the public to assess natural resource injuries 
and losses and to determine the actions required to compensate the 
public for those injuries and losses. OPA further instructs the 
designated trustees to develop and implement a plan for the 
restoration, rehabilitation, replacement, or acquisition of the 
equivalent of the injured natural resources under their trusteeship, 
including the loss of use and services from those resources from the 
time of injury until the time restoration to baseline (the resource 
quality and conditions that would exist if the spill had not occurred) 
is complete.
    The Deepwater Horizon oil spill Trustees are:
     U.S. Environmental Protection Agency (EPA);
     U.S. Department of the Interior (DOI), as represented by 
the National Park Service,
    U.S. Fish and Wildlife Service, and Bureau of Land Management;
     National Oceanic and Atmospheric Administration (NOAA), on 
behalf of the U.S. Department of Commerce;
     U.S. Department of Agriculture (USDA);
     State of Louisiana Coastal Protection and Restoration 
Authority (CPRA), Oil Spill Coordinator's Office (LOSCO), Department of 
Environmental Quality (LDEQ), Department of Wildlife and Fisheries 
(LDWF), and Department of Natural Resources (LDNR);
     State of Mississippi Department of Environmental Quality;
     State of Alabama Department of Conservation and Natural 
Resources and Geological Survey of Alabama;
     State of Florida Department of Environmental Protection 
and Fish and Wildlife Conservation Commission; and
     State of Texas Parks and Wildlife Department, General Land 
Office, and Commission on Environmental Quality.
    On April 4, 2016, the Trustees reached and finalized a settlement 
of their natural resource damage claims

[[Page 23461]]

with BP in a Consent Decree approved by the United States District 
Court for the Eastern District of Louisiana. Pursuant to that Consent 
Decree, restoration projects in the Louisiana Restoration Area are now 
chosen and managed by the Louisiana TIG. The Louisiana TIG is composed 
of the following Trustees: CPRA, LOSCO, LDEQ, LDWF, LDNR, EPA, DOI, 
NOAA, USDA.

Background

    In the December 2017 Draft RP/EA #2, the Louisiana TIG presented to 
the public its plan for providing partial compensation for recreational 
use services lost as a result of the Deepwater Horizon oil spill. The 
public comment period for the Draft RP/EA #2 began on December 20, 
2017, and closed on February 2, 2018. The Louisiana TIG hosted a public 
meeting on January 24, 2018, in New Orleans. The Draft RP/EA #2 
proposed four restoration projects, evaluated in accordance with OPA 
and NEPA, including the Elmer's Island Access project. As proposed, the 
Elmer's Island Access project would enhance recreational opportunities 
within the Elmer's Island Refuge by incorporating a suite of features 
to improve upon existing access points, enhance the natural features of 
the area through reconnected hydrology, and develop a solution for 
improved access for recreational fishing activities targeting the 
eastern portion of Elmer's Island adjacent to Caminada Pass. In 
response to the public comments received on the Elmer's Island Access 
project proposed in the Draft RP/EA #2, the Louisiana TIG is proposing 
a modification to the original project feature. This modification would 
eliminate the proposed boardwalk and associated small boat launch and 
parking area at Elmer's Island, and provide a beach shuttle service 
that would allow improved public access to Caminada Pass, the most 
popular location for recreational fishing on Elmer's Island. The 
Louisiana TIG has prepared the Draft Supplemental RP/EA to inform the 
public about the proposed modification to the Elmer's Island Access 
project and to seek public comment.

Next Steps

    The public is encouraged to review and comment on the Draft 
Supplemental RP/EA. A public meeting is scheduled to also help 
facilitate the public review and comment process. Comments provided on 
the Draft Supplemental RP/EA will be considered along with comments 
previously received on the Draft RP/EA #2. A summary of comments 
received on the Draft Supplemental RP/EA and the Draft RP/EA #2 and the 
Louisiana TIG's responses, where applicable, will be included in the 
Final Restoration Plan/Environmental Assessment #2: Provide and Enhance 
Recreational Opportunities (Final RP/EA #2). Public comments on the 
Draft Supplemental RP/EA will inform the Louisiana TIG's decision on 
whether to select the Elmer's Island Access project, as modified, in 
the Final RP/EA #2.

Administrative Record

    The documents comprising the Administrative Record for the Draft 
Supplemental RP/EA can be viewed electronically at http://www.doi.gov/deepwaterhorizon/administrativerecord.

Authority

    The authority for this action is the Oil Pollution Act of 1990 (33 
U.S.C. 2701 et seq.), its implementing NRDA regulations found at 15 CFR 
part 990, and NEPA (42 U.S.C. 4321 et seq.).

    Dated: May 3, 2018.
Benita Best-Wong,
Acting Principal Deputy Assistant Administrator, Office of Water.
[FR Doc. 2018-10112 Filed 5-18-18; 8:45 am]
 BILLING CODE 6560-50-P



                                                23460                           Federal Register / Vol. 83, No. 98 / Monday, May 21, 2018 / Notices

                                                ENVIRONMENTAL PROTECTION                                public meeting that will be held at the               Production, Inc. (BP), in the Macondo
                                                AGENCY                                                  Tulane River and Coastal Center on May                prospect (Mississippi Canyon 252–
                                                                                                        22, 2018; Open House 5:30 p.m.,                       MC252), experienced a significant
                                                [FRL–9977–97–OW]                                        Meeting 6:00 p.m.; 1370 Port of New                   explosion, fire, and subsequent sinking
                                                                                                        Orleans Place, New Orleans, LA 70130.                 in the Gulf of Mexico, resulting in an
                                                Notice of Availability of the Deepwater
                                                                                                        ADDRESSES: Obtaining Documents: You                   unprecedented volume of oil and other
                                                Horizon Oil Spill Louisiana Trustee
                                                                                                        may download the Draft Supplemental                   discharges from the rig and from the
                                                Implementation Group Draft
                                                                                                        RP/EA at any of the following sites:                  wellhead on the seabed. The Deepwater
                                                Supplemental Restoration Plan and
                                                Environmental Assessment for the                          • http://www.gulfspill                              Horizon oil spill is the largest off shore
                                                                                                        restoration.noaa.gov.                                 oil spill in U.S. history, discharging
                                                Elmer’s Island Access Project
                                                Modification                                              • http://www.la-dwh.com.                            millions of barrels of oil over a period
                                                                                                          Alternatively, you may request a CD                 of 87 days.
                                                AGENCY:  Environmental Protection                       of the Draft Supplemental RP/EA (see                     The Trustees conducted the natural
                                                Agency (EPA).                                           FOR FURTHER INFORMATION CONTACT). You                 resource damage assessment for the
                                                ACTION: Notice of availability; request                 may also view the document at any of                  Deepwater Horizon oil spill under the
                                                for public comments.                                    the public facilities listed at http://               Oil Pollution Act of 1990 (33 U.S.C.
                                                                                                        www.gulfspillrestoration.noaa.gov.                    2701 et seq.). Under OPA, Federal and
                                                SUMMARY:    On December 20, 2017, the                     Submitting Comments: You may                        State agencies act as trustees on behalf
                                                Environmental Protection Agency (EPA)                   submit comments on the Draft                          of the public to assess natural resource
                                                published a Notice of Availability of the               Supplemental RP/EA by one of the                      injuries and losses and to determine the
                                                Deepwater Horizon Oil Spill Louisiana                   following methods:                                    actions required to compensate the
                                                Trustee Implementation Group                              • Via the Web: http://www.gulfspill                 public for those injuries and losses.
                                                (Louisiana TIG) Draft Restoration Plan                  restoration.noaa.gov/restoration-areas/               OPA further instructs the designated
                                                and Environmental Assessment #2:                        louisiana.                                            trustees to develop and implement a
                                                Provide and Enhance Recreational                          • Via U.S. Mail: U.S. Fish and                      plan for the restoration, rehabilitation,
                                                Opportunities (Draft RP/EA #2) and                      Wildlife Service, P.O. Box 49567,                     replacement, or acquisition of the
                                                requested comments from the public. In                  Atlanta, GA 30345.                                    equivalent of the injured natural
                                                response to the public comments                           • In Person: Verbal comments may be                 resources under their trusteeship,
                                                received on the Elmer’s Island Access                   provided at the public meeting on May                 including the loss of use and services
                                                project proposed in the Draft RP/EA #2,                 22, 2018.                                             from those resources from the time of
                                                the Louisiana TIG is proposing a                          Once submitted, comments cannot be                  injury until the time restoration to
                                                modification to the original Elmer’s                    edited or withdrawn. The Louisiana TIG                baseline (the resource quality and
                                                Island Access project feature. In                       may publish any comment received on                   conditions that would exist if the spill
                                                accordance with the Oil Pollution Act of                the document. Do not submit                           had not occurred) is complete.
                                                1990 (OPA) and the National                             electronically any information you                       The Deepwater Horizon oil spill
                                                Environmental Policy Act (NEPA), the                    consider to be Confidential Business                  Trustees are:
                                                Federal and State natural resource                      Information (CBI) or other information                   • U.S. Environmental Protection
                                                trustee agencies for the Louisiana TIG                  whose disclosure is restricted by statute.            Agency (EPA);
                                                prepared a Draft Supplemental                           Multimedia submissions (audio, video,                    • U.S. Department of the Interior
                                                Restoration Plan and Environmental                      etc.) must be accompanied by a written                (DOI), as represented by the National
                                                Assessment for the Elmer’s Island                       comment. The written comment is                       Park Service,
                                                Access Project Modification (Draft                      considered the official comment and                      U.S. Fish and Wildlife Service, and
                                                Supplemental RP/EA). The Draft                          should include discussion of all points               Bureau of Land Management;
                                                Supplemental RP/EA evaluates the                        you wish to make. The Louisiana TIG                      • National Oceanic and Atmospheric
                                                proposed change to the Elmer’s Island                   will generally not consider comments or               Administration (NOAA), on behalf of
                                                Access project and alternatives                         comment contents located outside of the               the U.S. Department of Commerce;
                                                considered by the Louisiana TIG under                   primary submission (i.e. on the web,                     • U.S. Department of Agriculture
                                                criteria set forth in the OPA natural                   cloud, or other file sharing system).                 (USDA);
                                                                                                        Please be aware that your entire                         • State of Louisiana Coastal
                                                resource damage assessment (NRDA)
                                                                                                        comment, including your personal                      Protection and Restoration Authority
                                                regulations, and evaluates their
                                                                                                        identifying information, will become                  (CPRA), Oil Spill Coordinator’s Office
                                                environmental effects in accordance
                                                                                                        part of the public record. Please note                (LOSCO), Department of Environmental
                                                with NEPA. The proposed modification
                                                                                                        that mailed comments must be                          Quality (LDEQ), Department of Wildlife
                                                to the Elmer’s Island Access project is
                                                                                                        postmarked on or before the comment                   and Fisheries (LDWF), and Department
                                                consistent with the restoration
                                                                                                        deadline of 30 days following                         of Natural Resources (LDNR);
                                                alternatives selected in the Deepwater                                                                           • State of Mississippi Department of
                                                Horizon oil spill Final Programmatic                    publication of this notice to be
                                                                                                        considered.                                           Environmental Quality;
                                                Damage Assessment and Restoration                                                                                • State of Alabama Department of
                                                Plan/Programmatic Environmental                         FOR FURTHER INFORMATION CONTACT:                      Conservation and Natural Resources and
                                                Impact Statement (PDARP/PEIS). The                        • Louisiana—Joann Hicks, 225–342–                   Geological Survey of Alabama;
                                                purpose of this notice is to inform the                 5477.                                                    • State of Florida Department of
                                                public of the availability of the Draft                   • EPA—Tim Landers, 202–566–2231.
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                              Environmental Protection and Fish and
                                                Supplemental RP/EA and to seek public                   SUPPLEMENTARY INFORMATION:                            Wildlife Conservation Commission; and
                                                comments on the document.                                                                                        • State of Texas Parks and Wildlife
                                                DATES: The Louisiana TIG will consider                  Introduction                                          Department, General Land Office, and
                                                public comments received on or before                     On April 20, 2010, the mobile                       Commission on Environmental Quality.
                                                June 20, 2018.                                          offshore drilling unit Deepwater                         On April 4, 2016, the Trustees
                                                   Public Meeting: The Louisiana TIG                    Horizon, which was being used to drill                reached and finalized a settlement of
                                                will also take verbal comments at a                     a well for BP Exploration and                         their natural resource damage claims


                                           VerDate Sep<11>2014   18:20 May 18, 2018   Jkt 244001   PO 00000   Frm 00047   Fmt 4703   Sfmt 4703   E:\FR\FM\21MYN1.SGM   21MYN1


                                                                                Federal Register / Vol. 83, No. 98 / Monday, May 21, 2018 / Notices                                                   23461

                                                with BP in a Consent Decree approved                    Draft Supplemental RP/EA and the Draft                  Final Supplemental Environmental
                                                by the United States District Court for                 RP/EA #2 and the Louisiana TIG’s                        Impact Statement/Environmental
                                                the Eastern District of Louisiana.                      responses, where applicable, will be                    Impact Report/Land Use Plan
                                                Pursuant to that Consent Decree,                        included in the Final Restoration Plan/                 Amendment, Review Period Ends: 06/
                                                restoration projects in the Louisiana                   Environmental Assessment #2: Provide                    21/2018, Contact: Mark DeMaio 760–
                                                Restoration Area are now chosen and                     and Enhance Recreational Opportunities                  833–7124.
                                                managed by the Louisiana TIG. The                       (Final RP/EA #2). Public comments on                  EIS No. 20180097, Final, USFS, CO,
                                                Louisiana TIG is composed of the                        the Draft Supplemental RP/EA will                       Travel Management—Rico West
                                                following Trustees: CPRA, LOSCO,                        inform the Louisiana TIG’s decision on                  Dolores Roads and Trails Project,
                                                LDEQ, LDWF, LDNR, EPA, DOI, NOAA,                       whether to select the Elmer’s Island                    Review Period Ends: 06/21/2018,
                                                USDA.                                                   Access project, as modified, in the Final               Contact: Deborah Kill 970–882–6822.
                                                Background                                              RP/EA #2.                                             EIS No. 20180098, Final, USFS, MT,
                                                                                                                                                                Starry Goat, Review Period Ends: 06/
                                                   In the December 2017 Draft RP/EA #2,                 Administrative Record
                                                                                                                                                                21/2018, Contact: Lisa Osborn 406–
                                                the Louisiana TIG presented to the                        The documents comprising the                          295–7426.
                                                public its plan for providing partial                   Administrative Record for the Draft                   EIS No. 20180099, Draft, FAA, AZ,
                                                compensation for recreational use                       Supplemental RP/EA can be viewed                        Tucson International Airport—
                                                services lost as a result of the Deepwater              electronically at http://www.doi.gov/                   Airfield Safety Enhancement Project,
                                                Horizon oil spill. The public comment                   deepwaterhorizon/administrativerecord.                  Comment Period Ends: 07/09/2018,
                                                period for the Draft RP/EA #2 began on                                                                          Contact: David B. Kessler, AICP 310–
                                                December 20, 2017, and closed on                        Authority
                                                                                                                                                                725–3615.
                                                February 2, 2018. The Louisiana TIG                       The authority for this action is the Oil            EIS No. 20180100, Final, USFS, CO, P
                                                hosted a public meeting on January 24,                  Pollution Act of 1990 (33 U.S.C. 2701 et                District-wide Salvage Project, Review
                                                2018, in New Orleans. The Draft RP/EA                   seq.), its implementing NRDA                            Period Ends: 07/05/2018, Contact:
                                                #2 proposed four restoration projects,                  regulations found at 15 CFR part 990,                   Mike Tooley 719–274–6321.
                                                evaluated in accordance with OPA and                    and NEPA (42 U.S.C. 4321 et seq.).                    EIS No. 20180101, Draft Supplement,
                                                NEPA, including the Elmer’s Island                                                                              Caltrans, CA, SR 710 North Study
                                                                                                          Dated: May 3, 2018.
                                                Access project. As proposed, the Elmer’s                                                                        FRDEIR/SDEIS_05–09–18, Comment
                                                Island Access project would enhance                     Benita Best-Wong,
                                                                                                        Acting Principal Deputy Assistant
                                                                                                                                                                Period Ends: 07/05/2018, Contact:
                                                recreational opportunities within the                                                                           Jason Roach 213–897–0357.
                                                Elmer’s Island Refuge by incorporating                  Administrator, Office of Water.
                                                                                                        [FR Doc. 2018–10112 Filed 5–18–18; 8:45 am]
                                                                                                                                                              EIS No. 20180102, Draft, NMFS, FL,
                                                a suite of features to improve upon                                                                             Coral Habitat Areas Considered for
                                                existing access points, enhance the                     BILLING CODE 6560–50–P
                                                                                                                                                                Habitat Areas of Particular Concern
                                                natural features of the area through                                                                            Designation in the Gulf of Mexico,
                                                reconnected hydrology, and develop a                                                                            Comment Period Ends: 07/05/2018,
                                                solution for improved access for                        ENVIRONMENTAL PROTECTION
                                                                                                        AGENCY                                                  Contact: Lauren Waters 727–209–
                                                recreational fishing activities targeting                                                                       5991.
                                                the eastern portion of Elmer’s Island                   [ER–FRL–9039–04–OP]                                   EIS No. 20180103, Final, USFWS, CA,
                                                adjacent to Caminada Pass. In response                                                                          Otay River Estuary Restoration
                                                to the public comments received on the                  Environmental Impact Statements;                        Project, South San Diego Bay Unit of
                                                Elmer’s Island Access project proposed                  Notice of Availability                                  the San Diego Bay National Wildlife
                                                in the Draft RP/EA #2, the Louisiana
                                                                                                          Responsible Agency: Office of Federal                 Refuge, California, Final
                                                TIG is proposing a modification to the
                                                                                                        Activities, General Information (202)                   Environmental Impact Statement,
                                                original project feature. This
                                                                                                        564–7156 or https://                                    Review Period Ends:
                                                modification would eliminate the
                                                                                                        www2.epa.gov/nepa/.                                     06/21/2018, Contact: Brian Collins
                                                proposed boardwalk and associated
                                                                                                        Weekly receipt of Environmental Impact                  619–575–2704.
                                                small boat launch and parking area at
                                                Elmer’s Island, and provide a beach                       Statements                                            Dated: May 17, 2018.
                                                shuttle service that would allow                        Filed 05/07/2018 Through 05/11/2018                   Brittany Bolen,
                                                improved public access to Caminada                      Pursuant to 40 CFR 1506.9                             Acting Assistant Administrator, Office of
                                                Pass, the most popular location for                                                                           Policy.
                                                                                                        Notice
                                                recreational fishing on Elmer’s Island.                                                                       [FR Doc. 2018–10937 Filed 5–18–18; 8:45 am]
                                                The Louisiana TIG has prepared the                        Section 309(a) of the Clean Air Act                 BILLING CODE 6560–50–P
                                                Draft Supplemental RP/EA to inform the                  requires that EPA make public its
                                                public about the proposed modification                  comments on EISs issued by other
                                                to the Elmer’s Island Access project and                Federal agencies. EPA’s comment letters               DEPARTMENT OF HEALTH AND
                                                to seek public comment.                                 on EISs are available at: https://                    HUMAN SERVICES
                                                                                                        cdxnodengn.epa.gov/cdx-nepa-public/
                                                Next Steps                                              action/eis/search.                                    Food and Drug Administration
                                                   The public is encouraged to review                   EIS No. 20180095, Final, USFWS, CA,
                                                and comment on the Draft                                  Final Environmental Impact                          [Docket No. FDA–2017–D–6759]
                                                Supplemental RP/EA. A public meeting                      Statement/Environmental Impact
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                              Establishing Effectiveness for Drugs
                                                is scheduled to also help facilitate the                  Report for the South Sacramento                     Intended To Treat Male
                                                public review and comment process.                        Habitat Conservation Plan, Review                   Hypogonadotropic Hypogonadism
                                                Comments provided on the Draft                            Period Ends: 06/21/2018, Contact:                   Attributed to Nonstructural Disorders;
                                                Supplemental RP/EA will be considered                     Nina Bicknese 916–414–6633.                         Guidance for Industry; Availability
                                                along with comments previously                          EIS No. 20180096, Final Supplement,
                                                received on the Draft RP/EA #2. A                         BLM, CA, Palen Solar Project                        AGENCY:   Food and Drug Administration,
                                                summary of comments received on the                       (formerly Palen Solar Power Project),               HHS.


                                           VerDate Sep<11>2014   18:20 May 18, 2018   Jkt 244001   PO 00000   Frm 00048   Fmt 4703   Sfmt 4703   E:\FR\FM\21MYN1.SGM   21MYN1



Document Created: 2018-11-02 11:08:18
Document Modified: 2018-11-02 11:08:18
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability; request for public comments.
DatesThe Louisiana TIG will consider public comments received on or before June 20, 2018.
Contact<bullet> Louisiana--Joann Hicks, 225-342-5477.
FR Citation83 FR 23460 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR